CN101277177A - Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling - Google Patents

Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling Download PDF

Info

Publication number
CN101277177A
CN101277177A CNA200710087586XA CN200710087586A CN101277177A CN 101277177 A CN101277177 A CN 101277177A CN A200710087586X A CNA200710087586X A CN A200710087586XA CN 200710087586 A CN200710087586 A CN 200710087586A CN 101277177 A CN101277177 A CN 101277177A
Authority
CN
China
Prior art keywords
tbs
scheduling
resource
value
modulation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710087586XA
Other languages
Chinese (zh)
Other versions
CN101277177B (en
Inventor
费佩燕
刘虎
殷玮玮
李轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN200710087586XA priority Critical patent/CN101277177B/en
Publication of CN101277177A publication Critical patent/CN101277177A/en
Application granted granted Critical
Publication of CN101277177B publication Critical patent/CN101277177B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a transmission method for confirming size and modulation method of a transmission module by scheduling un-scheduling multiplexing. The method unifies all possible resource of scheduling and un-scheduling by using basic resource unit RU, and grades to N resource grades, I TBS values are set in each resource grade, and N*1 resource grade tables are established. UE calculates factual distributed scheduling and un-scheduling resource amount when multiplexing, and selects the transmission module size, namely TBS value. UE transmits index corresponding selected TBS value to a node B, namely NodeB, then, NodeB calculates factual distributed scheduling and un-scheduling resource amount, confirms modulation method according with calculated resource amount and received TBS and processes demodulation. The method provided by the invention can avoid un-scheduling physical resource waste, and does not change prior signaling structure.

