CN1012746B CN 88103064 CN88103064A CN1012746B CN 1012746 B CN1012746 B CN 1012746B CN 88103064 CN88103064 CN 88103064 CN 88103064 A CN88103064 A CN 88103064A CN 1012746 B CN1012746 B CN 1012746B
Authority
CN
China
Prior art keywords
wire rope
climbing
post
climbs
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CN 88103064
Other languages
Chinese (zh)
Other versions
CN1038140A (en
Inventor
陈鹤芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Architectural Science & Technology Design Inst
Original Assignee
Tianjin Architectural Science & Technology Design Inst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Architectural Science & Technology Design Inst filed Critical Tianjin Architectural Science & Technology Design Inst
Priority to CN 88103064 priority Critical patent/CN1012746B/en
Publication of CN1038140A publication Critical patent/CN1038140A/en
Publication of CN1012746B publication Critical patent/CN1012746B/en
Expired legal-status Critical Current

Links

Images

Abstract

The present invention relates to a climbing template device which is particularly suitable for high-rise buildings with a scissor wall structural system and a cylinder structure. The climbing template device is composed of a climbing column, a winding engine and a template, wherein the template is convenient to freely adjust in a three-dimensional way by adopting a steel cable as a flexible lifting tool, the climbing template device only uses a suit of climbing transmission system, namely the winding engine, and is not changed, and a climbing template and a climbing-up climbing column can be alternated and a lowering template and a climbing-down climbing column can also be alternated by only transforming the turning direction of an electric motor; the template is provided with an operating platform which can solve the steel bar binding requirements, and the operating platform on an outer template can replace an outer eave scaffold or a hanging basket to carry out outer eave fitment construction when the climbing column climbs downwards. The present invention has multifunctional effects.

