CN101164666A - Fume automatic ventilated spraying system for adsorption tower - Google Patents

Fume automatic ventilated spraying system for adsorption tower Download PDF

Info

Publication number
CN101164666A
CN101164666A CNA2007101203963A CN200710120396A CN101164666A CN 101164666 A CN101164666 A CN 101164666A CN A2007101203963 A CNA2007101203963 A CN A2007101203963A CN 200710120396 A CN200710120396 A CN 200710120396A CN 101164666 A CN101164666 A CN 101164666A
Authority
CN
China
Prior art keywords
spray
spraying system
automatic
female pipe
fume
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101203963A
Other languages
Chinese (zh)
Inventor
蒋丛进
王文杰
周洪光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Guohua Beijing Electric Power Research Institute Co Ltd
Original Assignee
Beijing Guohua Electric Power Engineering Technology Co Ltd
China Shenhua Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Guohua Electric Power Engineering Technology Co Ltd, China Shenhua Energy Co Ltd filed Critical Beijing Guohua Electric Power Engineering Technology Co Ltd
Priority to CNA2007101203963A priority Critical patent/CN101164666A/en
Publication of CN101164666A publication Critical patent/CN101164666A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Chimneys And Flues (AREA)

Abstract

The present invention provides a flue gas automatic-cooling spray system for absorption column. Said flue gas automatic-cooling spray system includes spray subsystem and control subsystem. Said spray subsystem includes failure cooling water tank for storing water; spray main pipe whose one end is connected with said failure cooling water tank, said spray main pipe has at least one automatic valve; spray device connected with another end of spray main pipe, said spray device is placed in the flue stack before absorption column inlet, and has several nozzles. The described control subsystem includes a sensing device for detecting flue gas state in the flue stack before absorption column inlet and a control device which is connected with the sensing device and can be used for controlling automatic valve on the spray main pipe according to the signal given out from sensing device.

