CN101206754A - 基于多种约束规则的火电厂厂级负荷优化分配方法 - Google Patents
基于多种约束规则的火电厂厂级负荷优化分配方法 Download PDFInfo
- Publication number
- CN101206754A CN101206754A CNA2006101655646A CN200610165564A CN101206754A CN 101206754 A CN101206754 A CN 101206754A CN A2006101655646 A CNA2006101655646 A CN A2006101655646A CN 200610165564 A CN200610165564 A CN 200610165564A CN 101206754 A CN101206754 A CN 101206754A
- Authority
- CN
- China
- Prior art keywords
- load
- unit
- value
- factory
- follows
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明涉及节能技术领域,特别是一种基于多种约束规则的火电厂厂级负荷优化分配方法。包括;1)建立可组态的输入参数表;2)建立煤耗特性曲线;3)进行负荷趋势预测;4)保证安全性约束规则;5)实现快速性约束规则;6)优化经济性约束规则;7)多约束条件下的动态规划方法实现。本发明主要针对具有两台以上燃煤火电机组的电厂,协助运行值长进行负荷优化调度,降低设备损耗,降低发电煤耗,提高运行经济性。
Description
技术领域
本发明涉及节能技术领域,特别是一种基于多种约束规则的火电厂厂级负荷优化分配方法。
背景技术
目前,火力发电机组占全国装机总容量的70%以上,对不可再生的煤炭资源消耗巨大,因此,深入研究火电机组的节能降耗,对国民经济的可持续发展具有重要意义。厂级负荷优化分配就是节能降耗的一项重要措施。通过对全厂机组的负荷进行优化分配,在满足电网负荷要求和机组出力限制的条件下,实现综合供电成本最小。此外,合理的负荷优化分配还能减轻电网频繁波动给机组主辅设备带来的损害,提高电厂的安全生产管理水平。因此,负荷优化分配技术具有广阔的应用前景,参见[1]马传利,张树成,崔巨擘,等.大型火电机组优化运行技术的研究[J].动力工程,2002,22(4):1875-1878。
厂级负荷优化分配问题是一种带有约束条件的高维、非线性优化问题,其解法归纳起来,可分为三种类型:传统优化方法、随机化方法、数学优化方法。传统优化方法如等微增率法,虽简单易行,但要求机组的煤耗特性曲线连续上凹且无拐点,实际的煤耗特性曲线很难满足;随机化方法包括遗传方法、模拟退火、禁忌搜索等,在工程应用中不易实现;数学优化方法如动态规划法等,对煤耗特性曲线无要求、结果精准,但计算工作量大、实时性差。随着计算机硬件水平的提升,动态规划法的缺点将得以弥补。
目前大多数实施负荷优化分配技术的火电厂采用了动态规划法。但是他们的方法中却很少考虑火电机组的速率约束、多种经济性约束规则,参见[2]郭斌,康松.火电厂各机组间负荷调度实时优化自动控制系统的研究.发电设备,2001,26(6):26-30.[2],或者只考虑了一些经济性约束规则,没有考虑变负荷的速率约束,参见[3]沈丛奇,归一数,方炯.火电厂全厂负荷优化分配及其控制方式的研究.华东电力,2005,33(3):18-22.[3],从而造成方法的实用价值不高。因此,设计出一套满足经济性、快速性指标,综合考虑多种经济性约束规则的负荷优化分配方法,是火电厂节能降耗需要迫切解决的问题。
发明内容
本发明的目的是提供一种基于多种约束规则的火电厂厂级负荷优化分配方法。本发明是建立在厂级监督信息管理系统(SIS)之上的基于多种约束规则的厂级负荷优化分配方法。技术方案如下:
一种基于多种约束规则的火电厂厂级负荷优化分配方法,其步骤如下:
1)建立可组态的输入参数表;
2)建立煤耗特性曲线;
3)进行负荷趋势预测;
4)保证安全性约束规则;
5)实现快速性约束规则;
6)优化经济性约束规则;
7)多约束条件下的动态规划方法实现。
针对目前火电厂厂级负荷优化分配的研究和使用现状,我们设计了一种综合考虑安全、经济、快速性约束的动态规划负荷优化分配方法。此方法包括以下几个方面的内容:
1)建立可组态的输入参数表;包括如下:
负荷优化分配的参数输入包括三方面的内容,并且这三方面的内容均可组态:
(1)输入/输出信号
包括RB(锅炉辅机故障快速减负荷)、RD(机组负荷指令迫降)、RU(机组负荷指令迫升)、BI(负荷指令闭锁增)、BD(负荷指令闭锁减),变负荷速率、实际负荷值、实际负荷指令值、AGC(自动发电控制)指令值,主蒸汽压力,发电煤耗、供电煤耗,全厂总负荷指令、全厂最大允许总负荷、全厂最小允许总负荷、全厂AGC指令请求等;
(2)厂级组态参数表
包括机组台数、变负荷间隔、煤耗加权系数、日负荷预测加权系数等
(3)机组级组态参数表
变负荷上限、变负荷下限、机组稳定的负荷允许变化值、额定负荷对应磨台数等参数。
机组的输入参数表可以组态,使此功能模块的可维护性大大增强。
2)建立煤耗特性曲线如下;
采用统计方法计算煤耗特性曲线。计算步骤如下:
■对机组的可变负荷范围进行划分:
n0=(Nmax-Nmin)/Nh
其中,Nmax、Nmin、Nh分别为机组最大、最小允许负荷和变负荷间距。n0为机组可能运行的负荷工作点数;
■计算t0分钟内主要运行参数(主蒸汽压力等)的方差值,看其是否满足稳定条件;
■若满足稳定条件,则计算t0分钟内平均负荷和平均煤耗;
■将当前数据后推t1分钟,再次计算t0分钟内机组是否稳定;若稳定,则与上次稳定条件下相同负荷点的历史数据进行加权平均,加权方法如下:
Fn0=k1Fn(l-1)+k2Fnl