Description

Multi-functional climbing-up shuttering
The present invention relates to a kind of climbing template device of fixed buildings, is specially adapted to the high-rise building of shear wall structure system and tubular construction.
The transmission system of climbing of jumping formwork system adopts tower crane, electric screw bar, hydraulic test, Lever Blocks, jack etc. mostly in the prior art.
The deficiencies in the prior art in, as the electric screw bar transmission system (U.S. Pat P4530648) of climbing, the equipment heaviness, the cost height, lift is subjected to the restriction of screw rod length, installation requirement precision height, the Construction Arrangement difficulty needs the monolithic large platform.
The hydraulic cylinder transmission system (U.S. Pat P4060385) of climbing, the cost height is not durable, and leakage of oil, lift are little.
Adopt driven by motor chain and expansion link as climbing transmission system (U.S. Pat P3628223), the operation that two complete equipments just can be finished jumping formwork system and climbing shuttering need be set.
Lever Blocks or jack are as climbing transmission system, and hand labor intensity is big, and the transmission system of climbing when alternately climbing needs the checker position, and efficient is low, long in time limit.
One group of jumping formwork system must adopt two complete equipments in the prior art, and one overlaps the native system that climbs, a cover climbing shuttering, and can not satisfy the requirement of constructing at interior wall.
A kind of multi-functional climbing-up shuttering that the objective of the invention is to avoid above-mentioned weak point of the prior art and provide, only with the cover transmission system post that both can climb that climbs, can promote inside and outside template again, and can carry out climbing formwork for construction at interior wall, can also replace external scaffolding or hanging basket to carry out the exterior finish work construction.
Can reach purpose of the present invention by following measure, as shown in Figure 1, 2.
Exterior wall post (1) and the interior wall post (1) that climbs that climbs all can be lattice or solid-webbed column body, can adopt shaped steel (for example: section bars such as angle steel, channel-section steel, deformed steel) or the box-shaped steel make.The climb top of post (1) of exterior wall is provided with gooseneck boom (2), and gooseneck boom (2) climbs post (1) for removably connecting, as shown in Figure 1 with exterior wall.Gooseneck boom (2) leans out the climb cylinder of post (1) of exterior wall, and the available flange of dismountable movable gooseneck boom part connects or connects with bolt, also gooseneck boom (2) can be made into flexible rod-type, and promptly removable part of gooseneck boom (2) exterior wall of withdrawing climbs in the post (1).The length of gooseneck boom (2) will be according to lifting by crane and the requirement of assembly unit inner formword (21), exterior sheathing (22) and body of wall (6) thickness is determined.
The climb bottom of post (1) of exterior wall is pedestal (3), and the transmission system of climbing is attached in the pedestal (3).The climb middle part of post (1) of exterior wall is climbing shuttering support cylinder (8), climbing shuttering support cylinder (8) between gooseneck boom (2) and the pedestal (3) generally must not be less than the height of two floor high levels, and promptly the lift of template (20) between gooseneck boom (2) and pedestal (3) will satisfy the height of two floors.
The climb fixing means of post (1) of exterior wall is to pass pedestal (3) with bolt (5) to go up the locating hole of fixed bar (4) and be fixed on the body of wall (6), and makes the exterior wall post (1) that climbs parallel with body of wall (6), and bolt (5) will stagger with floor (7).
The exterior wall post (1) that climbs is arranged on the skin body of wall (6), and position is not subjected to the body of wall shape limitation, can not only arrange on the curved wall at the plane body of wall, also can the corner or the T-shaped wall place at angle arrange 90 ℃ of corners or arbitrarily.Can determine according to concrete condition of construction, shown in Fig. 4,5,6.
The climb top of post (1) of interior wall is provided with multidirectional gooseneck boom (2), and gooseneck boom (2) leans out the climb cylinder of post (1) of interior wall, as shown in Figure 2.The length of gooseneck boom (2) will be according to lifting by crane and the requirement of assembled formwork (20) and body of wall (6) thickness is determined.
The climb middle part of post (1) of interior wall is pedestal (3), and the transmission system of climbing is attached in the pedestal.The climb bottom of post (1) of interior wall is climbing shuttering support cylinder (8), and the climbing shuttering support cylinder is four cylinders, and can pass floor (7) and straddle on body of wall (6).In the lower end of climbing shuttering support cylinder (8) fixed bar (4) is set.The length of climbing shuttering support cylinder generally must not be less than the height of two floor floor heights, and promptly the lift of template (20) between pedestal (3) and fixed bar (4) will satisfy the height of two floors.
The climb fixing means of post (1) of interior wall is to be fixed on the body of wall (6) with the locating hole that bolt (5) passes on the fixed bar (4), and makes the interior wall post (1) that climbs parallel with body of wall (6).
The interior wall post (1) that climbs can be arranged on the inner wall of building body of wall (6), also can be arranged on the skin body of wall (6), and position is not subjected to the body of wall shape limitation.Can on cross body of wall, T-shaped body of wall, arrange, shown in Fig. 7,8, also can be 90 ℃ of corners, the corner at angle is arranged arbitrarily, straddles the condition of constructing can arrange on body of wall (6) as long as can satisfy the interior wall post (1) that climbs.
Exterior wall the climb transmission system of climbing of post of post and interior wall of climbing is attached in the pedestal (3) transmission adopted of climbing hoist engine (10), wire rope (12) and pulley (13).