Description

Dispatch non-dispatching multiplex and determine the transmission method of transport module size and modulation system
Technical field
The present invention relates to the high-speed uplink packet access technique in the wireless telecommunication system, relate in particular in the TD-SCDMA system, the MAC layer scheduling of HSUPA (high speed uplink packet access) and the method for non-dispatching multiplex transmission.
Background technology
In 3-G (Generation Three mobile communication system), for the upstream packet business of higher rate is provided, improve spectrum utilization efficiency, 3GPP (3rd Generaion Partnership Project) has introduced high speed uplink packet access (HSUPA in the standard of WCDMA and TD-CDMA system, High SpeedUplink Packet Access) characteristic, promptly up enhancing characteristic.The HSUPA system ascending reinforcement system that is otherwise known as abbreviates the E-DCH system as.In the TD-CDMA system, the HSUPA system physical layer is introduced the E-PUCH physical channel, is used to transmit the CCTrCH of E-DCH type.
There are two kinds of business among the HSUPA: dispatching services and non-scheduling service.Dispatching services is to distribute code channel, time slot and power resource by Node B (NodeB); And non-scheduling service comes Resources allocation by service wireless network controller (SRNC).Non-scheduling resource generally is to occur in the cycle, therefore, when the data volume of having distributed non-scheduling resource but not have non-scheduling service or a non-scheduling service very hour, if utilize unnecessary non-scheduling resource to come the transmitting and scheduling business, then can farthest avoid the wasting of resources.Here it is the scheduling and the meaning of non-dispatching multiplex.
Scheduling and non-scheduling are meant that the multiplexing of MAC layer the data of scheduling and non-scheduling service are merged into a TBS (transmission block size, Transport Block Size) in the MAC layer transmit.In physical layer, this multiplexing TBS is carried out unified CRC (cyclic redundancy check (CRC)) verification and coding and decoding, therefore the data mixing of scheduling and non-scheduling service is transmitted together, and is indivisible.
In the prior art, dispatching services and non-scheduling service be transmission separately, because the SF (spreading factor) that scheduling and non-scheduling resource use possibility is different, and the timeslot number difference, thus cause the waste of resource.
Summary of the invention
Technical problem to be solved by this invention is, the method of determining transport module size and modulation system when realizing scheduling and non-dispatching multiplex in a kind of high speed uplink packet access is provided, solve in the TDS-CDMA system in the HSUPA technology scheduling and non-scheduling service and avoid the waste of non-scheduling physical resource in the multiplexing problem of MAC layer.
For addressing the above problem, the invention provides a kind of transmission method that non-dispatching multiplex is determined transport module size and modulation system of dispatching, comprise the steps:
(1) basic resources unit is set, calculates scheduling and the possible altogether code channel time interval resource quantity C of non-scheduling according to Resource Unit normalization, with the mode of possible total resources C according to the normalization equivalence, be divided into N hierarchical resource, N can be divided exactly by 80;
(2) the minimum and maximum TBS value in each hierarchical resource in the calculation procedure 1 described N hierarchical resource is determined I the optional value of TBS having in each grade, sets up the TBS resource table of a N * I at the MAC layer;
(3) when scheduling and non-scheduling service exists simultaneously and the non-scheduling service data volume can carry less than the Radio Resource of configuration bit number, the non-scheduled transmission of the definite employing of MAC layer will be dispatched and be transmitted multiplexing with non-scheduling service;
(4) user equipment (UE) is according to independent respectively scheduling and the non-scheduling resource total amount of calculating actual allocated of described Resource Unit, and in view of the above and the power authorization conditions is independent from described TBS resource table selects TBS value corresponding under the different transmission meanss, and determine final TBS value, and definite modulation system according to the pairing modulation system of TBS value of two kinds of transmission meanss is whether identical.
Further, said method also has following characteristics:
Further comprise,
(5) index and the modulation system that user equipment (UE) is corresponding with selected TBS value is transferred to Node B;
(6) Node B is calculated the scheduling and the non-scheduling resource total amount of actual allocated, and obtains the TBS value of Node B in view of the above with the corresponding index of the TBS value that receives, and utilizes the modulation system that receives to carry out demodulation.
Further, said method also has following characteristics:
In the step (1):
Described resource units is the solid size road of spreading factor SF=16;
Described possible altogether code channel time interval resource quantity C is 1 to 80 Resource Unit.
Further, said method also has following characteristics:
In the step (2):
The bit number 23 that minimum TBS value in described each hierarchical resource is a schedule information;
Maximum TBS value in described each hierarchical resource is the maximum number bits that corresponding spreading factor SF=1, modulation system may be transmitted during for 16QAM, satisfies following formula for maximum TBS value in N the hierarchical resource:
TBS / M × SF 704 - 17 × ENI × SF - ( 24 + ceil ( ( TBS + 24 ) / 5114 ) × 4 ) / M × SF + 704 × ( t - 1 ) = 1
Wherein, the 17th, 17 symbols that UCCH takies, 24 correspondences be the number of CRC check bit, 4 correspondences be Turbo coding and the tail bit that carries over through punching, M is the value of modulation system correspondence, and during QPSK, M=2 is during 16QAM, M=4, Ceil is the number that rounds up, t is a timeslot number; ENI is the E-UCCH number.
Further, said method also has following characteristics:
Design TBS resource table in the step (2) may further comprise the steps:
(2-1) the solid size road with spreading factor SF=16 is defined as basic resource units RU;
(2-2) according to the RU of basic resources unit, determine scheduling and the possible total resources quantity of non-scheduling;
(2-3) institute might resource be divided into N hierarchical resource;
(2-4) in each hierarchical resource, determine maximum TBS value and minimum TBS value in each hierarchical resource;