Description

The fume automatic ventilated spraying system that is used for the absorption tower
Technical field
The present invention relates to spray system, particularly a kind of fume automatic ventilated spraying system that is used for the absorption tower.
Background technology
In the absorption tower of power plant, in order to guarantee the safe and stable operation of desulphurization system, the flue gas that conventional desulfurization designing requirement enters the absorption tower must meet some requirements, especially certain temperature condition to be satisfied, anticorrosion line with rubber, spraying layer FRP pipeline, demister element of inside, absorption tower etc. can not be damaged.
When the rising of boiler smoke temperature anomaly or whole slurry circulating pump stoppage in transit, high-temperature flue gas does not allow to enter the absorption tower, but enters chimney by gas bypass, enters atmosphere, comes thus the absorption tower is protected.
Yet, in the desulphurization system that the bypass flue is not set, the absorption tower just becomes the essential passage of boiler smoke, can not the satisfied temperature condition if enter the flue gas on absorption tower, will damage anticorrosion line with rubber, spraying layer FRP pipeline, demister element of inside, absorption tower etc. so.
Summary of the invention
In order to address the above problem, promptly for the desulphurization system that the bypass flue is not set, the absorption tower just becomes the essential passage of boiler smoke, then must guarantee to meet the requirements in the flue-gas temperature of absorption tower inlet.Therefore, the present invention proposes at absorption tower inlet the flue gas cool-down spray equipment will be set.In addition, in order to guarantee absorption tower system safety, also require the spray equipment can be according to the flue gas situation of porch, absorption tower and automatic spray.
The fume automatic ventilated spraying system that is used for the absorption tower of the present invention raises or when all slurry circulating pump is stopped transport, carries out the automatic spray cooling at the absorption tower inlet in boiler smoke temperature anomaly, and the temperature that makes the flue gas that enters the absorption tower in allowed limits.
At the fume automatic ventilated spraying system that is used for the absorption tower of the present invention, described fume automatic ventilated spraying system comprises: spray subsystem and RACS,
The spray subsystem comprises: the accident cooling water tank that is used for retaining; The female pipe of the spray that one end is connected with the accident cooling water tank, this sprays has at least one automatic valve on female pipe; With the spray equipment that the other end of the female pipe of spray links to each other, this spray equipment is arranged in the preceding flue of absorption tower inlet, and a plurality of nozzles are arranged,
RACS comprises: the sensing device that detects the flue gas state in the preceding flue of absorption tower inlet; With the control device that links to each other with sensing device, can control the automatic valve that sprays on female pipe according to the signal that sensing device sends.The state of the flue gas in the flue of sensing device detection before the inlet of absorption tower, when the flue gas state is undesirable, sensing device sends signal to control device, thereby control device sends instruction according to this signal to the spray subsystem, opens automatic valve and sprays.
In fume automatic ventilated spraying system of the present invention, above-mentioned sensing device is a temperature sensor, when the temperature of flue gas surpasses setting value, just sends signal to control device immediately.
In fume automatic ventilated spraying system of the present invention, above-mentioned spray equipment has a plurality of branches shower, is equipped with a plurality of nozzles on each branch's shower.
In fume automatic ventilated spraying system of the present invention, the accident cooling water tank is arranged on the top of flue.
In fume automatic ventilated spraying system of the present invention, above-mentioned accident cooling water tank is can be according to the water tank of liquid level automatic water supplement.
In fume automatic ventilated spraying system of the present invention, above-mentioned accident cooling water tank is connected with power plant cooling water water supplement apparatus and/or power plant's fire water equipment.
In fume automatic ventilated spraying system of the present invention, on the accident cooling water tank, be connected with the female pipe of a plurality of sprays, the automatic valve that the female pipe of each spray all has at least one, and each sprays female pipe and respectively is connected with a spray equipment at the other end, these spray equipments are arranged at respectively in the preceding flue of different absorption tower inlets, and a plurality of nozzles are arranged.
In fume automatic ventilated spraying system of the present invention, the female pipe of above-mentioned spray is all connected with the oxidation air pipeline in the middle of mother manages.
In fume automatic ventilated spraying system of the present invention, spray the upstream that automatic valve on female pipe is positioned at the female pipe of spray and the tie point of oxidation air pipeline.
In fume automatic ventilated spraying system of the present invention, in above-mentioned oxidation air pipeline, be provided with the valve of regularly opening automatically.
The invention has the advantages that fume automatic ventilated spraying system can spray cooling to high-temperature flue gas automatically fast in the porch, absorption tower, guarantee the absorption tower inlet temperature within allowed band, the protection absorption tower is not damaged by high temperature; And, because the spray process is all carried out automatically, both guaranteed the safety of desulphurization system, also saved great amount of manpower.
Description of drawings
Fig. 1 is the structural representation that is used for the spray subsystem on absorption tower of the present invention;
Fig. 2 is a spray equipment in the spray subsystem shown in Figure 1 and a concrete structure layout drawing of nozzle thereof.
The explanation of Reference numeral:
Flue gas flue before the inlet of 1 absorption tower
2 spray equipments
The 2a nozzle
The female pipe of 3 sprays
4a, 4b automatic valve
5 accident cooling water tanks
6 oxidation air pipelines
The 6a automatic valve
The specific embodiment
Below, embodiments of the present invention are described with reference to the accompanying drawings.
At the fume automatic ventilated spraying system that is used for the absorption tower of the present invention, described fume automatic ventilated spraying system comprises: spray subsystem and RACS.
As shown in Figure 1, the spray subsystem has: the accident cooling water tank 5 that is used for retaining; The female pipe 3 of the spray that one end is connected with accident cooling water tank 5, the female pipe 3 of this spray has at least one automatic valve 4a; With the spray equipment 2 that the other end of the female pipe 3 of spray links to each other, this spray equipment 2 is arranged in the preceding flue 1 of absorption tower inlet, and a plurality of nozzle 2a are arranged.In actual applications,, more closely sealing safer in order when closing, to realize, the female pipe 3 of spray can also have another automatic valve 4b.And described RACS and automatic valve 4a, 4b are equipped with standby electricity, as battery, therefore, can guarantee that automatic valve 4a, 4b also can open fast under the situation of power plant's dead electricity.
RACS comprises: the sensing device that detects the flue gas state in the preceding flue 1 of absorption tower inlet; With the signal that links to each other with sensing device, can send according to sensing device to spraying the automatic valve 4a on female pipe 3, the control device that 4b controls.The state of the flue gas in the flue 1 of sensing device detection before the inlet of absorption tower, when the flue gas state is undesirable, for example when flue-gas temperature is higher than predetermined value, sensing device sends signal to control device, thereby control device sends instruction according to this signal to the spray subsystem, opens automatic valve 4a, 4b and sprays.At this moment, accident cooling water tank 5 is arranged on the top of flue, and spray system adopts the gravity flow mode.And when the liquid level of accident cooling water tank 5 was reduced to predetermined altitude, it can automatic water supplement.
In addition, according to as mentioned above, above-mentioned sensing device can be temperature sensor as required, when the temperature of flue gas surpasses predetermined value, just sends signal to control device immediately.
And above-mentioned spray equipment 2 has a plurality of branches shower, is respectively equipped with a plurality of nozzle 2a on these branch's showers.As shown in Figure 2, branch's shower is with the setting that is spaced of 1100mm, and then the spacing with 1400mm respectively is provided with 3 nozzles on each branch's shower.Certainly, above-mentioned arrangement setting be a kind of for example, the number of branch's shower and nozzle can be according to the size of flue and concrete the setting.
And above-mentioned accident cooling water tank 5 is connected with power plant cooling water water supplement apparatus and/or power plant's fire water equipment, so that moisturizing.
In spray system of the present invention, on accident cooling water tank 5, can be connected with the female pipe 3 of a plurality of sprays, the automatic valve that the female pipe of each spray all has at least one, and each sprays female pipe and respectively is connected with a spray equipment at the other end, these spray equipments are arranged at respectively in the preceding flue of different absorption tower inlets, and a plurality of nozzles are arranged.
In addition, in spray system of the present invention, the female pipe 3 of above-mentioned spray is all connected with oxidation air pipeline 6 in the middle of mother manages, and, spray the upstream that automatic valve on female pipe all is positioned at the female pipe 3 of spray and the tie point of oxidation air pipeline 6.And, in above-mentioned oxidation air pipeline 6, be provided with the automatic valve 6a that regularly opens automatically.Automatic valve 6a regularly opens automatically, and automatic valve 4a, the 4b on the female pipe 3 of spray closes when opening, and can regularly purge the nozzle 2a in the flue with oxidation air thus, prevents that nozzle 2a from not resulting in blockage owing to not moving for a long time.
In addition; flue gas cool-down spray equipment 2 should be arranged in the horizontal segment of the former flue gas flue before the inlet of absorption tower; apart from absorption tower inlet certain distance; in the state of accident; spray equipment is opened fast; can reduce flue-gas temperature, the anticorrosion lining and the absorption tower internal unit of protection flue gas flue are not destroyed by high temperature.
Technical scope of the present invention not only is confined to the content in the above-mentioned explanation, those skilled in the art can be under the prerequisite that does not break away from the technology of the present invention thought, the foregoing description is carried out various deformation and modification, and these distortion and revise to work as and belong in the scope of the present invention.

