CN101272600A - Method for implementing bearing re-establishing, and its related device - Google Patents

Method for implementing bearing re-establishing, and its related device Download PDF

Info

Publication number
CN101272600A
CN101272600A CNA2007100871981A CN200710087198A CN101272600A CN 101272600 A CN101272600 A CN 101272600A CN A2007100871981 A CNA2007100871981 A CN A2007100871981A CN 200710087198 A CN200710087198 A CN 200710087198A CN 101272600 A CN101272600 A CN 101272600A
Authority
CN
China
Prior art keywords
upright
strategy
user
gbr
reconstruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100871981A
Other languages
Chinese (zh)
Other versions
CN101272600B (en
Inventor
胡伟华
吴问付
张艳平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN2007100871981A priority Critical patent/CN101272600B/en
Priority to PCT/CN2008/000495 priority patent/WO2008116378A1/en
Publication of CN101272600A publication Critical patent/CN101272600A/en
Application granted granted Critical
Publication of CN101272600B publication Critical patent/CN101272600B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/19Connection re-establishment

Abstract

The invention discloses a method for realizing re-establishment of bearing, which comprises the following steps: when the user is switched to an activated state from an idle state, a core network instructs an access network to establish a corresponding access side bearing according to a bearing re-establishment strategy which is collocated in advance; then the access network establishes the corresponding access side bearing according to the instruction of the core network. If the bearing re-establishment strategy is not collocated in advance for the user, when the user is switched to the activated state from the idle state, the core network guides the access network to establish all non-GBR access side bearing, and the access network establishes all non-GBR access side bearing according to the instruction of the core network. The proposal of the invention can well improve the service starting speed, reduce the time for establishing the service process and improve the application experience of users.

