CN101246043B - On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing - Google Patents

On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing Download PDF

Info

Publication number
CN101246043B
CN101246043B CN2008101028850A CN200810102885A CN101246043B CN 101246043 B CN101246043 B CN 101246043B CN 2008101028850 A CN2008101028850 A CN 2008101028850A CN 200810102885 A CN200810102885 A CN 200810102885A CN 101246043 B CN101246043 B CN 101246043B
Authority
CN
China
Prior art keywords
vibration
transformer
monitoring
magnetic biasing
noise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008101028850A
Other languages
Chinese (zh)
Other versions
CN101246043A (en
Inventor
何金良
马宏彬
曾嵘
张波
陈水明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN2008101028850A priority Critical patent/CN101246043B/en
Publication of CN101246043A publication Critical patent/CN101246043A/en
Application granted granted Critical
Publication of CN101246043B publication Critical patent/CN101246043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The present invention relates to a method for on-line monitoring the vibration and noise of the alternating-current power transformer which is affected by the direct-current magnetic biasing, and the method belongs to the electric power safety monitoring technique in the electric field, and the method comprises the following steps: when the direct-current magnetic biasing does not exist collecting the noise acoustic pressure signal of the noise sound pressure meter at the transformer position to confirm the vibration signal monitoring point, and recording the principal character data of vibration of transformer body when no direct-current magnetic biasing exists at the monitoring point; when the direct-current magnetic biasing state appears executing on-line monitoring according to the sampling interval, sampling frequency and monitoring period, and setting the monitoring threshold value of the maximum vibration amplitude; after each monitoring period analyzing the preserved raw data, when the early warning state appears steadily for more than one day continuously, the transformer body is needed to be further detected, otherwise, the operation state of the transformer is taken for excellent; the invention can realize the judgment to the vibration state of the transformer at the state of direct-current magnetic biasing and guarantee the safe and stable operation of the power transformer through long-period on-line monitoring.