(2-5) TBS maximum and minimum value in each hierarchical resource are taken the logarithm in the log-domain space, carry out even interpolation between the two, again interpolation gained logarithm value is converted to corresponding TBS value, determines I TBS value having in each hierarchical resource, the TBS resource table of a N * I of generation.
Further, said method also has following characteristics:
Step (4):
(4-1) according to described Resource Unit, utilize following two formula respectively the scheduling and the non-scheduling resource of actual allocated to be carried out normalization, after the calculating, obtain the total separately number of resources of scheduling resource and non-scheduling resource:
N _ s = Σ i _ s ts _ s ( SF sf _ s ) i _ s N _ ns = Σ i _ ns ts _ ns ( SF sf _ ns ) i _ ns
Wherein, SF=16, i_s represent i time slot scheduling, should be i_s=1 in the following formula, and similarly, i_ns represents i non-time slot scheduling, i_ns=1, whole formulate be from 1 be added to ts_s or ts_ns, promptly a plurality of time slots and;
(4-2), from described TBS resource table, search each self-corresponding hierarchical resource respectively, obtain dispatching the TBS group corresponding with non-scheduling according to hierarchical resource according to scheduling and the non-scheduled resources number N _ s and the N_ns of reality;
(4-3) utilize number of resources described in step (4-1), (4-2), described TBS value, according to different modulation systems and transmission means, calculate different modulating mode and transmission means corresponding code rate λ value, wherein, described modulation system is QPSK modulation or 16QAM modulation, and described transmission means is scheduled transmission or non-scheduled transmission;
(4-4) select the TBS value of described code check λ in specified scope in the TBS hierarchical resource of scheduling and non-scheduling correspondence, described specified scope is that Node B disposes the one group of maximum/minimum code rate λ _ max/ λ _ min to user equipment (UE);
(4-5) distribute to 8 of subscriber equipment with reference to code check λ value and 8 reference powers biasings, according to the power bias of the sub-TBS needs of code check interpolation calculation correspondence according to Node B;
(4-6) whether the TBS corresponding power of more different respectively transport-type correspondences is less than or equal to the authorization power of this transport-type;
(4-7) data that will satisfy in the corresponding TBS that is less than or equal to authorization power and the subscriber equipment buffer memory compare, select to be less than or equal to, perhaps greater than but near the data cached TBS value of subscriber equipment;
(4-8) from two kinds of transmission meanss, two kinds of modulation systems, select to satisfy authorization power requirement and the maximum modulation system of corresponding TBS value respectively, when the maximum TBS that selects in two kinds of modulation systems was identical, relatively the little modulation system of power configuration skew was selected in the skew of the power configuration of corresponding needs;
If (4-9) scheduling, the modulation system of non-scheduling is identical, and then that two kinds of transmission meanss are the selected direct addition of TBS is as final TBS value;
(4-10) in described TBS resource table, select in the corresponding TBS group in the RU of basic resources unit conversion back, the most approaching and with the final TBS that chooses in the step (4-9) smaller or equal to the TBS value of this final TBS, the TBS value of selecting when multiplexing.
Further, said method also has following characteristics:
Step (4-9) further can be divided into:
The modulation system of scheduling and non-scheduling selection is not simultaneously:
If the TBS that scheduling is selected is invalid, the then final TBS that selects is the TBS of non-scheduling, and modulation system is the modulation system that non-scheduling is selected;
If the TBS that non-scheduling is selected is invalid, the then final TBS that selects is the TBS of scheduling, the modulation system that modulation system is selected for scheduling;
If the TBS that scheduling and non-scheduling are selected is effective, then:
If the TBS of non-scheduling is greater than the TBS of scheduling, then final TBS is non-scheduling TBS+ (identical with non-scheduling modulation system and TBS maximum among the TBS that scheduling is selected), and perhaps final TBS is non-scheduling TBS; Final modulation system is the modulation system that non-scheduling is selected;
If the TBS that dispatches is greater than the TBS of non-scheduling, then final TBS is scheduling TBS+ (identical with the scheduling modulation system and TBS maximum among the TBS that non-scheduling is selected), and perhaps final TBS is scheduling TBS; The modulation system that final modulation system is selected for scheduling.
Further, said method also has following characteristics:
Step (6) further can be divided into:
(6-1) according to described Resource Unit, Node B utilizes following two formula respectively normalization to be carried out in scheduling and non-scheduling resource, calculates scheduling resource and the total number of resources of non-scheduling resource:
N = Σ i _ s ts _ s ( SF sf _ s ) i _ s Σ i _ ns ts _ ns ( SF sf _ ns ) i _ ns
Wherein, SF=16, i_s represent i time slot scheduling, should be i_s=1 in the following formula, and similarly, i_ns represents i non-time slot scheduling, i_ns=1, whole formulate be from 1 be added to ts_s or ts_ns, promptly a plurality of time slots and;
(6-2) the resource units number N is converted the columns that obtains the place hierarchical resource in the TBS resource table, in conjunction with the TBS index of reported by user equipment UE, in the TBS resource table, find the TBS value of corresponding Node B, and the modulation system that adopts UE to report is carried out demodulation.
As from the foregoing, the present invention can be to having different SF, choose a TBS when scheduling of different time-gap number and non-scheduling service are multiplexing, the different optional value of TBS of correspondence when scheduling drops on different grades with the summation of non-scheduling resource, choose TBS with UE respectively according to scheduling and non-scheduling physical layer resources, the method that sub-TBS is merged has been avoided the waste of physical channel resources afterwards, also needn't change existing signaling structure simultaneously.
Description of drawings
Fig. 1 is that HSUPA scheduling and the non-scheduling service of TD-SCDMA system among the present invention is at the multiplexing schematic diagram of MAC layer;
Fig. 2 is a flow chart of selecting TBS and modulation system among the present invention during the non-dispatching multiplex of scheduling;
Fig. 3 is the flow chart that the UE side is selected TBS and modulation system among the present invention;