其中,Fn(l-1)、Fnl、Fn0分别为机组过去、当前和加权后n0负荷点的
煤耗值。k1、k2分别为权系数。
对煤耗特性曲线进行统计计算,使之变的比较科学,从而使负荷优化分配算法更有实际意义。
3)进行负荷趋势预测如下;
主要基于日负荷曲线的统计平均值进行负荷预测。基本原理和计算如下:
对过去较长一段时间tc内的日负荷曲线各个较短时间段tb内的平均值进行平均,得到过去平均日负荷曲线初值;
对过去一天内的负荷进行统计平均计算,由这些tb时间段内平均值连接而成昨天的日负荷曲线;
对平均日负荷初值和昨天的日负荷曲线进行加权,对明天负荷进行预测,并一直递推计算:
Np=k3Nc+k4Ny
其中,Np、Nc、Ny分别为机组负荷预测输出值、初值、昨天值。k3、k4分别为权系数。经过递推计算,当前负荷预测值将变为下一次负荷预测的初值。
若中调给出第二日负荷变化趋势曲线,可以在给定负荷曲线的基础上进行负荷统计预测。
根据负荷的趋势变化曲线,可以提前对相应的设备启停作好准备,从而为指导运行发挥更好的作用。
4)保证安全性约束规则如下;
负荷优化分配的根本目标是节能降耗,全厂发电经济性水平的提升。但前提首先要保证机组运行的安全性,才能保证机组运行的经济性。
与厂级负荷优化分配相关的安全性因素,包括机组的辅机和控制系统的运行情况,主要考虑以下内容,从以下步骤来保证安全性:
■协调投入
单机至少投入一种协调控制方式,才能参与厂级负荷优化分配;
■单机最大、最小负荷约束
负荷分配值不能超出允许的最大、最小负荷值
■RB
RB发生时,本机将不参与负荷分配;
■RU
RU发生时,本机不允许分配负荷值下降;
■RD
RD发生时,本机不允许分配负荷值上升;
■BI
BI发生时,本机不允许分配负荷值上升;
■BD
BD发生时,本机不允许分配负荷值下降;
5)实现快速性约束规则如下;
考虑到不同机组响应负荷变化的能力不同,对某台机组所分配的负荷也应该与它这种能力成正比。采用如下公式可以实现这种方法:
其中,Pi为给第i台机组分配的负荷,Vi为第i台机组实际可以达到的变负荷速率;
机组的快速性约束规则,可以保证全厂的负荷与指令间偏差足够小,满足全厂负荷的上网品质。
6)优化经济性约束规则如下;
所谓经济性约束规则,主要依据机组运行过程中的经验,总结出对机组运行经济性有较大影响的优化规则,例如下面的规则:
■全厂负荷优化分配采用轮流调节的方法,以投入最少机组来完成负荷调节任务为原则,最大限度地减少机组变负荷的频度;
■在选择机组加、减负荷时,应避免机组在短时间内反向变负荷,即机组完成一次加负荷任务后,让其稳定运行一段时间后再去承担减负荷任务,这样能防止机组热负荷下波动产生的疲劳损耗;
类似这些约束规则的实现,可以有效提高机组设备及运行的安全性和经济性。
7)多约束条件下的动态规划方法实现如下;
满足上述安全性、经济性、快速性约束规则的动态规划方法在具体实现时很复杂,其原理如下:
■动态规划法基本原理,其计算方法如下:
设Prl为状态变量,代表系统负荷值,Pl为决策变量,代表机组的发电功率,Fn(Prl)为最优指标函数,即最小耗量函数,表示系统负荷为Prl时第n级决策完成后系统的总煤耗量。按动态规划最优性原理进行递推计算的步骤如下:
第一级决策:考虑编号为1(编号是任意排定的)的机组参与运行时,这时最小耗量函数F1(Pl)即为此机组的耗量特性:
式中,P1min≤Prl=Pl≤P1max。
第二级决策:考虑编号为2的机组与第一级决策结果所构成的组合,这时最小耗量函数为:
式中,
P2min≤P2≤P2max且P2≠Prl
第n级决策:考虑编号为n的机组与n-1级决策结果所构成的组合,这时最小耗量函数为
式中,
Pnmin≤Pn≤Pnmax且Pn≠Prl
同时记录决策结果。类似地,可以继续第n+1,n+2,…级决策的计算,一直到最后一台机组加入运行,完成所有的决策。
多约束条件下的动态规划方法具体实现算法如下:
■推导计算公式求解
推导公式并没有明显的解析式,常用求解方法是离散造表法。计算分为两步:顺序造表、逆序分配。
顺序造表是按照i=1,2,…n的顺序,根据Prn的大小次序,求出与之相对应的Fi *(Pri)和Pi *填入相应的表格中;在此基础上是逆序分配,根据给定的Pri,由表格按逆序方向求出与之相对应的所有Pi *的值。
◆顺序造表
当i=1时,
此时P1min≤Pr1≤P1max,并且Pr1和P1分别按间隔d分成多个数据点,于是得到序列:
Pr1min,Pr1min+d,Pr1min+2d,…,Pr1max
P1min,P1min+d,P1min+2d,…,P1max
递推公式计算表(1=1)
Pr1 | Pr1min | Pr1min+d | Pr1min+2d | …… |
F1 * | …… | |||
P1 * | P1min | P1min+d | P1min+2d | …… |
将上式写为离散形式:
设k=0,1,2、、、可以得到所以对应点的数据,将F1 *,Pr1,P1 *填入上表中。
当i=2时,递推公式的离散形式为:
式中:
对于任意给定的l,为算出最优的递推函数值F2 *,需将变量 代入上式右边,通过计算比较出个括号中值最小者。括号中第一项由函数F2(P2)得到。第二项由前表中第二行F1 *数据项查得。对于所有l进行上述计算,将结果填入下表中。
递推公式计算表(i=2)
Pr2 | Pr2min | Pr2min+d | Pr2min+2d | …… |
F2 * | …… | |||
P2 * | …… |
当i=3,4,、、、n,按照上述计算方法,我们可以进行第3,4,、、、n步的计算推导,造出与上表现类似的表格。
当所有n步计算和造表完成以后,将所有这些表格汇成总表,如下表:
递推公式计算表(i=n)
◆逆序分配
