CN101251020A - 分段钻孔反复注浆方法 - Google Patents

分段钻孔反复注浆方法 Download PDF

Info

Publication number
CN101251020A
CN101251020A CNA200810049530XA CN200810049530A CN101251020A CN 101251020 A CN101251020 A CN 101251020A CN A200810049530X A CNA200810049530X A CN A200810049530XA CN 200810049530 A CN200810049530 A CN 200810049530A CN 101251020 A CN101251020 A CN 101251020A
Authority
CN
China
Prior art keywords
grouting
slip casting
drilling
hole
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810049530XA
Other languages
English (en)
Inventor
李治国
王全胜
徐海廷
卓越
张文强
邹翀
付仲润
刘坤昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CNA200810049530XA priority Critical patent/CN101251020A/zh
Publication of CN101251020A publication Critical patent/CN101251020A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明提出的分段钻孔反复注浆方法其工艺步骤为:先用钻机在止浆墙(3)上钻出浅孔,退出钻杆(2),安装孔口管(6)并用锚固剂(7)固定在孔口壁上,孔口管位于钻孔外的一端联接排水装置(10)、防突水装置(9),通过防突水装置、排水装置、孔口管开始继续钻孔至第一段设计孔深后,退出钻杆,拆除防突水装置及排水装置,在孔口管上通过快速接头(5)与带有进浆阀(15)、泄压阀(16)的注浆三通(14)连接,并连接注浆管(13),进行注浆作业,当注浆达到设计要求后,停止注浆,拆除注浆装置,在孔口管上连接排水装置、防突水装置,通过防突水装置、排水装置、孔口管继续进行下一段的钻孔,钻孔完成后再注浆,如此钻孔一段,注浆一段,前进一段,直至完成该孔注浆。