Exterior wall climbs, and post (1) promotes or wire rope (12) one ends of falling template (20) are connected with the reel (11) of hoist engine (10), the other end passes climb post (1), gooseneck boom (2) and pulley (13) of exterior wall and is fixed on the gooseneck boom (2), and pulley (13) is connected with template (20); Climb or climb down the climb end of wire rope (12) of post (1) of exterior wall and be connected with the reel (11) of hoist engine (10), the other end passes climb post (1) and the pulley that climbs (24) of exterior wall and is fixed on the pedestal (3), and the pulley that climbs (24) is connected with template (20).Start hoist engine (10) retractable wire rope (12) and drive pulley (13) and the pulley that climbs (24) and promote or fall template (20) or climb or climb down the exterior wall post (1) that climbs, as shown in Figure 1 along body of wall (6) along body of wall (6).
Interior wall climbs, and post (1) promotes or wire rope (12) one ends of falling template (20) are connected with the reel (11) of hoist engine (10), the other end passes climb post (1), gooseneck boom (2) and pulley (13) of interior wall and is fixed on the pedestal (3), and pulley (13) is connected with template (20); Climb or climb down the climb end of wire rope (12) of post (1) of interior wall and be connected with the reel (11) of hoist engine (10), the other end passes climb post (1), gooseneck boom (2) and the pulley that climbs (24) of interior wall and is fixed on the support cylinder (8), and the pulley that climbs (24) is connected with template (20).Start hoist engine (10) retractable wire rope (12) and drive pulley (13) and the pulley that climbs (24) and promote or fall template (20) or climb or climb down the interior wall post (1) that climbs, as shown in Figure 2 along body of wall (6) along body of wall (6).
The reel (11) of hoist engine (10) can adopt single multi-joint reel or two multi-joint reels, also can determine according to the practice of construction engine request, as Fig. 3 and shown in Figure 16.
Reel (11) adopts single multi-joint reel, the coiling mode of wire rope (12) is: promote or an end of falling the wire rope (12c) of inner formword (21) and exterior sheathing (22) and wire rope (12b) is coiled on the C connection (11C) and B connection (11b) of reel (11) separately, climb or the end and wire rope (12c) and the wire rope (12b) that climb down the wire rope (12a) of the post that climbs (1) is the A that rightabout is coiled in reel (11) and joins on (11a).Start hoist engine (10), reel (11) clockwise or be rotated counterclockwise, rolling wire rope (12c) and wire rope (12b) are emitted wire rope (12a) simultaneously.Inner formword (21) and exterior sheathing (22) are raised or the post that climbs (1) climbs down; Reel (11) counterclockwise or turn clockwise is emitted wire rope (12c) and wire rope (12b), and while rolling wire rope (12a) is fallen inner formword (21) and exterior sheathing (22) or the post that climbs (1).
Also wire rope (12a) and wire rope (12b) can be coiled in reel (11) same, wire rope (12c) is coiled in another connection, reel (11) is made double crosslinking drum, as shown in figure 17, increase the wire rope of a climbing shuttering if desired again, reel (11) is made three and is got final product.
Reel (11) adopts two multi-joint reels, adopts gear drive between two reels, and the coiling mode of wire rope (12) is: the coil direction of the wire rope of one of them multi-joint reel (12) is identical with the coil direction of the wire rope (12) of single multi-joint reel; The coiling mode of the wire rope of another multi-joint reel (12) is opposite with it, the coil direction that promptly promotes or fall the wire rope (12e) of template (20) and wire rope (12f) is opposite with the coil direction of wire rope (12c) and wire rope (12b), climbs or to climb down the coil direction of wire rope (12d) of the post that climbs (1) opposite with the coil direction of wire rope (12a).Such two reels can promote or fall template (20), climb or climb down the operation of the post that climbs (1) synchronously when working.
Also wire rope (12d) and wire rope (12e) can be coiled in same in, wire rope (12f) is coiled in another connection, reel (11) is made double crosslinking drum, as shown in figure 18.Two reels all can adopt this mode.
The wire rope (12) that promotes or fall template (20) and the wire rope (12) that climbs or climb down the post that climbs (1) can be coiled on reel any as required, but the direction of coiling wants opposite.
Upper end at inner formword (21) and exterior sheathing (22) is provided with builder's jack operating platform (23), carry out fluid concrete operation with, segmentation promote the assembling reinforcement operation with, exterior finish work construction in order to and other constructing operation use.
Exterior wall post (1) the lift operations program following (shown in Fig. 9,10,11) of climbing of climbing:
1. be fixed on and pour and reach on the first floor concrete wall (6) of desired strength with will the climb pedestal (3) of post (1) of bolt (5), the exterior wall post (1) that climbs is parallel with body of wall (6), behind the reinforcing bar of the intact second layer floor of colligation, with bolt (5) fixedly inner formword (21) and exterior sheathing (22), the concrete of cast second layer floor;
2. after the concrete for the treatment of second layer floor body of wall (6) reaches the requirement degree, the dismantle bolt (5) of fixed form (20), with die sinking device (crowbar, separate type hydraulic jack, screw all can) die sinking, behind the reinforcing bar of intact the 3rd floor layer of colligation, starting hoist engine (10) is promoted to second layer floor simultaneously with inner formword (21) and exterior sheathing (22) and fixes fluid concrete with bolt (5);
3. after the concrete for the treatment of the 3rd floor layer body of wall (6) reaches desired strength, remove the climb set bolt (5) of post (1) and first floor body of wall (6) of exterior wall, starting hoist engine (10) upwards climbs the exterior wall post (1) that climbs, pedestal (3) rises to second layer floor, pass the locating hole of fixed bar (4) with bolt (5), pedestal (3) is fixed on the body of wall (6) of second layer floor;
4. the operation sequence that repeats (2) and (3) when carrying out the construction of the 4th floor layer is until top layer.
Interior wall the climb climbing program of post of climbing program and the exterior wall of post that climbs is identical.
When waiting to construct to n floor layer (being top layer), the exterior wall post (1) that climbs climbs down downwards, and its operation sequence is as follows, shown in Figure 12,13,14,15:
1. after concrete wall (6) reaches the regulation desired strength, remove inner formword (21) and gooseneck boom (2);