Description

Realize method and relevant device thereof that bearer reconstruction is upright
Technical field
The present invention relates to the mobile communication technology field, especially relate to a kind of method, mobility management apparatus and relevant network element device thereof of realizing that bearer reconstruction is upright.
Background technology
3G (Third Generation) Moblie normal structure (3GPP) is being studied a kind of brand-new evolvement network in order to strengthen the competitiveness of future network, called after System Architecture Evolution (SAE, System ArchitectureEvolution) system.As shown in Figure 1, block architecture diagram for existing SAE system, the UMTS Terrestrial radio access network (EUTRAN, Evolved UMTS Terrestrial Radio Access Network) 10 that comprises evolution is used to realize all and evolvement network wireless access function associated; Mobility Management Entity (MME, Mobility Management Entity) 20 is responsible for the chain of command mobile management, comprises the management to user's context and mobile status, distributing user temporary identity sign etc.; Service system architecture evolution gateway (ServingSAE GW, Serving System Architecture Evolution Gateway) 30 is the user's face anchor points between the 3GPP connecting system, is responsible for stopping the interface of ETURAN 10; Packet data network System Architecture Evolution gateway (PDN SAE GW, Packet Data Network System Architecture EvolutionGateway) 40, it is the user's face anchor point between 3GPP connecting system and the non-3GPP connecting system, be responsible for the interface of termination and external packet data network (PDN, Packet Data Network); "Policy and Charging Rules Function entity (PCRF, Policy and Charging Rule Function) 50 is used for the control of deal with strategy control and flow based charging; Home subscriber server (HSS, Home Subscriber Server) 60 is used to store user's CAMEL-Subscription-Information.
Wherein existing SAE system architecture also is in the continuous evolution process, has defined three kinds of User Status in the SAE system: released state (LTE_DETACHED is called for short Detached) refers to the state when UE does not insert the SAE system; Idle condition (LTE_IDLE is called for short Idle) and state of activation (LTE_ACTIVE is called for short Active) refer to the state after UE inserts the SAE system; Wherein when the user is in the Idle state, evolution Access Network side is not for the user sets up radio bearer resources, and there is not user's context in evolution NodeB yet on (being called for short eNB), also do not have corresponding S1 interface signaling connection between core net and the Access Network; When the user is in the Active state, evolution Access Network side has been set up radio bearer resources for the user, the context that has the user on the eNB, and exist corresponding S1 interface signaling to connect between core net and the Access Network, the user is in that Active state following time can be carried out normal context data processing and signaling message is mutual.
As shown in Figure 2, for having the mutual conversion schematic diagram of user between Idle state and Active state in the SAE system now, when the signaling connection of S1 interface was released (S1 signaling connectionreleased), the user can switch to the Idle state from the Active state; When the signaling connection of S1 interface was established (S1 signaling connection established), the user can switch to the Active state from the Idle state.Wherein the signaling of S1 interface discharges and can be initiated by core net (CN), and when separating shutdown such as the user, the S1 interface signaling that MME can notify eNB to discharge the user connects; The signaling of S1 interface discharges also can be initiated by eNB, and in the use of monitoring and scheduling interface-free resources, when surveying less than user movable or out of touch, the S1 interface signaling that eNB can discharge the user connects such as eNB.In addition, the user initiates any signaling process, comprise and adhere to (Attach), tracing section updating (TAU, TrackingArea Update), initiate service request (Service Request), response paging and separation etc. to MME and all can trigger the signaling connection of setting up the S1 interface, thereby the user will enter the Active state, when discharged the connection of S1 interface signaling next time again, the user just can come back to the Idle state.
As shown in Figure 3, for having now in the SAE system, the user switches to the process chart of Active state by initiating Service Request from the Idle state, and processing procedure wherein is: UE sends service request (Service Request) message and gives MME (step 1); If MME accepts the service request that UE sends, MME will return professional (Service Accept) message of accepting and give UE (step 2); If the type of service of UE request is a signaling, then MME does not initiate the flow process of setting up of RAB, if the type of service of UE request is data, then MME sends RAB and sets up request (Radio AccessBearer Assignment Request) message and give eNB, sets up flow process (step 3) with what request eNB initiated RAB; ENB sends radio bearer foundation (Radio Bearer Setup) message and gives UE to set up radio bearer (step 4); UE returns radio bearer foundation and finishes (Radio Bearer Setup Complete) message to eNB (step 5); ENB returns RAB and sets up response (Radio Access BearerAssignment Response) message to MME (step 6); MME sends and revises bearer context request (Update Bearer Context Request) message to Serving SAE Gateway (step 7); Serving SAE Gateway returns something for repairs and changes bearer context response (Update Bearer Context Response) message to MME (step 8).The signaling that can set up the S1 interface by this process connects and radio bearer, therefore can make the user switch to the Active state from the Idle state.Said process is initiatively initiated service request by the user and is realized self switching to the Active state from the Idle state, network side also can pass through to user's distributing paging in addition, initiate service request with the indication user, thereby realize switching to the Active state from the Idle state.
Because the user is in Idle state following time, evolution Access Network side is not set up radio bearer resources for the user, and it also is d/d that the S1 interface signaling between Access Network and the core net connects, when being in user under the Idle state like this and will using related service, will to require network side the Active state procedure be that it rebuilds upright corresponding bearer resource switching to from the Idle state, as rebuild upright radio bearer, distribute idle wireless resource etc.Carrying generally is divided into assurance bit rate (GBR, Guaranteed Bit Rate) carrying and non-GBR carrying, wherein for the GBR carrying, needs network side to distribute proprietary Internet resources; For non-GBR carrying, do not need network side to distribute proprietary Internet resources, comprise default SAE carrying and signaling bear etc.
At present, the user is when the Idle state switches to the Active state, network side is only rebuild the bearing resource that the user need use usually, and do not rebuild other bearing resource, for example there are three carryings: carrying A, default SAE carrying, signaling bear wherein carries the video traffic that A is used to carry the user.When the user under being in the Idle state wants to use video traffic, UE will ask network side to rebuild upright carrying A for it, and network side only founds carrying A for the user rebuilds like this, and for default SAE carrying and signaling bear, will can not rebuild upright.If the user wants to continue to use the IMS business like this, will initiate the service request flow process once more and rebuild upright signaling bear for it with the request network side, could carry out the foundation of IMS operation flow based on rebuilding upright signaling bear, therefore will cause the setup delay of operation flow to increase.
Summary of the invention
The embodiment of the invention proposes a kind of method that realizes that bearer reconstruction is upright, to reduce the setup delay of operation flow.
The corresponding embodiment of the invention has also proposed a kind of mobility management apparatus and relevant network element device thereof.
The embodiment of the invention proposes a kind of method that realizes that bearer reconstruction is upright, comprises step: switched to by idle condition in the state of activation process the user, core net is set up corresponding access side carrying according to the upright strategy indication of pre-configured bearer reconstruction Access Network; Access Network is set up corresponding access side carrying according to the indication of core net.
The embodiment of the invention also proposes a kind of mobility management apparatus, comprises the unit that is used to obtain the upright strategy of pre-configured bearer reconstruction; Be used for switching to the state of activation process by idle condition, set up the corresponding unit that inserts the side carrying according to the upright strategy indication of pre-configured bearer reconstruction Access Network the user.
The embodiment of the invention also proposes a kind of network element device, comprises the unit that is used to store the upright strategy of pre-configured bearer reconstruction; Be used for the upright strategy of the bearer reconstruction of storage is notified to the unit of the Mobility Management Entity of core net.
The embodiment of the invention also proposes a kind of method that realizes that bearer reconstruction is upright, comprises step: switched to by idle condition in the state of activation process the user, core net indication Access Network is set up all non-ensured bit rates and is inserted the side carrying; Access Network is set up all non-ensured bit rates according to the indication of core net and is inserted the side carrying.