Description

AC power transformer influenced by DC magnetic biasing vibration and noise on-line monitoring method
Technical field
The invention belongs to electrical field electric power safety monitoring technology, particularly a kind of method of monitoring the AC power transformer running status of influenced by DC magnetic biasing by monitoring power transformer tank surface vibration and noise state and then realization.
Background technology
Power transformer is the nucleus equipment in the AC electric power systems, and its iron core excitation family curve presents typical nonlinear.Under normal operation, transformer mainly operates near this characteristic saturation point, but under the influence of straight-flow system one pole line residual current, the DC current that flows into the earth will have the part electric current to flow near the AC power transformer of the neutral ground of direct current grounding pole, the DC current that flows into can reach tens amperes, therefore transformer fe the direct current flux component will occur in the heart, magnetic flux moves to a certain lateral deviation, equipment work point very easily enters saturated section of exciting characteristic curve, the generation half-wave is saturated, and this phenomenon just is referred to as DC magnetic biasing.DC magnetic biasing will cause the box house leakage flux to increase, the winding current distortion obviously, and then cause unshakable in one's determination and the basket vibration aggravation, tank surface vibration and noise obviously increase, vibration amplitude can reach original vibrational state more than 5 times, may produce for the structure of transformer and damage, power transformer runnability and serviceable life are produced serious influence.
Transformer body vibration mainly causes by the magnetostriction and the basket vibration of iron core, the situation that compresses of the vibration on power transformer device body surface and Transformer Winding and iron core, the displacement of winding and be out of shape closely related.Magnetostriction and transformer port voltage unshakable in one's determination have close ties, and the vibration of winding and winding current and transformer working load are closely connected.After the DC magnetic biasing state occurs, if distortion, displacement or avalanche are taking place in one of high-low pressure winding, compressing of winding is not enough, difference in height between the high-low pressure winding is enlarged gradually, cause the uneven aggravation of winding ampere-turn, the axial force that leakage field is caused increases, thus the vibration of winding aggravation; If the core pressing degree is affected, siliconized plate takes place loosening, when perhaps the deadweight of siliconized plate will make bending unshakable in one's determination or distortion, it is big that slit between the siliconized plate becomes, and it is big that the leakage field between siliconized plate seam crossing and the lamination becomes, and caused electromagnetic attraction to become big, so it is big that vibration unshakable in one's determination becomes, when there was the fault of multipoint earthing in iron core, the siliconized plate heating can cause that also the flexible iron coring vibration that causes of magnetic hysteresis becomes big in addition.These are in particular in being characterized as on the vibration signal: rumble spectrum changes, and the more harmonic components of high order occurred, and the amplitude of vibration becomes big.
Present research for transformer body vibration and noise, to probe into the character of vibration of transformer body and noise, be to be attached to vibration transducer on the diverse location of transformer tank surface by magnet base, near transformer, arrange the noise sound pressure meter, extract and analyze the vibration acceleration signal of tank surface according to field demand by sampling apparatus, and then realization is for the monitoring of transformer core and winding physical state, monitoring system and whole electric system are not electrically connected, and can not exert an influence to the normal operation of whole electric system.But it only can realize the monitoring of interior noise acoustic pressure waveform of short time and vibration amplitude, do not possess continuity on time, lack description intuitively for vibrational waveform, can't realize synchronous monitoring and result's comparison of noise and vibration, do not judge the variation of rumble spectrum quantitatively, can't realize under the Under Direct Current Bias judgement by long-term on-line monitoring for the transformer vibrational state.
Summary of the invention
The objective of the invention is for overcoming the weak point of prior art, AC power transformer vibration and noise on-line monitoring method under a kind of DC magnetic biasing state is proposed, can pass through long-term on-line monitoring, for the judgement of transformer vibrational state, ensure the power transformer safe and stable operation under the realization Under Direct Current Bias.
The vibration and noise on-line monitoring method of AC power transformer behind the DC magnetic biasing state that the present invention proposes is characterized in that, may further comprise the steps:
1) when not having DC magnetic biasing, at transforming plant main transformer depressor scene, 3 or 4 above vibration transducers are attached on the transformer tank surface, arrange apart from transformer one segment distance place that in the positive midpoint of transformer-cabinet (general spacing is a 1-3 rice to a noise sound pressure meter, the far and near change influence for relative quantity of distance is little, but it is excessive for noise contribution to cross the sound source that closely will cause near part, crosses the interference that far then can not ignore other noise source); In the time of setting, (be generally 1-3 days, load variations situation according to the locality is determined, as long as can determine the vibration amplitude scope of tank surface when transformer normally moves under the non DC bias condition), (sampling interval got final product less than 5 minutes, 5 minutes or can guarantee complete record transformer vibration variation tendency for a comparatively long period of time less than 5 minutes sampling interval according to the sampling interval of setting, sample frequency; Sample frequency generally is set at 2.5kHz-5kHz, because the transformer rumble spectrum is distributed in the scope of 50-1000Hz, according to sampling thheorem, what sample frequency will reach this frequency range at least is about 2.5kHz more than 2 times, but because the restriction of collecting device, the highest 5kHz that is set in), the noise sound pressure signal of the noise sound pressure meter of collection position, and the vibration signal of gathering the vibration transducer behind the conversion diverse location, determine position that vibration signal changes maximum vibration transducer as the vibration signal monitoring point according to sampled data, and the principal character data of transformer body vibration when writing down this monitoring point non DC bias;
2) after the DC magnetic biasing state occurred, according to described sampling interval, sample frequency, and monitoring periods carries out on-line monitoring, and (monitoring periods was generally 1-7 days, to observe obvious and lasting variation tendency, kept small amount of data simultaneously.Monitoring), the monitoring threshold of setting the maximum vibration amplitude is (when threshold value can be made as non DC bias 120% of the maximum vibration amplitude, monitoring threshold is crossed the young pathbreaker and is noted a large amount of invalid datas, monitoring threshold is excessive then may to cause the starting stage in time to pinpoint the problems), have only when vibration amplitude surpasses this threshold value and in database, preserve raw data, otherwise only in database, write down each time spectral magnitude in vibration peak valley and the corresponding frequencies scope;
3) every through a monitoring periods, the raw data that analysis is saved when the early warning situation appears in (continuous more than 1 day) steady in a long-term, then needs the transformer body is further detected (suspecting that the transformer inner structure may go wrong), otherwise, think that the transformer running status keeps good;
Above-mentioned steps 1) in during the monitoring point non DC bias principal character data of transformer body vibration comprise: (1) monitoring point vibrational waveform and noise waveform; (2) the tank surface vibration amplitude of different operating load correspondences, and draw the interior vibration amplitude curve of setting-up time, determine the maximal value of vibration amplitude under the normal condition and the scope of minimum value; (3) internal vibration of 50-1400Hz scope and noise spectrum distribute; (4) ratio of corresponding amplitude of each time frequency spectrum and time domain vibration amplitude.
Any of following four kinds of situations the early warning situation appears above-mentioned steps 3) is;
(1) vibration amplitude exceeds more than 20% of scope of the maximal value and the minimum value of vibration amplitude;
(2), and, do not cause the transformer operating load because of having obvious change as if the maximal value that exceeds vibration amplitude of described vibration amplitude and more than 20% of scope of minimum value;
(3) there is the high order frequency spectrum to occur in the spectral range;
(4) ratio of corresponding amplitude of each time frequency spectrum and time domain vibration amplitude has exceeded 20% variation range.
The beneficial effect of patent of the present invention is, can monitor bigger DC magnetic biasing (as under the DC line one pole line residual current method of operation or sun magnetic storm time appears) to the adverse effect of AC electric power systems and main power equipment, ensure the power transformer safe and stable operation, have crucial economic benefit.
Description of drawings
Fig. 1 is preceding measuring point place vibration acceleration time domain waveform of the DC magnetic biasing of present embodiment and frequency-domain analysis figure, and wherein, Fig. 1 (a) is the vibration time domain waveform, and Fig. 1 (b) is a vibration frequency specturm analysis.
Fig. 2 is time internal vibration crest and a corresponding time relationship curve map in the present embodiment.
Fig. 3 is an each harmonic spectrum component change curve in time.Wherein curve 1 is the frequency component change curve in time of 350Hz, and curve 2 is the frequency component change curve in time of 450Hz.
Fig. 4 is measuring point place vibration acceleration time domain waveform and frequency-domain analysis figure in the DC magnetic biasing process, and wherein, Fig. 4 (a) is the vibration time domain waveform, and Fig. 4 (b) is a vibration frequency specturm analysis.
Fig. 5 is measuring point place vibration acceleration time domain waveform and frequency-domain analysis figure after the DC magnetic biasing of present embodiment, and wherein, Fig. 5 (a) is the vibration time domain waveform, and Fig. 5 (b) is a vibration frequency specturm analysis.
Embodiment
The AC power transformer influenced by DC magnetic biasing vibration and noise on-line monitoring method that the present invention proposes reaches embodiment in conjunction with the accompanying drawings and is described in detail as follows:
The method of present embodiment may further comprise the steps:
When not having DC magnetic biasing, at transforming plant main transformer depressor scene, 3 vibration transducers are attached to by magnet base on the diverse location of transformer tank surface, arrange a noise sound pressure meter in the positive midpoint of transformer-cabinet apart from 1 meter distance of transformer; In 1 day time, gather the noise sound pressure signal of the noise sound pressure meter of described position with the sample frequency of 5.2kHz, and the vibration signal of gathering the vibration transducer behind the conversion diverse location, determine that according to sampled data vibration signal changes the position of maximum vibration transducer as the vibration signal monitoring point, present embodiment monitors the time domain waveform of this point shown in Fig. 1 (a), and waveform is clear, and is obviously regular, in a certain moment in monitoring periods, its vibration wave peak maximum is 7.5m/s 2Vibration trough minimum value is-10.0m/s, its maximum vibration amplitude is carried out spectrum analysis to the vibrational waveform of this point, its result is shown in Fig. 1 (b), visible spectrum mainly is distributed in the 200-600Hz scope, wherein the component of 350-450Hz is the most obvious, and results of spectral shows the frequency component that does not almost have 800Hz above in this vibration signal.
Present embodiment is made as 5.2kHz with the sample frequency of vibration signal, signal sampling is made as per 2 minutes once sampling at interval, in the Access database, write down the peak value of each vibration and the spectrum distribution in automatic analysis and the 50-1400Hz scope, in 1 day time range, monitor the time dependent curve of tank surface vibration amplitude, and determined the maximal value of vibration amplitude under the normal condition and the scope of minimum value thus.As shown in Figure 2, the crest maximal value of this some vibration is 17m/s 2, minimum is 1m/s 2, the meritorious ordinate of the data presentation correspondence that obtains from Control Room is respectively 460 and 200, also is respectively the maximal value and the minimum value of load.Think the following 1m/s of being limited to of vibration amplitude thus 2, on be limited to 17m/s 2
Also monitor for the amplitude of main spectrum component and the ratio of vibration amplitude because the component of 350Hz and 450Hz accounts for main part, here weight analysis the situation of change of these two kinds of components once, as shown in Figure 3.Curve 1 is the spectral magnitude of 350Hz correspondence and the ratio curve of time domain vibration amplitude, between 9%-11%; Curve 2 is the spectral magnitude of 400Hz correspondence and the ratio of time domain vibration amplitude, between 28%-32%.
When DC magnetic biasing occurring, shown in Fig. 4 (a), this measuring point vibration signal amplitude rises rapidly, and it is very irregular that waveform becomes, and the vibration wave peak maximum reaches 50m/s 2, the trough minimum value reaches-20m/s 2, shown in Fig. 4 (b), the above high fdrequency component of 800-1200Hz occurs.Under Under Direct Current Bias, because external condition has obvious change, can't be according to changing the state of determining the transformer inner structure this moment, in addition, because it is a process of aggravation gradually that the inner structure of transformer is destroyed, so need further analyze after DC magnetic biasing and monitor.
Fig. 5 has provided the DC magnetic biasing time domain waveform and the frequency-domain analysis figure of the vibration signal of this measuring point afterwards, can intuitively find out from Fig. 5 (a), and vibrational waveform does not have to change substantially, and its vibration wave peak maximum is 6.0m/s 2Vibration trough minimum value is-8.0m/s, vibrational waveform to this point carries out spectrum analysis, its result is as Fig. 5. (b), frequency spectrum still mainly is distributed in the 200-600Hz scope, component with 350-450Hz is the most obvious, and the above frequency component of 800Hz almost disappears in this vibration signal, can think consistent with the vibrational state before the DC magnetic biasing.
After occurring, DC magnetic biasing compares with appearance vibration before, if magnetic bias 20% the scope before that surpasses steady in a long-term of the vibration under the same load after the magnetic bias, such as, if ordinate is in 200 or when following, the amplitude of this monitoring point has the long-term 1.2m/s that significantly surpasses 2Ordinate is in 460 or when following, the amplitude of this monitoring point has the long-term 20m/s that significantly surpasses 2We think that transformer inside may go wrong, and need to determine in conjunction with other measuring point and on-the-spot actual investigation.In this process of the test, after Under Direct Current Bias, the vibration amplitude of having monitored when corresponding maximum is meritorious to be 460 left and right sides is 17.3m/s 2, to compare during with the non DC bias condition, its variation range is about 2%, less than 20%; Minimum vibration amplitude of gaining merit when being 200 left and right sides is 1m/s 2, compare basic not variation during with the non DC bias condition.
In addition, in the frequency range of 50-1400Hz, whether monitoring has a large amount of and long-term appearance of higher hamonic wave on the one hand, and whether the ratio of monitoring interior humorous wave amplitude of 300-450Hz and crest on the other hand can also return and be stabilized within the original scope after the of short duration fluctuation.If the variation of this ratio range for a long time greater than 20%, also is necessary to carry out suitable detection to investigate transformer state.In this process of the test, still between 9%-11%, the ratio of the spectral magnitude of 400Hz correspondence and time domain vibration maximum amplitude is still between 28%-32% for the ratio of the spectral magnitude of 350Hz correspondence and time domain vibration maximum amplitude after DC magnetic biasing.Measuring point is similar therewith for the signal of other vibration measuring points and noise measuring point, in this specific implementation process, in conjunction with the result of all measuring points, can think that running status is good in the short time range of this transformer after DC magnetic biasing, but still need further long-time on-line monitoring.

