CN101236408A - Plant supervision device and method - Google Patents

Plant supervision device and method Download PDF

Info

Publication number
CN101236408A
CN101236408A CNA2007100343622A CN200710034362A CN101236408A CN 101236408 A CN101236408 A CN 101236408A CN A2007100343622 A CNA2007100343622 A CN A2007100343622A CN 200710034362 A CN200710034362 A CN 200710034362A CN 101236408 A CN101236408 A CN 101236408A
Authority
CN
China
Prior art keywords
bar code
shop
code area
production
packing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100343622A
Other languages
Chinese (zh)
Inventor
巫碧兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007100343622A priority Critical patent/CN101236408A/en
Publication of CN101236408A publication Critical patent/CN101236408A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses a production management device and a method, wherein, the production management device comprises a productive mechanism comprising at least one feeding unit, a forming unit connected with the feeding unit, a packing unit connected with the forming unit and a control unit provided with an output interface and an input interface and connected with the forming unit; and a management mechanism outputted through the output interface and arranged on a finished product packaging. One surface of the management mechanism is provided with at least one feeding shop inner code unit, a producing shop inner code unit, a packaging shop inner code unit, a quality controlling shop inner code unit and a selling shop inner code. Therefore, after the needed finished product is formed, the management mechanism can be directly arranged on the finished product packaging, which can make operation staff conveniently perform control and management, thereby the effective management is achieved.

