CN101244608A - Cast-in-situ beam maintaining method - Google Patents

Cast-in-situ beam maintaining method Download PDF

Info

Publication number
CN101244608A
CN101244608A CNA2008100450008A CN200810045000A CN101244608A CN 101244608 A CN101244608 A CN 101244608A CN A2008100450008 A CNA2008100450008 A CN A2008100450008A CN 200810045000 A CN200810045000 A CN 200810045000A CN 101244608 A CN101244608 A CN 101244608A
Authority
CN
China
Prior art keywords
temperature
maintenance
cast
concrete
controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100450008A
Other languages
Chinese (zh)
Inventor
钟万波
陈拥军
党泽周
蒲永峰
陈洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju Co Ltd
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CNA2008100450008A priority Critical patent/CN101244608A/en
Publication of CN101244608A publication Critical patent/CN101244608A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a maintenance method for cast-in-place beam, which is characterized in that a steam pipeline is respectively arranged at the bottom of the bottom plate, in the lower side of two flange plates and in the internal box; a maintaining tarpaulin is supported at a steel tube bracket erected on walkway railing in both sides of the mould; the maintaining time for static period is between six to eight hours, and the constant temperature can be controlled between 30 to 35 DEG C; generally, the constant temperature period is kept for twelve hours, and the temperature decreasing speed is no more than five DEG C per hour. The maintenance method of the invention has the advantages of capability to provide complete maintenance technology for cast-in-place beam in field environment, great durability for cast-in-place beam, early removal for the internal mould, short turnover for mould and bracket, accelerated construction speed, increased construction efficiency, ensured prefabricated quality for the beam and saved cost.

Description

Cast-in-situ beam maintaining method
Technical field
The present invention relates to a kind of cast-in-situ beam maintaining method.
Background technology
Existing heat and moisture preserving maintaining process is mostly at bridge girder plant or precast plant and decide, and maintenance problem and complete maintaining process extremely are short of in the cast-in-situ box girder lowered in field environment and be directed to.And the maintenance problem of cast-in-situ box girder also is of equal importance, the durability of cast-in-place beam, and the model turnaround time, the operation and the engineering cost of whole piece circuit made in same restriction.
Summary of the invention
The objective of the invention is: a kind of precast beam maintenance process is provided.
The objective of the invention is to realize by the enforcement following technical proposals:
A kind of cast-in-situ beam maintaining method is characterized in that: adopt following maintenance step:
Step 1, case beam are on pedestal before the maintenance of prefabricated back, in base plate bottom side and two flange plate downsides, interior case, respectively arrange one of jet chimney, each jet chimney adopts independently control valve, with military quilt or sponge back cover, set up steel pipe support on the railing of aisle, model both sides at the bed die downside, support ground keeps space, the 1m left and right sides in top of concrete, tarpaulin is supported on the support, hang down around it and form a maintenance cover, tight whole pedestal and case beam shade
Step 2, beam body concrete pouring finish, curing period to hydrothermal curing is limited to quiet stopping the phase, time was controlled at 6~8 hours, the quiet phase of stopping can be supplied with steam in a small amount temperature of shed is controlled at about 20 ℃ in canopy, the point for measuring temperature of temperature measurer is arranged in span centre, three cross sections of beam-ends head amount to 18 each observation station, represent in beam body web, base plate, top board, flange plate, the maintenance canopy respectively and interior oven temperature, degree.
Step 3: temperature is risen to the thermostat temperature of regulation by the quiet phase of stopping; Programming rate must not be greater than per hour 10 ℃, and programming rate is unsuitable too fast;
Step 4: thermostat temperature should be controlled at 30~35 ℃; Constant temperature phase ordinary circumstance keeps 12h, also can prolong constant temperature time by the laboratory decision according to the test specimen detection case;
Step 5: when reaching the regulation constant temperature time, take out with the concrete of beam maintenance and check that test specimen stops the steam supply cooling after test reaches concrete demoulding intensity, cooling rate is not more than per hour 5 ℃; When temperature of shed cool to canopy outside during temperature difference≤15 ℃, remove maintenance cover and temperature instrumentation;
In whole temperature controlled processes, regulate evaporation tube steam supply by control valve, the temperature of each one in the control maintenance cover, the temperature difference at each position is not more than 10 ℃ in the canopy cover.
Adopt above-described maintenance process, the curing temperature of moisture-heat preservation is controlled at 30-35 ℃, and to the late strength of concrete development, works durability effect is very obvious, and construction speed is fast, improves efficiency of construction, guarantees the beam prefabricated quality of case, has saved cost simultaneously.
Description of drawings
Fig. 1 is a cast-in-situ box girder curing means schematic diagram.
The point for measuring temperature layout drawing of Fig. 2 temperature measuring equipment.
The specific embodiment
The case beam is on pedestal before the maintenance of prefabricated back, respectively arrange 6 one of jet chimneys in base plate bottom side and two flange plate downsides, interior case, each jet chimney adopts independently control valve, at the bed die downside with military quilt or sponge 4 back covers, keep humidity in the maintenance canopy, prevent that steam from leaking.Set up steel pipe support 3 on aisle, the model both sides railing 1, support ground keeps space, the 1m left and right sides in top of concrete, is beneficial to steam and flows, and prevents the concrete hot-spot.Tarpaulin 2 is supported on the support, and hanging down around it forms a maintenance cover, tight whole pedestal and case beam shade, the concrete layout as shown in Figure 1.
Beam body concrete pouring finishes, curing period to hydrothermal curing is limited to quiet stopping the phase, time was controlled at 6~8 hours, the quiet phase of stopping can be supplied with steam in a small amount temperature of shed is controlled at about 20 ℃ in canopy, the point for measuring temperature 5 of temperature measurer is arranged in span centre, three cross sections of beam-ends head amount to 18 observation stations, represent in beam body web, base plate, top board, flange plate, the maintenance canopy respectively and interior oven temperature, degree.
Temperature is risen to the thermostat temperature of regulation by the quiet phase of stopping; Programming rate must not be greater than per hour 10 ℃, and programming rate is unsuitable too fast;
Thermostat temperature should be controlled at 30~35 ℃; Constant temperature phase ordinary circumstance keeps 12h, also can prolong constant temperature time by the laboratory decision according to the test specimen detection case;
Step 5: when reaching the regulation constant temperature time, take out with the concrete of beam maintenance and check that test specimen stops the steam supply cooling after test reaches concrete demoulding intensity, cooling rate is not more than per hour 5 ℃; When temperature of shed cool to canopy outside during temperature difference≤15 ℃, remove maintenance cover and temperature instrumentation;
In whole temperature controlled processes, regulate evaporation tube steam supply by control valve, the temperature of each one in the control maintenance cover, the temperature difference at each position is not more than 10 ℃ in the canopy cover.
Adopt above-described maintenance process, complete maintaining process in the cast-in-situ box girder lowered in field environment is provided, the curing temperature of moisture-heat preservation is controlled at 30-35 ℃, late strength of concrete is developed, works durability effect is very obvious, on the one hand, has avoided concrete to endure cold when intensity is very low, the good environment that a strength development is arranged has been guaranteed its inherent quality; On the other hand, reduced case beam temperature difference between inside and outside concrete, make the secondary stress that causes by internal-external temperature difference reduce, prevented that Temperature Cracks from appearring in concrete, and it is early strong to have improved concrete, make the internal mold dismounting time in advance, model, support are shortened turnover period, have accelerated construction speed greatly, improved efficiency of construction, guarantee the beam prefabricated quality of case, saved cost simultaneously.