Fig. 4 be among the present invention during physical layer multiplex the NodeB side judge the flow chart of TBS.
Embodiment
Below in conjunction with drawings and the specific embodiments technical solution of the present invention is described in further detail.
In order to realize carrying out multiplexingly, make various resources effectively to utilize, the key technology for being selected to of TBS in multiplexing to scheduling and non-scheduling resource.
In the present embodiment, as shown in Figure 1, at first dispatching services and non-scheduling service are distinguished.If non-scheduling service is arranged, whether no matter dispatching services arranged, then be referred to as non-scheduled transmission, use the Process ID and the E-HICH channel of non-scheduling; If have only dispatching services, then be referred to as scheduled transmission, use the Process ID and the E-HICH channel of scheduling; That is to say that when existing dispatching services also has non-scheduling service transport layer is combined among the TBS all business as non-scheduled transmission, corresponding physical layer and MAC structure are as shown in Figure 1.
The general thought of present embodiment is as follows: at scheduling and the possible altogether code channel time interval resource quantity of non-scheduling, with the mode of possible total resources quantity according to the normalization equivalence, be divided into N hierarchical resource, and determine to have I the optional value of TBS in each grade, TBS resource table at a N * I of MAC layer design precomputes various possible TBS values in table; Secondly, when scheduling and non-scheduling service exists simultaneously and the non-scheduling service data volume can carry less than the Radio Resource of configuration bit number, the non-scheduled transmission of the definite employing of MAC layer promptly need be transmitted scheduling and non-scheduling service multiplexing; Once more, user equipment (UE) calculates the scheduling and the total resources of actual allocated, after considering the power authorization conditions again, from the TBS table of design, select the TBS value of corresponding TBS when multiplexing, UE is transferred to Node B (NodeB) with selected TBS index, Node B is also calculated the scheduling and the non-scheduling resource total amount of actual allocated, and determines the TBS value of Node B in view of the above with the TBS index that receives, and the modulation system of utilizing UE to send is carried out demodulation.
As shown in Figure 2, shown the method for designing of the TBS when realizing scheduling and non-dispatching multiplex in the present embodiment, comprised the steps:
Step 201: calculate scheduling and the possible altogether code channel time interval resource quantity of non-scheduling, and the code channel time interval resource quantity of gained is divided into N hierarchical resource, design I the optional value of TBS that has in each hierarchical resource, at MAC layer design TBS resource table.
Step 202: when scheduling and non-scheduling service when existing simultaneously and the non-scheduling service data volume can carry less than the Radio Resource of configuration bit number the time, the non-scheduled transmission of the definite employing of MAC layer promptly need be transmitted scheduling and non-scheduling service multiplexing.
Step 203:UE calculates the scheduling and the non-scheduling resource total amount of actual allocated, and in view of the above and the power mandate from the TBS resource table, select TBS, and definite modulation system, concrete steps as shown in Figure 3.
Step 204: by UCCH, UE is transferred to NodeB with the index of selected TBS.
Step 205:NodeB calculates the scheduling and the non-scheduling resource total amount of actual allocated, and carries out demodulation with the modulation system that receives, and detailed process as shown in Figure 4.
In described step 201, the detailed process of the optional value of design TBS resource is as follows.
(1) at first, determine a resource units (RU, Resource Unit), the solid size road with SF=16 in the present embodiment is defined as basic resource units (RU).
(2) then, possible maximum resource quantity and minimum resource quantity are determined in normalization according to Resource Unit.
Because the resource that scheduling and non-scheduling take altogether is at most the full code channel of 5 time slots, minimum is the code channel of a SF=16 of single time slot.That is to say to take 80 basic RU at most, minimum takies 1 basic RU.
(3) next, with the mode of step 2 kind of possible total resources quantity according to the normalization equivalence, be divided into N hierarchical resource, N is relevant with modulation system, and can be divided exactly by 80.
N=5 in the present embodiment, promptly divide 5 hierarchical resources:
1~16 RU of the first estate correspondence; 17~32 RU of the second grade correspondence; 33~48 RU of tertiary gradient correspondence; 49~64 RU of fourth estate correspondence; 65~80 RU of the 5th grade correspondence.
(4) afterwards, at each hierarchical resource, need maximum TBS value and minimum TBS value in definite each grade.
What the minimum value of TBS was got is the bit number 23 of schedule information;
The maximum number bits that the maximum of TBS should corresponding SF=1, modulation system may be transmitted during for 16QAM, therefore, the maximum of TBS satisfies following formula in N hierarchical resource as can be seen:
TBS / M × SF 704 - 17 × ENI × SF - ( 24 + ceil ( ( TBS + 24 ) / 5114 ) ×4 ) / M × SF + 704 ( t - 1 ) = 1
Wherein, the 17th, 17 symbols that UCCH takies, 24 correspondences be the number of CRC check bit, 4 correspondences be Turbo coding and the tail bit that carries over through punching, M is the value of modulation system correspondence, and during QPSK, M=2 is during 16QAM, M=4, Ceil is the number that rounds up, t is a timeslot number; ENI is the E-UCCH number;
Can obtain the maximum of TBS in N the different resource grade by following formula:
When N=1, TBSmax=2720;
When N=2, TBSmax=5532;
When N=3, TBSmax=8348;
When N=4, TBSmax=11160;
When N=5, TBSmax=13976.
(5) last, after the TBS maximum and minimum value in having determined each hierarchical resource, need be between TBS maximum in each hierarchical resource and minimum value the some TBS values of equally spaced insertion, wherein, public technology document " Ericsson.R1-02-DRAFT; Signaling ofTransport Block Sizes for HS-DSCH " according to Ericsson, TBS should evenly distribute in log-domain, can reduce the length of the padding under the worst case, therefore when carrying out interpolation, we are according to I TBS in each hierarchical resource in this principle design HSUPA system, that is, and and during interpolation, TBS maximum and minimum value are taken the logarithm, carry out even interpolation in log-domain, the logarithm value that interpolation is obtained is converted to corresponding TBS numerical value again, thereby can obtain I TBS value having in each hierarchical resource.
