CN101154170A - Information processing apparatus, control apparatus therefor, control method therefor and control program - Google Patents
Information processing apparatus, control apparatus therefor, control method therefor and control program Download PDFInfo
- Publication number
- CN101154170A CN101154170A CNA2007101028875A CN200710102887A CN101154170A CN 101154170 A CN101154170 A CN 101154170A CN A2007101028875 A CNA2007101028875 A CN A2007101028875A CN 200710102887 A CN200710102887 A CN 200710102887A CN 101154170 A CN101154170 A CN 101154170A
- Authority
- CN
- China
- Prior art keywords
- messaging device
- initialization process
- power supply
- handled
- outage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
- G06F11/2284—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing by power-on test, e.g. power-on self test [POST]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
- Power Sources (AREA)
- Debugging And Monitoring (AREA)
Abstract
An information processing apparatus carrying out hardware diagnosis processing by means of initializing processing of each part of hardware when power supply in the apparatus is started, has a power-off initializing processing part carrying out the hardware diagnosis processing when the power supply in the apparatus is cut off; and a power-off timing control part controlling timing of cutting off the power supply in the apparatus in such a manner that the power supply in the apparatus is carried out after the hardware diagnosis processing and trouble reporting processing carried out by said power-off initializing processing part are finished.
Description
Technical field
The present invention relates to a kind of messaging device and opertaing device thereof, control method and make computing machine carry out the control program of this control method, even relate in particular to a kind of messaging device and opertaing device, control method of the situation that is used for when the hardware of messaging device breaks down, also avoiding hindering normal operation and make computing machine carry out the control program of this control method.
Background technology
For example, for the computing machine that is called as main frame, consider the characteristics of application, should avoid the situation of outage, wherein said main frame is in order to carry out the messaging device of the information processing relevant with the ATM (that is ATM (Automatic Teller Machine)) of bank etc.
In such messaging device, at normal operation period, when only during power initiation is handled (promptly, system initialization process and carry out hardware diagnostic therein and handle during) when breaking down in the nextport hardware component NextPort of operation, can not detect fault in this nextport hardware component NextPort before handling carrying out power initiation.Particularly, for example, when operating in of messaging device stop the end of the year, make that this messaging device is closed after, when this messaging device is restarted in the beginning of next year again, just detect the fault of nextport hardware component NextPort.In this case, before beginning this treatment facility brought into operation, next year could detect fault in the nextport hardware component NextPort immediately.Consider the time that system initialization process is required, usually, determine in messaging device, to start the real time of power initiation processing start-up time according to the operation of formal scheduling.Therefore, when the fault that detects during power initiation is handled in the nextport hardware component NextPort, and when because when recovering fault and needing some defective assembly of replacement, these processing need the corresponding time, out of order situation can occur.That is, operation starts the operation start-up time that it(?) may not can reach above-mentioned formal scheduling, perhaps in the worst case, system down can occur after start-up system.
Fig. 1 and Fig. 2 illustrate the operational flow diagram that is used for illustrating the system start-up processing of carrying out in the prior art when the power supply of log-on message treatment facility.
In Fig. 1,, during power supply in the log-on message treatment facility, in step S2, automatically perform system start-up according to predefined procedure and handle when in step S1.When normal termination system start-up is handled, in step S3, finish power initiation and handle.
Afterwards, at step S4, the OS of log-on message treatment facility (operating system), IPL (initial program loader) etc., therefore, messaging device brings into operation.
Then, when operation,, stop OS etc.,, start predetermined power source and cut off and handle at step S6 at step S5 at (for example the end of the year equal time) Stop message treatment facility of predetermined down periods, thereby at step S7, the operation of termination message treatment facility.
Then, after past down periods, the operation of start information treatment facility once more at step S11, is carried out power initiation and is handled.Then, similarly, at step S12, the executive system initialization process.Then, when in step S13 for being, i.e. during normal termination system initialization process, at step S14, the normal operation of start information treatment facility.
Yet when being not in step S13, when promptly detecting the fault in the hardware during the reservation system diagnostic process in system initialization process, at step S15, notice is the CE (customer engineer) of Surveillance center at a distance, to solve this fault.In addition, at step S16,, in messaging device, carry out dump and handle in response to the detection of hardware fault.