Description

The production management apparatus and method
Technical field:
The present invention relates to a kind of production management apparatus and method, refer to especially a kind ofly can directly on the packing of this finished product management organization be set after required finished product moulding, the convenient working personnel carry out required keyholed back plate, and reach the effect of effective management.
Background technology:
General traditional production device is mainly constituted by connecting charger, make-up machine and packaging machine on the control system; Can when producing, utilize control system control charger, the action of make-up machine and packaging machine, and raw material can be exported by charger, with make-up machine raw material is made required finished product, utilize packaging machine to be packed afterwards again, after to be packaged the finished product vanning is deposited, and the mode of filling in automatic printing or by the operating personnel is on the forms that indicate paster and keyholed back plate, insert required finished product data with the mode of character narrate, to indicate again afterwards paster sticking in finished product and (or) on the outer container, and the tabulation of the forms of keyholed back plate filed for reference, for operating personnel's identification and this finished product of management and control.
With above-mentioned process units, though its FEOL can reach the manufacturing effect of robotization, but after finishing, manufacturing then must carry out filling in of quantity Calculation and relevant label and forms with manual type, therefore, not only when making, produce man-hour, waste on the increase of operation and manpower use, and when carrying out filling in of quantity Calculation and relevant label and forms with manual type, easily cause misdescription and make relevant label and forms lose accuracy, when in addition carrying out filling in of quantity Calculation and relevant label and forms with the mode of character narrate, this literal also can't see through the electronic equipment interpretation, only with manual observation, and then cause relevant operating personnel to be difficult for carrying out the keyholed back plate of finished product, and when production operation, can't reach effective management to finished product.
Summary of the invention:
Technical matters solved by the invention is: at above-mentioned the deficiencies in the prior art, a kind of production management apparatus and method are provided, can after required finished product moulding, directly on the packing of this finished product, management organization be set, the convenient working personnel carry out required keyholed back plate, and reach the effect of effective management.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of production management device, it comprises a production mechanism, and this production mechanism includes a feed unit, a forming unit that is connected with feed unit, a packaging unit that is connected with forming unit at least, and one is connected with forming unit and has and import and the control module of output interface; This device also comprises a management organization, this management organization is by output interface output and be arranged on the finished product packing, code element in shop when code element, a packing in shop when code element, is produced in the shop in when having a charging at least on the one side of this management organization, code element in shop when shop ISN and shipment when product guarantor checks.
Production management method of the present invention comprises the steps:
The production stage that production mechanism carries out: by the feed unit supply needed raw material of this production mechanism, by forming unit raw material is made as finished product again, the related data when the input interface input of the control module through having input interface and output interface in the moulding is made is also controlled the moulding action; Pass through the packaging unit packed products at last; And
The management process that management organization carries out: with management organization by output interface output and be arranged on the finished product packing, code element in shop when code element, a packing in shop when code element, was produced in the shop when related data of importing according to input interface formed at least one charging on the one side of management organization, code element and carrying out in shop when shop ISN and shipment when product guarantor checks.
So, can directly on the packing of this finished product management organization be set after required finished product moulding, the convenient working personnel carry out required keyholed back plate, and reach the effect of effective management.
Description of drawings:
Fig. 1 is a basic framework synoptic diagram of the present invention.
Fig. 2 is a block schematic diagram of the present invention.
Fig. 3 is a utilization view of the present invention.
Fig. 4 is a utilization state schematic flow sheet of the present invention.
Fig. 5 is the synoptic diagram of management organization of the present invention.
Label declaration:
Production mechanism 1 feed unit 11
Forming unit 12 packaging units 13
Workbench 121 moulds 122
Packaging body 131 control modules 14
Input interface 141 output interfaces 142
Power unit 15 management organizations 2
21 charging date of code element bar code area 211 in shop during charging
Manufacturer coding bar code area 212 first material label encoding strip font code districts 213
The second material label encoding strip font code district 214
Flowing water code bar code area 215 when establishment is made
22 date of manufacture of code element bar code area 221 in shop during production
Machine code bar code area 222 moulds coding bar code area 223
Mould die cavity quantity coding bar code area 224
Material label encoding strip font code district 225
The date of inspection bar code area 226 survey report bar code areas 227
Checker's bar code area 228 of encoding
Code element 23 packing date bar code areas 231 in shop during packing
Code element 24 in shop when manner of packing bar code area 232 product are protected check
The date of inspection bar code area 241 survey report bar code areas 242
Checker's bar code area 243 of encoding
25 shipment date of code element bar code area 251 in shop during shipment
Order lot number bar code area 252 quantity bar code areas 253
Manufacturer's bar code area 254 is made national bar code area 255
Business is left bill of sales bar code area 256
Transport aspect bar code area 257 and paste portion 26
Finished product 3
Embodiment:
See also Figure 1 and Figure 2, be respectively basic framework synoptic diagram of the present invention and block schematic diagram of the present invention.As shown in the figure: the present invention is a kind of production management apparatus and method, and its device is made of a production mechanism 1 and a management organization 2 at least.
The above-mentioned production mechanism of carrying 1 includes a feed unit 11, a forming unit that is connected with feed unit 11 12, a packaging unit 13 that is connected with forming unit 12 at least, and one is connected with forming unit 12 and has and import and the control module 14 of output interface 141,142, wherein, this forming unit 12 is made of a workbench 121 and most mould 122 at least, and this control module 14 can be connected with a power unit 15.
This management organization 2 is by output interface 142 output and be arranged on the packing of finished product, and code element 23 in shop when code element 22, a packing in shop when code element 21, is produced in the shop when having a charging at least on the one side of this management organization 2, code element 25 in shop when shop ISN 24 and shipment when product guarantor checks.In this way, constitute a brand-new production management device by said structure.
See also Fig. 3-shown in Figure 5, be respectively the synoptic diagram of utilization view of the present invention, utilization state schematic flow sheet of the present invention and management organization of the present invention.As shown in the figure: when utilization, the packaging type control gauge standard book of formatting bought in elder generation's designing material code name, mode of production style normalization standard book in the processing procedure, commercial disignation packing of product style normalization standard book, charging, processing procedure, OQC standard code style normalization standard book, commodity shipment packing is transported the procedural style control gauge standard book of formatting, and the standard book of respectively standardizing all must contain numbering (being the bar code sequence number); And when using, feed unit 11 supply needed raw materials by production mechanism 1, and the related data when making by input interface 141 inputs of control module 14, and the required mould 122 on the forming unit 12 when select making, and on workbench 121, cooperate selected mould 122 to be shaped to required finished product 3 raw material in the feed unit 11 by forming unit 12, again this finished product 3 is delivered to this packaging unit 13 afterwards, with required packaging body 131 this finished product 3 is packed, then be arranged on the packaging body 131 of this finished product 3 after to be packaged the finishing by the output interface 142 outgoing management mechanisms 2 of control module 14;
And when this management organization 2 produces, during charging on its one side in the shop code element 21 include charging date bar code area 211, manufacturer's coding bar code area 212, the first material label encoding strip font code district 213, the second material label encoding strip font code district 214 at least and work out flowing water code bar code area 215 when making; During this production in the shop code element 22 include date of manufacture bar code area 221, machine code bar code area 222, mould coding bar code area 223, mould die cavity quantity coding bar code area 224, material label encoding strip font code district 225, date of inspection bar code area 226, survey report bar code area 227 and the checker bar code area 228 of encoding at least; During this packing in the shop code element 23 include packing date bar code area 231 and manner of packing bar code area 232 at least; Shop ISN 24 included bar code area 241 date of inspection, survey report bar code area 242 and the checker bar code area 243 of encoding at least when this product were protected check; Code element 25 includes shipment date bar code area 251, order lot number bar code area 252, quantity bar code area 253, manufacturer's bar code area 254 at least, makes national bar code area 255 in the shop during this shipment, business is left bill of sales bar code area 256 and transported aspect bar code area 257; And has the portion of pasting 26 on the another side of this management organization 2, in order to packaging body 131 appropriate locations that stick in finished product 3, code element 21 in the shop when using the charging that makes this operating personnel can utilize management organization 2, when code element 23, product are protected shop ISN 24 and shipment when checking in the shop when code element 22, packing in the shop when producing in the shop scanning of code element 25 cooperation scanning machines carry out required material keyholed back plate, and reach effective management when making production.
In sum, production management apparatus and method of the present invention can effectively be improved the various shortcoming of prior art, can be after required finished product moulding, directly on the packing of this finished product, management organization is set, the convenient working personnel carry out required keyholed back plate, and reach the effect of effective management, and then the present invention are produced can more progressive, more practical, more be in order designer's the institute must, really meet the important document of application for a patent for invention, proposed patented claim in accordance with the law.
Only the above only is preferred embodiment of the present invention, when not limiting scope of the invention process with this; So all simple equivalent of being done according to the present patent application claim and description of the invention content change and modify, all should still belong in the scope that patent of the present invention contains.