The embodiment of the invention also proposes a kind of mobility management apparatus, comprises being used for switching to the state of activation process the user by idle condition, and the indication Access Network is set up the unit that all non-ensured bit rates insert the side carrying.
The embodiment of the invention switches to the Active state procedure from the Idle state the user, network side can be rebuild upright corresponding bearer resource for the user according to the upright strategy of pre-configured bearer reconstruction, therefore can realize rebuilding upright non-GBR carrying for the user once, or set up corresponding GBR carrying in advance, the user is when follow-up needs use these non-GBR carryings or GBR carrying to set up operation flow like this, can directly use and rebuild upright good non-GBR carrying and GBR carrying, therefore can improve initiation of services speed preferably, reduce the settling time of operation flow, improve user's experience.
Description of drawings
In order to make the embodiment of the invention and more clear to the beneficial effect that should be able to reach, below in conjunction with each accompanying drawing the embodiment of the invention is described in detail, in each accompanying drawing:
Fig. 1 is the block architecture diagram of existing SAE system;
Fig. 2 has the mutual conversion schematic diagram of user between Idle state and Active state in the SAE system now;
Fig. 3 is for having now in the SAE system, and the user switches to the process chart of Active state from the Idle state by initiation Service Request;
Fig. 4 realizes the embodiment flow chart of bearer reconstruction cube method in evolvement network for the present invention;
Fig. 5 is embodied as the first embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying;
Fig. 6 is embodied as the second embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying;
Fig. 7 is embodied as the 3rd embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying;
Fig. 8 is embodied as the 4th embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying;
Fig. 9 be the user in attaching process, HSS is sent to the Processing Example schematic diagram that MME preserves with user's CAMEL-Subscription-Information;
Figure 10 be the user in attaching process, SPR or PCRF are sent to the Processing Example schematic diagram that MME preserves with pre-configured policy information.
Embodiment
In the SAE system, be carried under the mode based on shared channel for non-GBR, only when the actual transmissions data, just can take interface-free resources, so even also can not waste network transmission resource having to rebuild upright non-GBR carrying under the professional situation about using.Based on this principle, the embodiment of the invention proposes to switch to the Active state procedure from the Idle state the user, network side can be rebuild upright non-GBR carrying for the user once, the user is when follow-up needs use these non-GBR carryings to set up operation flow like this, can directly use and rebuild upright good non-GBR carrying, therefore can improve initiation of services speed preferably, reduce the settling time of operation flow, strengthen user's experience.The upright non-GBR of reconstruction is not carried on when having transfer of data and can take network transmission resource yet in advance in addition.
For example switch to the Active state procedure from the Idle state the user, network side is rebuild upright all non-GBR carryings (comprising default SAE carrying and signaling bear or the like) for the user once, UE just can directly carry out the foundation of IMS session flow process by rebuilding upright signaling bear follow-up carrying out when IMS is professional like this, and after no longer needing to rebuild upright signaling bear by Service Request flow process, carry out the foundation of IMS session flow process again, so just can reduce the time delay that IMS session flow process is set up.
As shown in Figure 4, realize the embodiment flow chart of bearer reconstruction cube method for the present invention, wherein switched in the Active state procedure by the Idle state the user, core net is set up corresponding access side carrying (step 100) according to the upright strategy indication of pre-configured bearer reconstruction Access Network; Access Network is set up corresponding access side carrying (step 200) according to the indication of core net.If do not dispose the upright strategy of corresponding bearer reconstruction in advance for the user, switch in the Active state procedure by the Idle state the user, core net can be defaulted as all non-GBR carryings all needs reconstruction upright, then indicates the upright all non-GBR of Access Network reconstruction to insert side and carries; Access Network is set up all non-GBR according to the indication of core net and is inserted the side carrying.The process of setting up that wherein inserts the side carrying comprises that UE sets up to the radio bearer between the eNB, and eNB sets up to the RAB between the user entity (as ServingSAE Gateway).
Describe for convenient, upright bearing resource is divided into non-GBR carrying and two kinds of situations of GBR carrying come the embodiment of the invention is set forth with rebuilding, and at first describes based on the situation of rebuilding upright non-GBR bearing resource below.
First kind of mode: when the user switches to the Active state from the Idle state, UE with the core net interactive messages in carry the upright strategy of non-GBR bearer reconstruction, requiring core net is that it rebuilds upright non-GBR carrying.
As shown in Figure 5, for being embodied as the first embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying, wherein specific implementation process is as follows:
Step 11.UE sends Service Request message to MME, carries the upright strategy of non-GBR bearer reconstruction in this request message, the upright strategy of wherein non-GBR bearer reconstruction can but be not limited to comprise following several situation:
1) rebuilds upright default SAE carrying;
2) rebuild upright all non-GBR carryings;
Non-GBR pre-established when 3) rebuilding upright adhering to carries (as default SAE carrying, signaling bear etc.).
UE in the Service Request message that MME sends, carry the upright strategy of non-GBR bearer reconstruction can but be not limited to realize in the following way:
Service Request message is expanded,, be used to carry the upright strategy of non-GBR bearer reconstruction of UE configuration to increase a Non-GBR Status cell therein.As shown in table 1 below, be the embodiment (only describe the cell relevant with the embodiment of the invention among this embodiment, other cell will not be described) that ServiceRequest message is expanded here:
Table 1: the content of expansion back Service Request message
IEI (cell identifier) Information Element (cell) Type (type) Presence (essential pattern) Format (form) Length (length)
Service Request Message type M V 1
Service type Service type M V 1/2
37 Non-GBR status Non-GBR status O TLV 4
Table 2: be the particular content of Non-GBR status cell
Figure A20071008719800111
Table 3: be Non-GBR status Value
Non-GBR status Value 0 establish Default SAE Bearer 1 establish all non-GBR Bearers 2 establish pre-non-GBR Bearers
UE carries the upright strategy of non-GBR bearer reconstruction of configuration in the Uplink data of Service Request message status cell, state as the default SAE carrying of UE is set to activated state (state is set to activated state and shows that this carrying needs reconstruction is upright), maybe the state of all non-GBR carryings is set to activated state (comprising that default SAE carrying is set to activated state), and non-GBR carrying (as default SAE carrying, signaling bear etc.) state pre-established when perhaps adhering to is set to activated state.
Based in the above-mentioned table shown in the content, for example the Non-GBR status Value of Non-GBRstatus cell carrying is 0 o'clock in the Service Request message after the expansion, represent the upright strategy of non-GBR bearer reconstruction to attach most importance to and set up default SAE carrying, being that the upright strategy of the non-GBR bearer reconstruction of 1 interval scale is attached most importance to and set up all non-GBR carryings, is that the upright strategy of the non-GBR bearer reconstruction of 2 interval scales is attached most importance to and set up non-GBR carrying pre-established when adhering to.
If the step 12. MME request of accepting business, then answer business are accepted message and are given UE.
The upright strategy of non-GBR bearer reconstruction that carries in the business request information that step 13.MME analysis UE sends, determine to need to rebuild upright which non-GBR carrying, send RAB then and set up request message to eNB, wherein the RAB of Fa Songing is set up and is comprised in the request message that MME analyzes the upright non-GBR that will rebuild that determines and carries.If do not carry the upright strategy of non-GBR bearer reconstruction in the Service Request message that UE sends, then MME is defaulted as all non-GBR carryings all needs reconstruction upright, then sets up to carry in the request message at the RAB that sends to eNB and rebuilds upright all non-GBR loaded information.
Step 14.eNB sets up the upright non-GBR that will rebuild that comprises in the request message according to the RAB that receives and carries, and sends radio bearer and sets up message to UE, and UE sets up corresponding radio bearer with indication;
After step 15.UE sets up and finishes corresponding radio bearer, reply radio bearer foundation and finish message to eNB.
Step 16.eNB replys RAB and sets up response message to MME.
Step 17.MME sends and revises bearer context request message to Serving SAE Gateway.