When in step S15 notice distant place Surveillance center, at the step S17 of Fig. 2, CE carries out proper arrangement, with the necessary assembly that obtains to be used to replace, at step S18, in fact carries out the work of replacing assembly.
Afterwards, the power initiation of carrying out once more in the messaging device is handled, at step S20, by the operation of step S11 to S14 start information treatment facility.
Suppose that the time of termination system operation is points in evenings 23 after dump is handled, and be points in mornings 8 in the formal scheduling time of next day system's operation beginning.In this case, power initiation is handled in for example 6 beginnings, with above-mentioned 8 the system operation beginning in morning of normal realization.
Yet, at step S12, when in power initiation is handled, during system initialization process, detecting hardware fault, at step S17, replacing assembly for necessity of this fault that achieves a solution arranges the required time to need quite a lot of time, therefore may not can realize the startup of the normal operation of system in the formal time of arranging (that is, mornings 8 point).Therefore, in fact, the startup meeting of normal operation postpones 4 hours because break down, for example to point in mornings 12.Therefore, according to prior art, then be difficult to the time that effectively reduction system stops.
Especially, in some situation, the messaging device that for example uses in bank moves 24 hours basically continuously, only just understands the halt system operation at the end of the year to first several days of next year or several hrs.In this case, the time of the operation of the system after system closing startup is by strict control.In addition, for for example annual situation that only can make system closing 1 time, in fact to handle also be only can carry out 1 time every year to power initiation.In this case, seldom have an opportunity to detect this fault that only during system initialization process, could find.Therefore, when the operation after system closing is delayed start-up time as mentioned above, the fault of atm feature in the bank may appear for example stopping.
Below, in conjunction with handle unique response error event for power initiation, list the example of the hardware component failures of moving during the system initialization process in power initiation is handled only, comprising:
1) hardware operational mode register fault: owing to the mistake in order to register that the hardware operational mode is set causes;
2) the tuning fault of clock: owing to causing in order to the mistake among the EEPROM (electrically erasable programmable ROM) that preserves tuning data (phase adjusted data);
3) microprogram/tuning file storage medium fault of file/clock is set: owing to the mistake in the hard disk drive of SVP (service processor) causes.
SVP refers to a kind of opertaing device, and it is to have in order to the state of monitor message treatment facility and the application specific processor of operation, and it is realized by the 2nd CPU with a CPU separate configuration of the basic function of carrying out messaging device.Dispose SVP especially as main frame for this messaging device, perhaps as the device of playing an important role relatively, with the continuous operation of guarantee information treatment facility.
TOHKEMY No.2001-142839 discloses a kind of prior art related to the present invention.
Summary of the invention
Consider the problems referred to above, design the present invention, one object of the present invention is to provide a kind of messaging device and opertaing device, control method and makes computing machine carry out the program of this control method, make this messaging device be configured to, even when only findable hardware fault occurs during the initialization process in carrying out the power initiation processing, also can avoid operation to stop.
To achieve these goals, according to the present invention, executive system initialization process when the power supply in this messaging device is cut off; With the actual opportunity of the dump of control in this messaging device so that finish that hardware diagnostic is handled and the signalling trouble processing after carry out dump in this messaging device.
According to first scheme of the present invention, a kind of messaging device is provided, the hardware diagnostic of carrying out in the initialization process during its power supply in starting this messaging device is handled, this messaging device comprises: outage initialization process portion, carry out hardware diagnostic and handle when its power supply in this messaging device is cut off; With outage control part on opportunity, it controls the dump opportunity in this messaging device so that finish to handle by the hardware diagnostic that described outage initialization process portion carries out and the signalling trouble processing after carry out dump in this messaging device.
According to alternative plan of the present invention, a kind of state of monitor message treatment facility and opertaing device of operation of being used for is provided, comprise: energising initialization process portion, the hardware diagnostic of carrying out when its power supply in this messaging device is activated in initialization process is handled; Outage initialization process portion carries out hardware diagnostic and handles when its power supply in this messaging device is cut off; With outage control part on opportunity, it controls the dump opportunity in this messaging device so that finish to handle by the hardware diagnostic that described outage initialization process portion carries out and the signalling trouble processing after carry out dump in this messaging device.