For example, in the present embodiment, 14 TBS values of insertion as shown in table 1 are even there are 16 TBS values in each hierarchical resource.So just obtained TBS resource table as shown in table 1.Can be 32 TBS values in other embodiments of the invention, or 2048 TBS values.
By above step (1)~(5), we can obtain might resource situation under corresponding TBS resource table, as shown in table 1:
TBS value when table 1:HSUPA MAC is multiplexing under the different resource unit
INDEX The TBS of N=1 The TBS of N=2 The TBS of N=3 The TBS of N=4 The TBS of N=5
0 23 23 23 23 23
1 32 33 34 35 35
2 43 48 50 52 54
3 60 69 75 79 83
4 82 99 111 120 127
5 113 143 164 181 195
6 155 206 243 273 299
7 213 297 360 412 458
8 293 428 533 623 702
9 403 617 790 940 1076
10 554 890 1170 1420 1650
11 762 1282 1734 2145 2530
12 1047 1848 2568 3239 3878
13 1439 2663 3804 4893 5946
14 1979 3838 5635 7389 9116
15 2720 5532 8348 11160 13976
In the TBS resource table shown in the table 1, first classifies the TBS index value as, and value is 0~15, respectively corresponding 5 hierarchical resources of secondary series to the six row.
Because we adopt the solid size road of SF=16 as the RU of basic resources unit, the scheduling and the non-scheduling resource that have different SF so can normalize on the basic RU, addition promptly obtains reality resource quantity altogether, and then comes to select corresponding TBS according to total resources from the TBS resource table shown in the table 1.
In step 203 shown in Figure 2, UE calculates the scheduling of actual allocated and the step of non-scheduling resource total amount, and in view of the above and the power mandate from the TBS resource table, select TBS, and definite modulation system can be subdivided into following concrete steps, with reference to shown in Figure 3:
Step 301: the independent RU stock number of calculating scheduling resource and non-scheduling resource.
If scheduling resource is: ts_s (scheduling time slot corresponding resource), sf_s (spreading factor that scheduling is corresponding); If non-scheduling resource is: ts_ns (non-scheduling time slot corresponding resource), sf_ns (spreading factor of non-scheduling correspondence);
Scheduling resource and non-scheduling resource are all converted on the resource of SF=16, and conversion back scheduling/non-scheduling RU resource is respectively:
N _ s = Σ l _ s ts _ s ( SF sf _ s ) l _ s N _ ns = Σ i _ ns ts _ ns ( SF sf _ ns ) i _ ns
Above-mentioned two formula processs for: utilize the SF=16 basic resource unit independently the time-slot code channel resource of scheduling/non-scheduling to be carried out normalized respectively, obtain the RU number N _ s of scheduling resource and the RU number N _ ns of non-scheduling resource.Wherein, SF=16, i_s represent i time slot scheduling, should be i_s=1 in the following formula, and similarly, i_ns represents i non-time slot scheduling, i_ns=1, whole formulate be from 1 be added to ts_s or ts_ns, promptly a plurality of time slots and.
Step 302: the independent TBS that calculates scheduling resource and non-scheduling resource correspondence.
According to the scheduling/non-scheduling RU number N _ s and the N_ns of conversion, each self-corresponding TBS of selection scheduling and non-scheduling organizes from 5 groups of TBS resources shown in the table 1 respectively;
In the present embodiment, as shown in table 1, the TBS resource is divided into 5 groups altogether in the table 1, and every group of corresponding RU resource is respectively:
The 1st group: N=[1,16]; The 2nd group: N=[7,32];
The 3rd group: N=[33,48]; The 4th group: N=[49,64];
The 5th group: N=[65,80];
So Dui Ying scheduling/non-scheduling TBS set of resources is not:
index _ group _ TBS _ ns = ceil ( N _ ns 16 )
index _ group _ TBS _ s = ceil ( N _ s 16 )
Wherein, index_group_TBS_s, index_group_TBS_ns represent TBS resource group index and the TBS resource group index of non-scheduling, i.e. Dui Ying N value, the just group number of dispatching respectively.
After in above-mentioned steps 302, finding scheduling and each self-corresponding resource group of non-scheduling, promptly obtain corresponding group number.How following step is being dispatched in the resource group separately if will being introduced/the corresponding TBS value of non-scheduling, promptly in the group of correspondence, search the TBS index, and find the position of the row in the table 1.
Step 303:, calculate different modulating mode and transmission means corresponding code rate λ value according to different modulation systems and different transmission meanss.
Described modulation system can be QPSK modulation or 16QAM modulation; Described transmission means can be scheduled transmission or non-scheduled transmission.Utilize following four formula, can obtain 4 λ values under different modulating mode and the different transmission meanss:
λ_QPSK_ns=TBS_group_ns/N_ns/88;
λ_16QAM_ns=TBS_group_ns/N_ns/176;
λ_QPSK_s=TBS_group_s /N_s/88;
λ_16QAM_s=TBS_group_s/N_s/176;
Wherein, TBS_group_s is meant the group TBS (being 16 in table 1 altogether) of scheduling resource correspondence, and TBS_group_ns is meant the group TBS (being 16 in table 1 altogether) of non-scheduling resource correspondence.
Group number index_group_TBS_s according to step 302 selection, index_group_TBS_ns, calculate scheduling respectively, this group TBS (16 TBS of non-scheduling resource correspondence, in certain delegation in the correspondence table 1 16 row) code check, because modulation system has 2 kinds, therefore, calculates 2 kinds of modulation system corresponding code rate respectively.
Step 304: in scheduling and each self-corresponding TBS resource group of non-scheduling, select the TBS value of code check λ in specified scope.
Because UE is in application UPA business, NodeB can dispose one group of maximum/minimum code rate λ _ max/ λ _ min and give UE, need to select λ to satisfy the TBS value that λ _ max/ λ _ min requires, promptly select for the first time, select to satisfy the TBS that code check requires in 32 TBS values from original a group, TBS scope=A, A<=32, symbolic formulation is as follows:
For non-scheduling:
QPSK_index_ns=find(λ_QPSK_ns(find((λ_QPSK_ns<λ_max)>λ_min)))
16QAM_index_ns=find(λ_16QAM_ns(find((λ_16QAM_ns<λ_max)>λ_min)))
λ_QPSK_1_ns=λ_QPSK_ns(QPSK_index_ns)
λ_16QAM_1_ns=λ_16QAM_ns(16QAM_index_ns)
TBS_QPSK_1_ns=TBS_QPSK_ns(QPSK_index_ns)
TBS_16QAM_1_ns=TBS_16QAM_ns(16QAM_index_ns)
For scheduling:
QPSK_index_s=find(λ_QPSK_s(find((λ_QPSK_s<λ_max)>λ_min)))
16QAM_index_s=find(λ_16QAM_s(find((λ_16QAM_s<λ_max)>λ_min)))
λ_QPSK_1_s=λ_QPSK_s(QPSK_index_s)
λ_16QAM_1_s=λ_16QAM_s(16QAM_index_s)
TBS_QPSK_1_s=TBS_QPSK_s(QPSK_index_s)
TBS_16QAM_1_s=TBS_16QAM_s(16QAM_index_s)