Claims (4)

1. the vibration and noise on-line monitoring method of AC power transformer behind the DC magnetic biasing state is characterized in that, may further comprise the steps:
1) when not having DC magnetic biasing, at transforming plant main transformer depressor scene, 3 or 4 above vibration transducers are attached on the transformer tank surface, arrange a noise sound pressure meter apart from transformer one segment distance place in the positive midpoint of transformer-cabinet; In the time of setting, according to sampling interval, the sample frequency set, the noise sound pressure signal of acquisition noise sound pressure meter, and the vibration signal of gathering the vibration transducer behind the conversion diverse location, determine position that vibration signal changes maximum vibration transducer as the vibration signal monitoring point according to sampled data, and the principal character data of transformer body vibration when writing down this monitoring point non DC bias;
2) after the DC magnetic biasing state occurs, according to described sampling interval, sample frequency, and monitoring periods carries out on-line monitoring, set the monitoring threshold of maximum vibration amplitude, have only when vibration amplitude surpasses this threshold value and in database, preserve raw data, otherwise only in database, write down each time spectral magnitude in vibration peak valley and the corresponding frequencies scope;
3) every through a monitoring periods, analyze the raw data that is saved, when the early warning situation appears in continuous stablizing more than 1 day, then need the transformer body is further detected, otherwise, think that the transformer running status keeps good;
2. method according to claim 1 is characterized in that, in the described step 1) during non DC bias of monitoring point the principal character data of transformer body vibration comprise: (1) monitoring point vibrational waveform and noise waveform; (2) the tank surface vibration amplitude of different operating load correspondences, and draw the interior vibration amplitude curve of setting-up time, determine the maximal value of vibration amplitude under the normal condition and the scope of minimum value; (3) internal vibration of 50-1400Hz scope and noise spectrum distribute; (4) ratio of corresponding amplitude of each time frequency spectrum and time domain vibration amplitude.
3. method according to claim 1 is characterized in that occurring the early warning situation described in the described step 3) is one of following three kinds of situations:
(1) vibration amplitude exceeds the maximal value and the minimum value 20% of vibration amplitude;
(2) there is the high order frequency spectrum to occur in the spectral range;
(3) ratio of corresponding amplitude of each time frequency spectrum and time domain vibration amplitude has exceeded 20% variation range.
4. method according to claim 1 is characterized in that, described sampling interval is 2.5kHz-5kHz less than 5 minutes, sample frequency, when the monitoring threshold of described maximum vibration amplitude is non DC bias 120% of the maximum vibration amplitude.
CN2008101028850A 2008-03-28 2008-03-28 On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing Active CN101246043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101028850A CN101246043B (en) 2008-03-28 2008-03-28 On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101028850A CN101246043B (en) 2008-03-28 2008-03-28 On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing

Publications (2)

Publication Number Publication Date
CN101246043A CN101246043A (en) 2008-08-20
CN101246043B true CN101246043B (en) 2010-08-25

Family

ID=39946623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101028850A Active CN101246043B (en) 2008-03-28 2008-03-28 On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing

Country Status (1)

