CN101193812A CNA2006800201292A CN200680020129A CN101193812A CN 101193812 A CN101193812 A CN 101193812A CN A2006800201292 A CNA2006800201292 A CN A2006800201292A CN 200680020129 A CN200680020129 A CN 200680020129A CN 101193812 A CN101193812 A CN 101193812A
Authority
CN
China
Prior art keywords
elevator
controlling elevator
data
measurement results
controlling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006800201292A
Other languages
Chinese (zh)
Other versions
CN101193812B (en
Inventor
星野孝道
鸟谷部训
会田敬一
藤野笃哉
吉川敏文
斋藤达郎
冈部令
池富力
米田健治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN101193812A publication Critical patent/CN101193812A/en
Application granted granted Critical
Publication of CN101193812B publication Critical patent/CN101193812B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B3/00Applications of devices for indicating or signalling operating conditions of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B3/00Applications of devices for indicating or signalling operating conditions of elevators
    • B66B3/002Indicators
    • B66B3/008Displaying information not related to the elevator, e.g. weather, publicity, internet or TV

Abstract

At least the measured values of the landing continuation time, the number of persons using the elevators, and the number of operating cars are displayed along with a graph on a screen so that the actual elevator operating state can be recognized at a glance. Thus, even without using a special device, the operating state in the past and of the present and the convenience specifications setting state are displayed in an at-a-glance form to enable even an unexperted operator to easily recognize them.

Description

Apparatus for controlling elevator
Technical field
The present invention relates to a kind of elevator operation conditions display method of suitable demonstration elevator operation conditions and the device that is used to realize the varied requirement of user.
Background technology
As prior art, a kind of method of personalized assisting system is for example disclosed in patent documentation 1, in the method,, under the state of off line, retrieve implementation method for group's management that can realize user's multiple requirement that operation proposes to elevator control is provided
In addition, disclose a kind of method in patent documentation 2, it has a kind of alerting signal output unit, deterioration whether occurred by this unit judges operation service situation, and occurred worsening and during the decision output alarm signal, exported statistics being judged as with described alerting signal.
And, certain methods is disclosed in patent documentation 3, accepting from elevator control gear the elevator monitoring arrangement of operation conditions, when the elevator operation exception has taken place,, can monitor operation conditions effectively by on telltale, showing operation conditions.
The special fair 07-98624 communique of patent documentation 1 Japan's patent
The patent documentation 2 open patent 2004-26450 of Japan communiques
The patent documentation 3 open patent 2004-189358 of Japan communiques
In described prior art, special-purpose conversion equipment need be set the signal data from apparatus for controlling elevator is carried out conversion, owing to show that required most of function all is arranged on the user end apparatus side, so need to install software, and when carrying out edition upgrading etc., need expensive time and time.
Summary of the invention
According to technology involved in the present invention, a kind of system can promptly be provided, it is by adopting the WEB technology, make the systematic function of picture data all concentrate on the product side, by using WEB browser as the user end apparatus side software, can reduce the intensity of described maintenance activity, and can carry out the exchange of user end apparatus easily and append, in addition can be easily the demonstration and the in-use performance specification of the operation conditions of elevator be changed, thereby can estimate the operation conditions of elevator definitely in simple mode according to user's requirement.
Below represent concrete display method example, the present invention also aims to provide a kind of Presentation Function, it passes through the online mode that the generated cycle with regulation, sequential mode is collected and the record operating data when for example adopting with 0.1 second cycle, and, store the measurement result data of elevator hall call time length, elevator number of users and elevator operation platform number at least according to this operating data.When generating chart according to described canned data, exceed sign that the position mark that shows yardstick can distinguish with normal conditions etc. at the elevator lobby call duration, and show that simultaneously elevator number of users and elevator as its major cause move platform number etc., so, even the beginner also can understand operation conditions easily.
The invention effect
According to the present invention, in service after elevator is paid, even the beginner of elevator management, also can be according to the characteristics in various buildings, easily the in-use performance specification is changed and grasped easily operation conditions, when receiving user's complaint, can promptly take countermeasure, the service that can prevent that operating efficiency from descending can be provided, thereby can avoid causing customer complaint, therefore have the effect that can promote the building value added because of operating efficiency descends.
In addition, according to the present invention, owing to aspect system and arranging, adopted the WEB technology, can append easily and the effect of maintaining operation such as exchange so have, in contrast to this, in the prior art, because most function all is arranged on the user end apparatus side, when needs append and during maintaining operation such as exchange, under the situation of user end apparatus One's name is legion, then need expensive labour and time.
Description of drawings
Fig. 1 is the integral structure figure that has used cluster management system of the present invention.
Fig. 2 is the integral structure figure that has used monomer elevator control system of the present invention.
Fig. 3 is the constructional drawing of the operating data table of one embodiment of the invention.
Fig. 4 is the lift car status data table and the call state structure of data table figure of one embodiment of the invention.
Fig. 5 is a WEB server internal piloting diagram of block of the present invention.
Fig. 6 is the diagram of circuit of the data processing section in the WEB server internal piloting diagram of block of the present invention.
Fig. 7 is the diagram of circuit of an embodiment of in-use performance specification project data setting of the present invention.
Fig. 8 is the diagram of circuit (1) of an embodiment of picture data generation of the present invention.
Fig. 9 is the diagram of circuit (2) of an embodiment of picture data generation of the present invention.
Figure 10 is to use the graph structure figure in the specification project.
Figure 11 is an embodiment (1) of picture data of the present invention.
Figure 12 is an embodiment (2) of picture data of the present invention.
Figure 13 is an embodiment (3) of picture data of the present invention.
Figure 14 is an embodiment (4) of picture data of the present invention.
Figure 15 is an embodiment (5) of picture data of the present invention.
Figure 16 is an embodiment (6) of picture data of the present invention.
Among the figure:
100: group's management control system;
210~2n0: apparatus for controlling elevator;
300: user end apparatus.
The specific embodiment
(embodiment)
For concrete form of implementation of the present invention is described, below with reference to the accompanying drawings, an embodiment of the group management elevator system that can be effectively many elevators be distributed is described in detail.
Fig. 1 is the integral structure figure that has used group management elevator of the present invention system.At first, this group management elevator system has: apparatus for controlling elevator 210,220,2n0 that many elevators are controlled respectively; The operation of each elevator is controlled to obtain group's management control system 100 of optimum operation efficient on the whole; And show the picture data that sends from described control system, and can be to the user end apparatus 300 that shows that specification and various in-use performance specification project claim.
Apparatus for controlling elevator 210,220 ... 2n0 controls the operation of each elevator respectively by operation control system 213 and speed control system 214.Wherein, operation control system 213 is under the control that is positioned at group management control system 100 in-to-in operation management control system 101, carry out and the corresponding to operation of operation scheme that moves automatically and manually operation waits elevator, speed control system 214 is mainly used in to be controlled electrical motor.In addition, each elevator for example is constituted as information with each projects such as switch of load data in the lift car and elevator door respectively and sends to operation management control system 101 in group management control system 100.At this, operation management control system 211 in the apparatus for controlling elevator and WEB server 212 are constituted as in group's management operating is failure to actuate.
In group's management control system 100, operating datas such as elevator information that is at every moment changing and elevator lobby call information are sent to learning system 103, learning system 103 is according to described operating data study traffic, and judgement which kind of operation procedure this moment is more suitable for.Intelligence system 104 uses learning outcome to generate the optimum operation program of corresponding various flows of the people automatically.The described operation procedure of operation management control system 101 usefulness distributes control, and which allocation of elevators decision calls out to elevator lobby, and sends assignment command that elevator lobby calls out etc. to apparatus for controlling elevator.In addition, operation management control system 101 sends to WEB server 102 with described operating data, and as required will from the various requirement of WEB server 102 as instruction send to apparatus for controlling elevator 210,220 ... 2n0.Wherein, WEB server 102 has the function of carrying out the information transmission by the WWW (World Wide Web) that is used as the use of standard document system on the internet.
In user end apparatus 300, for example from making picture data be presented at WEB browser 304 on the telltale 301 in the computer, the requirement instruction of the displaying contents of user instruction and the change of various in-use performance specification project etc. sent to require to send part 302, send to WEB server 102 thereby will require instruction to wait.In WEB server 102, instruction is sent instruction to operation management control system 101 as required, generates necessary picture data simultaneously, and this picture data is sent to picture data accepts part 303.Accept in the part 303 at picture data, will send WEB browser 304 to from the picture data that WEB browser 102 receives.WEB browser 304 is constituted as according to picture data and graphically shows on telltale 301.
Fig. 2 is the system construction figure of monomer elevator, and as can be seen from the figure, compared to Figure 1, operation management control system 211 and WEB server 212 are carried out action, so realize function easily under independent situation.
Fig. 3 represent one embodiment of the invention the time sequential mode operation (state) structure of data table.The collection date of store status data and appointed time section in the data gathering date data table (DATE) 31 (collecting time opening and collection concluding time).Status data table (TDAT) 32 (with reference to Fig. 4) is to be used for the chart of store status data in regular turn, is made of lift car status data table (CPT) 321 and call state data sheet (HCT) 322.
In lift car status data table (CPT) 321, store the data such as elevator position, direction and lift car internal load of each elevator respectively.Call state data sheet (HCT) 322 is at each KOC kind of call, and the elevator lobby call distribution situation of all directions of storage elevator hall call time of origin, each floor and each are taken advantage of and called out login situation, call duration and take advantage of into the concluding time into the emerging bed of interest of layer etc.
Numeric data table (SDAT) the 33rd is used for storing in regular turn the chart of detailed data under the situation that predefined strange phenomena has taken place, be made of call distribution evaluation number table (AST) 331 and parameter list (SPT) 332.
Fig. 5 is WEB server 102,212 an in-to-ins control diagram of block.WEB server 102,212 comprises: data determination part 51, and it is suitable with the data determination unit, according to measuring from the operating data of operation management control system 101,211; Data processing section 52, it is suitable with data processing unit, carries out the statistical treatment and the judgement of determination data and could export and make export permit; The data accumulation part 53 of the data during accumulation is measured; To the output 54 that user end apparatus 300 is exported, it is suitable with the output unit that user end apparatus 300 is exported, and the result of data processing section 52 is outputed to and can realize in the user end apparatus 300 of visual display by computer etc.; Importation 55, it is suitable with the input block of importing from user end apparatus 300, accepts the requirement instruction from user end apparatus 300; And data setting part 56, it judges that according to could exporting of data processing section 52 carrying out operation management control system 101,211 in-to-in specifications changes.
Fig. 6 is that the operation conditions in the data processing section 52 shows and the diagram of circuit that alters the procedure 600 of in-use performance specification project.Below explanation is measured the data of work hours section etc. in the present embodiment and is generated and utilizes the situation of the relevant picture data of situation with it.
In step 601, specify initial in-use performance specification project and enter next procedure 602.
Whether the in-use performance specification project of affirmation appointment in step 602 is the time period that needs change.
As when being confirmed as needing change (in step 602, be judged as " be " time), carrying out the change of the in-use performance specification project of appointment in step 603 handles, as when being confirmed as there is no need to change (be judged as in step 602 " deny " time), affirmation up to all in-use performance specification projects only ends up being, and carries out the processing of step 604 to step 605 repeatedly.
Confirm that in step 606 determination data is whether below specified quantity, if (" is below specified quantity (can continue record usually and accumulate 12 months) " time), then enter step 607, and if (" not more than specified quantity " time), step 609 then entered.
In step 607, measure, and in step 608, write down measurement results by data accumulation part 53 to carry out operating data according to the required project of the operation conditions of Operational Data Analysis elevator.
In step 609, confirm whether to have various requirement from the change request of the in-use performance specification project of user end apparatus 300 and the picture data generation of determination data etc., (" not under the situation of not receiving requirement "), do not carry out the processing of step 610 and step 611 and directly finish.
If in step 610, confirm to have received for example the be on duty time period relevant when requiring to make elevator in the standby to turn back to the requirement etc. of the layer that starts, then carry out the required data setting of in-use performance specification project change and handle with in-use performance specification project.
In step 611, generate picture datas from the data accumulation part 53 of measurement result according to display format (time period, data determination project, in-use performance specification project).
Fig. 7 is the diagram of circuit 700 of a specific embodiment relevant with the data setting treatment step 610 of Fig. 6.
Enter next procedure 702 after in step 701, specifying initial in-use performance specification project.
Whether the in-use performance specification project of confirming appointment in step 702 has change request, as does not have change request (" not "), then enter step 705.
In step 703, carry out the operation history number of times of the in-use performance specification project of appointment is added one processing.This resume number of times is using when the more person of resume number of times begins to show in regular turn when generating picture data.
Carry out the setting change of setting content of the in-use performance specification project of appointment in step 704, the time period that for example is on duty will change to as " elevator being carried out uniform distribution according to the flow of the people situation " this setting content of common specification as " time period that is on duty the elevator in the standby is turned back to start layer " this setting content of selecting specification.
In step 705, confirm whole in-use performance specification projects, if also do not finish (" not "), then enter step 706, confirm the requirement of technical routine etc.
The picture data that Fig. 8 is illustrated in Fig. 6 generates the diagram of circuit 800 of an embodiment of the picture data that generates a plurality of measurement results that can analyze the elevator operation conditions in the treatment step 611.
In step 801, to in the step 608 of Fig. 6, write down in the data accumulation part 53 of measurement result, the data that can be used for the elevator operational application in the data of for example elevator lobby call duration in the demonstration fixed time section that limits, elevator number of users and elevator operation platform number are read into picture and generate with (reading) in the work area.Whether whether in step 802, confirming needs special display condition situation is differently shown, for example confirm with graphical presentation the time the situation that exceeds yardstick or exceed numerical value more than the regulation numerical value etc. than aviation value to be differently shown.
As be confirmed to be when being necessary to be differently shown (in step 802, confirm as " be " time), in step 803, to generating the mark data of distinguishing required special demonstration with the specification project settings in the work area at picture data.
In step 804, generate demonstration specification according to picture with the content of work area and chart yardstick etc., generate print area at least can with the corresponding picture data of width of the A4 size original copy of horizontal placement.
The picture data that Fig. 9 is illustrated in Fig. 6 generates the diagram of circuit of an embodiment of the picture data that generates elevator in-use performance specification project in the treatment step 611.
In step 901, begin in regular turn whole in-use performance specification projects to be sorted from the more person of operation history number of times.
In step 902, specify initial in-use performance specification project, in step 903, for example repeat the processing of steps performed 904,906,907 at the power user who gets permission to change all events (processing), repeat to carry out 905,906,907 processing for domestic consumer, use the work area thereby whole projects are read into the picture generation.
In step 908, generate demonstration specification according to picture with the content of work area and chart yardstick etc., generate print area at least can with the corresponding picture datas that are used for showing in the user end apparatus 300 with telltale of width of the A4 size original copy of horizontal placement.
Figure 10 represents the structure of data sheet (UTBL) of the in-use performance specification project of one embodiment of the invention.(standard specification of specification or select the specification content when conduct that setting item title and manufacturer are recommended among the UTL1~UTLn) is dispatched from the factory, data setting information storage such as the required for example fixed time section of various in-use performance specifications, floor name are on the setting data hurdle (among the UDAT1~UDATn) on the item-title hurdle.In addition, also has grade hurdle (ULVL1~ULVLn) and operation information hurdle (UINFO1~UINFOn), the grade hurdle (records among the ULVL1~ULVLn) and the corresponding information of various usage license grades (for example could reading and writing and show), and (store the operating conditions of the number of operations that comprises usage license grade among the UINFO1~UINFOn), for example represent that the user can only be in the information that reads the enterprising enforcement usefulness of special-purpose grade to having finished the project of setting by elevator maintenance maintenance company on the operation information hurdle.
Figure 11 is an embodiment of the picture data of generation in the step 804 of Fig. 8, in the present embodiment, three projects (elevator lobby call duration and elevator number of users and the average elevator operation platform number (summation (platform time)/minute of time is enrolled in group's management of=each elevator) measured respectively in all directions up and down of each floor) have been specified as the mensuration project, the demonstration yardstick is a standard scale, as display format, adopted the display mode that for example shows simultaneously as the elevator number of users and the elevator operation platform number of the major cause that causes the elevator lobby call duration to prolong, below this has been elaborated.
Monitor status when the expression of the demonstration of picture data shown in Figure 11 example monitors according to the elevator operation conditions in 100 couples of time period 10:00~10:30 of group's management control system of Fig. 1 comprises the viewing area NWTM of current time, the viewing area WT of displaying contents title, the time period viewing area ST that shows operation conditions, title viewing area ADT1 and AST2, the viewing area ADS1 and the ADS2 that show the yardstick explanation, the combination viewing area ADTBL1 and the ADTBL2 of the chart that uses determination data and chart label and character and generate, do not need the title of the mensuration project that shows by floor and the combination viewing area BDT1 of determination data, print button PRT as printing beginning decision button, download the download button DL of beginning decision button as picture data, the button that decision turns back to last picture promptly returns a picture button RTN.
In addition, embodiment shown in Figure 12 is a specific embodiment of further understanding one day the user who utilizes situation who utilizes situation and each time period at hope, in the drawings, arrange according to the time period, aggregate value or aviation value as the whole floors that comprise up direction and down direction, measurement result project to appointment shows, thus can be at a glance and grasp running state definitely.
In addition, embodiment shown in Figure 13 be at hope further understand one month utilize situation and the user's who utilizes situation of each day specific embodiment in the week, in the drawings, show with the sky to be the aggregate value or the aviation value of unit in regular turn according to the date, measurement result to appointment shows, thus also can be at a glance and grasp running state definitely.
Figure 14 represents the lattice in the elevator lobby call duration hurdle of Figure 11 have been carried out the situation of change.
Among the figure, the elevator lobby call duration of bottom up direction has exceeded yardstick, for this reason, and the size by magnifying text and additional *(asterisk) CHKM distinguishes with this and general value.
Figure 15 is illustrated in an embodiment of the picture data that is generated in the step 906 of Fig. 9, and it can confirm the setting content of all in-use performance specification projects according to number of operations in the guide look mode.
Figure 16 represents to wish to change the specification content among Figure 15 and presses the embodiment that the SET button enters shown elevator in-use performance specification situation of coming out when setting picture.

Claims (26)

1. an apparatus for controlling elevator is used to control monomer elevator, has the data bank of storage elevator operating data,
It has the elevator operation and management control system, described elevator operation and management control system has the WEB server, the WWW that this server has by being used as the use of standard document system on the internet carries out the function that information sends, user end apparatus is connected with described WEB server by communication unit, and have the WEB browser that the picture data to a plurality of measurement results of being generated according to operating data by described WEB server etc. shows, on this user end apparatus, have the demonstration of the operation conditions of elevator and the change function that the in-use performance specification changes.
2. apparatus for controlling elevator as claimed in claim 1 is characterized in that, a plurality of measurement results that can analyze the elevator operation conditions in a plurality of measurement results that generate according to described operating data to the major general are presented on the picture.
3. apparatus for controlling elevator as claimed in claim 1, it is characterized in that, count these three measurement results to the major general according to the elevator lobby call duration in a plurality of measurement results of described operating data generation, elevator number of users and elevator operation platform and be presented on the picture.
4. apparatus for controlling elevator as claimed in claim 3 is characterized in that, described elevator operation platform number is the interior average elevator operation platform number of minute that is illustrated in regulation.
5. apparatus for controlling elevator as claimed in claim 3 is characterized in that, described elevator operation platform number is the interior minimum elevator operation platform number of minute that is illustrated in regulation.
6. apparatus for controlling elevator as claimed in claim 1 is characterized in that, will comprise that whole floors of up direction and down direction or one day aggregate value or aviation value show at least according to a plurality of measurement results conducts that described operating data generates.
7. apparatus for controlling elevator as claimed in claim 6 is characterized in that, the project that will be limited to appointment according to a plurality of measurement results that described operating data generates shows.
8. apparatus for controlling elevator as claimed in claim 7 is characterized in that, shows a plurality of measurement results that generate according to described operating data in the mode of arranging according to the time period.
9. apparatus for controlling elevator as claimed in claim 7 is characterized in that, shows a plurality of measurement results that generate according to described operating data in the mode of arranging according to chronological order.
10. apparatus for controlling elevator as claimed in claim 1 is characterized in that, will be limited to the appointed time section according to a plurality of measurement results that described operating data generates and show.
11. apparatus for controlling elevator as claimed in claim 1 is characterized in that, the floor that will be limited to regulation according to a plurality of measurement results that described operating data generates shows.
12. apparatus for controlling elevator as claimed in claim 1 is characterized in that, it is that usually said html document data generate that described picture data uses the data that do not rely on application software, therefore also can use being merely able to show under the environment of text.
13. apparatus for controlling elevator as claimed in claim 12 is characterized in that, the label that the use form is used is usually said form label, and the color differentiating by character and character can carry out chart and show.
14. apparatus for controlling elevator as claimed in claim 13 is characterized in that, can change the yardstick of the lattice on the chart.
15. apparatus for controlling elevator as claimed in claim 13 is characterized in that, can show by numerical value to show the chart that combines.
16. apparatus for controlling elevator as claimed in claim 13 is characterized in that, can will exceed the position of yardstick and partly make a distinction usually.
17. each the described apparatus for controlling elevator as claim 12 to 16 is characterized in that, when the content of described picture data is printed, generate print area at least can with the corresponding picture data of width of the A4 size original copy of horizontal placement.
18. apparatus for controlling elevator as claimed in claim 6 is characterized in that, when the picture data of a plurality of measurement results of having downloaded described generation etc., can download the picture data of the detailed measurement result that comprises each floor.
19. apparatus for controlling elevator as claimed in claim 10 is characterized in that,, urges and downloading on turning back to during a picture having passed through specific time.
20. apparatus for controlling elevator as claimed in claim 1 is characterized in that, automatically downloads to user end apparatus according to designated time intervals.
21. apparatus for controlling elevator as claimed in claim 1 is characterized in that, at the project that can change the described in-use performance specification of claim 1, can set relative importance value by user and elevator maintenance maintenance company at least.
22. apparatus for controlling elevator as claimed in claim 1 is characterized in that, at the project that can change the described in-use performance specification of claim 1, more person begins to show in regular turn from operation history.
23. apparatus for controlling elevator as claimed in claim 1 is characterized in that, at the project that can change the described in-use performance specification of claim 1, and the preferential project that meets the building characteristics that shows.
24. each the described apparatus for controlling elevator as claim 21 to 23 is characterized in that, at the project of having been carried out setting change by elevator maintenance maintenance company, the user can not be operated this situation to these projects inform the user at least.
25. each the described apparatus for controlling elevator as claim 1 to 24 is characterized in that, has only the people who obtains the apparatus for controlling elevator usage license can the demonstration and the in-use performance specification of operation conditions be changed.
26. apparatus for controlling elevator as claimed in claim 25 is characterized in that, can be according to the usage license grade restriction opereating specification of apparatus for controlling elevator.
CN2006800201292A 2005-09-27 2006-09-22 Group managemtn elevator system Active CN101193812B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2005279018A JP4928761B2 (en) 2005-09-27 2005-09-27 Group management elevator system
JP279018/2005 2005-09-27
PCT/JP2006/318817 WO2007037175A1 (en) 2005-09-27 2006-09-22 Elevator control system