在完成顺序造表基础上,给定全厂总负荷Prn后,按顺序造表的反方向查表,就能求出各台机组的最优负荷Pi *。具体步骤分两步:第一步:根据给定的全厂总负荷需求Prn,设n台机组全部投入运行,在上表中第3n-2列确定其相应的位置:若有对应功率值,则由表可直接得到该行第3n-1列对应的Fn *值,由该行第3n列得到对应的n号机组所带的最优负荷值Pn *。
第二步:从总负荷Prn中减去n号机组所带的负荷值得Pn *得Pr(n-1),由上表中第3n-5列可以找到相应的位置,由3n-4列得到系统最优Fn-1 *值,由3n-3列得到n-1号机组所带的最优负荷值Pn-1 *按此类推,可以查得全部机组所带最优负荷值。
本发明的有益效果:(补充发明的有益效果)
基于多种约束的动态规划法,可以在满足机组安全性的前提下,大大提高机组的经济性和响应电网负荷需求的能力,并使负荷优化分配功能进一步实用化。
附图说明
图1是本发明的厂级负荷分配主站图。
图2是本发明的机组负荷分配站图。
图3是本发明的方法流程图。
具体实施方式
以下实施例用于说明本发明,但不用来限制本发明的范围。
本发明的数据载体是火电厂SIS系统实时数据库。由华电天仁康派SIS的负荷优化分配模块具体实现。负荷优化分配模块的功能及原理见上述三部分,其具体实现包括以下几部分。但是下述实例也只为说明本发明的技术,并非限制本发明,因此,任何应用本发明技术的修饰与延伸应用,皆不脱离本发明权利要求所保护的范围。
实时数据库。负荷优化分配模块的数据来源是实时数据库,例如PI,eDNA,IH等典型的实时数据库。负荷优化分配模块一方面从数据库中读取需要的实时数据,另一方面还要将煤耗特性参数等计算点存入数据库。
计算站。计算站主要完成机组煤耗特性、各机组优化负荷分配指令等参数的计算和存储。
功能展示。功能展示主要包括两方面的内容(见图1、图2):
■负荷指令和曲线的对比。包括全厂负荷指令和全厂总负荷的曲线对比,各机组负荷指令和实际负荷的曲线对比等;图1
■负荷分配站。包括全厂负荷指令分配站和各机组负荷指令分配站。全厂负荷指令分配站主要完成向机组输出各机组AGC指令或者优化分配指令;机组负荷指令分配站完成机组负荷分配的手动/自动切换功能及手动设置该机组负荷指令功能。图2
图3是本发明的方法流程,其方法步骤已包括在发明内容中,在此不再赘述。
Claims (10)
1.一种基于多种约束规则的火电厂厂级负荷优化分配方法,其步骤如下:
1)建立可组态的输入参数表;
2)建立煤耗特性曲线;
3)进行负荷趋势预测;
4)保证安全性约束规则;
5)实现快速性约束规则;
6)优化经济性约束规则;
7)多约束条件下的动态规划方法实现。
2.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤1)建立可组态的输入参数表;包括如下:
负荷优化分配的参数输入包括三方面的内容,并且这三方面的内容均可组态:
(1)输入/输出信号
包括RB、RD、RU、BI、BD,变负荷速率、实际负荷值、实际负荷指令值、AGC指令值,主蒸汽压力,发电煤耗、供电煤耗,全厂总负荷指令、全厂最大允许总负荷.全厂最小允许总负荷、全厂AGC请求;
(2)厂级组态参数表
包括机组台数、变负荷间隔、煤耗加权系数、日负荷预测加权系数;
(3)机组级组态参数表
变负荷上限、变负荷下限、机组稳定的负荷允许变化值、额定负荷对应磨台数参数。
3.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤2)建立煤耗特性曲线如下:
煤耗特性曲线,计算步骤如下:
■对机组的可变负荷范围进行划分:
n0=(Nmax-Nmin)/Nh
其中,Nmax、Nmim、Nh分别为机组最大、最小允许负荷和变负荷间距,nO为机组可能运行的负荷工作点数;
■计算t0分钟内主要运行参数的方差值,看其是否满足稳定条件;
■若满足稳定条件,则计算t0分钟内平均负荷和平均煤耗;
■将当前数据后推t1分钟,再次计算t0分钟内机组是否稳定;若稳定,则与上次稳定条件下相同负荷点的历史数据进行加权平均,加权方法如下:
Fn0=k1Fn(l-1)+k2Fnl
其中,Fn(l-1)、Fnl、Fn0分别为机组过去、当前和加权后nO负荷点的煤耗值。k1、k2分别为权系数。
4.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤3)进行负荷趋势预测计算如下;
对过去较长一段时间tc内的日负荷曲线各个较短时间段tb内的平均值进行平均,得到过去平均日负荷曲线初值;
对过去一天内的负荷进行统计平均计算,由这些tb时间段内平均值连接而成昨天的日负荷曲线;
对平均日负荷初值和昨天的日负荷曲线进行加权,对明天负荷进行预测,并一直递推计算:
Np=k3Nc+k4Ny
其中,Np、Nc、Ny分别为机组负荷预测输出值、初值、昨天值,k3、k4分别为权系数,经过递推计算,当前负荷预测值将变为下一次负荷预测的初值;
若中调给出第二日负荷调度曲线,则在此曲线基础上进行负荷预测及调整。
5.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤4)保证安全性约束规则如下;
与厂级负荷优化分配相关的安全性因素,包括机组的辅机和控制系统的运行情况,保证安全性步骤如下:
■协调投入
单机至少投入一种协调控制方式,才能参与厂级负荷优化分配;
■单机最大、最小负荷约束
负荷分配值不能超出允许的最大、最小负荷值
■RB
RB发生时,本机将不参与负荷分配;
■RU
RU发生时,本机不允许分配负荷值下降;
■RD
RD发生时,本机不允许分配负荷值上升;
■BI
BI发生时,本机不允许分配负荷值上升;
■BD
BD发生时,本机不允许分配负荷值下降。
6.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤5)实现快速性约束规则如下;
考虑到不同机组响应负荷变化的能力不同,对某台机组所分配的负荷也应该与它这种能力成正比,采用如下公式可以实现这种方法:
其中,Pi为给第i台机组分配的负荷,Vi为第i台机组实际可以达到的变负荷速率。
7.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤6)优化经济性约束规则如下;
■全厂负荷优化分配采用轮流调节的方法,以投入最少机组来完成负荷调节任务为原则,最大限度地减少机组变负荷的频度;
■在选择机组加、减负荷时,应避免机组在短时间内反向变负荷,即机组完成一次加负荷任务后,让其稳定运行一段时间后再去承担减负荷任务,这样能防止机组热负荷下波动产生的疲劳损耗。
8.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤7)多约束条件下的动态规划方法实现如下:
设Prl为状态变量,代表系统负荷值,Pl为决策变量,代表机组的发电功率,Fn(Prl)为最优指标函数,即最小耗量函数,表示系统负荷为Prl时第n级决策完成后系统的总煤耗量,按动态规划最优性原理进行递推计算的步骤如下:
第一级决策:考虑编号为1的机组参与运行时,这时最小耗量函数F1(Pl)即为此机组的耗量特性:
式中,P1min≤Prl=Pl≤P1max
第二级决策:考虑编号为2的机组与第一级决策结果所构成的组合,这时最小耗量函数为:
式中,
P2min≤Prl≤P2max且Prl≠Pl
第n级决策:考虑编号为n的机组与n-1级决策结果所构成的组合,这时最小耗量函数为
式中,
Pkmin≤Pl≤Pkmax且Prl≠Pl
同时记录决策结果,类似地,可以继续第n+1,n+2,...级决策的计算,一直到最后一台机组加入运行,完成所有的决策。
9.根据权利要求1所述的负荷优化分配方法,其特征在于,步骤7)多约束条件下的动态规划方法具体实现算法如下:
推导计算公式求解,采用离散造表法,计算分为两步:顺序造表、逆序分配
顺序造表是按照1=1,2,...n的顺序,根据Prn的大小次序,求出与之相对应的Fl *(Prl)和Pl *填入相应的表格中;在此基础上是逆序分配,根据给定的Prl,由表格按逆序方向求出与之相对应的所有Pl k的值
◆顺序造表
当1=1时,
此时Pln in≤Prl≤Pln ax,并且Prl和Pl分别按间隔d分成多个数据点,
于是得到序列:
Prln in,Prln in+d,Prln in+2d,...,Prln in
Plmin,Plmin+d,Plmin+2d,...,Plmln
将上式写为离散形式:
设k=0,1,2、、、可以得到所以对应点的数据,将Fl *,Pl,Pl *填入上表中,
当1=2时,递推公式的离散形式为:
式中:
L=0,1,2......θ1
M=0,1,2......,θm
对于任意给定的1,为算出最优的递推函数值F2 *,需将变m=0,1,2,, 、、、θm代入上式右边,通过计算比较出θm+1个括号中值最小者,括号中第一项由函数F2(P2)得到,第二项由前表中第二行Fl *数据项查得,对于所有1进行上述计算,将结果填入表中
当1=3,4,、、、n,按照上述计算方法,我们可以进行第3,4,、、、n步的计算推导,造出与上表现类似的表格
当所有n步计算和造表完成以后,将所有这些表格汇成总表,
◆逆序分配
在完成顺序造表基础上,给定全厂总负荷Prn后,按顺序造表的反方向查表,就能求出各台机组的最优负荷Pl *。
10.根据权利要求9所述的负荷优化分配方法,其特征在于,所述求出各台机组的最优负荷Pl *,具体步骤分两步:
第一步:根据给定的全厂总负荷需求Prn,设n台机组全部投入运行,在上表中第3n-2列确定其相应的位置:若有对应功率值,则由表可直接得到该行第3n-1列对应的值,由该行第3n列得到对应的n号机组所带的最优负荷值;
第二步:从总负荷Prn中减去n号机组所带的负荷值得Pn *得Pr(n-1),由上表中第3n-5列可以找到相应的位置,由3n-4列得到系统最优Fn-1 *值,由3n-3列得到n-1号机组所带的最优负荷值Pn-1 *
按此类推,可以查得全部机组所带最优负荷值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2006101655646A CN101206754B (zh) | 2006-12-21 | 2006-12-21 | 基于多种约束规则的火电厂厂级负荷优化分配方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2006101655646A CN101206754B (zh) | 2006-12-21 | 2006-12-21 | 基于多种约束规则的火电厂厂级负荷优化分配方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101206754A true CN101206754A (zh) | 2008-06-25 |
CN101206754B CN101206754B (zh) | 2012-05-02 |
Family
ID=39566930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2006101655646A Active CN101206754B (zh) | 2006-12-21 | 2006-12-21 | 基于多种约束规则的火电厂厂级负荷优化分配方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101206754B (zh) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7729809B2 (en) | 2006-06-23 | 2010-06-01 | Saudi Arabian Oil Company | System, method, and program product for targeting and identification of optimal process variables in constrained energy recovery systems |
