Skim coating repair technique for flame resisting wire cable conveying belt Download PDFInfo
- Publication number
- CN101190572A CN101190572A CNA2006101497341A CN200610149734A CN101190572A CN 101190572 A CN101190572 A CN 101190572A CN A2006101497341 A CNA2006101497341 A CN A2006101497341A CN 200610149734 A CN200610149734 A CN 200610149734A CN 101190572 A CN101190572 A CN 101190572A
- Authority
- CN
- China
- Prior art keywords
- carbon black
- bonding
- belt
- glue
- cleaning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Adhesives Or Adhesive Processes (AREA)
Abstract
The invention concretely relates to the restoration technique of an old steel core belt used for a transmission tool. The process is completed by the following steps: 1) cleaning before the restoration: an upper old cover coat and a lower old cover coat of the steel core belt are firstly peeled off; 2) buffing: the cover coat of original belt after being peeled is buffed to increase the surface roughness; 3) cleaning: an adhesive surface is cleaned by a cleaning agent and air dried; 4) preparing glue: sulfur (S), accelerator D, accelerator TMTM, ZnO, MgO, stearic acid, polyethylene wax, moderate supersonic carbon black 220, conductive carbon black (HG-IB), white carbon black (175 model), aluminium hydroxide, ammonium polyphosphate, pentaerythritol, decabromodiphenyl oxide, MB202, triarylphoshate, ultra fine antimony trioxide are added into neoprene adhesive (PM-40) according to proportions and are stirred uniformly; 5) coating: two adhesive interfaces of an original belt and a new belt are coated three times after completing the glue preparation; 6) bonding: the original belt and the new belt are bonded ; 7) press curing.
Description
Technical field
The invention belongs to the recovery technique field of material means of transportation in the industrial production, be specifically related to a kind of renovation technique technology of old steel core band.
Background technology
In the industrial production, conveyer belt not only will bear wearing and tearing, burn into scuffing of institute's transported material etc. in running, also bear certain shear stress, under this working condition, easily cause conveyer belt concentrated wear, breakage to occur, seriously then cause situations such as longitudinal tear.
Goal of the invention:
The present invention is intended to the abrasion condition at steel wire inner core conveyer belt, and a kind of reliable and stable renovation technique is provided.
Summary of the invention
The present invention is achieved through the following technical solutions:
1) repair before cleaning: earlier the old rubber cover up and down of steel core band is peeled off, peel off stepmother's tape thickness tolerance to be controlled at ± the 0.5mm scope in.
2) polishing: the original tape rubber cover polishing after will peeling off increases surface roughness.
3) cleaning: clean bonding plane with cleaning agent, and make it dry.
4) join glue: in neoprene (PM-40), add in proportion sulphur (S), diphenylguanidine, TM monex TM, ZnO, MgO, stearic acid, Tissuemat E, in super carbon black 220, conductive carbon black (HG-IB) white carbon black (175#) aluminium hydroxide, APP, pentaerythrite, deca-BDE, MB202, triaryl phosphate, superfine antimony trioxide and stir.Required each component ratio is: neoprene (PM-40) 52.6-53%, sulphur (S) 0.43-0.45%, diphenylguanidine 0.52-0.54%, TM monex TM 0.46-0.5%, ZnO 2.1-2.3%, MgO 4.3-4.5%, stearic acid 0.89-0.9%, Tissuemat E 2.1-2.3%, in super carbon black 220 3.5-3.54%, conductive carbon black (HG-IB) 3.06-3.1%, white carbon black (175#) 7.44-7.5%, aluminium hydroxide 3.94-3.98%, APP 1.3-1.34%, pentaerythrite (carefully) 3.92-4.0%, deca-BDE 4.3-4.5%, MB2021.72-2.0%, triaryl phosphate 4.3-4.5%, superfine antimony trioxide 2.1-2.3%
5) gluing: join glue finish after in 1 hour to master tape with newly be with two bonding planes gluing three times respectively.Pressure a little during brushing ground floor glue, brushing second layer glue when treating the glued membrane solvent evaporates to leather hard, the gluing temperature is 40~50 ℃.
6) bonding: superimposed two bonding planes make it to combine closely.
7) press cure: the semi-finished product after bonding are put as vulcanizer hot plate center.The control vapour pressure is 0.32Mpa-0.35Mpa, sulfide stress 3Mpa-5Mpa.The sulfuration width should be greater than the semi-finished product width 10mm-12mm after bonding.Sulfidation finishes to close admission valve in preceding 5 minutes and opens exhaust valve, and the adhesive tape after treating will vulcanize after steam is all discharged in the hot plate is pulled out hot plate.
The specific embodiment:
Below in conjunction with example the specific embodiment of this invention is described, but not as the restriction to summary of the invention:
Embodiment 1
1) repair before cleaning: earlier the old rubber cover up and down of steel core band is peeled off, its cover thickness should peel off stepmother's tape thickness tolerance to be controlled at according to new tape thickness or working condition decision ± the 0.5mm scope in.
2) polishing: the original tape rubber cover polishing after will peeling off makes it surface roughness and increases, thereby makes it to strengthen with the contact-making surface of rubber, and adhesive force is also just big more.
3) cleaning: clean bonding plane with cleaning agent, dry naturally, high wind dries up or the far-infrared lamp low temperature drying all can, the rubber cover surface portion after must make polishing must not have dust, water, foreign material and greasy dirt.
4) join glue: in neoprene (PM-40), add in proportion sulphur (S), diphenylguanidine, TM monex TM, ZnO, MgO, stearic acid, Tissuemat E, in super carbon black 220, conductive carbon black (HG-IB) white carbon black (175#) aluminium hydroxide, APP, pentaerythrite, deca-BDE, MB202, triaryl phosphate, superfine antimony trioxide and stir.Required each component ratio is: neoprene (PM-40) 52.8%, sulphur (S) 0.43%, diphenylguanidine 0.54%, TM monex TM 0.48%, ZnO 2.2%, MgO 4.4%, stearic acid 0.9%, Tissuemat E 2.2%, in super carbon black 220 3.5%, conductive carbon black (HG-IB) 3.08%, white carbon black (175#) 7.47%, aluminium hydroxide 3.96%, APP 1.32%, pentaerythrite (carefully) 3.96%, deca-BDE 4.4%, MB2021.76%, triaryl phosphate 4.4%, superfine antimony trioxide 2.2%.
5) gluing: join glue finish after in 1 hour to master tape with newly be with two bonding planes gluing three times respectively.Pressure a little during brushing ground floor glue so that glued membrane can soak into gluing of surfaces preferably, avoids forming local starved or pore; Brushing second layer glue when treating the glued membrane solvent evaporates to leather hard; Cross low available baking lamp as temperature glued membrane is baked to 40 ℃~50 ℃, shorten hardening time to accelerate solvent evaporates.
6) bonding: superimposed two bonding planes make it to combine closely, and should note getting rid of the air between two bonding planes in the adhesion process.
7) press cure: the semi-finished product after bonding are put as vulcanizer hot plate center.The control vapour pressure is 0.32Mpa, sulfide stress 3.5Mpa.Top iron sulfuration width should be advisable greater than the semi-finished product width 10mm after bonding.Sulfidation finishes to close admission valve in preceding 5 minutes and opens exhaust valve, and the adhesive tape after treating will vulcanize after steam is all discharged in the hot plate is pulled out hot plate.
Embodiment 2
1) repair before cleaning: earlier the old rubber cover up and down of steel core band is peeled off, its cover thickness should peel off stepmother's tape thickness tolerance to be controlled at according to new tape thickness or working condition decision ± the 0.5mm scope in.
2) polishing: the original tape rubber cover polishing after will peeling off makes it surface roughness and increases, thereby makes it to strengthen with the contact-making surface of rubber, and adhesive force is also just big more.
3) cleaning: clean bonding plane with cleaning agent, dry naturally, high wind dries up or the far-infrared lamp low temperature drying all can, the rubber cover surface portion after must make polishing must not have dust, water, foreign material and greasy dirt.
4) join glue: in neoprene (PM-40), add in proportion sulphur (S), diphenylguanidine, TM monex TM, ZnO, MgO, stearic acid, Tissuemat E, in super carbon black 220, conductive carbon black (HG-IB) white carbon black (175#) aluminium hydroxide, APP, pentaerythrite, deca-BDE, MB202, triaryl phosphate, superfine antimony trioxide and stir.Required each component ratio is: neoprene (PM-40) 52.8%, sulphur (S) 0.44%, diphenylguanidine 0.53%, TM monex TM 0.48%, ZnO 2.2%, MgO 4.4%, stearic acid 0.88%, Tissuemat E 2.2%, in super carbon black 220 3.52%, conductive carbon black (HG-IB) 3.09%, white carbon black (175#) 7.47%, aluminium hydroxide 3.95%, APP 1.32%, pentaerythrite (carefully) 3.95%, deca-BDE 4.4%, MB202 1.77%, triaryl phosphate 4.4%, superfine antimony trioxide 2.2%.
5) gluing: join glue finish after in 1 hour to master tape with newly be with two bonding planes gluing three times respectively.Pressure a little during brushing ground floor glue so that glued membrane can soak into gluing of surfaces preferably, avoids forming local starved or pore; Brushing second layer glue when treating the glued membrane solvent evaporates to leather hard; Cross low available baking lamp as temperature glued membrane is baked to 40 ℃~50 ℃, shorten hardening time to accelerate solvent evaporates.
6) bonding: superimposed two bonding planes make it to combine closely, and should note getting rid of the air between two bonding planes in the adhesion process.
7) press cure: the semi-finished product after bonding are put as vulcanizer hot plate center.The control vapour pressure is 0.35Mpa, sulfide stress 4.5Mpa.Top iron sulfuration width is greater than the semi-finished product width 10mm after bonding.Sulfidation finishes to close admission valve in preceding 5 minutes and opens exhaust valve, and the adhesive tape after treating will vulcanize after steam is all discharged in the hot plate is pulled out hot plate.
Claims (1)
1. one kind is used for the difficult kiss-coating renovation technique that fires steel cord conveyor belt, it is characterized in that producing as follows:
1) repair before cleaning: earlier the old rubber cover up and down of steel core band is peeled off, peel off stepmother's tape thickness tolerance to be controlled at ± the 0.5mm scope in.
2) polishing: the original tape rubber cover polishing after will peeling off increases surface roughness.
3) cleaning: clean bonding plane with cleaning agent, and make it dry.
4) join glue: in neoprene (PM-40), add in proportion sulphur (S), diphenylguanidine, TM monex TM, ZnO, MgO, stearic acid, Tissuemat E, in super carbon black 220, conductive carbon black (HG-IB) white carbon black (175#) aluminium hydroxide, APP, pentaerythrite, deca-BDE, MB202, triaryl phosphate, superfine antimony trioxide and stir.
5) gluing: join glue finish after in 1 hour to master tape with newly be with two bonding planes gluing three times respectively.Pressure a little during brushing ground floor glue, brushing second layer glue when treating the glued membrane solvent evaporates to leather hard.Described gluing temperature is 40~50 ℃.
6) bonding: superimposed two bonding planes make it to combine closely.
7) press cure: the semi-finished product after bonding are put as vulcanizer hot plate center press cure.The control vapour pressure is 0.32Mpa-0.35Mpa, sulfide stress 3Mpa-5Mpa.The sulfuration width should be greater than the semi-finished product width 10mm-12mm after bonding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2006101497341A CN101190572A (en) | 2006-11-20 | 2006-11-20 | Skim coating repair technique for flame resisting wire cable conveying belt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2006101497341A CN101190572A (en) | 2006-11-20 | 2006-11-20 | Skim coating repair technique for flame resisting wire cable conveying belt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101190572A true CN101190572A (en) | 2008-06-04 |
Family
ID=39485837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2006101497341A Pending CN101190572A (en) | 2006-11-20 | 2006-11-20 | Skim coating repair technique for flame resisting wire cable conveying belt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101190572A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804698A (en) * | 2010-03-20 | 2010-08-18 | 太原钢铁(集团)有限公司 | Repairing method of local damage of steel-core rubber belt |
CN101934588A (en) * | 2010-08-30 | 2011-01-05 | 任子成 | Method for repairing broken rubber conveying belt and heating device thereof |
CN102211411A (en) * | 2011-03-03 | 2011-10-12 | 新兴铸管股份有限公司 | Method for repairing broken belt with large inclination angle |
CN102585318A (en) * | 2011-12-15 | 2012-07-18 | 常熟市新华化工有限公司 | High weather-resistant inflaming retarding special rubber composition |
CN106918491A (en) * | 2017-03-28 | 2017-07-04 | 攀钢集团攀枝花钢铁研究院有限公司 | A kind of rapid prototyping method of overall breaking force of steel wire rope experiment |
CN107521131A (en) * | 2017-09-11 | 2017-12-29 | 无锡宝通科技股份有限公司 | A kind of steel wire rope longitudinal tear fast repairing method |