According to third party's case of the present invention, a kind of state of monitor message treatment facility and control method of operation of being used for is provided, the initialization process step that comprises the steps: to switch on, the hardware diagnostic of carrying out when the power supply in this messaging device is activated in the initialization process is handled; Outage initialization process step is carried out hardware diagnostic and is handled when the power supply in this messaging device is cut off; With outage controlled step on opportunity, wherein control the dump opportunity in this messaging device, so that after hardware diagnostic processing that finishes to carry out and signalling trouble processing, carry out the dump in this messaging device by described outage initialization process step.
According to cubic case of the present invention, a kind of messaging device that disposes a plurality of assemblies is provided, comprising: initialization section, when being cut off, carries out its power supply in this messaging device the initialization process of this messaging device; And determination portion, whether determine in initialization process has any assembly to break down in described a plurality of assemblies.
According to the 5th scheme of the present invention, a kind of control method that disposes the messaging device of a plurality of assemblies is provided, comprise the steps: initialization step, when being cut off, carries out the power supply in this messaging device the initialization process of this messaging device; And determining step, whether determine in initialization process has any assembly to break down in described a plurality of assemblies.
Therefore, when stopping this messaging device, promptly when cutting off the electricity supply, also can find the hardware fault of finding during the hardware diagnostic in the system initialization process of execution is handled when the operation of this messaging device begins in the prior art.
Therefore, even be configured to be retrieved as and solve hardware fault and assembly, also can during machine switched off, carry out this and replace processing in order to replace for needing the time to carry out necessity.Therefore, can effectively avoid since hardware fault and after system's operation beginning the problem of the system closing of generation.
Therefore, according to the present invention, can effectively avoid in the prior art owing to the operation in the messaging device that only findable this hardware fault takes place when cutting off the electricity supply stops.
Description of drawings
When describing in detail below reading in conjunction with the accompanying drawings, other purposes of the present invention and further characteristics will become clearer, wherein:
Fig. 1 and Fig. 2 illustrate the operational flow diagram that is used to illustrate problem in the prior art;
Fig. 3 illustrates the example of the hardware configuration of messaging device (server) in an embodiment of the present invention;
Fig. 4 illustrates the functional block diagram of the power initiation function that is used to illustrate SVP subsystem shown in Figure 3;
Fig. 5 illustrates the functional block diagram of the dump function that is used to illustrate SVP subsystem shown in Figure 3;
Fig. 6, Fig. 7, Fig. 8 and Fig. 9 illustrate the operational flow diagram of the power initiation/cut-out operation that is used to illustrate SVP subsystem shown in Figure 3; With
Figure 10 illustrate hardware diagnostic effectively/the invalid configuration diagrammatic sketch that page or leaf is set.
Embodiment
Below, embodiment of the present invention will be described.
In an embodiment of the present invention, when the power supply in the messaging device is cut off, carry out in order to implement the system initialization process of hardware operational diagnostics.Therefore, then can fast detecting arrive, any possible hardware fault exclusive (that is, handling exclusive) for power initiation for initialization process.When the dump in the messaging device, can find fault thus.Usually, according to the formal scheduling of above-mentioned reservation system operation, several hrs or several days were arranged before the power supply of log-on message treatment facility once more.Therefore, can suitably dispose, be to solve the necessary assembly that fault is replaced with the acquisition.Therefore, after the operation of actual beginning system, can avoid taking place the system down of the messaging device of alternate manner.
It should be noted, for with prior art in the hardware diagnostic of implementing when the power supply of log-on message treatment facility carried out handle and distinguish, the hardware diagnostic of carrying out during below in an embodiment of the present invention, with dump is handled and is called " dump diagnostic process ".
In the dump diagnostic process, when the power initiation in the messaging device, in the prior art in these projects of Shi Xianing, carry out during the power supply of all items of system initialization process (removing) in the log-on message treatment facility in order to be connected to the processing of SSU (following description).