Claims (10)

1. production management device, it comprises a production mechanism, and this production mechanism includes a feed unit, a forming unit that is connected with feed unit, a packaging unit that is connected with forming unit at least, and one is connected with forming unit and has and import and the control module of output interface; It is characterized in that: this device also comprises a management organization, this management organization is by output interface output and be arranged on the finished product packing, code element in shop when code element, a packing in shop when code element, is produced in the shop in when having a charging at least on the one side of this management organization, code element in shop when shop ISN and shipment when product guarantor checks.
2. production management device according to claim 1 is characterized in that: described forming unit is made of a workbench and number mould at least.
3. production management device according to claim 1 is characterized in that: described control module is connected with a power unit.
4. production management device according to claim 1 is characterized in that: have the portion of pasting on the another side of described management organization.
5. production management device according to claim 1 is characterized in that: flowing water code bar code area when code element includes charging date bar code area, manufacturer's coding bar code area, the first material label encoding strip font code district, the second material label encoding strip font code district and establishment at least and makes in the shop during described charging.
6. production management device according to claim 1 is characterized in that: during described production in the shop code element include date of manufacture bar code area, machine code bar code area, mould coding bar code area, mould die cavity quantity coding bar code area, material label encoding strip font code district, date of inspection bar code area, survey report bar code area and the checker bar code area of encoding at least.
7. production management device according to claim 1 is characterized in that: during described packing in the shop code element include packing date bar code area and manner of packing bar code area at least.
8. production management device according to claim 1 is characterized in that: the shop ISN included the bar code area date of inspection, survey report bar code area and the checker bar code area of encoding at least when described product were protected check.
9. production management device according to claim 1 is characterized in that: code element includes shipment date bar code area, order lot number bar code area, quantity bar code area, manufacturer's bar code area at least, makes national bar code area in the shop during described shipment, business is left the bill of sales bar code area and transported the aspect bar code area.
10. production management method, it is characterized in that: this method may further comprise the steps:
The production stage that production mechanism carries out: by the feed unit supply needed raw material of this production mechanism, by forming unit raw material is made as finished product again, the related data when the input interface input of the control module through having input interface and output interface in the moulding is made is also controlled the moulding action; Pass through the packaging unit packed products at last; And
The management process that management organization carries out: with management organization by output interface output and be arranged on the finished product packing, code element in shop when code element, a packing in shop when code element, was produced in the shop when related data of importing according to input interface formed at least one charging on the one side of management organization, code element and carrying out in shop when shop ISN and shipment when product guarantor checks.
CNA2007100343622A 2007-01-31 2007-01-31 Plant supervision device and method Pending CN101236408A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100343622A CN101236408A (en) 2007-01-31 2007-01-31 Plant supervision device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100343622A CN101236408A (en) 2007-01-31 2007-01-31 Plant supervision device and method

Publications (1)

Publication Number Publication Date
CN101236408A true CN101236408A (en) 2008-08-06

Family

ID=39920079

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100343622A Pending CN101236408A (en) 2007-01-31 2007-01-31 Plant supervision device and method

Country Status (1)

Country Link
CN (1) CN101236408A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102609829A (en) * 2012-01-16 2012-07-25 成霖企业股份有限公司 Ceramic product method using bar code to control

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102609829A (en) * 2012-01-16 2012-07-25 成霖企业股份有限公司 Ceramic product method using bar code to control
CN102609829B (en) * 2012-01-16 2017-03-01 成霖企业股份有限公司 A kind of method of utilization bar code management and control ceramic product

Similar Documents

Publication Publication Date Title
CN105069584A (en) Liquid crystal glass substrate post-processing production information management system and management method
CN105225028A (en) A kind of liquid crystal glass base production information method for tracing based on virtual ID
CN105607605B (en) Composing room's intelligence control system and control method
CN101833307B (en) System and method for automatically integrating technological operation and management of plastic and rubber products
CN110471633A (en) A kind of method and system for transmitting automatic printing labeling part by parameter
CN103645720A (en) Assembly line production cost real-time monitoring device and assembly line production cost diagnostic method
CN104007703B (en) System and method is realized in communication between a kind of product virtual parts and actual parts
CN105799205A (en) Full-automatic carton production system and method
CN105825345A (en) Printing production line quality tracking management system
CN101236408A (en) Plant supervision device and method
CN112446797B (en) Carton processing control system
KR20140127998A (en) Piping materials managing device and method
CN106777548A (en) The three-dimensional data base of tool part digital standards sets up system and method
CN103676872B (en) A kind of method and system of production management
CN111369263B (en) Tracing code correlation method and system
CN114881513A (en) 3D printer product quality analysis management and control system
CN104554928A (en) Automatic film-sealing mechanism
CN201484714U (en) Materiel package and identification integrated machine
CN104316154A (en) Multi-material weighing method
CN208789287U (en) A kind of cigarette case dress bar code multiple speed printing speed device
CN204614028U (en) A kind of rubber supply-chain management system
CN104441642A (en) 3D printing birthday cake making operation mode
CN107316110A (en) A kind of electrokinetic cell production and manufacturing management system
CN205573109U (en) Full -automatic carton production system
CN202337067U (en) Weighing code curving system for battery processing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080806