Claims (1)

1, a kind of cast-in-situ beam maintaining method is characterized in that: adopt following maintenance step:
Step 1, case beam are on pedestal before the maintenance of prefabricated back, in base plate bottom side and two flange plate downsides, interior case, respectively arrange one of jet chimney, each jet chimney adopts independently control valve, at the bed die downside with military quilt or sponge back cover, set up steel pipe support on the railing of aisle, model both sides, support ground keeps space, the 1m left and right sides in top of concrete, and tarpaulin is supported on the support, hang down around it and form a maintenance cover, tight whole pedestal and case beam shade;
Step 2, beam body concrete pouring finish, curing period to hydrothermal curing is limited to quiet stopping the phase, time was controlled at 6~8 hours, the quiet phase of stopping can be supplied with steam in a small amount temperature of shed is controlled at about 20 ℃ in canopy, the point for measuring temperature of temperature measurer is arranged in span centre, three cross sections of beam-ends head amount to 18 each observation station, represent in beam body web, base plate, top board, flange plate, the maintenance canopy respectively and interior oven temperature, degree.
Step 3: temperature is risen to the thermostat temperature of regulation by the quiet phase of stopping; Programming rate must not be greater than per hour 10 ℃, and programming rate is unsuitable too fast;
Step 4: thermostat temperature should be controlled at 30~35 ℃; Constant temperature phase ordinary circumstance keeps 12h, also can prolong constant temperature time by the laboratory decision according to the test specimen detection case;
Step 5: when reaching the regulation constant temperature time, take out with the concrete of beam maintenance and check that test specimen stops the steam supply cooling after test reaches concrete demoulding intensity, cooling rate is not more than per hour 5 ℃; When temperature of shed cool to canopy outside during temperature difference≤15 ℃, remove maintenance cover and temperature instrumentation;
In whole temperature controlled processes, regulate evaporation tube steam supply by control valve, the temperature of each one in the control maintenance cover, the temperature difference at each position is not more than 10 ℃ in the canopy cover.
CNA2008100450008A 2008-03-17 2008-03-17 Cast-in-situ beam maintaining method Pending CN101244608A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100450008A CN101244608A (en) 2008-03-17 2008-03-17 Cast-in-situ beam maintaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100450008A CN101244608A (en) 2008-03-17 2008-03-17 Cast-in-situ beam maintaining method