Publications (2)

Publication Number Publication Date
CN101193812A true CN101193812A (en) 2008-06-04
CN101193812B CN101193812B (en) 2012-03-28

Family

ID=37899602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006800201292A Active CN101193812B (en) 2005-09-27 2006-09-22 Group managemtn elevator system

Country Status (4)

Country Link
JP (1) JP4928761B2 (en)
CN (1) CN101193812B (en)
HK (1) HK1119643A1 (en)
WO (1) WO2007037175A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111689322A (en) * 2019-03-13 2020-09-22 株式会社日立大厦系统 Visualization device and visualization method for elevator running state and elevator control system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5986911B2 (en) * 2012-12-13 2016-09-06 株式会社日立製作所 Elevator operation monitoring system
WO2020225875A1 (en) * 2019-05-08 2020-11-12 株式会社日立ビルシステム Operation state display system and operation state display method
WO2022176003A1 (en) * 2021-02-16 2022-08-25 株式会社日立製作所 Elevator operation information display system

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2619464B2 (en) * 1988-03-09 1997-06-11 株式会社日立製作所 Elevator visit display
JPH075231B2 (en) * 1989-05-19 1995-01-25 三菱電機株式会社 Operation specification setting device for elevator control
JPH03297764A (en) * 1990-04-13 1991-12-27 Hitachi Ltd Device and method for predicting service performance of elevator
JP2845258B2 (en) * 1993-12-22 1999-01-13 三菱電機株式会社 Elevator monitoring device
JP3428849B2 (en) * 1996-03-08 2003-07-22 三菱電機株式会社 Elevator equipment determination support system
JPH1059634A (en) * 1996-08-20 1998-03-03 Hitachi Ltd Elevator operating specification setting device
JPH10250949A (en) * 1997-03-12 1998-09-22 Hitachi Building Syst Co Ltd Operating condition display device for group supervisory operation elevator
JP2001278556A (en) * 2000-03-30 2001-10-10 Mitsubishi Electric Building Techno Service Co Ltd Remote supervisory system for building facility
JP2002249286A (en) * 2001-02-21 2002-09-03 Hitachi Building Systems Co Ltd Control device for elevator
JP2003182946A (en) * 2001-12-18 2003-07-03 Toshiba Elevator Co Ltd Elevator maintenance system
JP2003267641A (en) * 2002-03-20 2003-09-25 Hitachi Ltd Elevator operational information monitoring system
JP2003300680A (en) * 2002-04-10 2003-10-21 Takao Suzuki Elevator system and method of controlling it
JP2004189358A (en) * 2002-12-09 2004-07-08 Mitsubishi Electric Corp Elevator monitoring device
JP2005193998A (en) * 2003-12-26 2005-07-21 Taisei Corp Operating system of elevator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111689322A (en) * 2019-03-13 2020-09-22 株式会社日立大厦系统 Visualization device and visualization method for elevator running state and elevator control system
CN111689322B (en) * 2019-03-13 2021-08-27 株式会社日立大厦系统 Visualization device and visualization method for elevator running state and elevator control system

Also Published As

Publication number Publication date
HK1119643A1 (en) 2009-03-13
JP4928761B2 (en) 2012-05-09
WO2007037175A1 (en) 2007-04-05
JP2007091354A (en) 2007-04-12
CN101193812B (en) 2012-03-28

Similar Documents

Publication Publication Date Title
JP4939004B2 (en) Elevator inspection report preparation method and inspection report preparation device
US9978186B2 (en) Information reporting system for managing a fleet of an industrial vehicles
US6442459B1 (en) Dynamic aircraft maintenance management system
JP4705833B2 (en) Elevator inspection report generator
CN101193812B (en) Group managemtn elevator system
JP2006056677A (en) Elevator operational situation monitoring system
JP4410859B2 (en) Display system for operation monitoring control in water treatment facilities
CN102438930A (en) Elevator monitoring and control method, program and elevator monitoring and control apparatus
EP2246287B1 (en) A Process for Detecting and Using Data concerning Safety Conditions of Cable or Chain Lifting Apparatus and a Relative Device
JP7057258B2 (en) Building information visualization device
JP7045260B2 (en) Occupancy rate analysis system, availability analysis program, and availability analysis method
JPH0829901B2 (en) Maintenance equipment for building facilities
JP4523432B2 (en) Integrated elevator maintenance information provision system
JPH03297764A (en) Device and method for predicting service performance of elevator
WO2022176003A1 (en) Elevator operation information display system
JPH10124580A (en) Diagnostic report preparation supporting system
JP2023079740A (en) Elevator lifting monitoring system, elevator lifting monitoring method and program
WO2020225875A1 (en) Operation state display system and operation state display method
Beebe Lift management
JPH02138083A (en) Terminal device for elevator
JP2002068610A (en) Method of providing information on elevator facility plan
JP2005154117A (en) Elevator group management support device
JP2002318610A (en) Load adjustment supporting device
JP2000264549A (en) Operation control device for double deck elevator
JPH072444A (en) Research data processing device for elevator replacement site

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1119643

Country of ref document: HK

C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1119643

Country of ref document: HK