Step 18.Serving SAE Gateway replys and revises the bearer context response message to MME.
The processing procedure of above-mentioned first embodiment is initiatively initiated service request by the user and is realized self switching to the Active state from the Idle state, network side also can pass through to user's distributing paging business in addition, initiate service request with the indication user to network side, thereby realize switching to the Active state from the Idle state, also will carry out in the frame of broken lines in step 11 front like this and handle: Serving SAE Gateway receives and is handed down to the downlink data packet that is in the user under the Idle state; Serving SAE Gateway sends beep-page message and triggers the paging flow process to MME; MME sends beep-page message to eNB; ENB sends beep-page message to UE, and UE sends Service Request message to MME after receiving beep-page message more then.Below each is can trigger UE by network side equally in the process chart of embodiment to carry out state and switch with ServiceRequest because principle is similar, will no longer be repeated in this description below.
Above-mentioned first kind of mode is not limited in the Service Request handling process, and user's other flow processs when the Idle state switches to the Active state also can be rebuild upright non-GBR carrying according to the UE that is designated as that UE sends such as network side in the TAU handling process.
As shown in Figure 6, for being embodied as the second embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying, wherein specific implementation process is as follows:
Step 31.UE sends tracing section updating request (TAU Request) message and gives MME, carry the upright strategy of non-GBR bearer reconstruction of UE configuration in this request message, the type that the upright strategy of wherein non-GBR bearer reconstruction may comprise is with reference to the introduction among above-mentioned first embodiment.
UE in the TAU Request message that MME sends, carry the upright strategy of non-GBR bearer reconstruction can but be not limited to realize in the following way:
TAU Request message is expanded,, be used to carry the upright strategy of non-GBR bearer reconstruction of UE configuration to increase a Non-GBR Status cell therein.As shown in table 4 below, be the embodiment (only describe the cell relevant with the embodiment of the invention among this embodiment, other cell will not be described) that TAU Request message is expanded here:
Table 4: the content of expansion back TAU Request message
IEI (cell identifier) Information Element (cell) Type (type) Presence (essential pattern) Format (form) Length (length)
Tracking area update request message identity Message type M V 1
37 Non-GBR status Non-GBR status O TLV 4
About the particular content of Non-GBR status cell and Non-GBR status Value please specifically referring to table 2 and table 3 among above-mentioned first embodiment.
UE carries the upright strategy of non-GBR bearer reconstruction of configuration in the Uplink data of TAU Request message status cell, state as the default SAE carrying of UE is set to activated state (state is set to activated state and shows upright this carrying of needs reconstruction), maybe the state of all non-GBR carryings is set to activated state (comprising that default SAE carrying is set to activated state), and non-GBR carrying (as default SAE carrying, signaling bear etc.) state pre-established when perhaps adhering to is set to activated state.
If the step 32. MME request of accepting business, then answer business are accepted message and are given UE.
The upright strategy of non-GBR bearer reconstruction that carries in the TAU request message that step 33.MME analysis UE sends need to determine upright which the non-GBR carrying of reconstruction.If do not carry the upright strategy of non-GBR bearer reconstruction in the Service Request message that UE sends, then MME is defaulted as all non-GBR carryings all needs to rebuild upright.The upright process of the reconstruction of wherein relevant non-GBR carrying no longer gives too much to give unnecessary details with step 13~18 among above-mentioned first embodiment here.
The second way: when the user switches to the Active state from the Idle state, whether be that the strategy that the user rebuilds upright non-GBR carrying and rebuilds upright which non-GBR carrying is pre-configured on the MME by operator.
As shown in Figure 7, for being embodied as the 3rd embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying, wherein specific implementation process is as follows:
Step 41.UE sends Service Request message to MME.
If the step 42. MME request of accepting business, then answer business are accepted message and are given UE.
Step 43.MME is the upright strategy of user configured non-GBR bearer reconstruction in self according to operator, determines to need to rebuild upright which non-GBR carrying.The type that the upright strategy of wherein non-GBR bearer reconstruction may comprise is with reference to the introduction among above-mentioned first embodiment.If operator is the upright strategy of the non-GBR bearer reconstruction of configuration on MME not, then MME is defaulted as all non-GBR carryings all needs to rebuild upright.The upright process of the reconstruction of wherein relevant non-GBR carrying no longer gives too much to give unnecessary details with step 13~18 among above-mentioned first embodiment here.
The above-mentioned second way is not limited in the Service Request handling process, user's other flow processs when the Idle state switches to the Active state can be that UE rebuilds upright non-GBR carrying according to operator's configured strategy on MME also such as network side in the TAU handling process.
As shown in Figure 8, for being embodied as the 4th embodiment processing procedure schematic diagram that the user rebuilds upright non-GBR carrying, wherein specific implementation process is as follows:
Step 51.UE sends the tracing section updating request message to MME.
If the step 52. MME request of accepting business, then answer business are accepted message and are given UE.
Step 53.MME is the upright strategy of user configured non-GBR bearer reconstruction in self according to operator, determines to need to rebuild upright which non-GBR carrying.The type that the upright strategy of wherein non-GBR bearer reconstruction may comprise is with reference to the introduction among above-mentioned first embodiment.If operator is the upright strategy of the non-GBR bearer reconstruction of configuration on MME not, then MME is defaulted as all non-GBR carryings all needs to rebuild upright.The upright process of the reconstruction of wherein relevant non-GBR carrying no longer gives too much to give unnecessary details with step 13~18 among above-mentioned first embodiment here.
The third mode: when the user switches to the Active state from the Idle state, whether be that the user rebuilds the strategy of upright non-GBR carrying and upright which the non-GBR carrying of reconstruction by the subscription data decision of preserving among the user HSS.The user is sent to MME by HSS with this user's CAMEL-Subscription-Information and preserves in attaching process.Which after follow-up MME receives the service request request message that UE sends, determine whether rebuilding upright non-GBR carrying and rebuilding upright non-GBR carrying for the user according to the user signing contract information of preserving.
As shown in Figure 9, for the user in attaching process, HSS is sent to the Processing Example schematic diagram that MME preserves with user's CAMEL-Subscription-Information, wherein concrete processing procedure is as follows:
Step 61.UE sends and adheres to request (Attach request) message to MME, and processing is adhered in request.
Step 62.MME sends the position and upgrades (Update Location) message to HSS.
Step 63.HSS sends and inserts subscription data (Insert Subscriber Data) message to MME, wherein be included as the upright strategy of non-GBR bearer reconstruction of user UE configuration in the insertion subscription data of this transmission, the type that the upright strategy of wherein non-GBR bearer reconstruction may comprise is with reference to the introduction among above-mentioned first embodiment.
Step 64.MME replys and inserts subscription data affirmation (Insert Subscriber Data Ack) message to HSS.
Step 65.HSS sends the position and upgrades affirmation (Update Location Ack) message to MME.
The upright strategy of the non-GBR bearer reconstruction that comprises in the subscription data is inserted in step 66.MME preservation, and replys and adhere to acceptance (Attach Accept) message to UE.
Follow-up MME is after receiving the Service Request message that UE sends, if accept this service request, then answer business is accepted message and given UE, and according to the upright strategy of the non-GBR bearer reconstruction of preserving, determines to need to rebuild upright which non-GBR carrying.If be not included as the upright strategy of the non-GBR bearer reconstruction of user UE configuration in the insertion subscription data that HSS sends, then MME is defaulted as all non-GBR carryings all needs to rebuild upright.The upright process of the reconstruction of wherein relevant non-GBR carrying no longer gives too much to give unnecessary details with step 13~18 among above-mentioned first embodiment here.
In like manner, follow-up MME is after receiving the TAU Request message that UE sends, if accept this service request, then answer business is accepted message and given UE, and according to the upright strategy of the non-GBR bearer reconstruction of preserving, determines to need to rebuild upright which non-GBR carrying.