2. start hoist engine (10), it is fixing with bolt (5) that exterior sheathing (22) drops to n-1 floor layer by n floor layer, and n floor layer is carried out the exterior finish work construction;
3. treat that the construction of n floor layer exterior finish work finishes, remove the climb bolt (5) of post (1) and n-2 floor layer body of wall (6) of fixed outer wall, starting hoist engine (10) climbs down the exterior wall post (1) that climbs downwards, pedestal (3) is climbed down to n-3 floor layer by n~2 floor layers, pass locating hole on the fixed bar (4) with bolt (5), the exterior wall post (1) that climbs is fixing;
4. repeat 2 and 3 operation sequence when descending the construction of first floor layer exterior finish work, until the first floor.
If the height of a floor of height less than of template (20), can be in a floor segmentation promote or fall template (20), stepped climb exterior wall post and the interior wall post that climbs that climbs, the exterior wall post that climbs is climbed down in segmentation.
The present invention adopts wire rope as the flexible instrument that climbs, can make the template adjustment have very big degree of freedom, be convenient to carry out three-dimensional adjustment, can guarantee the precision of building construction size, and can carry out climbing formwork for construction at interior wall, can satisfy the concrete once-cast of floor (7) and body of wall (6), be i.e. benzvalene form cast, help mechanized construction, be specially adapted to pumping concrete construction.Equipment is simple, only overlaps the transmission system of climbing with one, need not any change, only turning to of conversion motor can promote inside and outside template simultaneously, can also upgrade the polylith template simultaneously, and the exterior wall that can also climb post and the interior wall post that climbs that climbs, climb down the exterior wall post that climbs downwards.Itself has operating platform template, can solve the needs of reinforcing bar binding construction, need not to set up pin hand stool.When exterior wall climbs post when climbing downwards, the operating platform on the exterior sheathing can replace outer eaves scaffold or hanging basket.Carry out outer eaves construction finishing, reach multi-functional purpose.The circuit of the transmission system of climbing of whole climbing template devices at whole construction scene is connected with master console, the operation that post climbs down of climbing of template by master console control whole construction face promotes, interior wall climbs post and exterior wall climbs climbing of post and exterior wall, make the whole construction face can promote or fall template simultaneously, climb simultaneously or climb down setting prop, be convenient to the execution control of job site.Because adopt hoist engine as climbing transmission system, all operation is mechanized construction, can alleviate a large amount of hand labor power, reduces a large amount of constructors, is convenient to accelerate speed of application.
Fig. 1: climbing template device is fixed on the lateral view on the body of wall.
Fig. 2: the lateral view of climbing template device.
Fig. 3: the lateral view of hoist engine.
Fig. 4,5: climbing template device is arranged on the vertical view of corner.
Fig. 6: climbing template device is arranged on the vertical view of T-shaped wall.
Fig. 7: climbing template device is arranged on the vertical view at cross wall place.
Fig. 8: climbing template device is arranged on the vertical view at T-shaped wall place.
Fig. 9,10,11: the make progress lateral view of climbing program of climbing template device.
Figure 12,13,14,15: climbing template device climbs down the lateral view of program downwards.
Figure 16: the vertical view of hoist engine.
Figure 17: the lateral view of hoist engine.
Figure 18: the vertical view of hoist engine.
Embodiment 1:
The exterior wall post (1) that climbs is the lattice cylinder, and the upper end is provided with dismountable movable gooseneck boom (2), and the climb bottom of post (1) of exterior wall is pedestal (3), as shown in Figure 1.Hoist engine (10) is arranged in the pedestal (3), the reel of hoist engine (10) adopts single multi-joint reel (11), promote or fall the wire rope (12c) of inner formword (21) and exterior sheathing (22) and C that wire rope (12b) is coiled in reel (11) separately joins (11C) and B joins on (11b), promote or to fall the climb coil direction of wire rope (12a) of post (1) and exterior sheathing (22) of exterior wall opposite with it.Reel (11) turns clockwise when the needs climbing shuttering, and rolling wire rope (12c) and wire rope (12b) are emitted wire rope (12a) simultaneously, and template upwards promotes.When exterior wall climbs post (1) need climb the time, reel is rotated counterclockwise, and emits wire rope (12c) and wire rope (12b), and rolling wire rope (12a) simultaneously, the exterior wall post (1) that climbs upwards climbs.When exterior sheathing (22) need be fallen, reel (11) was rotated counterclockwise, and emitted wire rope (12c) and wire rope (12b), while rolling wire rope (12a), and exterior sheathing (22) is fallen.When exterior wall climbs post (1) need climb down the time, reel (11) turns clockwise, and rolling wire rope (12c) and wire rope (12b) are emitted wire rope (12a) simultaneously, and the exterior wall post (1) that climbs climbs down.Fixed bar (4) is arranged on the pedestal (3), and is fixing with locating hole and body of wall (6) that bolt (5) passes on the fixed bar (4).
Embodiment 2:
The interior wall post (1) that climbs is the lattice cylinder, and top is provided with fixing multidirectional gooseneck boom (2), and the middle part is pedestal (3), and the bottom is climbing shuttering support cylinder (8), as shown in Figure 2.Hoist engine (10) is arranged in the pedestal (3), the reel of hoisting machine (10) adopts two multi-joint reels (11), the winding of the wire rope of one of them multi-joint reel is identical with single multi-joint roller steel wire rope winding with the winding of the wire rope of single multi-joint reel, the winding of another multi-joint roller steel wire rope is opposite with it, the coil direction of wire rope (12) that promptly promotes or fall template (20) is opposite with wire rope (12b) with wire rope (12c), promotes or to fall the climb coil direction of wire rope of post (1) of interior wall opposite with the coil direction of wire rope (12a).
Fixed bar (4) is set on climbing shuttering support cylinder (8), passes locating hole on the fixed bar (4) with bolt (5).Fixing with body of wall (6).

Claims (4)

1, a kind of climbing template device that is applicable to fixed buildings, be by the post that climbs, the transmission system of climbing and template are formed, the transmission system of climbing is fixedly mounted on the post that climbs, template is connected with the end of the transmission system of climbing, the structure that all has confession and body of wall to install and fix on the template and the post that climbs, the transmission system of climbing is hoist engine (10), wire rope (12) and pulley, the invention is characterized in by exterior wall post and the interior wall climbing template device that post is formed that climbs that climbs, the climb gooseneck boom and the exterior wall of post upper end of exterior wall climbs post for removably connecting, the reel (11) of hoist engine (10) is single multi-joint reel, promote or fall mould and pull the wire rope of (20) (12c), wire rope (12b) is same steering wheel on reel (11), the wire rope (12a) that climbs or climb down the post that climbs (1) is rightabout and is coiled on the reel (11) with it, with wire rope (12a), wire rope (12b), wire rope (12c) coil separately one or with wire rope (12a) and wire rope (12b) be coiled in same in, wire rope (12c) is coiled in another connection.
2, climbing template device as claimed in claim 1, the reel (11) that it is characterized in that hoist engine (10) is two multi-joint reels, every steel cable (12) coil direction of a multi-joint reel all coil direction with every steel cable (12) of single multi-joint reel is identical, and another multi-joint reel promotes or to fall the coil direction of the wire rope (12a) of template (20) and wire rope (12f) opposite with the coil direction of wire rope (12c) and wire rope (12b); Climb or to climb down the coil direction of wire rope (12d) of the post that climbs (1) opposite with the coil direction of wire rope (12a), with wire rope (12d), wire rope (12e) and wire rope (12f) coil separately one or with wire rope (12d) and wire rope (12e) be coiled in same in, wire rope (12f) is coiled in another connection.
3, climbing template device as claimed in claim 1 is characterized in that interior wall climbs fixed bar (4) to be set on the climbing shuttering support cylinder (8) of post, and is fixing with locating hole and body of wall (6) that bolt (5) passes on the fixed bar (4).
4, climbing template device as claimed in claim 1 is characterized in that interior wall climbs fixed bar (4) to be set on the climbing shuttering dress dagger body (8) of post, fixes with locating hole and body of wall (6) that bolt (5) passes on the fixed bar (4).
CN 88103064 1988-05-27 1988-05-27 Multi-functional climbing-up shuttering Expired CN1012746B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 88103064 CN1012746B (en) 1988-05-27 1988-05-27 Multi-functional climbing-up shuttering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 88103064 CN1012746B (en) 1988-05-27 1988-05-27 Multi-functional climbing-up shuttering