Description

分段钻孔反复注浆方法
技术领域
本发明属于隧道和地下工程高水压、富水软弱破碎围岩的超前堵水和加固技术,主要提出了一种分段钻孔反复注浆方法。
背景技术
在高水压、富水流砂层或软弱地层中进行隧道和地下工程施工,最容易出现的问题是围岩大变形和坍塌以及开挖面涌水、突泥,危及人员、设备安全,造成伤亡事故,严重时,可能引起地表坍塌,水位下降,植被枯死,影响居民正常生活,对地面环境造成破坏。为了保证施工安全,目前国内外常用的地层加固和堵水方法为注浆法,注浆法就是通过一定的压力把一定量的胶凝性材料注入岩层或土体,使其在岩层裂缝或土体空隙中流动、扩散、充填、固结,形成有一定强度和低透水性的胶结体,加固地层,封堵地下水,从而提高围岩的自稳定时间,保证开挖安全。目前国内外比较常用的注浆方法为全孔一次性注浆。这种方法浆液往往沿钻孔壁上的某些薄弱部位形成通道,扩散较远,而其他部位浆液扩散很少或没有扩散,造成地层加固的均匀性较差。另外这种方法比较适合浅孔注浆,进行深孔注浆时,如果钻孔壁坍塌或注浆花管上的出浆孔被泥沙堵塞,可能造成孔底及中间某些部位难以进浆,影响注浆效果。
发明内容
本发明的目的即是提出一种分段钻孔反复注浆方法,通过此种方法,使浆液扩散比较均匀,获得比较好的注浆效果。
本发明方法的工艺步骤为:先用钻机在止浆墙上钻出浅孔,退出钻杆,将孔口管一端用钻机顶入钻孔中并用锚固剂固定在孔口壁上,孔口管位于钻孔外的一端联接排水装置、防突水装置,通过排水装置、防突水装置开始继续钻孔至第一段设计孔深后,退出钻杆,拆除防突水装置及排水装置,在孔口管上通过快速接头与带有进浆阀、泄压阀的注浆三通连接,而后连接注浆管,进行注浆作业,浆液沿钻孔向地层扩散,进行加固堵水,当注浆达到设计要求后,停止注浆;拆除注浆三通,在孔口管上连接排水装置、防突水装置,通过防突水装置、排水装置、孔口管继续进行下一段的钻孔,钻孔完成后再注浆,如此钻孔一段,注浆一段,前进一段,直至完成该钻孔的注浆,再进行下一孔钻孔注浆施工。
分段钻孔反复注浆可采用“一机多孔”的方式,即一台钻机钻多个注浆孔,钻完一孔后,本孔注浆的同时,钻机可以移至距离本孔一定距离的其它位置钻另一孔,如此钻孔注浆平行作业,可以大大提高工作效率。
本发明提出的分段钻孔反复注浆方法适用于高水压富水流砂或软弱破碎堵水,反复钻注,压力可控,浆液扩散比较均匀,注浆效果较好,可以保证开挖安全,提高施工速度,具有较大的推广使用价值。
附图说明
图1-图6为本发明注浆方法操作步骤的示意图。
图中,1、钻机,2、钻杆,3、止浆墙,4、钻头,5、快速接头,6、孔口管,7、锚固剂,8、水泥砂浆,9、防突水装置,10、排水装置,11、法兰盘,12、钻孔,13、注浆管,14、注浆三通,15、进浆阀,16、泄压阀,17、浆液,18、加固土体。
具体实施方式
结合附图对本发明钻孔注浆方法加以说明:
如图1所示,步骤(1)开孔。钻机1就位后,根据开孔位置及钻孔参数调整钻机角度满足设计钻孔要求,钻孔1.8m。
如图2所示,步骤(2)退出钻杆,安装孔口管6。本发明分段钻孔、反复注浆工艺方法需安设牢固、可靠的孔口管6。孔口管6采用无缝钢管加工制作,一端焊接快速接头5,另一端用水泥砂浆8封堵20cm。安装前在孔口管距快速接头端部30cm处开始缠绕麻丝成纺锤形,并将锚固剂7放入孔口内。采用钻机1将孔口管6顶入钻孔中,孔口管6外留20cm;快速接头5为现有隧道施工装置中普遍采用的部件。
如图3所示,步骤(3)安装排水装置10和防突水装置9。孔口管6安设固结完成后,把排水装置10和防突水装置9用法兰盘11连接起来,并通过快速接头5连接在孔口管6上;防突水装置9、排水装置10为隧道施工装置中普遍采用的部件。
如图4所示,步骤(4)钻孔。通过防突水装置9、排水装置10及孔口管6开始钻孔,根据设计段长控制钻孔深度,一般分段长度为3~5m。
如图5所示,步骤(5)退出钻杆2,拆除防突水装置9及排水装置10。
如图6所示,步骤(6)注浆。通过快速接头5将带有进浆阀15和泄压阀16的注浆三通14与孔口管6连接,并接上注浆管13。管路连接完成后,开始注浆。注浆前打开进浆阀15,关闭泄压阀16,开启注浆泵,开始实施孔口注浆,浆液17沿钻孔12向地层扩散进行加固堵水。当注浆达到设计标准后,即可停止注浆。可拆卸注浆机构,重复图3、图4所示步骤,连接排水装置10、防突水装置9,钻机进行下一段的钻孔,再重复图5、图6工艺步骤。如此钻孔一段,注浆一段,反复循环进行直至完成该孔注浆,再进行下一孔钻孔注浆施工。

Claims (1)

1、一种分段钻孔反复注浆方法,其特征是:先用钻机在止浆墙(3)上钻出浅孔,退出钻杆(2),安装孔口管(6)并用锚固剂(7)固定在孔口壁上,孔口管(6)位于钻孔外的一端联接排水装置(10)、防突水装置(9),通过防突水装置(9)、排水装置(10)、孔口管(6)开始继续钻孔至第一段设计孔深后,退出钻杆(2),拆除防突水装置(9)及排水装置(10),在孔口管(6)上通过快速接头(5)与带有进浆阀(15)、泄压阀(16)的注浆三通(14)连接,并连接注浆管(13),进行注浆作业,当注浆达到设计要求后,停止注浆,拆除注浆装置,在孔口管(6)上连接排水装置(10)、防突水装置(9),通过防突水装置(9)、排水装置(10)、孔口管(6)继续进行下一段的钻孔,钻孔完成后再注浆,如此钻孔一段,注浆一段,前进一段,直至完成该孔注浆。
CNA200810049530XA 2008-04-14 2008-04-14 分段钻孔反复注浆方法 Pending CN101251020A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810049530XA CN101251020A (zh) 2008-04-14 2008-04-14 分段钻孔反复注浆方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200810049530XA CN101251020A (zh) 2008-04-14 2008-04-14 分段钻孔反复注浆方法