Step 305: according to 8 reference power biasings with reference to the sub-TBS needs of code check λ value interpolation calculation correspondence.
UE when application UPA is professional, Node B will dispose 8 with reference to the λ value and in requisition for power, according to physical layer difference TBS, the different modulating mode selects corresponding code rate to calculate at the Ior/Ioc at BLER=0.1 place.
The power of E_PUCH is: P E-PUCH=P E-base+ L+ β e+ K E-PUCH
Wherein, β eBe gain factor, E-TFC transport block length, E-PUCH physical resource size, the E-PUCH modulation system selected from UE obtain.
β e0, e+ α e+ Δ HarqDB, wherein β 0 , e = β λ 0 + β λ 1 - β λ 0 λ 1 - λ 0 ( λ e - λ 0 ) dB (interpolation formula)
Obtain after the interpolation:
β 0e_ QPSK_ns represents the reference power of non-scheduled transmission QPSK needs;
β 0e_ 16QAM_ns represents the reference power of non-scheduled transmission 16QAM needs;
β 0e_ QPSK_s, the reference power that expression scheduled transmission QPSK needs;
β 0e_ 16QAM_s, the reference power that expression scheduled transmission 16QAM needs;
Step 306: whether the power under the TBS of more different respectively transport-type correspondences is less than or equal to the authorization power of this transport-type; Interpolation result according to step 305 calculating, the TBS (set B) that requires through the power mandate of selecting to satisfy the type (transferring non-scheduling) among the TBS (set A) that selects for the first time respectively from step 304 promptly selects for the second time, obtain set B, make set B<set A.
The symbolic formulation mode is as follows:
β 0e_QPSK_ns_after_β 0e_NS=β 0e_QPSK_ns(find(β 0e_QPSK_ns<β 0e_NS))
β 0e_16QAM_ns_after_β 0e_NS=β 0e_16QAM_ns(find(β 0e_16QAM_ns<β 0e_NS))
β 0e_QPSK_s_after_β 0e_S=β 0e_QPSK_s(find(β 0e_QPSK_s<β 0e_S))
β 0e_16QAM_s_after_β 0e_S=β 0e_16QAM_s(find(β 0e_16QAM_s<β 0e_S))
Step 307: compare with UE BUFFER, select TBS less than UE BUFFER.Wherein,, from set B, select the type (scheduling, non-scheduling) to satisfy the set that buffer requires respectively, promptly gather C, make set C<set B according to the result of step 306;
The symbolic formulation mode is as follows:
TBS_QPSK_after_buffer_ns=TBS_QPSK_ns(find(TBS_QPSK_1_ns<UE_Buffer))
TBS_16QAM_after_buffer_ns=TBS_16QAM_ns(find(TBS_16QAM_1_ns<UE_Buffer))
TBS_QPSK_after_buffer_s=TBS_QPSK_s(find(TBS_QPSK_1_s<UE_Buffer))
TBS_16QAM_after_buffer_s=TBS_16QAM_s(find(TBS_16QAM_1_s<UE_Buffer))
Step 308: respectively from two kinds of transmission meanss, select in two kinds of modulation systems to satisfy the authorization power requirement, and the TBS maximum.When the maximum TBS that selects when two kinds of modulation systems was identical, the relatively power configuration of corresponding needs skew selected the power configuration skew little.
That is, if the power that the power that the QPSK of non-scheduling resource needs needs smaller or equal to the 16QAM of non-scheduling resource, then selecting modulation mode is QPSK, otherwise selects 16QAM;
If the power of the QPSK of scheduling resource needs is smaller or equal to the power of the 16QAM needs of scheduling resource, then selecting modulation mode is QPSK, otherwise selects 16QAM.
The symbolic formulation mode is as follows:
if(β 0e_QPSK_ns>β 0e_16QAM_ns):type_mod_ns=16QAM
if(β 0e_QPSK_ns<=β 0e_16QAM_ns):type_mod_ns=QPSK
if(β 0e_QPSK_s>β 0e_16QAM_s):type_mod_s=16QAM
if(β 0e_QPSK_s<=β 0e_16QAM_s):type_mod_s=QPSK
Step 309: final TBS value final_TBS and the TFC value of determining to upload to nodeB.
If scheduling, the modulation system that non-scheduling is selected is identical, then:
With two independent direct additions of selecting of TBS value, and in the TBS table, find the most approaching but less than the TBS value after the stack as final TBS.
If scheduling, the modulation system difference that non-scheduling is selected, then:
If the TBS that scheduling is selected is invalid, then
The final TBS that selects is the TBS of non-scheduling, and modulation system is the modulation system that non-scheduling is selected;
If the TBS that non-scheduling is selected is invalid, then
The final TBS that selects is the TBS of scheduling, the modulation system that modulation system is selected for scheduling;
If scheduling, the TBS that non-scheduling is selected is effective, then:
If the TBS of non-scheduling is greater than the TBS of scheduling, then
Final TBS is non-scheduling TBS+ (identical with non-scheduling modulation system and TBS maximum among the TBS that scheduling is selected), and perhaps final TBS is non-scheduling TBS; Final modulation system is the modulation system that non-scheduling is selected;
If the TBS of scheduling is greater than the TBS of non-scheduling, then
Final TBS is scheduling TBS+ (identical with the scheduling modulation system and TBS maximum among the TBS that non-scheduling is selected), and perhaps final TBS is scheduling TBS; The modulation system that final modulation system is selected for scheduling.
The symbolic formulation mode is as follows:
if(type_mod_ns≠type_mod_s)
if(TBS_ns≠0&TBS_s==0)
then:final_TBS=TBS_ns,type_mod=type_mod_ns;
if(TBS_ns==0&TBS_s≠0)
then:final_TBS=TBS_s,type_mod=type_mod_s;
if(TBS_ns≠0&TBS_s≠0)
if(TBS_ns>TBS_s),then:final_TBS=TBS_ns+max(TBS_s(type_mod_ns))
type_mod=type_mod_ns;
if(TBS_ns<=TBS_s),then:final_TBS=TBS_s+max(TBS_ns(type_mod_s)),
type_mod=type_mod_s;
Step 310: in TBS set, select in the corresponding group in RU conversion back and the final_TBS that chooses in the above-mentioned steps 309 is the most approaching and smaller or equal to the value of this final_TBS:
final_TBS_index=max(find((final_TBS-TBS_group)>=0))
As shown in Figure 4, in step 205 shown in Figure 2, NodeB obtains the TBS value also according to the part of each step shown in Figure 3, and process is as follows:
Step 401: conversion RU.
Total RU resource translation method is as follows:
If scheduling resource is: ts_s, sf_s;
Non-scheduling resource is: ts_ns, sf_ns;
Scheduling and non-scheduling resource are all converted on the resource units of SF=16, and the total resource in conversion back is:
N = Σ i _ s ts _ s ( SF sf _ s ) i _ s Σ i _ ns ts _ ns ( SF sf _ ns ) i _ ns
Step 402: according to total RU number of resources N of conversion, and UE sends to the TBS index final_TBS_index of NodeB, the corresponding TBS value of selection from 5 groups of TBS resources;
index_TBS_NodeB=ceil(N/16)
TBS_nodeB=TBS_set(index_TBS_NodeB,final_TBS_index)
The resource N that calculates according to step 401 converts on 16 code channels, and rounds up, and determines TBS selects in the table 1 row number.(of selecting in 16 the insides from table 1, at once number) reports Node B by E-UCCH because final TBS, and therefore, Node B can know selected TBS according to above-mentioned two information.Because modulation system is to show to transmit, so Node B side does not need to calculate modulation system again.