CN101917015A (zh) * | 2010-07-20 | 2010-12-15 | 国电南瑞科技股份有限公司 | 基于主站agc系统的水电厂振动区跨越方法 |
US8032262B2 (en) | 2009-10-08 | 2011-10-04 | Saudi Arabian Oil Company | System, method, and program product for synthesizing non-constrained and constrained heat exchanger networks |
US8116918B2 (en) | 2006-06-23 | 2012-02-14 | Saudi Arabian Oil Company | Systems, program product, and methods for synthesizing heat exchanger networks that exhibit life-cycle switchability and flexibility under all possible combinations of process variations |
US8116920B2 (en) | 2009-10-08 | 2012-02-14 | Saudi Arabian Oil Company | System, method, and program product for synthesizing non-thermodynamically constrained heat exchanger networks |
US8150560B2 (en) | 2006-06-23 | 2012-04-03 | Saudi Arabian Oil Company | Methods for heat exchanger network energy efficiency assessment and lifetime retrofit |
US8150559B2 (en) | 2006-06-23 | 2012-04-03 | Saudi Arabian Oil Company | Systems and program product for heat exchanger network energy efficiency assessment and lifetime retrofit |
US8311682B2 (en) | 2006-06-23 | 2012-11-13 | Saudi Arabian Oil Company | Systems, program product, and methods for synthesizing heat exchanger networks that account for future higher levels of disturbances and uncertainty, and identifying optimal topology for future retrofit |
US8364327B2 (en) | 2006-06-23 | 2013-01-29 | Saudi Arabian Oil Company | Systems, program product, and methods for targeting optimal process conditions that render an optimal heat exchanger network design under varying conditions |
CN102982488A (zh) * | 2011-05-04 | 2013-03-20 | 通用电气公司 | 用于实现发电厂操作的统计比较的自动化系统和方法 |
US8417486B2 (en) | 2009-10-30 | 2013-04-09 | Saudi Arabian Oil Company | System, method, and program product for synthesizing heat exchanger networks and identifying optimal topology for future retrofit |
CN103138293A (zh) * | 2013-03-04 | 2013-06-05 | 中国神华能源股份有限公司 | 火电厂厂级负荷优化分配方法及系统 |
CN103713613A (zh) * | 2014-01-02 | 2014-04-09 | 国家电网公司 | Propr模式下火电机组负荷优化控制方法 |
CN104123593A (zh) * | 2014-07-16 | 2014-10-29 | 上海交通大学 | 基于煤耗特性曲线在线滚动更新的多模式负荷调度方法 |
CN104866675A (zh) * | 2015-05-27 | 2015-08-26 | 东南大学 | 一种基于特性系数的单抽供热机组热电负荷分配方法 |
CN104901341A (zh) * | 2015-06-26 | 2015-09-09 | 华北电力大学 | 基于机组出力及变负荷速率的火力发电煤耗量计算方法 |
CN105005872A (zh) * | 2015-08-06 | 2015-10-28 | 北京交通大学 | 一种移峰填谷的储能系统的容量配置方法 |
CN105098843A (zh) * | 2015-08-25 | 2015-11-25 | 南京南瑞继保电气有限公司 | 用于火电厂厂级自动发电控制系统的负荷优化分配方法和系统 |
CN105204330A (zh) * | 2015-07-10 | 2015-12-30 | 国电科学技术研究院 | 一种在火电厂汽温系统中牛顿力学控制器的设计方法 |
CN106647255A (zh) * | 2016-09-29 | 2017-05-10 | 国电科学技术研究院 | 按设定误差性能指标函数收敛的火电机组协调控制方法 |
CN107612045A (zh) * | 2017-10-09 | 2018-01-19 | 国网安徽省电力公司 | 一种电厂机组发电量智能分配系统及方法 |
CN107688877A (zh) * | 2017-09-08 | 2018-02-13 | 广东电网有限责任公司电力调度控制中心 | 一种基于新型自组织格栅动态库的负荷分配方法 |
CN107818385A (zh) * | 2017-11-24 | 2018-03-20 | 南瑞集团有限公司 | 一种梯级水电站群实时运行趋势预测方法 |
CN108492047A (zh) * | 2018-03-30 | 2018-09-04 | 南京上古网络科技有限公司 | 基于即时状态延续的水电机组负荷高效分配方法 |
CN108594642A (zh) * | 2018-04-23 | 2018-09-28 | 深圳市华之任有限公司 | 运行功率周期变化设备群负荷均匀化控制方法及系统 |
CN110648031A (zh) * | 2019-11-28 | 2020-01-03 | 广东电网有限责任公司 | 一种基于逆序动态规划的能量路由器最优运行调度方法 |
CN112510703A (zh) * | 2020-11-26 | 2021-03-16 | 贵州电网有限责任公司 | 一种考虑煤耗曲线修正的多能源接入电网优化调度方法 |
CN112836357A (zh) * | 2021-01-15 | 2021-05-25 | 国核电力规划设计研究院有限公司 | 一种基于改进动态规划算法的火电机组负荷优化分配方法 |
CN113268699A (zh) * | 2021-05-20 | 2021-08-17 | 西安热工研究院有限公司 | 一种工业供汽电厂热负荷厂级优化分配系统及方法 |
-
2006
- 2006-12-21 CN CN2006101655646A patent/CN101206754B/zh active Active
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8116918B2 (en) | 2006-06-23 | 2012-02-14 | Saudi Arabian Oil Company | Systems, program product, and methods for synthesizing heat exchanger networks that exhibit life-cycle switchability and flexibility under all possible combinations of process variations |
US8150560B2 (en) | 2006-06-23 | 2012-04-03 | Saudi Arabian Oil Company | Methods for heat exchanger network energy efficiency assessment and lifetime retrofit |
US8150559B2 (en) | 2006-06-23 | 2012-04-03 | Saudi Arabian Oil Company | Systems and program product for heat exchanger network energy efficiency assessment and lifetime retrofit |
US8311682B2 (en) | 2006-06-23 | 2012-11-13 | Saudi Arabian Oil Company | Systems, program product, and methods for synthesizing heat exchanger networks that account for future higher levels of disturbances and uncertainty, and identifying optimal topology for future retrofit |
US8364327B2 (en) | 2006-06-23 | 2013-01-29 | Saudi Arabian Oil Company | Systems, program product, and methods for targeting optimal process conditions that render an optimal heat exchanger network design under varying conditions |
US7729809B2 (en) | 2006-06-23 | 2010-06-01 | Saudi Arabian Oil Company | System, method, and program product for targeting and identification of optimal process variables in constrained energy recovery systems |
US8032262B2 (en) | 2009-10-08 | 2011-10-04 | Saudi Arabian Oil Company | System, method, and program product for synthesizing non-constrained and constrained heat exchanger networks |
US8116920B2 (en) | 2009-10-08 | 2012-02-14 | Saudi Arabian Oil Company | System, method, and program product for synthesizing non-thermodynamically constrained heat exchanger networks |
US8417486B2 (en) | 2009-10-30 | 2013-04-09 | Saudi Arabian Oil Company | System, method, and program product for synthesizing heat exchanger networks and identifying optimal topology for future retrofit |
CN101917015A (zh) * | 2010-07-20 | 2010-12-15 | 国电南瑞科技股份有限公司 | 基于主站agc系统的水电厂振动区跨越方法 |
CN101917015B (zh) * | 2010-07-20 | 2012-12-05 | 国电南瑞科技股份有限公司 | 基于主站agc系统的水电厂振动区跨越方法 |
CN102982488A (zh) * | 2011-05-04 | 2013-03-20 | 通用电气公司 | 用于实现发电厂操作的统计比较的自动化系统和方法 |
CN103138293A (zh) * | 2013-03-04 | 2013-06-05 | 中国神华能源股份有限公司 | 火电厂厂级负荷优化分配方法及系统 |
CN103713613A (zh) * | 2014-01-02 | 2014-04-09 | 国家电网公司 | Propr模式下火电机组负荷优化控制方法 |
CN104123593A (zh) * | 2014-07-16 | 2014-10-29 | 上海交通大学 | 基于煤耗特性曲线在线滚动更新的多模式负荷调度方法 |
CN104123593B (zh) * | 2014-07-16 | 2017-10-31 | 上海交通大学 | 基于煤耗特性曲线在线滚动更新的多模式负荷调度方法 |
CN104866675A (zh) * | 2015-05-27 | 2015-08-26 | 东南大学 | 一种基于特性系数的单抽供热机组热电负荷分配方法 |
CN104866675B (zh) * | 2015-05-27 | 2018-06-01 | 东南大学 | 一种基于特性系数的单抽供热机组热电负荷分配方法 |
CN104901341A (zh) * | 2015-06-26 | 2015-09-09 | 华北电力大学 | 基于机组出力及变负荷速率的火力发电煤耗量计算方法 |
CN104901341B (zh) * | 2015-06-26 | 2017-08-04 | 华北电力大学 | 基于机组出力及变负荷速率的火力发电煤耗量计算方法 |
CN105204330A (zh) * | 2015-07-10 | 2015-12-30 | 国电科学技术研究院 | 一种在火电厂汽温系统中牛顿力学控制器的设计方法 |
CN105204330B (zh) * | 2015-07-10 | 2018-01-09 | 国电科学技术研究院 | 一种在火电厂汽温系统中牛顿力学控制器的设计方法 |
CN105005872A (zh) * | 2015-08-06 | 2015-10-28 | 北京交通大学 | 一种移峰填谷的储能系统的容量配置方法 |
CN105098843A (zh) * | 2015-08-25 | 2015-11-25 | 南京南瑞继保电气有限公司 | 用于火电厂厂级自动发电控制系统的负荷优化分配方法和系统 |
CN105098843B (zh) * | 2015-08-25 | 2017-05-17 | 南京南瑞继保电气有限公司 | 用于火电厂厂级自动发电控制系统的负荷优化分配方法和系统 |
CN106647255B (zh) * | 2016-09-29 | 2019-10-11 | 国电科学技术研究院有限公司 | 按设定误差性能指标函数收敛的火电机组协调控制方法 |
CN106647255A (zh) * | 2016-09-29 | 2017-05-10 | 国电科学技术研究院 | 按设定误差性能指标函数收敛的火电机组协调控制方法 |
CN107688877A (zh) * | 2017-09-08 | 2018-02-13 | 广东电网有限责任公司电力调度控制中心 | 一种基于新型自组织格栅动态库的负荷分配方法 |
CN107688877B (zh) * | 2017-09-08 | 2020-09-25 | 广东电网有限责任公司电力调度控制中心 | 一种基于新型自组织格栅动态库的负荷分配方法 |
CN107612045A (zh) * | 2017-10-09 | 2018-01-19 | 国网安徽省电力公司 | 一种电厂机组发电量智能分配系统及方法 |
CN107818385A (zh) * | 2017-11-24 | 2018-03-20 | 南瑞集团有限公司 | 一种梯级水电站群实时运行趋势预测方法 |
CN107818385B (zh) * | 2017-11-24 | 2022-01-25 | 南瑞集团有限公司 | 一种梯级水电站群实时运行趋势预测方法 |
CN108492047A (zh) * | 2018-03-30 | 2018-09-04 | 南京上古网络科技有限公司 | 基于即时状态延续的水电机组负荷高效分配方法 |
CN108594642A (zh) * | 2018-04-23 | 2018-09-28 | 深圳市华之任有限公司 | 运行功率周期变化设备群负荷均匀化控制方法及系统 |
CN110648031A (zh) * | 2019-11-28 | 2020-01-03 | 广东电网有限责任公司 | 一种基于逆序动态规划的能量路由器最优运行调度方法 |
CN112510703A (zh) * | 2020-11-26 | 2021-03-16 | 贵州电网有限责任公司 | 一种考虑煤耗曲线修正的多能源接入电网优化调度方法 |
CN112510703B (zh) * | 2020-11-26 | 2022-10-04 | 贵州电网有限责任公司 | 一种考虑煤耗曲线修正的多能源接入电网优化调度方法 |
CN112836357A (zh) * | 2021-01-15 | 2021-05-25 | 国核电力规划设计研究院有限公司 | 一种基于改进动态规划算法的火电机组负荷优化分配方法 |
CN113268699A (zh) * | 2021-05-20 | 2021-08-17 | 西安热工研究院有限公司 | 一种工业供汽电厂热负荷厂级优化分配系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101206754B (zh) | 2012-05-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101206754B (zh) | 基于多种约束规则的火电厂厂级负荷优化分配方法 | |
CN101552474B (zh) | 基于稳定断面安全约束的agc分层协调控制方法 | |
Ma et al. | Voltage regulation methods for active distribution networks considering the reactive power optimization of substations | |
CN108846507A (zh) | 基于混合整数二阶锥规划的电-气耦合系统日前经济调度方法 | |
CN102915006B (zh) | 一种冶金企业副产煤气离线分析在线调度方法 | |
CN105098843B (zh) | 用于火电厂厂级自动发电控制系统的负荷优化分配方法和系统 | |
CN107800157A (zh) | 含聚合温控负荷和新能源的虚拟发电厂双层优化调度方法 | |
CN102222906A (zh) | 一种适应多目标的电网分层分区潮流自动控制方法 | |
CN103426035A (zh) | 钢铁行业副产高炉煤气自平衡调度系统及产消量预测方法 | |
CN111342459B (zh) | 一种电力需量决策分析系统及方法 | |
CN103439926A (zh) | 一种钢铁企业煤气优化调度装置 | |
CN114722709B (zh) | 兼顾发电量和最小出力的梯级水库群优化调度方法及系统 | |
CN104113085A (zh) | 一种微电网能量优化管理方法 | |
CN103595061A (zh) | 基于综合效益分析的企业电网无功优化方法及系统 | |
CN110968063A (zh) | 基于人工智能的煤气系统优化调度方法 | |
CN112018823A (zh) | 一种配电网多目标鲁棒优化方法 | |
CN105515010A (zh) | 一种基于合作对策的二级电压协调控制方法及系统 | |
CN101989743B (zh) | 基于直流潮流的节能发电调度优化方法 | |
CN108365637B (zh) | 一种送电计划与抽水储能发电计划优化方法及系统 | |
CN105098788A (zh) | 一种时序递进的无功电压优化调度控制方法 | |
CN105490268A (zh) | 一种交直流互联电网的负荷跟踪方法及系统 | |
CN104424372B (zh) | 用于动力驱动设备选型的蒸汽动力系统建模方法和装置 | |
CN108734419A (zh) | 一种基于知识迁移的高炉煤气调度系统建模方法 | |
CN105743124B (zh) | 一种可再生能源发电的储能配置方法及系统 | |
CN104967130B (zh) | 联网/孤网可转换电力系统的avc控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | "change of name, title or address" | ||
CP03 | "change of name, title or address" |
Address after: 101303 2nd floor, building 307, Guodian New Energy Institute, 9 Yingcai North 2nd Street, future science and Technology City, Changping District, Beijing Patentee after: Guoneng xinkong Internet Technology Co.,Ltd. Address before: 102200, Zhongxing Road 10, Changping District science and Technology Park, Beijing, A277 Patentee before: BEIJING HUADIAN TIANREN ELECTRIC POWER CONTROL TECHNOLOGY Co.,Ltd. |