CN101265867B - 山川h型水轮发电装置 - Google Patents
山川h型水轮发电装置 Download PDFInfo
- Publication number
- CN101265867B CN101265867B CN2008100613679A CN200810061367A CN101265867B CN 101265867 B CN101265867 B CN 101265867B CN 2008100613679 A CN2008100613679 A CN 2008100613679A CN 200810061367 A CN200810061367 A CN 200810061367A CN 101265867 B CN101265867 B CN 101265867B
- Authority
- CN
- China
- Prior art keywords
- water
- casting frame
- river
- sides
- waterwheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Hydraulic Turbines (AREA)
Abstract
一种山川H型水轮发电装置,其特征是,用上、下铸架以螺栓夹紧在桩上,在上、下铸架之间安装A、B两组H型二翼双层水轮,并且用两个导流板使水流强化做功的作用角增大;在水面以上安装两台发电机,用联轴节与该A、B两组H型二翼双层水轮的轴连接;在山川中安装时不用建临时截水坝,可在水道中直接安装,无潜水作业。本结构取代特定地域的拦河坝,抗地震强,施工周期短,不碍生态环保,不动迁住户,还可拆迁易地重建。
Description
本发明是属于山川江河中应用H型水轮的水力发电。山川的水流永远是单向,所以结构较简单、无需转向装置。
近来看了一篇报道:一记者努力主张重视生态环保,尤其在地震易发的省域建造拦河坝水力发电。本人想以申请专利为渠道提供一些免建拦河坝的水力发电结构。
图1,在湍急的流水中打下高强度钢筋砼柱桩1,再把预先在工厂制成的H型水轮机(A、B并列二台)为整机的吊装套入桩1(此刻上下二件铸架3的螺栓3a、3b来旋紧)待整机沉入水文记录的最低水位以下后,把四枚螺栓紧固,使整机固定于桩1,最后套入电机架2于桩1上端紧固,用联轴节分别与两台发电机连接,完成A组、B组两台H型水轮发电机结合成的整机,全部安装完毕。
W是水流向,F是水面,4是轴,5是一字撑毂,6是(防腐蚀处理轻金属合金)翼片,1a是分水棱(再生硬橡胶制成)见图2,有缓冲防撞作用,1b是角钢,Aa、Bb是导流板(塑钢网夹层、玻纤环氧树脂板),图2的空心箭头是A、B各水轮的旋向。
假如安装时工程船难以锚定,则可向两岸陆上张拉定位。紧固螺栓3a、3b时,可用略加改装的棘轮扳手夹具在工程船操作紧固,勿必潜水作业。
图3示意较宽的河截面的河心段并列装数台水力发电整机,两侧近河岸让它留空,待大水时水涨河面宽两边泻水。为了各桩1的稳固,除了按一排桩1作一字横拉一直线的钢拉杆以外,再向两岸(向上流)分别斜拉钢拉杆;从一字横拉线上易发觉某一桩有偏向,就可调整该桩的斜拉杆的张力。
本结构取代特定地域的拦河坝,抗地震强,施工周期短,不碍生态环保,不动迁住户,还可拆迁易地重建。
附图说明:
图1是山川H型水轮发电立体图。
图2是铸架、导流板、A、B组水轮(一翼)位置示意图。
图3是数组水轮截江安装示意图。
Claims (1)
1.一种山川H型水轮发电装置,其特征是,在河面较宽的河心段中央、在河的截面方向安装数台水轮发电整机,两侧近河岸留空,横向一字形排列,各整机的桩顶端都用一字形钢拉杆向左右岸上张紧;同时各桩顶也斜向上流方向的两岸用钢拉杆张拉,以增强抗洪抗地震能力;大水时水涨河面更宽,两边泻水,中间仍继续发电;所述水轮发电整机的上、下铸架以螺栓夹紧在桩上,在上、下铸架之间安装A、B两组H型二翼双层水轮,并且用两个导流板使水流强化做功的作用角增大;在水面以上安装两台发电机,用联轴节与该A、B两组H型二翼双层水轮的轴连接;在山川中安装时不用建临时截水坝,能在水道中直接安装,无潜水作业。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100613679A CN101265867B (zh) | 2008-04-24 | 2008-04-24 | 山川h型水轮发电装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100613679A CN101265867B (zh) | 2008-04-24 | 2008-04-24 | 山川h型水轮发电装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101265867A CN101265867A (zh) | 2008-09-17 |
CN101265867B true CN101265867B (zh) | 2010-12-29 |
Family
ID=39988494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100613679A Expired - Fee Related CN101265867B (zh) | 2008-04-24 | 2008-04-24 | 山川h型水轮发电装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101265867B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103334866A (zh) * | 2013-07-11 | 2013-10-02 | 哈尔滨工程大学 | 一种十字型潮流能水轮机 |
CN104863086A (zh) * | 2015-06-01 | 2015-08-26 | 杨德林 | 利用海水发电的防波堤 |
-
2008
- 2008-04-24 CN CN2008100613679A patent/CN101265867B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101265867A (zh) | 2008-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101666073B (zh) | 钢板桩江河、湖泊堤防堵口施工方法 | |
EP1565651A1 (en) | Supporting structures for water current (including tidal stream) turbines | |
CN201915368U (zh) | 水流自我耗散消能的水坝结构 | |
CN101265867B (zh) | 山川h型水轮发电装置 | |
CN106560560B (zh) | 卷席截流水电站建筑方法 | |
CN107435323A (zh) | 一种优化后的联合消能工体型 | |
DE102006014205A1 (de) | Schwimmendes Wasserrad als Kleinkraftwerk zur Gewinnung von elektrischem Strom | |
RU144821U1 (ru) | Эксплуатационный водосброс плотины (варианты) | |
CN203270531U (zh) | 一种水电站库区钢制拦污装置 | |
CN101914905A (zh) | 非固化横断式的防洪水利工程建筑 | |
CN102287309B (zh) | 流水发电机 | |
KR20070093225A (ko) | 수력발전 방법 및 장치 | |
CN203701041U (zh) | 后置式拦船装置 | |
KR20050003976A (ko) | 부유식 수력발전 장치 | |
CN113987621A (zh) | 根据水阻力的拦污网设计方法 | |
CN108677880B (zh) | 用于复杂地质条件下的桩林坝 | |
CN101089386A (zh) | 新型水能发电的结构方法 | |
DE202012007307U1 (de) | Einschwenkbares Flusskraftwerk | |
DE10210597A1 (de) | Wasserkraftwerk | |
DE202012005351U1 (de) | Unterspülte Wasserkraftanlage | |
CN203821325U (zh) | 一种开阔深厚软基河流上的截流建筑物 | |
CN114032856B (zh) | 一种渠道和压力前池连接处加固装置的施工方法 | |
CN210216438U (zh) | 一种河流截流用运输堆石料的施工设备 | |
CN107489132A (zh) | 一种生态型水电站 | |
CN213773503U (zh) | 一种海上风电基础防冲刷装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101229 Termination date: 20110424 |