Claims (8)

1. dispatch the method that non-dispatching multiplex is determined transport module size and modulation system for one kind, it is characterized in that, comprise the steps:
(1) basic resources unit is set, calculates scheduling and the possible altogether code channel time interval resource quantity C of non-scheduling according to Resource Unit normalization, with the mode of possible total resources C according to the normalization equivalence, be divided into N hierarchical resource, N can be divided exactly by 80;
(2) the minimum and maximum transport module size in each hierarchical resource is the TBS value in the calculation procedure 1 described N hierarchical resource, determines I the optional value of TBS having in each grade, sets up the TBS resource table of a N * I at the MAC layer;
(3) when scheduling and non-scheduling service exists simultaneously and the non-scheduling service data volume can carry less than the Radio Resource of configuration bit number, the non-scheduled transmission of the definite employing of MAC layer will be dispatched and be transmitted multiplexing with non-scheduling service;
(4) user equipment (UE) is according to independent respectively scheduling and the non-scheduling resource total amount of calculating actual allocated of described Resource Unit, and in view of the above and the power authorization conditions is independent from described TBS resource table selects TBS value corresponding under the different transmission meanss, and determine final TBS value, and definite modulation system according to the pairing modulation system of TBS value under two kinds of transmission meanss is whether identical.
2. the method for claim 1 is characterized in that, further comprise,
(5) index and the modulation system that user equipment (UE) is corresponding with selected TBS value is transferred to Node B;
(6) Node B is calculated the scheduling and the non-scheduling resource total amount of actual allocated, and obtains the TBS value of Node B in view of the above with the index of the corresponding TBS value that receives, and utilizes the modulation system that receives to carry out demodulation.
3. the method for claim 1 is characterized in that, in the step (1):
Described resource units is the solid size road of spreading factor SF=16;
Described possible altogether code channel time interval resource quantity C is 1 to 80 Resource Unit.
4. the method for claim 1 is characterized in that, in the step (2):
The bit number 23 that minimum TBS value in described each hierarchical resource is a schedule information;
Maximum TBS value in described each hierarchical resource is the maximum number bits that corresponding spreading factor SF=1, modulation system may be transmitted during for 16QAM, satisfies following formula for maximum TBS value in N the hierarchical resource:
TBS / M × SF 704 - 17 × ENI × SF - ( 24 + ceil ( ( TBS + 24 ) / 5114 ) × 4 ) / M × SF + 704 × ( t - 1 ) = 1
Wherein, the 17th, 17 symbols that UCCH takies, 24 correspondences be the number of CRC check bit, 4 correspondences be Turbo coding and the tail bit that carries over through punching, M is the value of modulation system correspondence, and during QPSK, M=2 is during 16QAM, M=4, Ceil is the number that rounds up, t is a timeslot number; ENI is the E-UCCH number.
5. the method for claim 1 is characterized in that, step is set up the TBS resource table in (2), further can be divided into:
(2-1) the solid size road with spreading factor SF=16 is defined as basic resource units RU;
(2-2) according to the RU of basic resources unit, determine scheduling and the possible total resources quantity of non-scheduling;
(2-3) institute might resource be divided into N hierarchical resource;
(2-4) in each hierarchical resource, determine maximum TBS value and minimum TBS value in each hierarchical resource;
(2-5) TBS maximum and minimum value in each hierarchical resource are taken the logarithm in the log-domain space, carry out even interpolation between the two, again interpolation gained logarithm value is converted to corresponding TBS value, determines I TBS value having in each hierarchical resource, the TBS resource table of a N * I of generation.
6. as claim 1 or 3 described methods, it is characterized in that step (4) further can be divided into:
(4-1) according to described Resource Unit, utilize following two formula respectively the scheduling and the non-scheduling resource of actual allocated to be carried out normalization, after the calculating, obtain the total separately number of resources of scheduling resource and non-scheduling resource:
N _ s = Σ i _ s ts _ s ( SF sf _ s ) i _ s N _ ns = Σ i _ ns ts _ ns ( SF sf _ ns ) i _ ns
Wherein, SF=16, i_s represent i time slot scheduling, should be i_s=1 in the following formula, and similarly, i_ns represents i non-time slot scheduling, i_ns=1, whole formulate be from 1 be added to ts_s or ts_ns, promptly a plurality of time slots and;
(4-2), from described TBS resource table, search each self-corresponding hierarchical resource respectively, obtain dispatching the TBS group corresponding with non-scheduling according to hierarchical resource according to scheduling and the non-scheduled resources number N _ s and the N_ns of reality;
(4-3) utilize number of resources described in step (4-1), (4-2), described TBS value, according to different modulation systems and transmission means, calculate different modulating mode and transmission means corresponding code rate λ value, wherein, described modulation system is QPSK modulation or 16QAM modulation, and described transmission means is scheduled transmission or non-scheduled transmission;
(4-4) select the TBS value of described code check λ in specified scope in the TBS hierarchical resource of scheduling and non-scheduling correspondence, described specified scope is one group of maximum/minimum code rate λ _ max/ λ _ min that the B node configuration is given user equipment (UE);
(4-5) distribute to 8 of subscriber equipment with reference to code check λ value and 8 reference powers biasings, according to the power bias of the sub-TBS needs of code check interpolation calculation correspondence according to the B node;
(4-6) whether the TBS corresponding power of more different respectively transport-type correspondences is less than or equal to the authorization power of this transport-type;
(4-7) data that will satisfy in the buffer memory of the corresponding TBS that is less than or equal to authorization power and subscriber equipment compare, select to be less than or equal to, perhaps greater than but near the data cached TBS value of subscriber equipment;
(4-8) from two kinds of transmission meanss, two kinds of modulation systems, select to satisfy authorization power requirement and the maximum modulation system of corresponding TBS value respectively, when the maximum TBS that selects in two kinds of modulation systems was identical, relatively the little modulation system of power configuration skew was selected in the skew of the power configuration of corresponding needs;
If (4-9) scheduling, the modulation system of non-scheduling is identical, and then that two kinds of transmission meanss are the selected direct addition of TBS is as final TBS value;
(4-10) in described TBS resource table, select in the corresponding TBS group in the RU of basic resources unit conversion back, the most approaching and with the final TBS that chooses in the step (4-9) smaller or equal to the TBS value of this final TBS, the TBS value of selecting when multiplexing.
7. method as claimed in claim 6 is characterized in that, step (4-9) further can be divided into:
In the modulation system of scheduling and non-scheduling selection not simultaneously:
If the TBS that scheduling is selected is invalid, the then final TBS that selects is the TBS of non-scheduling, and modulation system is the modulation system that non-scheduling is selected;
If the TBS that non-scheduling is selected is invalid, the then final TBS that selects is the TBS of scheduling, the modulation system that modulation system is selected for scheduling;
If the TBS that scheduling and non-scheduling are selected is effective: then:
If the TBS of non-scheduling is greater than the TBS of scheduling, then final TBS is non-scheduling TBS+ (identical with non-scheduling modulation system and TBS maximum among the TBS that scheduling is selected), and perhaps final TBS is non-scheduling TBS; Final modulation system is the modulation system that non-scheduling is selected;
If the TBS that dispatches is greater than the TBS of non-scheduling, then final TBS is scheduling TBS+ (identical with the scheduling modulation system and TBS maximum among the TBS that non-scheduling is selected), and perhaps final TBS is scheduling TBS; The modulation system that final modulation system is selected for scheduling.
8. method as claimed in claim 2 is characterized in that, step (6) further can be divided into:
(6-1) according to described Resource Unit, Node B utilizes following two formula respectively normalization to be carried out in scheduling and non-scheduling resource, calculates scheduling resource and the total number of resources of non-scheduling resource:
N = Σ i _ s ts _ s ( SF sf _ s ) i _ s + Σ i _ ns ts _ ns ( SF sf _ ns ) i _ ns
Wherein, SF=16, i_s represent i time slot scheduling, should be i_s=1 in the following formula, and similarly, i_ns represents i non-time slot scheduling, i_ns=1, whole formulate be from 1 be added to ts_s or ts_ns, promptly a plurality of time slots and;
(6-2) resource units number N conversion is obtained the columns of place hierarchical resource in the TBS resource table,, in the TBS resource table, find the TBS value of corresponding Node B, and the modulation system that employing UE reports is carried out demodulation in conjunction with the index of the TBS value of reported by user equipment UE.
CN200710087586XA 2007-03-30 2007-03-30 Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling Expired - Fee Related CN101277177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710087586XA CN101277177B (en) 2007-03-30 2007-03-30 Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710087586XA CN101277177B (en) 2007-03-30 2007-03-30 Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling

Publications (2)

Publication Number Publication Date
CN101277177A true CN101277177A (en) 2008-10-01
CN101277177B CN101277177B (en) 2011-03-16

Family

ID=39996224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710087586XA Expired - Fee Related CN101277177B (en) 2007-03-30 2007-03-30 Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling

Country Status (1)

Country Link
CN (1) CN101277177B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101958767A (en) * 2010-10-22 2011-01-26 北京北方烽火科技有限公司 Frequency domain resource scheduling method and device
CN102238636A (en) * 2010-04-30 2011-11-09 中兴通讯股份有限公司 Method and system for configuring actually used TBS (transport block size) table of UE (user equipment) on network side
WO2013166786A1 (en) * 2012-05-11 2013-11-14 华为技术有限公司 Data transmission method and device
CN103427936A (en) * 2012-05-18 2013-12-04 中兴通讯股份有限公司 Method and device for selecting transmission format
CN107615814A (en) * 2015-08-10 2018-01-19 华为技术有限公司 Method, base station and the terminal of transmitting uplink data

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3426218B2 (en) * 2001-01-19 2003-07-14 松下電器産業株式会社 Base station apparatus and encoding / modulation method
CN100433901C (en) * 2005-02-05 2008-11-12 上海贝尔阿尔卡特股份有限公司 Transmitting-receiving method of multi-media broadcasting business, and realizing apparatus therefor

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102238636A (en) * 2010-04-30 2011-11-09 中兴通讯股份有限公司 Method and system for configuring actually used TBS (transport block size) table of UE (user equipment) on network side
CN102238636B (en) * 2010-04-30 2016-06-15 中兴通讯股份有限公司 The method and system of network side configuration the used transmission block form of subscriber equipment reality
CN101958767A (en) * 2010-10-22 2011-01-26 北京北方烽火科技有限公司 Frequency domain resource scheduling method and device
CN101958767B (en) * 2010-10-22 2013-03-13 北京北方烽火科技有限公司 Frequency domain resource scheduling method and device
WO2013166786A1 (en) * 2012-05-11 2013-11-14 华为技术有限公司 Data transmission method and device
US9584254B2 (en) 2012-05-11 2017-02-28 Huawei Technologies Co., Ltd. Data transmission method and device for reducing loss of information bits
CN103427936A (en) * 2012-05-18 2013-12-04 中兴通讯股份有限公司 Method and device for selecting transmission format
CN103427936B (en) * 2012-05-18 2017-08-11 深圳市中兴微电子技术有限公司 A kind of method and device of selection transformat
CN107615814A (en) * 2015-08-10 2018-01-19 华为技术有限公司 Method, base station and the terminal of transmitting uplink data
CN112087801A (en) * 2015-08-10 2020-12-15 华为技术有限公司 Uplink data transmission method, base station and terminal
CN112087801B (en) * 2015-08-10 2023-03-24 华为技术有限公司 Uplink data transmission method, base station and terminal

Also Published As

Publication number Publication date
CN101277177B (en) 2011-03-16

Similar Documents

Publication Publication Date Title
CN103079262B (en) Mode selection and resource allocation method of device-to-device (D2D) users in cellular system
CN101340413B (en) Method for solving uncontrollability of OFDMA system terminal power spectral density
CN101141779B (en) Scheduling authorization method and device of multi-carrier HSUPA
CN102687568B (en) Adaptive scheduling data transmission based on the transmission power and the number of physical resource blocks
CN102036354B (en) Method and device for allocating power to downlink control channel, and base station
CN101309460B (en) Method and apparatus for resource distribution between multiple users
CN101969663B (en) Method, device and system for transmitting control information
CN100415020C (en) Code resource distribution method of high speed physical downward sharing channel
CN105191441A (en) Determination method and device for allocating priority for channel power
CN101277177B (en) Transmission method for determining transmission module size and modulation system by multiplexing scheduling and non-scheduling
CN101640940A (en) Method and base station for indicating modulation encoding scheme during multi-user joint mapping
CN102404838B (en) Uplink resource allocation method and uplink resource allocation device
CN100483980C (en) Code channel management in a wireless communication system
CN101192906B (en) Method for transferring HARQ response message based on E-HICH channel of TD-SCDMA system
CN101222270B (en) TBS and modulation mode selection method and apparatus
CN102123508B (en) Time slot resource allocation method and device
CN102571261A (en) Indicating method and indicating device for MCS (Modulation Coding Scheme) of spatial stream
CN102056317B (en) Dispatching method for high-speed downlink packet access
CN101521940B (en) Method for reporting ability grades and allocating channel resources for user equipment
CN101277465B (en) Method for multiplexing scheduling and non-scheduling in upstream reinforced system
CN101222271B (en) TBS and modulation mode selection method and apparatus
CN101282190B (en) Method for multiplexing scheduling and non-scheduling service transmission in high speed upstream packet access
CN101299836A (en) Scheduling information position indication method
CN106160929A (en) The method and apparatus that UCI encodes, determines the through-put power of UCI
CN102123506A (en) Resource allocation method and device for multiple users

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316