The 4th kind of mode: when the user switches to the Active state from the Idle state, whether be that the strategy that the user rebuilds upright non-GBR carrying and rebuilds upright which non-GBR carrying is pre-configured among the PCRF by operator, or be pre-configured in the strategy and charging execution function entity (PCEF, Policy and ChargingEnforcement Function) in, can also be pre-configured in the subscriber policy subscribed database (SPR, Subscription Profile Repository).The user is sent to MME by PCRF or PCEF or SPR with pre-configured strategy and preserves in attaching process.Which after follow-up MME receives the servicerequest request message that UE sends, determine whether rebuilding upright non-GBR carrying and rebuilding upright non-GBR carrying for the user according to the user signing contract information of preserving.
As shown in figure 10, for the user in attaching process, SPR or PCRF are sent to the Processing Example schematic diagram that MME preserves with pre-configured policy information, its concrete processing procedure is as follows:
Step 71.UE sends and adheres to request (Attach Request) message to MME.
Step 72.MME sends and creates bearer context request (Create Bearer Context Request) message to Serving SAE Gateway, creates the SAE carrying with request Serving SAE Gateway.
Step 73.Serving SAE Gateway sends and creates bearer context request (Create BearerContext Request) message to PDN SAE Gateway, creates the SAE carrying with request PDN SAE Gateway.
Step 74.PDN SAE Gateway sends request strategy and charging regulation (Request Policy andCharging Rules) message arrives PCRF.
If existing among the PCRF is the upright strategy of user configured non-GBR bearer reconstruction in advance, then in subsequent step 77, pre-configured strategy is returned to PDN SAE Gateway by strategy and charging regulation supply (Policy and ChargingRules Provision) message; If there is not user's subscription data among the PCRF, then in step 75, PCRF sends subscription data request (Profile Request) message to SPR, wherein stores the PCRF strategy that need use and the relevant subscription data that charges among the SPR, and then obtains user's subscription data.
Step 76.SPR returns subscription data response (Profile Response) message and gives PCRF, wherein carries user's subscription data, can comprise in user's the subscription data that operator is the upright strategy of the pre-configured non-GBR bearer reconstruction of user.
Step 77.PCRF returns strategy and charging regulation supply (Policy and Charging RulesProvision) message arrives PDN SAE Gateway, carries user's the upright strategy of non-GBR bearer reconstruction in this answer message.The upright process of the reconstruction of wherein relevant non-GBR carrying no longer gives too much to give unnecessary details with step 13~18 among above-mentioned first embodiment here.
Be that the upright strategy of non-GBR bearer reconstruction can dispose in PCRF in advance, also can in SPR, dispose in advance, in the subscription data response message, carry to PCRF by SPR.
Step 78.PDN SAE Gateway replys and creates bearer context response (Create BearerContext Response) message to Serving SAE Gateway, carries the upright strategy of non-GBR bearer reconstruction of UE in this answer message.The upright strategy of certain non-GBR bearer reconstruction also can dispose in PDN SAEGateway, carries the Gateway to Serving SAE by PDN SAE Gateway by Create Bearer Context Response message.
Step 79.Serving SAE Gateway replys and creates bearer context response (Create BearerContext Response) message to MME, disappears and replys the upright strategy of the non-GBR bearer reconstruction that carries UE in the message.
Step 80.MME preserves the upright strategy of the non-GBR bearer reconstruction that comprises in the Create Bearer Context Response message that receives, and initiates radio bearer and set up processing procedure, to set up the corresponding RAB of SAE carrying.This part processing procedure is a known technology, no longer does elaborating here.
Step 81.MME replys and adheres to acceptance (Attach Accept) message to UE.
Wherein in the present embodiment, load creating processing procedure (step 2~10) and user adhere to the precedence relationship that processing procedure does not have sequential, the load creating processing procedure can be finished (as creating default SAE carrying) in adhering to processing procedure, also can carry out load creating again after finishing and handle (as setting up signaling bear) adhering to.
Follow-up MME is after receiving the request message that UE sends (comprising Service Request message or TAU Request message), if accept this service request, then answer business is accepted message and is given UE, and, determine to need to rebuild upright which non-GBR carrying according to the upright strategy of the non-GBR bearer reconstruction of preserving.The upright process of the reconstruction of wherein relevant non-GBR carrying no longer gives too much to give unnecessary details with step 13~18 among above-mentioned first embodiment here.
The reconstruction that also can be applied to the GBR carrying for the upright principle of the reconstruction of non-GBR carrying is upright, as for video terminal, these terminals generally have signaling bear and GBR carrying, and signaling bear is used for carrying out the video traffic session and sets up flow process, and the GBR carrying is used for the transmission of video Business Stream.Signaling bear and GBR carrying all will be released when the user is in the Idle state.For such terminal, carry out just existing when the video traffic session is set up the processing of video traffic, so, can dispose the strategy of rebuilding upright all carryings for such terminal.Terminal is when the Idle state switches to the Active state like this, according to the upright strategy of pre-configured bearer reconstruction, network side will be rebuild upright signaling bear and GBR carrying for the user, the user is after finishing the video traffic session and setting up flow process on the signaling bear, just the processing of carrying out video traffic in the upright GBR carrying can rebuild, so also can accelerate the access of video traffic, strengthen user's experience.
Above-mentioned in the SAE communication system, decide the scheme of rebuilding upright which carrying also can be applied to GPRS (GPRS according to the upright strategy of bearer reconstruction, General Packet Radio Service) in the system, for example switch to the Active state procedure from the Idle state at UE, Serving GPRS Support Node (SGSN, Serving GPRS Supporting Node) can come to rebuild upright corresponding RAB according to the upright strategy of the bearer reconstruction that is user preset for UE.
Implement principle based on said method, the embodiment of the invention also proposes mobility management apparatus in a kind of evolvement network (as the MME in the SAE system, or the SGSN in the gprs system etc.), comprising being used to obtain the unit of the upright strategy of pre-configured bearer reconstruction and being used for setting up the corresponding unit that inserts the side carrying according to the upright strategy indication of pre-configured bearer reconstruction Access Network.MME is last can also and then to comprise the unit that stores the upright strategy of pre-configured bearer reconstruction, and MME can determine to rebuild upright which bearing resource according to the strategy of itself storing like this; The unit further that perhaps is used for acquisition strategy realizes obtaining the upright strategy of corresponding bearer reconstruction by the upright strategy of pre-configured bearer reconstruction that receives extraneous network element device and send.
Network element device in corresponding a kind of evolvement network of proposition comprises the unit that is used to store the upright strategy of pre-configured bearer reconstruction; With the unit that is used for the upright strategy of the bearer reconstruction of storage is notified to core net MME.Wherein the network element device here can be UE, also can be the HSS in the core net or PCRF or PCEF, or SPR etc.
Implement principle based on said method, the embodiment of the invention has also proposed the mobility management apparatus in second kind of evolvement network, comprise and be used for switching to the Active state procedure by the Idle state the user, the indication Access Network is set up the unit that all non-GBR insert the side carrying, this mobility management apparatus is not used in and disposes under the situation of the upright strategy of bearer reconstruction for the user in advance, mobility management apparatus (as MME) is switched in the Active state procedure by the Idle state the user, can be defaulted as the user and rebuild upright all non-GBR bearing resources.In like manner this mobility management apparatus also can but be not limited to MME in the SAE system, or the SGSN in the gprs system.
The functional component that comprises in above-mentioned mobility management apparatus and the related network elements equipment can be realized by corresponding software programs, also can improve based on associated hardware module is upgraded and realize.
In sum, the embodiment of the invention switches to the Active state procedure from the Idle state the user, network side can be rebuild upright corresponding bearer resource for the user according to the upright strategy of pre-configured bearer reconstruction, therefore can realize rebuilding upright non-GBR carrying for the user once, the user is when follow-up needs use these non-GBR carryings to set up operation flow like this, can directly use and rebuild upright good non-GBR carrying, therefore can improve initiation of services speed preferably, reduce the settling time of operation flow.The upright non-GBR of reconstruction is not carried on when having transfer of data and can take network transmission resource yet in advance in addition.For also can and then improving professional toggle speed for the situation that the user sets up the GBR bearing resource in advance according to the upright strategy of pre-configured bearer reconstruction.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (18)