Country Link
CN (1) CN101246043B (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103033695B (en) * 2011-09-28 2016-03-02 特变电工股份有限公司 The detection method of transformer tolerance DC magnetic biasing ability
CN102520373B (en) * 2011-12-21 2014-01-29 绍兴电力局 Distinguishing method of direct current magnetic biasing of power transformer based on vibration analysis
CN102520240A (en) * 2012-01-05 2012-06-27 山东电力研究院 Magnetic bias current monitoring and early-warning system for large-scale transformer
CN102708295B (en) * 2012-05-14 2015-05-20 广东工业大学 Analysis method of bias magnet characteristic of electric sheet
CN103176062B (en) * 2013-03-05 2015-11-25 四川电力科学研究院 A kind of power transformer radiation audible noise computing method
CN103713217B (en) * 2013-12-25 2017-09-22 国网河南省电力公司电力科学研究院 The on-line monitoring method of Operation Condition of Power Transformers under a kind of Direct Current Bias
CN104345233A (en) * 2014-10-22 2015-02-11 国家电网公司 On-line monitoring terminal and detection method for fault detection of power distribution transformer
CN104330660A (en) * 2014-10-23 2015-02-04 中国南方电网有限责任公司电网技术研究中心 Power transformer DC magnetic bias state detection method based on noise method
CN105629086A (en) * 2014-11-04 2016-06-01 国家电网公司 Radiated audible noise calculating method of electric power reactor group
CN104599066B (en) * 2015-01-20 2017-10-24 国家电网公司 Main transformer of transformer substation noise statisticses analysis method
CN104573047A (en) * 2015-01-20 2015-04-29 国家电网公司 Transformer substation factory boundary noise statistics and analysis method
CN104792399B (en) * 2015-03-12 2017-12-08 国网浙江海盐县供电公司 A kind of online noise-monitoring equipment for distribution transformer
CN105606933A (en) * 2016-01-13 2016-05-25 中国南方电网有限责任公司超高压输电公司 Vibration-noise-based on-line monitoring system of converter transformer
CN107561377A (en) * 2016-06-30 2018-01-09 广州西门子变压器有限公司 The detection method of D.C. magnetic biasing in transformer
CN106249076B (en) * 2016-07-22 2019-10-11 国家电网公司 Distribution transformer condition detection method and system under the influence of by harmonic load
CN106441547A (en) * 2016-08-31 2017-02-22 许继集团有限公司 Transformer vibration monitoring method and apparatus
CN106324406B (en) * 2016-09-21 2019-07-12 许继集团有限公司 A kind of transformer DC magnetic bias method for diagnosing faults and device
CN106526436B (en) * 2016-10-18 2019-06-11 西安交通大学 A kind of Transformer Insulation Aging state evaluating method based on vibratory drilling method
CN108241098A (en) * 2016-12-27 2018-07-03 大唐观音岩水电开发有限公司 Power transformer D.C. magnetic biasing monitors system and monitoring method
CN108241099A (en) * 2016-12-27 2018-07-03 大唐观音岩水电开发有限公司 A kind of transformer DC magnetic bias status assessment and diagnostic method
CN108169583B (en) * 2017-11-17 2020-11-20 国网湖南省电力有限公司 Autotransformer direct-current magnetic bias discrimination method and system with neutral point grounded through capacitor
CN108362966B (en) * 2018-02-12 2020-11-03 广东电网有限责任公司电力科学研究院 High-precision noise online monitoring method and system for oil immersed transformer
CN109033612B (en) * 2018-07-20 2023-05-05 广西电网有限责任公司电力科学研究院 Transformer fault diagnosis method based on vibration noise and BP neural network
CN109405953A (en) * 2018-10-19 2019-03-01 全球能源互联网研究院有限公司 A kind of vibration and noise test method of oil-immersed type power reactor
CN109443523A (en) * 2018-10-23 2019-03-08 国网天津市电力公司电力科学研究院 A kind of 35kV is indoor or underground substation structural noise indirect measurement method
CN111044814B (en) * 2019-11-28 2023-03-14 中国电力科学研究院有限公司 Method and system for identifying transformer direct-current magnetic bias abnormality
CN111413566B (en) * 2020-04-20 2022-05-17 贵州电网有限责任公司 Transformer direct-current magnetic bias judgment method based on vibration signal processing
CN111580016A (en) * 2020-05-28 2020-08-25 沈阳工业大学 Transformer direct-current magnetic bias detection device and method through vibration signal analysis
CN111983524B (en) * 2020-08-26 2021-06-08 西南交通大学 Transformer winding fault assessment method based on oscillatory wave time-frequency transformation
CN112379164A (en) * 2020-12-04 2021-02-19 厦门市爱维达电子有限公司 Direct-bias real-time sampling algorithm for digital UPS (uninterrupted Power supply) control variable sampling
CN113532535B (en) * 2021-07-21 2024-03-15 国网江苏省电力有限公司宜兴市供电分公司 Power transformer winding state judging method
CN113970710B (en) * 2021-10-26 2023-06-09 广东电网有限责任公司佛山供电局 Method and system for monitoring DC magnetic bias running state of power transformer
CN114152824A (en) * 2021-11-15 2022-03-08 国网重庆市电力公司电力科学研究院 Real-time monitoring and optimal control method for environmental noise of transformer substation
CN115566639A (en) * 2022-11-14 2023-01-03 国网湖北省电力有限公司电力科学研究院 Multi-parameter control transformer neutral point current abnormity protection method