Claims (10)

1. a fume automatic ventilated spraying system that is used for the absorption tower is characterized in that, described fume automatic ventilated spraying system comprises: spray subsystem and RACS,
The spray subsystem comprises: the accident cooling water tank that is used for retaining; The female pipe of the spray that one end is connected with the accident cooling water tank, this sprays female pipe and has at least one automatic valve; With the spray equipment that the other end of the female pipe of spray links to each other, this spray equipment is arranged in the preceding flue of absorption tower inlet, and a plurality of nozzles are arranged,
RACS comprises: the sensing device that detects the flue gas state in the preceding flue of absorption tower inlet; With the control device that links to each other with sensing device, can control the automatic valve that sprays on female pipe according to the signal that sensing device sends.
2. fume automatic ventilated spraying system according to claim 1 is characterized in that, described sensing device is a temperature sensor.
3. fume automatic ventilated spraying system according to claim 1 is characterized in that, described spray equipment has a plurality of branches shower, is equipped with a plurality of nozzles on each branch's shower.
4. fume automatic ventilated spraying system according to claim 1 is characterized in that the accident cooling water tank is arranged on the top of flue.
5. fume automatic ventilated spraying system according to claim 4 is characterized in that, described accident cooling water tank is can be according to the water tank of liquid level automatic water supplement.
6. fume automatic ventilated spraying system according to claim 5 is characterized in that, described accident cooling water tank is connected with power plant cooling water water supplement apparatus and/or power plant's fire water equipment.
7. fume automatic ventilated spraying system according to claim 1, it is characterized in that, on the accident cooling water tank, be connected with the female pipe of a plurality of sprays, the automatic valve that the female pipe of each spray all has at least one, and each sprays female pipe and respectively is connected with a spray equipment at the other end, these spray equipments are arranged at respectively in the preceding flue of different absorption tower inlets, and a plurality of nozzles are arranged.
8. according to claim 1 or 7 described fume automatic ventilated spraying systems, it is characterized in that the female Guan Douyu oxidation air of described spray pipeline is connected.
9. fume automatic ventilated spraying system according to claim 8 is characterized in that, sprays the upstream that automatic valve on female pipe is positioned at the female pipe of spray and the tie point of oxidation air pipeline.
10. absorption tower according to claim 8 is characterized in that, is provided with the valve of regularly opening automatically in above-mentioned oxidation air pipeline.
CNA2007101203963A 2007-08-17 2007-08-17 Fume automatic ventilated spraying system for adsorption tower Pending CN101164666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101203963A CN101164666A (en) 2007-08-17 2007-08-17 Fume automatic ventilated spraying system for adsorption tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101203963A CN101164666A (en) 2007-08-17 2007-08-17 Fume automatic ventilated spraying system for adsorption tower