1. a method that realizes that bearer reconstruction is upright is characterized in that, comprises step:
Switched to by idle condition in the state of activation process the user, core net is set up corresponding access side carrying according to the upright strategy indication of pre-configured bearer reconstruction Access Network;
Access Network is set up corresponding access side carrying according to the indication of core net.
2. the method for claim 1 is characterized in that, sets up corresponding access side carrying by the indication of the Mobility Management Entity in core net Access Network.
3. method as claimed in claim 2 is characterized in that, the upright strategy of described bearer reconstruction is pre-configured in user equipment side;
Described subscriber equipment is carried at pre-configured strategy and reports Mobility Management Entity in the request message.
4. method as claimed in claim 2 is characterized in that, the upright strategy of described bearer reconstruction is pre-configured in the Mobility Management Entity.
5. method as claimed in claim 2 is characterized in that, the upright strategy of described bearer reconstruction is pre-configured in the home subscriber server;
Described home subscriber server is notified to Mobility Management Entity by position updating process with pre-configured strategy.
6. method as claimed in claim 2, it is characterized in that, the upright strategy of described bearer reconstruction is pre-configured in the "Policy and Charging Rules Function entity, or is pre-configured in strategy and the charging execution function entity, or is pre-configured in the subscriber policy subscribed database;
Described "Policy and Charging Rules Function entity or strategy and charging execution function entity or subscriber policy subscribed database are notified to Mobility Management Entity with pre-configured strategy in creating load bearing process.
7. as the described method of 1~6 any claim, it is characterized in that the upright strategy of described bearer reconstruction is:
Rebuild upright default System Architecture Evolution carrying; Or
Rebuild upright all non-ensured bit rate carryings; Or
Non-ensured bit rate pre-established when rebuilding upright adhering to carries.
8. method as claimed in claim 2 is characterized in that, sets up corresponding access side carrying by the evolution NodeB in the Mobility Management Entity indication Access Network;
Evolution NodeB sets up and correspondingly to insert the side carrying and comprise: set up the corresponding radio bearer between self and the subscriber equipment, and set up the corresponding RAB between self and the user entity.
9. a mobility management apparatus is characterized in that, comprising:
Be used to obtain the unit of the upright strategy of pre-configured bearer reconstruction;
Be used for switching to the state of activation process by idle condition, set up the corresponding unit that inserts the side carrying according to the upright strategy indication of pre-configured bearer reconstruction Access Network the user.
10. equipment as claimed in claim 9 is characterized in that, also comprises the unit that stores the upright strategy of pre-configured bearer reconstruction;
The described unit that is used for acquisition strategy obtains the upright strategy of pre-configured bearer reconstruction from self storing diplomatic unit.
11. equipment as claimed in claim 9 is characterized in that, described strategy is realized obtaining by the upright strategy of pre-configured bearer reconstruction that receives extraneous network element device and send in the described unit that is used for acquisition strategy.
12., it is characterized in that described mobility management apparatus is as claim 9,10 or 11 described equipment:
Mobility Management Entity MME in the System Architecture Evolution network; Or
Serving GPRS Support Node in the General Packet Radio Service System.
13. a network element device is characterized in that, comprising:
Be used to store the unit of the upright strategy of pre-configured bearer reconstruction;
Be used for the upright strategy of the bearer reconstruction of storage is notified to the unit of the Mobility Management Entity of core net.
14. equipment as claimed in claim 13 is characterized in that, described equipment is:
Subscriber equipment; Or
Home subscriber server in the core net or "Policy and Charging Rules Function entity or strategy and charging execution function entity or subscriber policy subscribed database.
15. a method that realizes that bearer reconstruction is upright is characterized in that, comprises step:
Switched to by idle condition in the state of activation process the user, core net indication Access Network is set up all non-ensured bit rates and is inserted the side carrying;
Access Network is set up all non-ensured bit rates according to the indication of core net and is inserted the side carrying.
16. method as claimed in claim 15 is characterized in that, sets up all non-ensured bit rates by the evolution NodeB in the indication of the Mobility Management Entity in the core net Access Network and inserts the side carrying;
Evolution NodeB sets up all non-ensured bit rate and inserts the side carrying and comprise: set up all the non-ensured bit rate radio bearers between self and the subscriber equipment, and set up all the non-ensured bit rate RABs between self and the user entity.
17. a mobility management apparatus is characterized in that, comprising: be used for switching to the state of activation process the user by idle condition, the indication Access Network is set up the unit that all non-ensured bit rates insert the side carrying.
18. equipment as claimed in claim 17 is characterized in that, described mobility management apparatus is:
Mobility Management Entity MME in the System Architecture Evolution network; Or
Serving GPRS Support Node in the General Packet Radio Service System.
CN2007100871981A 2007-03-23 2007-03-23 Method for implementing bearing re-establishing, and related device Active CN101272600B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2007100871981A CN101272600B (en) 2007-03-23 2007-03-23 Method for implementing bearing re-establishing, and related device
PCT/CN2008/000495 WO2008116378A1 (en) 2007-03-23 2008-03-13 A method and a relative device thereof for realizing bearer reestablish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100871981A CN101272600B (en) 2007-03-23 2007-03-23 Method for implementing bearing re-establishing, and related device