Publications (1)

Publication Number Publication Date
CN101244608A true CN101244608A (en) 2008-08-20

Family

ID=39945392

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100450008A Pending CN101244608A (en) 2008-03-17 2008-03-17 Cast-in-situ beam maintaining method

Country Status (1)

Country Link
CN (1) CN101244608A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528917A (en) * 2011-12-02 2012-07-04 中铁八局集团桥梁工程有限责任公司 Energy-saving environment friendly production method of concrete lining segment
CN108858697A (en) * 2018-07-09 2018-11-23 贵州新联爆破工程集团有限公司 A kind of prefabricated simple supported box beam template of Winter protection heating
CN110759748A (en) * 2019-11-15 2020-02-07 河北建设集团股份有限公司 Movable beam and slab curing device and beam and slab curing process
CN112411398A (en) * 2020-10-20 2021-02-26 中铁十一局集团第一工程有限公司 Maintenance method and maintenance system for cast-in-place beam of movable formwork
CN117403563A (en) * 2023-12-15 2024-01-16 中交一航局第三工程有限公司 Winter construction method for cast-in-situ continuous beam of bracket

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528917A (en) * 2011-12-02 2012-07-04 中铁八局集团桥梁工程有限责任公司 Energy-saving environment friendly production method of concrete lining segment
CN102528917B (en) * 2011-12-02 2014-06-18 中铁八局集团桥梁工程有限责任公司 Energy-saving environment friendly production method of concrete lining segment
CN108858697A (en) * 2018-07-09 2018-11-23 贵州新联爆破工程集团有限公司 A kind of prefabricated simple supported box beam template of Winter protection heating
CN110759748A (en) * 2019-11-15 2020-02-07 河北建设集团股份有限公司 Movable beam and slab curing device and beam and slab curing process
CN112411398A (en) * 2020-10-20 2021-02-26 中铁十一局集团第一工程有限公司 Maintenance method and maintenance system for cast-in-place beam of movable formwork
CN117403563A (en) * 2023-12-15 2024-01-16 中交一航局第三工程有限公司 Winter construction method for cast-in-situ continuous beam of bracket
CN117403563B (en) * 2023-12-15 2024-04-02 中交一航局第三工程有限公司 Winter construction method for cast-in-situ continuous beam of bracket

Similar Documents

Publication Publication Date Title
CN101244607A (en) Precast beam maintaining apparatus and maintaining method
CN101244608A (en) Cast-in-situ beam maintaining method
CN201169009Y (en) Precast beam maintaining apparatus
CN102490262A (en) Steam curing construction method for ballastless track plate
CN102966242A (en) Wall maintaining method based on automatic temperature measurement and temperature stress reduction
CN103660027B (en) A kind of concrete prefabricated product automation production technology
CN108908673B (en) Autoclaved curing method for prefabricated T beam in high-cold low-pressure area
CN201903284U (en) Multifunctional composite air intake control device for counter flow type natural draft cooling tower
CN102538571A (en) Multifunctional compound air inlet control device of counterflow type natural ventilation cooling tower
CN104633827A (en) Optimized design method for impacting jet ventilation system
CN102528917B (en) Energy-saving environment friendly production method of concrete lining segment
CN111996912A (en) Cast-in-place winter construction and maintenance method for box-shaped main beam segment of half-through type steel pipe concrete arch bridge
CN106435087A (en) Sectional assembling and mounting method for converter vaporization flue
CN102346158B (en) Damp heat aging test device
CN102072674A (en) Indirect air-cooling control system of surface condenser
CN102605951A (en) Construction method for steel plate concrete wall of primary loop cabin of high temperature gas cooled reactor
CN204730697U (en) A kind of steam power plant cooling tower antifreezing regulator control system
CN203947816U (en) A kind of indirect air cooling unit arrangement based on three tower unifications
CN210082050U (en) Efficient precast concrete shield constructs section of jurisdiction and evaporates curing cellar for storing things
CN102001133A (en) Three-dimensional circular production process for tubular pile
CN116122159A (en) Concrete bridge maintenance and detection system
CN103437288A (en) High-pier pouring forming method applied to bridge construction
CN210850765U (en) Maintenance pond suitable for cement mortar test body
CN205000250U (en) Be applied to heat preservation big -arch shelter of pier construction
CN103437286A (en) Full-span box girder segmental prefabricating method applied to bridge construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20080820