CN101275701A - Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor - Google Patents

Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor Download PDF

Info

Publication number
CN101275701A
CN101275701A CNA2008100531698A CN200810053169A CN101275701A CN 101275701 A CN101275701 A CN 101275701A CN A2008100531698 A CNA2008100531698 A CN A2008100531698A CN 200810053169 A CN200810053169 A CN 200810053169A CN 101275701 A CN101275701 A CN 101275701A
Authority
CN
China
Prior art keywords
glue
pipe
fuel gas
curing agent
outdoor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100531698A
Other languages
Chinese (zh)
Inventor
王好兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008100531698A priority Critical patent/CN101275701A/en
Publication of CN101275701A publication Critical patent/CN101275701A/en
Pending legal-status Critical Current

Links

Landscapes

  • Adhesives Or Adhesive Processes (AREA)

Abstract

The invention relates to a repair reinforcing means of the indoor fuel gas pipeline from the outdoor, characterized in that, the construction procedure is preprocessing, derusting process; rolling into the tube with the diameter bigger than that of the fuel gas tube with the earth work cloth; preprocessing the sleeve, adopting the special pressurzing extruder gun to inject the bedded glue liquor from the relative high end of the construction grade, for even dipping and curing; repairing and reinforcing the surface treatment with one time of antirust paint and two times of top coat. The invention has the following advantages: performing the action of the corrosion protection and structure reinforce on the indoor fuel gas pipeline from the outdoor, simple operation, long service life.

Description

The restoring and fastening method of leading fuel gas pipe-line from outdoor to indoor
Technical field
The invention belongs to band and press corrosion pipeline recovery technique, relate in particular to a kind of restoring and fastening method of leading fuel gas pipe-line from outdoor to indoor.
Background technique
At present, corrosion fuel tube generally adopts the replace tubes method.This operational method is carried out after must stopping the supple of gas or steam, and suppresses after changing end conduit again, the igniting of could ventilating after qualified.Directly influence user's life.Corrosion failure appears again in the new pipe of just having changed after several years.Make gas burning system exist the hidden danger of detonation.The inventor once applied for a patent (the patent No.: ZL97119962.0) disclose a kind of restoring and fastening method that is used for indoor gas pipeline, be mainly used in the reparation of indoor fuel gas pipeline.Because indoor pipeline is a Vertical direction, the glue of perfusion relies on its gravity flow more evenly to flood when repairing.Leading fuel gas pipe-line from outdoor to indoor comprises: (1) is from the underground horizontal transverse tube of combustion gas of drawing in Stall body of wall inlet chamber, because its horizontal transverse tube is not done any processing between the body of wall sleeve pipe, year in and year out under multiple etching condition effects such as kitchen high temperature, damp and hot, oil gas and rainwater, cause the serious corrosion of the horizontal transverse tube outer wall of introducing, its corrosion penetration can reach 1-2mm until perforation; (2) introduce bend pipe from the underground back of stretching out near the combustion gas on ground, because its ageing of asphalt anticorrosive coat cracking, rainwater can invade in the anticorrosive coat or also can destroy the anticorrosive coat of introducing bend pipe near the place, ground when sub-district ground construction black top oil, causes new pipe only to move and promptly corrosion or phenomenon of rupture can occur behind the 8-10.In addition, normally before bend pipe, carry out, wear so rust appears in inlet tube bending part behind the bend pipe easily from the preservative treatment of underground introducing bend pipe of drawing.Because the restoring and fastening method of indoor gas pipeline can not satisfy the technological requirement of outdoor gas pipeline, still adopts the replace tubes method for a long time, directly influences user's daily life.
Summary of the invention
The present invention is in order to overcome deficiency of the prior art, a kind of restoring and fastening method of leading fuel gas pipe-line from outdoor to indoor is provided, the outdoor introducing indoor fuel gas of repairing and reinforcement pipeline can stop the supple of gas or steam, be with to press and construct, utilization enhancing perfusion glue method guarantees that dipping evenly, prolongs the life-span of gas pipeline.
The present invention is achieved through the following technical solutions for achieving the above object: a kind of restoring and fastening method of leading fuel gas pipe-line from outdoor to indoor is characterized in that: construction sequence is:
(2) pretreatment
Horizontal transverse tube of combustion gas through walls or introducing bend pipe surface are done processing of rust removing, expose new metal covering;
(2) prefabricated sleeve pipe, enhancing perfusion glue
Be rolled into tubulose with geotextiles greater than the transverse tube diameter, be wrapped on the horizontal transverse tube, geotechnological stringing is taken mouth and vertically formed pipe box with rubber belt sealing along it, the pipe box two ends are fixing with larynx hoop chucking, the high-end relatively employing specialty pressurization injecting glue device pressurization of reserving the gradient from construction inject the glue for preparing, evenly dipping, solidify; In the standpipe place of the introducing bend pipe of removing old anticorrosive coat and rust cleaning parcel geotextiles, geotechnological stringing is taken mouth and vertically formed pipe box with rubber belt sealing along it, the geotextiles pipe box was pushed away the curved section of introducing bend pipe to be located and is responsible for former anticorrosive coat with underground horizontal combustion gas for 30 centimeters to join, with larynx hoop chucking interface, again wrap up the pipe box that geotextiles makes and the geotextiles pipe box of curved section again at the standpipe place and link into an integrated entity, several times from high-end pressurization inject the glue for preparing, dipping evenly, solidify;
(3) repairing and reinforcement surface treatment
After the perfusion glue is treated to solidify fully, a horizontal transverse tube or a rust proof paint of introducing bend pipe brush, twice finish paint.
A kind of glue that is used for the leading fuel gas pipe-line from outdoor to indoor reparation is characterized in that: mainly composed of the following components, count by weight
100 parts of resins
Curing agent 1-8 part
Promoter 0.2-8 part.
A kind of glue that is used for the leading fuel gas pipe-line from outdoor to indoor reparation is characterized in that: mainly composed of the following components, count by weight
100 parts of resins
Curing agent 1-8 part
Promoter 0.2-8 part
Fire retardant 50-100 part.
Described resin adopts epoxylite, vinyl ester resins, unsaturated polyester esters resin, furans resin; Epoxylite select for use T31,593 or polyamide resin make curing agent; Vinyl ester resins selects for use methyl-ethyl ketone peroxide to make curing agent; The furans resin selects for use glass comminuted steel shot or furan mastic powder to make curing agent; Unsaturated resinoid, unsaturated polyester esters resin select for use oxidation cyelohexanone dibutyl ester to stick with paste or cyclohexanone peroxide dibutyl ester paste is made curing agent, and promoter is adopted cycloalkanes cobalt vinyl benzene liquid or dimethylaniline vinyl benzene liquid.
Described fire retardant adopts aluminium hydroxide or San Yangization Antimony.
A kind of injecting glue device is characterized in that: mainly contain the conduit of inflator, storage glue jar and band filling nozzle, described inflator is communicated with storage glue jar by flexible pipe, and the conduit of band filling nozzle is connected with the bottom of storage glue jar.
Beneficial effect of the present invention: leading fuel gas pipe-line from outdoor to indoor is played anticorrosion and structure strengthen double action, need not stop the supple of gas or steam during construction, simple to operate, can prolong the 10-15 in working life of existing pipeline.Construction safety, repair time are short, and the protection tube mechanical property of formation, resistance to chemical corrosion all can satisfy the designing requirement of former pipeline.
Description of drawings
Fig. 1 is the schematic representation that the present invention repairs curing;
Fig. 2 is that the present invention adopts pressurization glue device schematic representation;
Fig. 3 is the structural representation of injecting glue device.
Embodiment
Below in conjunction with preferred embodiment, to details are as follows according to embodiment provided by the invention:
A kind of restoring and fastening method of leading fuel gas pipe-line from outdoor to indoor, construction sequence is:
(3) pretreatment
Horizontal transverse tube of combustion gas through walls or introducing bend pipe surface are done processing of rust removing, expose new metal covering;
(2) prefabricated sleeve pipe, enhancing perfusion glue
Be rolled into tubulose with geotextiles greater than the transverse tube diameter, be wrapped on the horizontal transverse tube 1, geotechnological stringing is taken mouth and vertically formed pipe box with rubber belt sealing along it, the pipe box two ends are fixing with larynx hoop chucking, the high-end relatively employing specialty pressurization injecting glue device pressurization of reserving the gradient from construction inject the glue for preparing, evenly dipping, solidify; In the standpipe place of the introducing bend pipe 2 of removing old anticorrosive coat and rust cleaning parcel geotextiles, geotechnological stringing is taken mouth and vertically formed pipe box with rubber belt sealing along it, the geotextiles pipe box was pushed away the curved section of introducing bend pipe to be located and is responsible for former anticorrosive coat with underground horizontal combustion gas for 30 centimeters to join, with larynx hoop chucking interface, again wrap up the pipe box that geotextiles makes and the geotextiles pipe box of curved section again at the standpipe place and link into an integrated entity, several times from high-end pressurization inject the glue for preparing, dipping evenly, solidify;
(3) repairing and reinforcement surface treatment
After the perfusion glue is treated to solidify fully, a horizontal transverse tube or a rust proof paint of introducing bend pipe brush, twice finish paint.
A kind of injecting glue device mainly contains the conduit 6 of inflator 3, storage glue jar 4 and band filling nozzle 5, and described inflator is communicated with storage glue jar by flexible pipe, is with the conduit of filling nozzle to be connected with the bottom of storing up the glue jar.
During repairing and reinforcement, if find that through rust cleaning, when removing old pitch anticorrosive coat pipeline has point-like to bore a hole and does repairing and reinforcement again after the rapid-result steel quick blocking.Potting compound ripple when construction end opening injecting glue that horizontal wall-passing pipe is high, horizontal transverse tube and introducing bend pipe glue cured layer thickness should be not less than 1.5mm.
Described resin adopts epoxylite, vinyl ester resins, unsaturated polyester esters resin, furans resin; Epoxylite select for use T31,593 or polyamide resin make curing agent; Vinyl ester resins selects for use methyl-ethyl ketone peroxide to make curing agent; The furans resin selects for use glass comminuted steel shot or furan mastic powder to make curing agent; Unsaturated resinoid, unsaturated polyester esters resin select for use oxidation cyelohexanone dibutyl ester to stick with paste or cyclohexanone peroxide dibutyl ester paste is made curing agent, and promoter is adopted cycloalkanes cobalt vinyl benzene liquid or dimethylaniline vinyl benzene liquid.Described fire retardant adopts aluminium hydroxide or San Yangization Antimony.Add fire retardant, colorant, anti-twist denaturant as required.Adopt gelatin viscosity different owing to above, nonwovens reinforcing material degree of compaction should be made corresponding adjustment in the selected geotextiles.Selected resin emulsion paint must adopt corresponding curing agent, promoter.
Epoxy resin model: E-42 (634), E-44 (6101), E-51 (618), E-20 (601), F-44, F-51; The curing agent of corresponding epoxy resin: T31,593 or 650/651/300/ polyamide resin;
Unsaturated polyester esters resin model: 2608,3301,306,196,191,199,182,7541; Vinylite model: ARZ2000, ARZ2001, ARZ3002, ARZ4000; Furans resin model: GM-1, GM-2, HF9200, FF9900.Adopt conventional merchandising on the market, receive the product of this sapecial coating factory as Wuxi A Erzi chemical industry Co., Ltd, Wuxi City heavily fortified point.
Embodiment 1
3,301 100 parts of unsaturated polyester esters resins
Curing agent cyclohexanone peroxide dibutyl ester is stuck with paste 1 part
Promoter cycloalkanes bores 0.2 part of vinyl benzene liquid.
Embodiment 2
3,301 100 parts of unsaturated polyester esters resins
Curing agent cyclohexanone peroxide dibutyl ester is stuck with paste 3 parts
4 parts of promoter cycloalkanes cobalt vinyl benzene liquid.
Embodiment 3
306 100 parts of unsaturated polyester esters resins
Curing agent oxidation cyelohexanone dibutyl ester is stuck with paste 2.5 parts
0.5 part of promoter dimethylaniline vinyl benzene liquid
Embodiment 4
100 parts of epoxy resin E44
8 parts of curing agent 650/651/300 polyamide resins
5 parts of promoter dimethylaniline vinyl benzene liquid.
Embodiment 5
100 parts of vinyl ester resins ARZ400
5 parts of curing agent methyl-ethyl ketone peroxides
8 parts of promoter cycloalkanes cobalt vinyl benzene liquid
50 parts of fire retardant San Yangization Antimony.
Embodiment 6
100 parts of furans resin GM-1
3 parts of curing agent glass comminuted steel shots
5 parts of promoter cycloalkanes cobalt vinyl benzene liquid
100 parts in fire retardant aluminium hydroxide.
Embodiment 7
100 parts of furans resin GM-1
3 parts of curing agent glass comminuted steel shots
8 parts of promoter cycloalkanes cobalt vinyl benzene liquid
70 parts in fire retardant aluminium hydroxide.
Repair and solidify the back detection:
(1), visual inspection, visual position is observed.The glue completion of cure, smooth nothing stream weighs down; Should there be continuous remaining bubble in the sleeve pipe; The glue continuous whole is filled up whole sleeve pipe, does not have continuous no glue district; Sleeve pipe and fuel tube are bonding closely, can not have from the drum phenomenon;
(2), the ultrasonic thickness gage thickness measuring, should be greater than 1.5mm;
(3), the electrical spark detector checks that 10KV reinforces anticorrosive coat and do not have puncture.
The above only is preferred embodiment of the present invention, is not structure of the present invention is done any pro forma restriction.Every foundation technical spirit of the present invention all still belongs in the scope of technological scheme of the present invention any simple modification, equivalent variations and modification that above embodiment did.

Claims (6)

1. the restoring and fastening method of a leading fuel gas pipe-line from outdoor to indoor, it is characterized in that: construction sequence is:
(1) pretreatment
Horizontal transverse tube of combustion gas through walls or introducing bend pipe surface are done processing of rust removing, expose new metal covering;
(2) prefabricated sleeve pipe, enhancing perfusion glue
Be rolled into tubulose with geotextiles greater than the transverse tube diameter, be wrapped on the horizontal transverse tube, geotechnological stringing is taken mouth and vertically formed pipe box with rubber belt sealing along it, the pipe box two ends are fixing with larynx hoop chucking, the high-end relatively employing specialty pressurization injecting glue device pressurization of reserving the gradient from construction inject the glue for preparing, evenly dipping, solidify; In the standpipe place of the introducing bend pipe of removing old anticorrosive coat and rust cleaning parcel geotextiles, geotechnological stringing is taken mouth and vertically formed pipe box with rubber belt sealing along it, the geotextiles pipe box was pushed away the curved section of introducing bend pipe to be located and is responsible for former anticorrosive coat with underground horizontal combustion gas for 30 centimeters to join, with larynx hoop chucking interface, again wrap up the pipe box that geotextiles makes and the geotextiles pipe box of curved section again at the standpipe place and link into an integrated entity, several times from high-end pressurization inject the glue for preparing, dipping evenly, solidify;
(3) repairing and reinforcement surface treatment
After the perfusion glue is treated to solidify fully, a horizontal transverse tube or a rust proof paint of introducing bend pipe brush, twice finish paint.
2, a kind of glue that is used for the leading fuel gas pipe-line from outdoor to indoor reparation is characterized in that: mainly composed of the following components, count by weight
100 parts of resins
Curing agent 1-8 part
Promoter 0.2-8 part.
3, a kind of glue that is used for the leading fuel gas pipe-line from outdoor to indoor reparation is characterized in that: mainly composed of the following components, count by weight
100 parts of resins
Curing agent 1-8 part
Promoter 0.2-8 part
Fire retardant 50-100 part.
4, according to claim 2 or 3 described glues, it is characterized in that: described resin adopts epoxylite, vinyl ester resins, unsaturated polyester esters resin, furans resin; Epoxylite select for use T31,593 or polyamide resin make curing agent; Vinyl ester resins selects for use methyl-ethyl ketone peroxide to make curing agent; The furans resin selects for use glass comminuted steel shot or furan mastic powder to make curing agent; Unsaturated resinoid, unsaturated polyester esters resin select for use oxidation cyelohexanone dibutyl ester to stick with paste or cyclohexanone peroxide dibutyl ester paste is made curing agent, and promoter is adopted cycloalkanes cobalt vinyl benzene liquid or dimethylaniline vinyl benzene liquid.
5, glue according to claim 3 is characterized in that: described fire retardant adopts aluminium hydroxide or San Yangization Antimony.
6, a kind of injecting glue device is characterized in that: mainly contain the conduit of inflator, storage glue jar and band filling nozzle, described inflator is communicated with storage glue jar by flexible pipe, and the conduit of band filling nozzle is connected with the bottom of storage glue jar.
CNA2008100531698A 2008-05-20 2008-05-20 Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor Pending CN101275701A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100531698A CN101275701A (en) 2008-05-20 2008-05-20 Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100531698A CN101275701A (en) 2008-05-20 2008-05-20 Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor

Publications (1)

Publication Number Publication Date
CN101275701A true CN101275701A (en) 2008-10-01

Family

ID=39995397

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100531698A Pending CN101275701A (en) 2008-05-20 2008-05-20 Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor

Country Status (1)

Country Link
CN (1) CN101275701A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711988A (en) * 2013-12-21 2014-04-09 深圳市百安百科技有限公司 Perfusion repair method of underwater complex structure
CN104251363A (en) * 2013-06-26 2014-12-31 上海梅山钢铁股份有限公司 Gas pipeline bellows plugging method
CN109973753A (en) * 2019-04-04 2019-07-05 王好兵 The restoring and fastening method of gas pipeline
CN116729014A (en) * 2023-06-16 2023-09-12 济南园林开发建设集团有限公司 Method for preparing landscape sculpture by hot bending elbow

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104251363A (en) * 2013-06-26 2014-12-31 上海梅山钢铁股份有限公司 Gas pipeline bellows plugging method
CN103711988A (en) * 2013-12-21 2014-04-09 深圳市百安百科技有限公司 Perfusion repair method of underwater complex structure
CN109973753A (en) * 2019-04-04 2019-07-05 王好兵 The restoring and fastening method of gas pipeline
CN116729014A (en) * 2023-06-16 2023-09-12 济南园林开发建设集团有限公司 Method for preparing landscape sculpture by hot bending elbow

Similar Documents

Publication Publication Date Title
CN102464861B (en) Pipeline repairing carbon fiber composite material system and application thereof
EP3296608B1 (en) Pressure infusion lining system
CN104246343B (en) Glass fibre tube-joining method and system
CN105670556B (en) A kind of petrochemical plant corrosion and protection carbon fiber reinforcement technique
CN105805432B (en) A kind of composite enhancing steel conduit and preparation method thereof
CN101967619B (en) Method for reinforcement repair of pipeline by using metal hot spraying and fibrous composite
CN104534221A (en) Method for repairing and reinforcing pipeline by means of composite materials
WO2006034653A1 (en) Carbon fiber composite for repairing and reinforcing pipelines having defects and the method of application
KR101359448B1 (en) Entire repairing method for pipe lines with non-excavation
CN101275701A (en) Restoring and fastening method for leading fuel gas pipe-line from outdoor to indoor
CN104421567A (en) Gas pipe corrosion defect under-pressure repair method
CN107893415A (en) A kind of corrosion-resistant miniature steel pipe pile and manufacture method
CN201706136U (en) Underground-to-overground section fuel gas inlet pipe with anticorrosion reinforced layer
CN106958718A (en) A kind of pipe lining restorative procedure
CN115076510B (en) Repairing device and repairing method for reinforcing and repairing pipeline lining
CN114688383A (en) Anticorrosion repairing method for temperature-resistant pressure-resistant composite pipe of liner of oil-gas-water mixed transportation pipeline
CN209278722U (en) A kind of convertible liner hose for pipeline rehabilitation
CN108253225B (en) A kind of welding petroleum pipeline device for plugging
CN207921427U (en) A kind of direct burial anticorrosive valve
CN207500646U (en) A kind of reinforced pipeline
CN203823255U (en) Fire-fighting underground high-pressure-resistant plastic composite tube
CN115596925A (en) Online repairing method for flexible composite pipe
CN213564857U (en) PE pipe with good sealing effect
CN218293844U (en) Large-flow high-pressure test pump
CN219473089U (en) Carbon fiber reinforced anti-corrosion repair structure for metal pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20081001