Publications (2)

Publication Number Publication Date
CN1038140A CN1038140A (en) 1989-12-20
CN1012746B true CN1012746B (en) 1991-06-05

Family

ID=4832427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 88103064 Expired CN1012746B (en) 1988-05-27 1988-05-27 Multi-functional climbing-up shuttering

Country Status (1)

Country Link
CN (1) CN1012746B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131706B (en) * 2014-07-28 2016-05-18 中建一局集团建设发展有限公司 The construction method of the two-layer connection structure of vertical reinforcement of concrete frame structure
EP3193006B1 (en) * 2016-01-12 2019-05-15 GE Renewable Technologies Device for reversing a blade of a runner unit

Also Published As

Publication number Publication date
CN1038140A (en) 1989-12-20

Similar Documents

Publication Publication Date Title
CN109138483B (en) Device for alternatively jacking storey-increasing building by utilizing high-strength concrete columns and steel slide ways and construction method thereof
CN1028556C (en) Building construction system
CN100526581C (en) Reciprocating self-climbing type climbing form system and its climbing form method
CN102505845A (en) Quick construction method for high-rise buildings
CN106592826A (en) Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN113445743B (en) Construction method for high-altitude overhanging ascending type concrete structure without jacking formwork
CN110714611A (en) Light climbing formwork steel frame system
CN1083889A (en) The construction method of stair and staircase and the construction method of stair and stair parts
CN1012746B (en) Multi-functional climbing-up shuttering
JPH09317183A (en) Construction method of building
CN1048066C (en) Method and apparatus for integrally self-lifting scaffold
CN216787815U (en) Slip form system suitable for variable cross-section vertical structure
JP2957328B2 (en) Peripheral holding self-elevating construction method
CN1048426A (en) Building cast-in-situ body of wall without climibing rack and its mould technology and mould
CN112431397B (en) High-rise building construction system and installation and use method thereof
CN211173071U (en) Light climbing formwork steel frame system
WO2005042876A1 (en) A lifting assembly for a shutter to allow continuous casting
CN217054601U (en) A auxiliary device for chimney reinforced concrete construction
CN1039505C (en) Floorslab design and its construction method of anti-seismic building with lifting form step by step
CN216921424U (en) Sectional lifting and mounting device for ultrahigh conical steel tower
CN210396069U (en) Elevator shaft lifting scaffold
CN1329201A (en) Non-binding prestressed two-way rib floor structure storey-by-storey lift slab construction method
CN108331175A (en) Telescopiform integrally promotes architectural construction
CN115012651A (en) Construction method for large-section turnover formwork small platform

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C13 Decision
GR02 Examined patent application
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Applicant after: Tianjin Inst. of Architectural Science

Applicant before: Tianjin Architectural Science & Technology Design Inst.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: TIANJIN ARCHITECTURAL SCIENCE + TECHNOLOGY DESIGN INST. TO: TIANJIN ARCHITECTURAL SCIENCE + TECHNOLOGY INST.

C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee