CN101270561A - Method for resolving surface drainage and communal facilities paving problem of city - Google Patents

Method for resolving surface drainage and communal facilities paving problem of city Download PDF

Info

Publication number
CN101270561A
CN101270561A CNA2007100736655A CN200710073665A CN101270561A CN 101270561 A CN101270561 A CN 101270561A CN A2007100736655 A CNA2007100736655 A CN A2007100736655A CN 200710073665 A CN200710073665 A CN 200710073665A CN 101270561 A CN101270561 A CN 101270561A
Authority
CN
China
Prior art keywords
communal facility
draining
laid
raceway groove
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100736655A
Other languages
Chinese (zh)
Other versions
CN101270561B (en
Inventor
单江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dan Jiang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007100736655A priority Critical patent/CN101270561B/en
Publication of CN101270561A publication Critical patent/CN101270561A/en
Application granted granted Critical
Publication of CN101270561B publication Critical patent/CN101270561B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Sewage (AREA)

Abstract

The invention relates to a method for solving road surface drain when raining and reasonably solving the paving of public facilities like a gas pipe and a communication cable, etc. The method includes that: A, the horizontal heights of the two sides of the surface of a road are higher than that of a middle isolating belt; B, a channel for drain is arranged below the lowest point of the road surface; C, a protection plate is arranged on the channel; C, a public facility pipeline is arranged in the channel. The invention can effectively solves the problem of road drain, thus leading the road to not result in accumulating water, not affecting the walkers on a footpath and not affecting the passengers to get in and off a bus; thereby being convenient for the walkers as well as being convenient for the finishing of the mud in a drain; the pipelines of the public facilities like the gas pipe and the communication cable are arranged in the drain, thus needing not to dig the road surface when mounting and maintaining the public facilities; thereby reducing the repeated inputting when paving the public facilities, greatly saving the mounting and maintenance cost of the public facilities as well as being able to prevent the accident like stealing a well cover from happening.

Description

Solve the method that urban pavement draining and communal facility are laid
Affiliated technical field
The present invention relates to a kind of method that urban pavement draining and communal facility are laid that solves, particularly a kind ofly can solve when raining surface drainage and rationally solve the method that communal facilitys such as gas flue, communications optical cable are laid.
Background technology
At present, the road surfacing in the known field all is to adopt cambered, is provided with the gutter on both sides of the road, is equipped with protected apron on the gutter, and below, road surface and below, sidewalk are equipped with communal facilitys such as gas flue, communications optical cable.Because domes are adopted on existing road surface, draining is carried out on the both sides on road in the road surface when draining, when raining, the pedestrian is in the roadside walking or by bike the time, and the automobile that speeds past on the road is easy to evoke the rainwater in roadside, splash on one's body the pedestrian of roadside, cause difficult situation.In addition, because surface drainage of the prior art is every a segment distance, establish an outfall in the roadside, lay a protected apron on the outfall, produce phenomenons such as the untimely or outfall obstruction of draining sometimes, if the untimely or phenomenon of blocking of draining appears in the bus stop point, splash passenger's water on one's body in the time of not only can causing bus to stop, but also can cause passenger getting on/off inconvenience etc.Communal facility such as gas flue, communications optical cable is laid on road surface below or below, sidewalk, just has to whenever be spaced a distance on the road surface or on the sidewalk be provided with a well lid, keeps in repair etc. to make things convenient for the staff.On the road surface, be provided with well lid, not only influence the attractive in appearance of road surface on the whole, and open out-of-dately at automobile, also be easy to well lid is dug, damage vehicle chassis, more likely cause the accident.Well lid of the prior art is owing to needing to be arranged on the road next door, and the burglar is easy to well lid started and steals.When on road surface and sidewalk, laying communal facility, inevitably highway or road surface, sidewalk to be excavated, after laying, again that its landfill is good, and each company all needs this step of repetition when laying, not only can influence the use on highway, sidewalk, but also understand, and cause unnecessary waste owing to overlapping investment human and material resources, financial resources.
Summary of the invention
Not smooth at the surface drainage that exists in the above-mentioned prior art, cause ponding easily, influence pedestrian's walking and passenger bus up and down, when communal facility is laid, meeting overlapping investment human and material resources, financial resources, cause unnecessary waste, and the well lid of maintenance usefulness overturns easily and damages vehicle, causes the accident, the also easy stolen deficiency that waits of well lid, the invention provides a kind of new road construction method, make on both sides of the road to intermediate, inclined, the gutter is located in the middle of the highway, the piping erection of communal facility such as gas flue, communications optical cable efficiently solves the problems referred to above in the gutter.
The technical scheme that the present invention solves its technical problem employing is: a kind of method that solves urban pavement draining and communal facility laying, and described method comprises:
A, highway pavement both sides level height are higher than intermediate isolating band level height;
Below B, the road surface minimum point draining raceway groove is arranged;
Be coated with protected apron on C, the raceway groove;
Be provided with the communal facility pipeline in D, the raceway groove.
The technical scheme that the present invention solves its technical problem employing further comprises:
Described trench sidewalls caves inward, and is communal facility piping erection platform, and communal facility piping erection is on erecting bed sidewall and upper wall, and the raceway groove lower end is the gutter that tangent plane is rectangle.
Described communal facility piping erection platform can be located at gutter one side, also can be located at the both sides, gutter.
The outside, described gutter is provided with the bracing frame that steel concrete is built.
The protected apron that covers on the described raceway groove can closely be arranged on the raceway groove, also can be intervally arranged.
Described protected apron can be the iron grate of cement board or band water-guiding hole.
Lower end, described gutter is provided with the desilting ditch.
Described desilting ditch is triangular in shape.
Described raceway groove water inlet lower ends downward is stretched out, and constitutes splash guard.
The invention has the beneficial effects as follows:
1, the present invention can effectively solve the highway drainage problem, rainwater is flowed in the middle of the highway, in the middle of highway, drain, can not cause ponding, rainwater on the road can not have influence on the pedestrian on the sidewalk yet, can not have influence on up and down bus etc. of passenger yet, make things convenient for the pedestrian, and made things convenient for the cleaning of mud in the gutter;
2, the present invention with communal facility piping erection such as gas flue, communications optical cables in the gutter, when communal facility is installed and is safeguarded, do not need to excavate the road surface, only need open the protected apron that covers on the gutter, the staff enters installation, maintenance and gets final product, reduce the overlapping investment when communal facility is laid, saved the installation and maintenance expense of communal facility greatly;
3, communal facility such as gas flue, communications optical cable pipeline concentrates on the position, gutter in the middle of the highway, helps the overall appearance of highway, can also prevent the generation of accidents such as well lid is stolen.
The invention will be further described below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is a tangent plane schematic diagram of the present invention.
Fig. 2 is the local enlarged diagram of a of Fig. 1.
Fig. 3 is a plan structure schematic diagram of the present invention.
Fig. 4 has the structural representation of flower bed isolation strip for the present invention.
Among the figure, 1-road, 2-water inlet, 3-gutter, 4-desilting ditch, 5-gas flue, 6-communications optical cable, 7-protected apron, 8-workbench, 9-well lid, 10-splash guard, 11-bracing frame, 12-flower bed isolation strip.
The specific embodiment
Present embodiment is a reference implementation mode of the present invention, and other embodiment can be implemented with reference to present embodiment according to concrete road construction and actual conditions needs, and its principle is identical with the present invention or approximate with basic structure, all belongs within the protection domain of the present invention.
Referring to accompanying drawing 1 and Fig. 2, Fig. 1 is a tangent plane schematic diagram of the present invention, and Fig. 2 is the local enlarged diagram of a of Fig. 1.Road 1 is depicted as the following tangent plane structural representation in ordinary road road surface, and wherein road 1 surperficial both sides level height is higher than intermediate isolating band level height, and concrete angle of inclination can be decided according to actual conditions.Existing road surface generally is arch, tilts to two ends in the middle of promptly road surface is, and two ends can be decided with reference to the angle of inclination that has the road surface now to the concrete angle of intermediate, inclined among the present invention.The draining raceway groove has been dug in the centre position, road surface below the road surface, trench sidewalls caves inward, and is communal facility piping erection platform, and communal facility piping erection is on erecting bed sidewall and upper wall, and the raceway groove lower end is the gutter 3 that tangent plane is rectangle.From sectional views, draining is divided into two parts up and down with raceway groove, referring to accompanying drawing 1, drainage channel the first half tangent plane is " protruding " font, the thin part of the first half " protruding " font is a water inlet 2, the bottom surface of the first half " protruding " font is a workbench 8, the centre position, bottom surface of the first half " protruding " font, promptly with water inlet 1 correspondence position (under the water inlet), be provided with the gutter 3 that tangent plane is rectangle, 3 lower ends, gutter are tangent plane desilting ditch 4 triangular in shape, and the both sides in raceway groove the first half gutter 3 are workbench 8, and workbench 8 is convenient to the communal facility staff and is safeguarded communal facility above standing in.Communal facilitys such as communications optical cable 6, gas flue 5 are installed above the workbench 8.Water inlet 2 lower ends downward are extended, constitute splash guard 10, splash guard 10 blocks the sewage that is entered by water inlet, making sewage can't flow to communal facilitys such as gas flue, communications optical cable gets on, thereby the cleaning that has kept the communal facility pipeline on the one hand, on the other hand, effectively prevented erosion and the damage of sewage to the communal facility pipeline.The bracing frame 11 that forms is built for steel concrete in the raceway groove outside, and bracing frame 11 is played a supporting role, and caves in to prevent the raceway groove top.Be equipped with protected apron 7 above the water inlet 2, protected apron 7 can adopt iron grate of the prior art, also can adopt cement system protected apron, and protected apron 7 is laid on the water inlet 2, is used for preventing that vehicle, pedestrian etc. from falling in the raceway groove because of carelessness.The protected apron of laying on the water inlet 37 is provided with a well lid 9 every a segment distance, communal facility safeguard and the maintenance personal can by under well lid 9 places in raceway groove, communal facility is laid and maintenance and repair etc., the staff also can by under well lid 9 places in raceway groove, desilting in the desilting ditch 4 and mud are cleared up.Between the well lid 9 spacing being set sets according to actual needs.Communal facilitys such as communications optical cable 6 and gas flue 5 can be removed protected apron 7 when laying, communal facility is gone in the raceway groove along water inlet 3 shops, the staff only need be installed in it in raceway groove and get final product, thereby saved when communal facility is laid and to have excavated the road surface, communal facility is completed, with steps such as the road surface landfill are good, time saving and energy saving again, but also remove the cost waste of overlapping investment simultaneously from, and maintenance and repair is convenient.
Water inlet 4 and protected apron 7 are arranged on the road centre position, and protected apron 7 both sides are provided with cement or protective guard made of iron, press protected apron 7 when preventing running, cause accident.Protected apron 7 and well lid 9 are arranged on the road centre position, can also effectively prevent the stolen phenomenon of protected apron 7 and well lid 9.Be arranged on road next door or the sidewalk as protected apron in the prior art 7 and well lid 9, the robber is easy to well lid is taken away, not only can cause the municipal financial burden, but also may therefore cause human casualty accident.And among the present invention protected apron 7 and well lid 9 are arranged on the road centre position, when wanting to steal well lid, the robber will certainly consider the influence of dealing vehicle on the road.Even well lid is stolen, because well lid is set in the middle of the road, and the well lid both sides are provided with protective guard, and vehicle and pedestrian can not go to wherein, have effectively avoided the generation of contingency.
If in the middle of road, be provided with the road surface of flower bed (being that road intermediate isolating band is a flower bed), referring to Fig. 4, flower bed isolation strip 12 is arranged on the highway centre position, 12 lower ends, flower bed isolation strip are provided with the draining raceway groove, and draining is same as described above with the raceway groove internal construction, and 12 both sides, flower bed isolation strip are spaced a distance and are provided with a water inlet 2, protected apron 7 is stamped on water inlet 2 upper berths, water inlet 2 lower ends are stretched in the raceway groove, and when raining, rainwater can enter into raceway groove along water inlet 2.Protected apron 7 can adopt iron grate of the prior art, also can adopt cement system protected apron etc.In the flower bed isolation strip every an end distance from being provided with a well lid 9, the distance that is provided with of well lid 9 can be with reference to the spacing distance of laying well lid on the communal facility pipeline in the prior art.
As also being arranged on drainage channel in cable street lamp, only need when highway construction, the penetration pipe of laying waterproof between electric pole and the raceway groove is installed at street lamp, after highway construction is good, street lamp is passed along penetration pipe with electric wire, to the street lamp electric pole, and road lighting cable, terminals and switch etc. all can be arranged in the raceway groove.The staff carries out wiring on can the workbench in raceway groove and to the maintenance and repair of circuit.
Enforcement of the present invention can be carried out when highway construction initial stage or highway rebuilding, when highway construction, earlier drainage channel is built well, and then laying highway pavement, after road surfacing is good, on raceway groove, be equipped with protected apron 7, can and need the highway drainage amount to determine the laying amount according to the rainfall of locality when laying protected apron 7, if displacement is less, can lay cement board, leave the draining slit between the cement board, if displacement is bigger, can lay cement board and the iron grate that has water-guiding hole at interval, the usage quantity ratio of cement board and iron grate will be determined according to the displacement of local needs, is as the criterion can satisfy local surface drainage fully.
When raining, rainwater, flows in the gutter 3 of raceway groove along water inlet 2 to centre position, road surface stream along the road surface, and the silt in the rainwater sinks in the desilting ditch 4, the silt in staff's periodic cleaning desilting ditch 4.Excessive as amount of rainfall, gutter 3 drainings are untimely, and rainwater can also flow away on workbench 8.Can not stop up raceway groove.
After the invention process, not only can increase the draining of highway pavement, make highway pavement not produce seeping phenomenon, and the well lid on the road surface 9 and protected apron 7 be arranged on the highway pavement centre position, can also effectively prevent the phenomenon that well lid is stolen.Communal facilitys such as communications optical cable 6, gas flue 5 are arranged in the raceway groove, and the staff need not excavate road when tubing, can make behind the road paving to put things right once and for all, and need not destroy the complete etc. of road surface.And maintenance, repair, enlarging are convenient, have saved human and material resources, financial resources greatly.

Claims (9)

1. one kind solves the method that urban pavement draining and communal facility are laid, and it is characterized in that: described method comprises:
A, highway pavement both sides level height are higher than intermediate isolating band level height;
Below B, the road surface minimum point draining raceway groove is arranged;
Be coated with protected apron on C, the raceway groove;
Be provided with the communal facility pipeline in D, the raceway groove.
2. the method that solution urban pavement according to claim 1 draining and communal facility are laid, it is characterized in that: described trench sidewalls caves inward, be communal facility piping erection platform, communal facility piping erection is on erecting bed sidewall and upper wall, and the raceway groove lower end is the gutter that tangent plane is rectangle.
3. the method that solution urban pavement according to claim 1 and 2 draining and communal facility are laid is characterized in that: the outside, described gutter is provided with the bracing frame that steel concrete is built.
4. the method that solution urban pavement according to claim 1 and 2 draining and communal facility are laid, it is characterized in that: the protected apron that covers on the described raceway groove can closely be arranged on the raceway groove, also can be intervally arranged.
5. the method that solution urban pavement according to claim 2 draining and communal facility are laid, it is characterized in that: lower end, described gutter is provided with the desilting ditch.
6. the method that solution urban pavement according to claim 2 draining and communal facility are laid, it is characterized in that: described communal facility piping erection platform can be located at gutter one side, also can be located at the both sides, gutter.
7. the method that solution urban pavement according to claim 2 draining and communal facility are laid, it is characterized in that: described raceway groove water inlet lower ends downward is stretched out, and constitutes splash guard.
8. the method that solution urban pavement according to claim 1 and 2 draining and communal facility are laid is characterized in that: described protected apron can be the iron grate of cement board or band water-guiding hole.
9. the method that solution urban pavement according to claim 5 draining and communal facility are laid, it is characterized in that: described desilting ditch is triangular in shape.
CN2007100736655A 2007-03-23 2007-03-23 Method for resolving surface drainage and communal facilities paving problem of city Expired - Fee Related CN101270561B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100736655A CN101270561B (en) 2007-03-23 2007-03-23 Method for resolving surface drainage and communal facilities paving problem of city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100736655A CN101270561B (en) 2007-03-23 2007-03-23 Method for resolving surface drainage and communal facilities paving problem of city

Publications (2)

Publication Number Publication Date
CN101270561A true CN101270561A (en) 2008-09-24
CN101270561B CN101270561B (en) 2010-04-21

Family

ID=40004766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100736655A Expired - Fee Related CN101270561B (en) 2007-03-23 2007-03-23 Method for resolving surface drainage and communal facilities paving problem of city

Country Status (1)

Country Link
CN (1) CN101270561B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080350A (en) * 2010-12-16 2011-06-01 西安科技大学 Ecological soil road
CN103774743A (en) * 2014-01-08 2014-05-07 张仁寿 Novel drainage grate
CN104179238A (en) * 2014-09-02 2014-12-03 张峰 Urban road underground pipeline and well mouth side moving and middling method
CN104196113A (en) * 2014-09-02 2014-12-10 张峰 Method for arranging drainage system in middle of bidirectional separated road
CN105113619A (en) * 2015-07-24 2015-12-02 陈新 Method for preventing urban water logging
CN106638222A (en) * 2017-02-17 2017-05-10 辛国臣 Road surface drainage system
CN110735560A (en) * 2018-07-18 2020-01-31 苏州园林营造产业股份有限公司 Combined garden isolation construction method and isolation belt thereof
CN112301817A (en) * 2019-08-02 2021-02-02 广西科学院 Pavement paving method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103246035A (en) * 2013-05-14 2013-08-14 中煤科工集团武汉设计研究院 Laying method for one-channel river-crossing of coal chute and communication optical cable

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2142852Y (en) * 1992-11-30 1993-09-29 郭朝木 Structure of safety landscape trough for communication and landscape engineering
CN1112175A (en) * 1994-12-31 1995-11-22 张祖辉 Opened self-cleaning road
DE19718733A1 (en) * 1997-05-02 1998-11-05 Gepro Ing Gmbh Central core shoring for rail systems
CN2661777Y (en) * 2003-12-19 2004-12-08 南京鸿宇市政设施投资管理有限责任公司 Municipal underground pipeline lane
CN100526556C (en) * 2004-04-12 2009-08-12 河南省第五建筑安装工程(集团)有限公司 W-type city roadway
CN1603525A (en) * 2004-11-09 2005-04-06 上海市政工程设计研究院 Integrated pipe canal

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080350A (en) * 2010-12-16 2011-06-01 西安科技大学 Ecological soil road
CN103774743A (en) * 2014-01-08 2014-05-07 张仁寿 Novel drainage grate
CN104179238A (en) * 2014-09-02 2014-12-03 张峰 Urban road underground pipeline and well mouth side moving and middling method
CN104196113A (en) * 2014-09-02 2014-12-10 张峰 Method for arranging drainage system in middle of bidirectional separated road
CN105113619A (en) * 2015-07-24 2015-12-02 陈新 Method for preventing urban water logging
CN106638222A (en) * 2017-02-17 2017-05-10 辛国臣 Road surface drainage system
WO2018149415A1 (en) * 2017-02-17 2018-08-23 王美兰 Road drainage system
CN106638222B (en) * 2017-02-17 2019-11-05 辛国臣 Surface drainage
CN110735560A (en) * 2018-07-18 2020-01-31 苏州园林营造产业股份有限公司 Combined garden isolation construction method and isolation belt thereof
CN112301817A (en) * 2019-08-02 2021-02-02 广西科学院 Pavement paving method

Also Published As

Publication number Publication date
CN101270561B (en) 2010-04-21

Similar Documents

Publication Publication Date Title
CN101270561B (en) Method for resolving surface drainage and communal facilities paving problem of city
CN102918206B (en) Modularization pipe section and the networking utility line system formed by it
CN107630464A (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN113818534A (en) Biological retention facility for sponge urban road
KR100834551B1 (en) Apparatus for reducing rainwater outflow
CN203977495U (en) The anti-rainwater impact system of garden type for residential quarter road
CN214006283U (en) Drainage structure for rainwater gravity flow crossing roof deformation joint
CN212001525U (en) Frameless linear trench cover plate
JPH11286984A (en) Multipurpose street gutter structure
Kumar et al. A comparative study of storm water drainage methods for urban storm water management
JP2022013483A (en) Construction method for simultaneously executing dividing of sewer system and undergrounding of electric wires, electric wire common ditch, and catchment basin
CN202220345U (en) Drain pipe system below community driveway
CN2871623Y (en) L-shaped curb with arc drain
CN215055648U (en) Upper cover soil covering and draining structure of vehicle
CN201151865Y (en) Highway drain system
CN215051759U (en) Road surface sewage collection structure
CN216891828U (en) Town road constructed based on prestressed concrete sheet pile
CN203977337U (en) Fixed central strip pier
CN216404943U (en) Road structure for relieving urban drainage
CN213389562U (en) Porous environment-friendly bituminous pavement that permeates water ageing resistance
CN211256527U (en) Road drainage brick and road drainage system
CN217630323U (en) Track traffic vehicle basement upper cover development seepage row integration rainwater drainage system
CN218345843U (en) Municipal administration road surface pavement rainwater collection device
CN215168704U (en) Dustproof fender that encloses of highway construction
JP2020029761A (en) Common ditch having flood countermeasure function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DAN JIANG

Free format text: FORMER OWNER: DAN YAO

Effective date: 20100726

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518000 ROOM 304, BUILDING 3, NO.3042, BAOAN SOUTH ROAD, LUOHU DISTRICT, SHENZHEN CITY, GUANGDONG PROVINCE TO: 518000 ROOM 304, BUILDING 3, NO.3042, BAOAN SOUTH ROAD, LUOHU DISTRICT, SHENZHEN CITY

TR01 Transfer of patent right

Effective date of registration: 20100726

Address after: 518000, room 3, building 3042, 304 South Baoan Road, Shenzhen, Luohu District

Patentee after: Dan Jiang

Address before: 518000 room 3, building 3042, 304 South Baoan Road, Luohu District, Guangdong, Shenzhen

Patentee before: Dan Yao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100421

Termination date: 20170323