Also Published As

Publication number Publication date
CN101246043A (en) 2008-08-20

Similar Documents

Publication Publication Date Title
CN101246043B (en) On-line monitoring method for vibration and noise of AC power transformer influenced by DC magnetic biasing
CN105973621B (en) GIS mechanical fault diagnosis method and system based on abnormal vibration analysis
CN102721465B (en) System and method for diagnosing and preliminarily positioning loosening faults of iron core of power transformer
Gao et al. Analysis of the intrinsic characteristics of the partial discharge induced by typical defects in GIS
CN105628419A (en) System and method of diagnosing GIS (Gas Insulated Switchgear) mechanical defects based on independent component analysis denoising
CN105629100A (en) System and method of diagnosing GIS (Gas Insulated Switchgear) mechanical defects based on abnormal vibration analysis
CN201909667U (en) Running status voice and local electro-discharge online monitoring and analyzing device of transformer
CN101650406A (en) Local discharge on-line detection method and device of high-voltage cross-linking polythene cable system
CN105223476A (en) A kind of fault arc detection method based on high-frequency characteristic and device
CN111624437A (en) Integrated comprehensive underground cable maintenance detection method, detection system and detection instrument
CN102116849B (en) Noncontact type measuring system and measuring method for switch power working parameters
CN202734953U (en) Power transformer iron core loosening fault diagnosis apparatus
CN103954352A (en) Online monitoring device for power reactor vibration
Charbkaew et al. Vibration signal analysis for condition monitoring of puffer‐type high‐voltage circuit breakers using wavelet transform
CN104251953A (en) Diagnosis method and device for loosening faults of on-load tap switch contact of power transformer
CN205091401U (en) Transformer winding vibration frequency response test system
CN109932053A (en) A kind of state monitoring apparatus and method for high-voltage shunt reactor
CN102721854B (en) Power network overvoltage signal detection method and system
CN204085686U (en) Power transformer inside loosens judgement system
CN206074741U (en) A kind of detection circuit for grounding net defect diagnosis
CN106324329B (en) Overvoltage self-adaptive identification method and system based on D-dot principle
CN105910695A (en) Detection system and method for GIS mechanical fault vibration
CN108680843A (en) A kind of method for detection of partial discharge of switch cabinet based on Radio Transmission Technology
CN203630283U (en) Hand-held detection device used for cable insulation detection
CN116593842A (en) Cable partial discharge detection system and method with broadband and filtering functions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant