CN101281226B - 导线大电流冲击试验方法 - Google Patents

导线大电流冲击试验方法 Download PDF

Info

Publication number
CN101281226B
CN101281226B CN2008100551456A CN200810055145A CN101281226B CN 101281226 B CN101281226 B CN 101281226B CN 2008100551456 A CN2008100551456 A CN 2008100551456A CN 200810055145 A CN200810055145 A CN 200810055145A CN 101281226 B CN101281226 B CN 101281226B
Authority
CN
China
Prior art keywords
conducting wire
transformer
impact test
copper conductor
current impact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100551456A
Other languages
English (en)
Other versions
CN101281226A (zh
Inventor
康京
高素霞
邢涛
李雄壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Tianwei Baobian Electric Co Ltd
Original Assignee
Baoding Tianwei Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Tianwei Group Co Ltd filed Critical Baoding Tianwei Group Co Ltd
Priority to CN2008100551456A priority Critical patent/CN101281226B/zh
Publication of CN101281226A publication Critical patent/CN101281226A/zh
Application granted granted Critical
Publication of CN101281226B publication Critical patent/CN101281226B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明涉及一种导线大电流冲击试验方法,适用于研究铜导线在经受大电流冲击后σ0.2(非比例延伸率为0.2%时的延伸强度)变化情况。本发明的技术要点是通过利用时间继电器控制通电时间,控制精度0.01秒,解决了通电时间的控制问题;通过准确测量导线电阻和通电电压,准确计算通电电流强度;通过恒温油浴试验箱,被测试铜导线放置在油浴试验箱中,完全模拟变压器运行环境。本发明的有益效果是为研究铜导线在大电流冲击后其机械能及电气性能等参数的变化提供了可靠的依据,对电网变压器的安全运行和可靠性也提供了有价值的指导意见。