CN108867072A (en) * | 2017-05-10 | 2018-11-23 | 台州宏元工艺有限公司 | A kind of industrial canvas dipping solution and its preparation process |
-
2006
- 2006-11-20 CN CNA2006101497341A patent/CN101190572A/en active Pending
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804698A (en) * | 2010-03-20 | 2010-08-18 | 太原钢铁(集团)有限公司 | Repairing method of local damage of steel-core rubber belt |
CN101804698B (en) * | 2010-03-20 | 2012-12-26 | 太原钢铁(集团)有限公司 | Repairing method of local damage of steel-core rubber belt |
CN101934588A (en) * | 2010-08-30 | 2011-01-05 | 任子成 | Method for repairing broken rubber conveying belt and heating device thereof |
CN101934588B (en) * | 2010-08-30 | 2013-01-16 | 任子成 | Method for repairing broken rubber conveying belt |
CN102211411A (en) * | 2011-03-03 | 2011-10-12 | 新兴铸管股份有限公司 | Method for repairing broken belt with large inclination angle |
CN102585318A (en) * | 2011-12-15 | 2012-07-18 | 常熟市新华化工有限公司 | High weather-resistant inflaming retarding special rubber composition |
CN102585318B (en) * | 2011-12-15 | 2013-10-02 | 常熟市新华化工有限公司 | High weather-resistant inflaming retarding special rubber composition |
CN106918491A (en) * | 2017-03-28 | 2017-07-04 | 攀钢集团攀枝花钢铁研究院有限公司 | A kind of rapid prototyping method of overall breaking force of steel wire rope experiment |
CN106918491B (en) * | 2017-03-28 | 2019-11-12 | 攀钢集团攀枝花钢铁研究院有限公司 | A kind of rapid prototyping method of overall breaking force of steel wire rope test |
CN108867072A (en) * | 2017-05-10 | 2018-11-23 | 台州宏元工艺有限公司 | A kind of industrial canvas dipping solution and its preparation process |
CN108867072B (en) * | 2017-05-10 | 2020-12-15 | 浙江宏元化纤股份有限公司 | Gum dipping liquid for industrial canvas and preparation process thereof |
CN107521131A (en) * | 2017-09-11 | 2017-12-29 | 无锡宝通科技股份有限公司 | A kind of steel wire rope longitudinal tear fast repairing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101190572A (en) | Skim coating repair technique for flame resisting wire cable conveying belt | |
CN101200625B (en) | Formula of adhesive agent for aircraft tire renewing | |
CN102115542B (en) | Method for adhering vulcanized rubber to metal | |
RU2659999C2 (en) | Surface treatment for structural bonding to aluminum | |
CN107540884B (en) | Method for bonding rubber and metal framework | |
CN101333306B (en) | Rubbering formula for aviation bead wire | |
CN102344767A (en) | Waterproof masking tape and adhesive for same | |
CN102899002B (en) | Adhesive used for bonding vulcanized ethylene propylene diene monomer rubber and cast iron, and application thereof | |
CN105690814A (en) | Conveyor belt damage repairing method | |
WO2015085570A1 (en) | Rubber solid adhesive and preparation method and use thereof | |
CN106633162A (en) | Surface method for improving adhesive property of polyether-ether-ketone and rubber | |
CN103666311A (en) | Hot melt masking tape and production process thereof | |
CN106633539B (en) | A kind of high temperature resistant, oil resistant, Abrasion-proof fluorine rubber rotating lip-type sealing ring and preparation method thereof | |
CN104889041A (en) | Vehicle PVC sealant coating process | |
CN107877404A (en) | A kind of preparation technology of environment-friendly type flexible polishing grinding tool | |
CN102773210B (en) | Method for coating treatment of body finishing paint of railway vehicle | |
CN110497630A (en) | The method for repairing and mending of solid rocket motor case insulation layer surface bulge defect | |
CN106239955A (en) | A kind of tyre rebuilding technique | |
CN108715315B (en) | High-temperature-resistant conveying belt and manufacturing process thereof | |
CN110228215A (en) | A kind of conveyer belt restorative procedure | |
CN101402273A (en) | Manufacturing method of carpet noise insulation pad composite-layer backing material for cars | |
CN207756452U (en) | It is a kind of to form the production equipment of DE Specular Lighting decorative effect on artificial board surface using powdery paints | |
CN115011002A (en) | Vulcanization process for large-size rubber track | |
CN111016225B (en) | Method for repairing conveyor belt by using high-molecular wear-resistant belt | |
CN202766469U (en) | Hot-melt masking tape |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20080604 |