Publications (1)

Publication Number Publication Date
CN101164666A true CN101164666A (en) 2008-04-23

Family

ID=39333602

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101203963A Pending CN101164666A (en) 2007-08-17 2007-08-17 Fume automatic ventilated spraying system for adsorption tower

Country Status (1)

Country Link
CN (1) CN101164666A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102218257A (en) * 2011-06-20 2011-10-19 武汉龙净环保工程有限公司 Absorption column inlet flushing and desuperheating device in smoke gas desulfurization system
CN107120886A (en) * 2017-05-18 2017-09-01 华电电力科学研究院 Thermal power plant's automatic cooling system and its application method
CN110115929A (en) * 2018-02-05 2019-08-13 宝塔国际石化工程技术有限公司 A kind of sulfur recovery facility sour gas alkali washing process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102218257A (en) * 2011-06-20 2011-10-19 武汉龙净环保工程有限公司 Absorption column inlet flushing and desuperheating device in smoke gas desulfurization system
CN107120886A (en) * 2017-05-18 2017-09-01 华电电力科学研究院 Thermal power plant's automatic cooling system and its application method
CN107120886B (en) * 2017-05-18 2022-09-09 华电电力科学研究院有限公司 Automatic cooling system for thermal power plant and use method thereof
CN110115929A (en) * 2018-02-05 2019-08-13 宝塔国际石化工程技术有限公司 A kind of sulfur recovery facility sour gas alkali washing process

Similar Documents

Publication Publication Date Title
CN105727735A (en) Multi-tank easy-to-maintain denitration apparatus
CN101164666A (en) Fume automatic ventilated spraying system for adsorption tower
CN104020737A (en) Slurry circulating pump RB control method of thermal power generating unit
CN101125279B (en) Flue-gas desulfurizing engineering high-temperature flue-gas controlling system and controlling method thereof
CN201091829Y (en) Gas fume automatic temperature drop spray system for absorption tower
CN203990298U (en) A kind of thermal power generation desulphurization system
CN106764447B (en) A kind of urea liquid anti-clogging protection system
CN203355598U (en) Spray device of flue gas desulfurization tower
CN202169134U (en) Novel desulphurization accident flue gas spray cooling system
CN102218257A (en) Absorption column inlet flushing and desuperheating device in smoke gas desulfurization system
CN202532515U (en) Flue gas multilevel cooling device for flue gas desulfurization system
CN202237717U (en) Adsorption tower entrance flushing and temperature reducing device in flue gas desulfurization system
CN103320568B (en) Multifunctional intelligent spray dust collection cooler
CN202438229U (en) Automatic spray device for absorbing tower accident
CN201085988Y (en) Desulfurization absorption system
CN205155918U (en) Vacuum type steam extraction recovery unit
CN105214494B (en) The adjustment method of fired power generating unit SCR denitration system
CN111720738A (en) Chemical device waste liquid collecting system and collecting method
KR101974003B1 (en) Reheater of desulfurization equipment with By-Pass Line
CN202581361U (en) Discharge device of with improved desulfurization chimney
CN101457274B (en) Explosion suppression system and method applied to steel converter gas recovery
CN107185377B (en) Propellant neutralizing, spraying and waste gas absorbing integrated system
CN206508760U (en) The pipe-line system of the supporting slurry circulating pump of desulfuration absorbing tower
CN105674313A (en) Safety protection device for chimney
CN203971233U (en) A kind of fire-fighting spray device of protecting chimney internal cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20090612

Address after: 4 floor, intercontinental tower 16, ande Road, Dongcheng District, Beijing, zip code: 100011

Applicant after: China Shenhua Energy Co

Co-applicant after: Shenhua Guohua (Beijing) Electric Power Research Institute Co., Ltd.

Address before: 4 floor, intercontinental tower 16, ande Road, Dongcheng District, Beijing, zip code: 100011

Applicant before: China Shenhua Energy Co

Co-applicant before: Beijing Guohua Electric Power Engineering Technology Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080423