Description

导线大电流冲击试验方法
技术领域
本发明涉及一种导线大电流冲击试验方法,适用于研究铜导线在经受大电流冲击后σ0.2(非比例延伸率为0.2%时的延伸强度)变化情况。
背景技术
电网的安全运行越来越引起关注,作为电网运行核心设备之一的变压器的安全性和可靠性也是变压器制造行业一直关注的问题。半硬态铜导线近10年来在变压器中得到大量应用,用于增强线圈的抗电流冲击和抗短路能力。当变压器发生短路时,半硬态铜导线在短路电流的冲击后,导线的强度是否发生了变化,变化的程度如何,能否保持其原有的强度,经检索,目前还没有进行过试验验证。
发明内容
本发明所要解决的技术问题是提供一种能够验证铜导线在大电流冲击后其强度变化情况的导线大电流冲击试验方法。
本发明解决其技术问题所采用的技术方案:
一、技术方案1:
导线大电流冲击试验方法,其特征在于其方法步骤如下:
(1)首先在恒温油浴箱中加入变压器油,然后将变压器油加热至变压器运行温度并保持恒温;
(2)取一段σ0.2的被测试铜导线,被测试铜导线的长度取决于变压器的短路电流,将所述被测试铜导线的两端接到导线大电流冲击试验装置(专利申请号:200820076474.4)的输出端上,然后将该段铜导线浸入所述恒温油浴箱内已恒温的变压器油中,并使所述被测试铜导线浸泡至与油浴温度一致,此时用电桥测量所述被测铜导线的电阻;所述σ0.2的含义为非比例延伸率为0.2%时的延伸强度;
(3)在保持通电电流不变的情况下,所述通电电流选定为变压器的短路电流,利用导线大电流冲击试验装置中的时间继电器依次给出不同的通电时间,利用电压表分别测量各次通电时的所述被测试铜导线两端的电压;
(4)在每次通电时间结束后,立即将被测试铜导线在万能试验机上进行σ0.2数值检测并记录σ0.2值,给制所述被测试铜导线的σ0.2值随通电时间的变化曲线。
本发明所述变压器油选用克拉玛依25号变压器油。
本发明所述时间继电器的控制精度为0.001秒。
本发明所述电压表的测量精度为0.001V;所述测量电阻的电桥的测量精度为0.0001Ω。
本发明所述变压器运行温度选用90℃,温度控制精度为1℃。
二、技术方案2:
导线大电流冲击试验方法,其特征在于其方法步骤如下:
(1)首先在恒温油浴箱中加入变压器油,然后将变压器油加热至变压器运行温度并保持恒温;
(2)取σ0.2的被测试铜导线8-10根,各根被测试铜导线的长度取决于变压器的短路电流,首先将最长的一根被测试铜导线的两端接到导线大电流冲击试验装置的输出端上,然后将该根被测试铜导线浸入所述恒温油浴箱内已恒温的变压器油中,使该根被测试铜导线浸泡至与油浴温度一致;此时用电桥测量该根被测试铜导线的电阻;
选择一个变压器短路时间为通电时间,利用导线大电流冲击试验装置的时间继电器控制通电时间,并测量在此通电时间内所述该根被测试铜导线两端的电压;
然后将所述该根被测试铜导线在万能试验机上进行σ0.2数值检测,并记录其σ0.2值;所述σ0.2的含义为非比例延伸率为0.2%时的延伸强度;
(3)重复上述第(2)步骤,依次测量剩下的几根被测试铜导线的σ0.2值并记录;在上述各次测量中,保持通电时间一致;
(4)将上述各次测量结果绘制成σ0.2值随通电电流强度的变化曲线。
本发明所述变压器油选用克拉玛依25号变压器油。
本发明所述时间继电器的控制精度为0.001秒。
本发明所述电压表的测量精度为0.001V;所述测量电阻的电桥的测量精度为0.0001Ω。
本发明所述变压器运行温度选用90℃,温度控制精度为1℃。
本发明的有益效果是为研究铜导线在大电流冲击后其机械能及电气性能等参数的变化提供了可靠的依据,对电网变压器的安全运行和可靠性也提供了有价值的指导意见。
附图说明
图1为导线大电流冲击试验装置的电路原理图。
图1中,1、热电耦,2、变压器油,3、油浴箱,4、被测铜导线,5、电加热管,T、变压器(变压器T的次级电压为4V),J1、J2、接触器,SJ、时间继电器,V、电压表,WK温控仪。
具体实施方式
实施例1(在保持恒定电流下改变通电时间,通电时间范围为2-30秒):
具体方法步骤按照上述发明内容部分中的技术方案1操作即可。
需要说明的是在选取被测试铜导线的长度时(要考虑所选导线的截面积,考虑导线大电流冲击试验装置的容量,以此推算选用导线的长度,保证最终使导线密度在约60A/mm2进行试验,观察通电时间与导线σ0.2关系),再参考变压器的短路电流的大小,变压器的短路电流一般为1000-3000A,若短路电流选定为1000A,变压器T的次级电压为4V,所选被测试铜导线的电阻为0.004Ω,其长度即可确定了。
实施例2(在保持恒定通电时间下改变电流大小):
具体方法步骤按照上述发明内容部分中的技术方案2操作即可。
需要说明的是通电时间选择变压器的短路时间,在本实施例中选定为10秒。
通过改变导线长度来取得不同的负荷电阻,依次取得不同的电流强度,所述各根被测试铜导线的长度的确定原则是根据变压器的短路电流大小而定,例如短路电流密度递增(从60A/mm2-220A/mm2)。变压器的次级电压为4V,那么所述各根被测试铜导线的长度即可确定。

Claims (10)

1.导线大电流冲击试验方法,其特征在于其方法步骤如下:
(1)首先在恒温油浴箱中加入变压器油,然后将变压器油加热至变压器运行温度并保持恒温;
(2)取一段σ0.2的被测试铜导线,被测试铜导线的长度取决于变压器的短路电流,将所述被测试铜导线的两端接到导线大电流冲击试验装置的输出端上,然后将该段铜导线浸入所述恒温油浴箱内已恒温的变压器油中,并使所述被测试铜导线浸泡至与油浴温度一致,此时用电桥测量所述被测铜导线的电阻;所述σ0.2的含义为非比例延伸率为0.2%时的延伸强度;
(3)在保持通电电流不变的情况下,所述通电电流选定为变压器的短路电流,利用导线大电流冲击试验装置中的时间继电器依次给出不同的通电时间,利用电压表分别测量各次通电时的所述被测试铜导线两端的电压;
(4)在每次通电时间结束后,立即将被测试铜导线在万能试验机上进行σ0.2数值检测并记录σ0.2值,给制所述被测试铜导线的σ0.2值随通电时间的变化曲线。
2.根据权利要求1所述的导线大电流冲击试验方法,其特征在于所述变压器油选用克拉玛依25号变压器油。
3.根据权利要求2所述的导线大电流冲击试验方法,其特征在于所述时间继电器的控制精度为0.001秒。
4.根据权利要求3所述的导线大电流冲击试验方法,其特征在于所述电压表的测量精度为0.001V;所述测量电阻的电桥的测量精度为0.0001Ω。
5.根据权利要求4所述的导线大电流冲击试验方法,其特征在于所述变压器运行温度选用90℃,温度控制精度为1℃。
6.导线大电流冲击试验方法,其特征在于其方法步骤如下:
(1)首先在恒温油浴箱中加入变压器油,然后将变压器油加热至变压器运行温度并保持恒温;
(2)取σ0.2的被测试铜导线8-10根,各根被测试铜导线的长度取决于变压器的短路电流,首先将最长的一根被测试铜导线的两端接到导线大电流冲击试验装置的输出端上,然后将该根被测试铜导线浸入所述恒温油浴箱内已恒温的变压器油中,使该根被测试铜导线浸泡至与油浴温度一致;此时用电桥测量该根被测试铜导线的电阻;
选择一个变压器短路时间为通电时间,利用导线大电流冲击试验装置的时间继电器控制通电时间,并测量在此通电时间内所述该根被测试铜导线两端的电压;
然后将所述该根被测试铜导线在万能试验机上进行σ0.2数值检测,并记录其σ0.2值;所述σ0.2的含义为非比例延伸率为0.2%时的延伸强度;
(3)重复上述第(2)步骤,依次测量剩下的几根被测试铜导线的σ0.2值并记录;在上述各次测量中,保持通电时间一致;
(4)将上述各次测量结果绘制成σ0.2值随通电电流强度的变化曲线。
7.根据权利要求6所述的导线大电流冲击试验方法,其特征在于所述变压器油选用克拉玛依25号变压器油。
8.根据权利要求7所述的导线大电流冲击试验方法,其特征在于所述时间继电器的控制精度为0.001秒。
9.根据权利要求8所述的导线大电流冲击试验方法,其特征在于所述电压表的测量精度为0.001V;所述测量电阻的电桥的测量精度为0.0001Ω。
10.根据权利要求9所述的导线大电流冲击试验方法,其特征在于所述变压器运行温度选用90℃,温度控制精度为1℃。
CN2008100551456A 2008-05-27 2008-05-27 导线大电流冲击试验方法 Active CN101281226B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100551456A CN101281226B (zh) 2008-05-27 2008-05-27 导线大电流冲击试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100551456A CN101281226B (zh) 2008-05-27 2008-05-27 导线大电流冲击试验方法

Publications (2)

Publication Number Publication Date
CN101281226A CN101281226A (zh) 2008-10-08
CN101281226B true CN101281226B (zh) 2010-06-02

Family

ID=40013784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100551456A Active CN101281226B (zh) 2008-05-27 2008-05-27 导线大电流冲击试验方法

Country Status (1)

Country Link
CN (1) CN101281226B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109212368B (zh) * 2018-11-02 2020-12-01 贵州电网有限责任公司 一种输电线路导地线耐雷电流烧蚀能力评估方法
CN112964311A (zh) * 2021-04-19 2021-06-15 天津福尔欣汽车线缆有限公司 测试汽车电缆载流量及过载时导体最大温升的试验装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4663585A (en) * 1984-01-31 1987-05-05 Baur Pruf-und Messtechnik K.G. Apparatus for testing dielectric strength of materials
CN2371562Y (zh) * 1999-01-08 2000-03-29 孙威 变压器油在线检测及处理装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4663585A (en) * 1984-01-31 1987-05-05 Baur Pruf-und Messtechnik K.G. Apparatus for testing dielectric strength of materials
CN2371562Y (zh) * 1999-01-08 2000-03-29 孙威 变压器油在线检测及处理装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
朱英浩.短路机械力耐受能力试验.变压器38 1.2001,38(1),1-7.
朱英浩.短路机械力耐受能力试验.变压器38 1.2001,38(1),1-7. *
高素霞,康京.换位导线的应用.变压器43 03.2006,43(03),26-31.
高素霞,康京.换位导线的应用.变压器43 03.2006,43(03),26-31. *

Also Published As

Publication number Publication date
CN101281226A (zh) 2008-10-08

Similar Documents

Publication Publication Date Title
Martin et al. An updated model to determine the life remaining of transformer insulation
Saha Review of time-domain polarization measurements for assessing insulation condition in aged transformers
Fofana et al. Effect of thermal transient on the polarization and depolarization current measurements
CN108089038B (zh) 分析绕组缺陷致热对油纸绝缘性能影响的试验装置及方法
Babel et al. Condition-based monitoring and prognostic health management of electric machine stator winding insulation
CN104730436A (zh) 结合逐级耐压法和等温松弛电流法的电缆老化评估方法
CN103809086A (zh) 基于频域Cole-Davidson模型的电力变压器受潮检测方法
CN103558461A (zh) 一种测试熔断器抗浪涌脉冲电流的方法
CN101281226B (zh) 导线大电流冲击试验方法
Behjat et al. An experimental approach for investigating low-level interturn winding faults in power transformers
CN102253089A (zh) 高压陶瓷电容器质量缺陷水平的非破坏检测和评价的方法
CN103792262A (zh) 基于频域Havriliak-Negami模型的电力变压器受潮检测方法
Lajnef et al. Ultracapacitors modeling improvement using an experimental characterization based on step and frequency responses
CN109387802A (zh) 一种高压电流互感器的额定电流误差检定方法
Weindl et al. Development of the p-factor in an accelerated ageing experiment of the MV PILC cables
CN201173957Y (zh) 导线大电流冲击试验装置
Szirmai et al. Modelling of dielectric processes in oil-paper insulation for replacement of Return Voltage Measurement
Plath et al. Dynamic analysis and testing of on-load tap changer
Saha et al. Some precautions for the field users of PDC measurement for transformer insulation condition assessment
Toudji et al. Predictive diagnostic based on HF modeling of electrical machines windings
Gutten et al. Diagnostics of transformer with insulation oil-paper
Abdullah et al. Prediction of Transformer Health Index Using Condition Situation Monitoring (CSM) Diagnostic Techniques
Duan et al. Computer simulation analysis of power transformer test design technology
Gutten et al. Use of diagnostic system for analysis of mechanical condition of transformers winding
CN106154092A (zh) 电气性能检测方法及装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Baoding Tianwei Group Co., Ltd.

Assignor: Baoding Tianwei Group Co., Ltd.

Contract record no.: 2011130000098

Denomination of invention: Conducting wire great current impact test method

Granted publication date: 20100602

License type: Exclusive License

Open date: 20081008

Record date: 20110715

ASS Succession or assignment of patent right

Owner name: BAODING TIANWEI BAOBIAN ELECTRIC CO., LTD.

Free format text: FORMER OWNER: BAODING TIANWEI GROUP CO., LTD.

Effective date: 20131230

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131230

Address after: 071056 West Road, Hebei, Baoding, No. 2222, No.

Patentee after: Baoding Tianwei Baobian Electric Co., Ltd.

Address before: 071056 Jin Di garden complex building, 128 chemical fiber road north, Baoding, Hebei

Patentee before: Baoding Tianwei Group Co., Ltd.