Publications (1)

Publication Number Publication Date
CN101251020A true CN101251020A (zh) 2008-08-27

Family

ID=39954594

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810049530XA Pending CN101251020A (zh) 2008-04-14 2008-04-14 分段钻孔反复注浆方法

Country Status (1)

Country Link
CN (1) CN101251020A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926770A (zh) * 2012-11-08 2013-02-13 中国神华能源股份有限公司 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN101638987B (zh) * 2009-07-24 2013-05-01 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN104141468A (zh) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 堵水装置
CN108086910A (zh) * 2018-01-18 2018-05-29 北京地矿工程建设有限责任公司 长螺旋挤扩桩钻孔机钻孔方法及长螺旋挤扩桩钻孔机
CN110004913A (zh) * 2019-04-10 2019-07-12 中国水利水电第七工程局成都水电建设工程有限公司 一种近接地铁车站的深层沉降地基加固施工方法
CN110259383A (zh) * 2019-07-04 2019-09-20 山东大学 一种前进式钻注一体装置及使用方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638987B (zh) * 2009-07-24 2013-05-01 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN102926770A (zh) * 2012-11-08 2013-02-13 中国神华能源股份有限公司 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN102926770B (zh) * 2012-11-08 2015-01-07 中国神华能源股份有限公司 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN104141468A (zh) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 堵水装置
CN104141468B (zh) * 2014-01-09 2016-09-21 成都绿迪科技有限公司 堵水装置
CN108086910A (zh) * 2018-01-18 2018-05-29 北京地矿工程建设有限责任公司 长螺旋挤扩桩钻孔机钻孔方法及长螺旋挤扩桩钻孔机
CN110004913A (zh) * 2019-04-10 2019-07-12 中国水利水电第七工程局成都水电建设工程有限公司 一种近接地铁车站的深层沉降地基加固施工方法
CN110259383A (zh) * 2019-07-04 2019-09-20 山东大学 一种前进式钻注一体装置及使用方法
CN110259383B (zh) * 2019-07-04 2020-05-26 山东大学 一种前进式钻注一体装置及使用方法

Similar Documents

Publication Publication Date Title
CN101251017B (zh) 孔口止浆钻杆分段后退式注浆方法
CN101251019B (zh) 孔口止浆管内混合双管分段后退式注浆方法
CN103334770B (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN101666234B (zh) 破碎岩体无止浆墙复合式注浆施工方法
CN101251018B (zh) 孔口止浆管外混合双管分段后退式注浆方法
CN104790873B (zh) 松软岩土层射流导向成孔‑扩孔‑防塌孔一体化钻进方法
CN105040775B (zh) 深层承压自流井封堵系统与方法
CN102787846B (zh) 海底隧道断层破碎带上堵下排的施工方法
CN108661650A (zh) 一种富水岩浆岩地区深大竖井井筒施工方法
CN111119940B (zh) 一种注浆施工处理方法
CN105863648B (zh) 一种暗挖浅覆大断面隧道施工方法
CN107605498A (zh) 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法
CN108868825B (zh) 高压大涌水量钻孔快速封堵方法
CN105351001B (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN104747075A (zh) 松软煤层喷浆防塌钻进方法
CN101251020A (zh) 分段钻孔反复注浆方法
CN105200978A (zh) 一种前进式定域双液注浆装置及施工方法
CN109057716A (zh) 一种带有高压射水流成孔旋挖钻头及其施工方法
CN110424892A (zh) 一种矿井近水平定向钻孔的突水治理方法
CN105909265B (zh) 穿越既有盾构隧道防隆起后退式深孔注浆系统及方法
CN201129177Y (zh) 钻杆后退分段注浆装置
CN110344784A (zh) 一种矿井近水平定向钻孔的突水治理装置
CN105041218A (zh) 一种防坍塌双向肋翼喷射注浆钻头及其使用方法
CN108590716A (zh) 一种巷道过富水断层树根型疏堵水一体化施工方法
CN201183950Y (zh) 无缝钢管自进式锚杆

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080827