Publications (2)

Publication Number Publication Date
CN101272600A true CN101272600A (en) 2008-09-24
CN101272600B CN101272600B (en) 2012-12-12

Family

ID=39788035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100871981A Active CN101272600B (en) 2007-03-23 2007-03-23 Method for implementing bearing re-establishing, and related device

Country Status (2)

Country Link
CN (1) CN101272600B (en)
WO (1) WO2008116378A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102196563A (en) * 2010-03-04 2011-09-21 电信科学技术研究院 Triggering condition notification method and device
CN102196562A (en) * 2010-03-04 2011-09-21 电信科学技术研究院 method and device for informing triggering condition
WO2015131305A1 (en) * 2014-03-04 2015-09-11 Telefonaktiebolaget L M Ericsson (Publ) Scheduling based on data traffic patterns
CN108449794A (en) * 2012-06-28 2018-08-24 华为技术有限公司 Downlink data transmission method, base station and gateway in LTE network
CN108617034A (en) * 2016-12-30 2018-10-02 华为技术有限公司 Connected state control method, equipment and the system of terminal
WO2019033901A1 (en) * 2017-08-14 2019-02-21 华为技术有限公司 Session management method, method for interworking between heterogeneous systems, and network device
CN109845320A (en) * 2018-02-09 2019-06-04 Oppo广东移动通信有限公司 The method and apparatus carried out data transmission based on quality of service

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9999086B2 (en) 2013-05-08 2018-06-12 Telefonaktiebolaget L M Ericsson (Publ) Packet data transfer re-establishment
CN110050478A (en) * 2016-12-26 2019-07-23 华为技术有限公司 A kind for the treatment of method and apparatus of communication interface failure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101055047B1 (en) * 2004-01-09 2011-08-05 엘지전자 주식회사 Method and apparatus for establishing wireless link between mobile terminal and wireless network of wireless mobile terminal
ES2497117T3 (en) * 2004-05-13 2014-09-22 Telefonaktiebolaget Lm Ericsson (Publ) Restoring wireless communication between a radio access network and a mobile station
CN100589484C (en) * 2005-11-29 2010-02-10 华为技术有限公司 Bearing system and method for media network gate control protocol
CN100563254C (en) * 2006-03-21 2009-11-25 华为技术有限公司 Method for roaming user data route in a kind of evolvement network

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102196563A (en) * 2010-03-04 2011-09-21 电信科学技术研究院 Triggering condition notification method and device
CN102196562A (en) * 2010-03-04 2011-09-21 电信科学技术研究院 method and device for informing triggering condition
CN102196563B (en) * 2010-03-04 2014-12-24 电信科学技术研究院 Triggering condition notification method and device
CN102196562B (en) * 2010-03-04 2015-05-06 电信科学技术研究院 method and device for informing triggering condition
CN108449794A (en) * 2012-06-28 2018-08-24 华为技术有限公司 Downlink data transmission method, base station and gateway in LTE network
CN108449794B (en) * 2012-06-28 2024-01-16 华为技术有限公司 Method for transmitting downlink data in LTE network, base station and service gateway
WO2015131305A1 (en) * 2014-03-04 2015-09-11 Telefonaktiebolaget L M Ericsson (Publ) Scheduling based on data traffic patterns
US10206144B2 (en) 2014-03-04 2019-02-12 Telefonaktiebolaget Lm Ericsson (Publ) Scheduling based on data traffic patterns
CN108617034B (en) * 2016-12-30 2021-02-23 华为技术有限公司 Connection state control method, equipment and system for terminal
CN108617034A (en) * 2016-12-30 2018-10-02 华为技术有限公司 Connected state control method, equipment and the system of terminal
WO2019033901A1 (en) * 2017-08-14 2019-02-21 华为技术有限公司 Session management method, method for interworking between heterogeneous systems, and network device
US11375396B2 (en) 2017-08-14 2022-06-28 Huawei Technologies Co., Ltd. Session management method, interworking method, and network apparatus
CN109845320A (en) * 2018-02-09 2019-06-04 Oppo广东移动通信有限公司 The method and apparatus carried out data transmission based on quality of service
WO2019153272A1 (en) * 2018-02-09 2019-08-15 Oppo广东移动通信有限公司 Quality of service-based method and device for data transmission
CN109845320B (en) * 2018-02-09 2020-12-04 Oppo广东移动通信有限公司 Method and equipment for data transmission based on service quality
US11089505B2 (en) 2018-02-09 2021-08-10 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method and device for transmitting data based on quality of service

Also Published As

Publication number Publication date
WO2008116378A1 (en) 2008-10-02
CN101272600B (en) 2012-12-12

Similar Documents

Publication Publication Date Title
CN101272600B (en) Method for implementing bearing re-establishing, and related device
CN102227150B (en) Resource processing method, communication system and mobility management network element
CN100584093C (en) A method and system transferring user device in mobile communication system
CN101047950B (en) Method for allocating default load in 3GPP evolution network
CN101453742B (en) Cell updating method, equipment and system
CN101115292B (en) Method for paging and connecting terminal and terminal and system for fast activating data transmission
CN101562842B (en) Method, system and device for resource allocation
CN101925042A (en) Method and system for controlling tunnel identifier allocation and devices
CN101222765A (en) Control method, system and device for circuit field fall-back
CN101478743A (en) Method and apparatus for EPS bearing management
CN105723797B (en) The method of the maximum carrying number of maintenance
CN101090559A (en) Network side user entity selection method
CN103546874B (en) A kind of method and system of call management
CN103517325A (en) Method and system for selecting network priority
CN103338487B (en) A kind of different intersystem reselection or switching handling method and equipment
CN103634746A (en) Method and apparatus for keeping PoC continuous connection handling capacity
CN103581839A (en) Broadband trunking service realizing method and broadband trunking service realizing system
US9560516B2 (en) Method to use existing NAS signaling connection for pending uplink signaling/data after TAU accept
CN103096391A (en) Resource optimization method and device under multiple public data network (PDN) connections
CN102014434B (en) Load re-distribution method and system for service gateway
CN102111815A (en) Method and device for controlling load balance
CN1902866B (en) A method for multimedia broadcast multicast service linking for pmm idle mobiles
CN101272521A (en) User mode indication method and service management method and device
CN101047957B (en) Method for quickly activating moving platform
CN102256218A (en) Transmission method and device for preferential warning message in machine type communication

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20080924

Assignee: Apple Computer, Inc.

Assignor: Huawei Technologies Co., Ltd.

Contract record no.: 2015990000755

Denomination of invention: Method for implementing bearing re-establishing, and its related device

Granted publication date: 20121212

License type: Common License

Record date: 20150827

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model