When in the dump diagnostic process, finding hardware fault, give Surveillance center at a distance with this signalling trouble, carry out the assembly of necessary arrangement then, and finish corresponding assembly in the shut-in time before the system of formal scheduling moves start-up time and replace to obtain to be used to replace.Therefore, can avoid the failure condition of the system closing of appearance after the operation of beginning system.
In addition, must prevent that above-mentioned notice to remote monitoring center is not fully implemented, this situation is owing to the power supply that is breaking at during notification error in the messaging device causes.For this reason, dispose such structure, make after finishing notification error the actual cut-out of carrying out the power supply in messaging device.Therefore, can be accomplished to the notice of remote monitoring center definitely.
Share above-mentioned SSU (system memory unit) by a plurality of messaging devices via communication network.When the power supply in one of them messaging device was cut off, this messaging device was carried out and is handled, to disconnect from SSU.According to the embodiment of the invention, after the processing that SSU disconnects, carry out the dump diagnostic process in execution.Therefore, if performed startup is handled identical startup and is handled and also carry out in the dump diagnostic process during with power supply in the log-on message treatment facility, then carry out the processing be connected to SSU, in the initialization process of carrying out when this processing is included in power supply in the log-on message treatment facility.Therefore, the SSU of disconnection is connected to messaging device once more.In addition, after the dump diagnostic process, the power supply in messaging device is being carried out under the situation of SSU disconnection process and will be cut off.Therefore, the power supply in messaging device will have problem ground to cut off, and SSU but keeps and being connected of messaging device simultaneously.For fear of this problem condition, preferably, in the dump diagnostic process of the embodiment of the invention, do not comprise processing to the connection of SSU (that is, being respective item) in order to the initialization process that is connected to the assembly that SSU disposes.
The preferred embodiments of the present invention have following characteristics:
1) when the power supply in the messaging device is cut off, in system initialization process, carries out hardware diagnostic.Therefore, then can quick diagnosis have any possible fault, thereby can realize before the operation start time recovering in the system of formal scheduling.
2) said system initialization process and I/O (external interface circuit) dump is handled executed in parallel.Therefore, compared with prior art, the required extra required time of extra executive system initialization process in the time of can being minimized in the messaging device dump.
3) in addition, only when correctly having finished power supply in messaging device and begun during performed system initialization process, performed system initialization process when the just actual subsequently power supply of carrying out in messaging device is cut off.That is, when correctly not finishing power supply in messaging device and begin, during performed system initialization process, then sent the predetermined failure notice.Also executive system initialization process when if the power supply in this case in messaging device is cut off, then system initialization process will can correctly not finished again, therefore, will repeat to notify identical fault to remote monitoring center once more.
4) in addition, preferably, provide traffic handling time (fixed value) to remote monitoring center notice fault for above-mentioned.Then, preferably,, cut off the electricity supply through after the traffic handling time.Therefore, can definitely guarantee to notify fault required in case of necessity between.
5) in addition, carrying out the said system initialization process when cutting off the electricity supply not is necessary for following situation: for example, and the trial run of before the actual motion of messaging device etc., carrying out.In this case, preferably, predetermined set information is provided and measurements (that is, user on the predetermined page that shows on display device operation) is set, arbitrarily to prevent actual execution performed initialization process when the power supply of cut-out messaging device.The actual execution of the system initialization process of carrying out in the time of therefore, can being omitted in the power supply that cuts off in the messaging device.
According to embodiments of the invention, detectable hardware fault in the time of can moving the power supply of opening in the messaging device for the beginning system in the prior art by detection is in advance avoided the system closing that may occur after the operation of beginning system.
Next, the configuration of the embodiment of the invention will be described in detail.
Fig. 3 illustrates the hardware block diagram according to the example of the server 500 of the embodiment of the invention.
As shown in Figure 3, server 500 comprises main system 100 and SVP subsystem 200.
Similarly, SVP subsystem 200 comprises: CPU 201, in order to carry out various operations by carry out the instruction that writes in preset sequence; Input part 202, for example keyboard, mouse etc. are in order to by data perhaps in user's input operation; Display part 203, for example CRT, liquid crystal display etc. are in order to show treatment progress, the result of CPU 201 to the user; Storer 204, for example ROM, RAM etc. treat the program carried out by CPU 201 in order to storage, perhaps can be used as the workspace of CPU 201; Hard disk drive 205 is used for stored programme, data etc.; CD-ROM drive 206 is in order to come from external load program or data as information recording carrier by use CD-ROM 207; With communication unit 208, in order to communicate via communication network 300 (for example internet, LAN, WAN etc.) and external server.
In embodiments of the present invention, with reference to as described in Fig. 4 to Figure 10, SVP subsystem 200 comprises the program of CPU 201 instructions via CD-ROM 207 or via communication network 300 load or unloads, is used for the control method of messaging device with execution as following.Then, this program is installed in the hard disk drive 205, from storer 204, correctly loads this program, and carry out this program by CPU 201.Thus, realize the control method of messaging device in embodiments of the present invention.
Fig. 4 illustrates the block diagram as the power initiation control part 10 of the functional block of SVP subsystem 200; Fig. 5 illustrates the block diagram as the dump control part 20 of another functional block of SVP subsystem 200.Carry out the function of power initiation control part 10 and dump control part 20 according to program by CPU 201.
Power initiation control part 10 comprises: initialization process startup portion 11, initialization process portion 12, initialization process be determination portion 13, notice portion 14, operation startup portion 15 and power initiation fault end portion 16 as a result.
Initialization process startup portion 11 receives the instruction of premise equipment power initiation from the outside, and starts the reservation system initialization process.Initialization process portion 12 carries out the system initialization process (describing with reference to Fig. 9 subsequently) that comprises the initialization diagnosis according to the instruction of initialization process startup portion 11.
Initialization process determination portion 13 has as a result determined whether the system initialization process that correctly end is carried out by initialization process portion 12.As initialization process definite result of determination portion 13 as a result, when determining correctly not finish initialization process, and when having detected fault, notice portion 14 breaks down to the CE of remote monitoring center notice.It should be noted that notice portion 14 also has the function that has correctly finished initialization process to the remote monitoring center notice for corresponding situation.In addition, when initialization result determination portion 13 has detected fault, the server 500 that power initiation fault end portion 16 stops to have fault.This expression, owing to there is fault, server 500 finishes its operation, but might not represent that the power supply in the server 500 is cut off.Therefore, in this case, server 500 can finish its operation under the situation of electric power starting.
When definite result of initialization result determination portion 13 represented correctly to finish initialization process, this instruction to main system 100 of operation startup portion 15 outputs was to start predetermined conventional processing.
Dump control part 20 shown in Fig. 5 comprises: initialization process startup portion 21, initialization process portion 22, initialization process be determination portion 23, notice portion 24, delay portion 25 and dump portion 26 as a result.
Initialization process startup portion 21 receives the instruction of premise equipment power initiation from the outside, and starts the reservation system initialization process.Initialization process portion 22 (is described with reference to Fig. 9 subsequently according to the instruction execution system initialization process of initialization process startup portion 21; And in this case, as mentioned above, system initialization process does not comprise the processing that connects SSU).
Initialization process determination portion 23 has as a result determined whether the system initialization process that correctly end is carried out by initialization process portion 22.
As initialization process definite result of determination portion 23 as a result, when determining correctly not finish initialization process, and when having detected fault, notice portion 24 breaks down to the CE of remote monitoring center notice.
After the result is determined in initialization process determination portion 23 outputs as a result, when carrying out above-mentioned notifier processes perhaps and then in notice portion 24 through after the scheduled delay that is provided with by delay portion 25, the core power supply that dump portion 26 cuts off in the server 500, promptly cut off power supply to each parts except that outside interface circuit 110 in the described server 500 of reference Fig. 3 (that is, CPU 101,201, storer 104,204 etc.).
Parallel with system initialization process portion 22 executive system initialization process, dump portion 26 carries out and handles to be breaking at the power supply in the external interface circuit 110.
Next, with reference to Fig. 6 to Fig. 8, will the operating process of being carried out by SVP subsystem 200 be described.
When SVP subsystem 200 receives the instruction of premise equipment power initiation from the outside,, handle by power initiation control part 10 beginning power initiations at step S31.It should be noted, in embodiments of the present invention, suppose that the power initiation processing is in 6 beginnings in the morning.Then, at step S32, initialization process startup portion 11 beginning system initialization process, initialization process portion 12 actual executive system initialization process.
Then, at step S33, initialization process determination portion 13 has as a result determined whether correctly ends with system initialization process.When definite result when in system initialization process, having detected fault (denying), then at step S34, the initialization process predetermined init state mark that has of determination portion 13 as a result is set to " failure " state.Then, as mentioned above, notice portion 14 exercise notices are handled, and then at step S34A, power initiation fault end portion 16 carries out the predetermined failure end process.
On the other hand, when initialization result determination portion 13 expression correctly during the ends with system initialization process, promptly step S33 is when being, then at step S35, above-mentioned initialization process mark is set to " success " state, and finishes power initiation.Then, operation startup portion 15 provides an instruction to make main system 100 begin conventional operations.At step S37, the main system 100 that receives this instruction thus starts OS (operating system), IPL (initial program loader) etc., and the beginning routine operation, promptly for example about the information processing of the ATM of bank.
Next, when when receiving the instruction of premise equipment dump during the routine operation of server 500 from the outside, at step S38, stop the OS of main system 100, at step S39, the dump control part 20 beginning dumps in SVP subsystem 200 are handled.In dump is handled,, carry out reservation system and block (lock-out) processing, SSU disconnection process etc. at step S40.
Next, at step S42, the initialization process portion 22 of dump control part 20 (in this case, do not comprise with SSU connection processing) before reality starts the reservation system initialization process determines whether the predetermined hardware diagnosis is provided with (describing subsequently) effective.In addition, at step S41, dump portion 26 starts dump and handles, to be breaking at the power supply in the external interface circuit 110.
Above-mentioned hardware diagnostic is provided with expression and makes the invalid information setting of system initialization process in dump is handled for the situation that starts the test run of carrying out before the routine operation of server 500 grades in reality etc.Carry out this setting by CE.For example, the page as shown in figure 10 that shows from the display screen of the display device 203 of SVP subsystem 200, predetermined item (i.e. " IDIAGAT SYSTEM POWER STAND-BY " project) is set to " D ", thus in dump is handled the bypass system initialization process.
When this hardware diagnostic configuration information was set to " D ", when promptly being set in dump is handled the bypass system initialization process, definite result of step S42 was not for, so the bypass system initialization process.Then, dump portion 26 carries out aforesaid dump processing.Promptly, at step S41A, the core power supply of server 500 (promptly, power supply in each parts as mentioned above, be the power supply of CPU 101,201, storer 104,204 etc.) be cut off, therefore at step S41, finish the dump of external interface circuit 110 as mentioned above and handle, handle thereby finish dump.
On the other hand, when the hardware diagnostic setting is set to " E " among the definite result at step S42, that is, when being set in dump is handled the executive system initialization process, definite result of step S42 is for being.Whether in this case, at step S44, initialization process startup portion 21 reads above-mentioned init state mark, successful to determine the system initialization process in power initiation.Thus, when determining that " success " that expression has correctly finished the initialization process in the power initiation is set to the init state mark (, the step S35 of Fig. 6, then among the step S44 of Fig. 7 for being), at step S45, initialization process portion 22 executive system initialization process.Yet, in this case, as mentioned above, carry out except with processing that SSU is connected system initialization process.
On the other hand, when in the initialization process mark, being set to " failure ", promptly in step S44 for not, this is illustrated in the system initialization process in the aforesaid power initiation and has detected fault, be the step S34 of Fig. 6, then system initialization process will no longer be carried out as mentioned above.Therefore, the bypass system initialization process, equally, at step S41A, cut off the core power supply (i.e. power supply in each parts, the i.e. power supply of CPU 101,201, storer 104,204) of server 500, therefore at step S41, finish the dump of external interface circuit 110 and handle, handle thereby finish dump.
After the system initialization process in end step S45, initialization process determination portion 23 as a result determines whether correct ends with system initialization process.When detecting fault, promptly be that promptly, when for example having detected CPU operational mode register fault, at step S47, the notice portion 24 of dump control part 20 does not carry out the notice of the CE of remote monitoring center in step S46 as the result who determines.And then at step S48, the delay portion 25 of dump control part 20 can finish the above-mentioned notifier processes of notice portion 24 definitely with a certain schedule time of dump processing delay that dump portion 26 carries out at this time durations.Therefore, owing to power supply is cut off, so notifier processes can be carried out under interference-free situation.
At step S46, initialization process determination portion 23 outputs are as a result determined after the result, perhaps and then at step S47 and S48, when notice portion 24 has carried out above-mentioned notifier processes through after the scheduled delay that is provided with by delay portion, at step S41A, the above-mentioned core power supply that dump portion 26 cuts off in the server 500.Then, finish the dump of external interface circuit 110 at step S41 and handle, thereby the dump of completing steps S43 is handled.
In addition, at step S49, in response to the notice to remote monitoring center, the CE of remote monitoring center makes necessary configuration, to obtain the necessary assembly in order to replace.So, replace processing at step S50 executive module.Afterwards, carry out the necessary operational testing that in server 500, starts power supply at step S51.Then, carrying out dump once more at step S52 handles.
As shown in Figure 6 and Figure 7, suppose to handle at the dump of 22:30 setting up procedure S39, for example in addition need to be used in 5 hours to carry out in order to the assembly that obtains to replace above-mentioned configuration, actual replace handle, the operation test after replacing it, then at step S45, the dump once more that detects under the situation of fault (at step S46 for not) in system initialization process is handled, until required all processing of step S52 can finish before 4 of the next mornings.Therefore, at second day, step S61 at Fig. 8, start power supply at 6, carry out the system initialization process identical at step S62 then with step S32, therefore at step S63, can be after two hours, promptly corresponding to 8 start-up systems operations (routine operation) of system start-up time of above-mentioned formal arrangement.
Therefore, according to the embodiment of the invention,, in handling, dump can detect this fault in advance even occur in power initiation of the prior art in handling during detected hardware fault.Therefore, after the operation start time of formal scheduling, can effectively guarantee necessary processing required in case of necessity between, promptly handle and operation demonstration in order to the configuration of replacing assembly, the actual replacement, therefore can prevent that the system operation of having arranged from being hindered.
Fig. 9 illustrates the operational flowchart of the operating process of said system initialization process (each among step S32, S45 and the S65).
As shown in Figure 9, for example order is carried out the initialization of the hardware of said system initialization process, server 500, promptly in the initialization of each register of step S71, in the initialization of each clock signal of step S72, in the initialization of the CPU 101 of step S73 and 201 with in the storer 104 of step S74 and 204 initialization.
Then, at step S75, determine that current initialization process is corresponding to initialization process of carrying out (the step S32 among Fig. 6 and each among the step S62 among Fig. 8) or the initialization process of carrying out (the step S45 of Fig. 7, promptly above-mentioned " dump diagnostic process ") in dump is handled in power initiation is handled.In current initialization process during corresponding to the initialization process in dump is handled, carried out (being), in step S75, for being, as mentioned above, skip the processing that is connected with SSU at step S76.
The invention is not restricted to the foregoing description, under the situation that does not break away from the desired key concept of the following claim of the present invention, can carry out various modifications and change.
The present invention is based on and require the right of priority of the Japanese patent application No.2006-263124 of submission on September 27th, 2006, quote its full content by reference at this.
Claims (33)
1. messaging device, the hardware diagnostic of carrying out in the initialization process during its power supply in starting this messaging device is handled, and this messaging device comprises:
Outage initialization process portion carries out hardware diagnostic and handles when its power supply in this messaging device is cut off; With
Outage control part on opportunity, it controls the dump opportunity in this messaging device so that finish to handle by the hardware diagnostic that described outage initialization process portion carries out and the signalling trouble processing after carry out dump in this messaging device.
2. messaging device as claimed in claim 1, the dump in the I/O portion of wherein said outage initialization process portion and this messaging device are handled and are carried out the hardware diagnostic processing concurrently.
3. messaging device as claimed in claim 1, whether the hardware diagnostic that wherein said outage initialization process portion carries out when determining power supply in having started this messaging device is handled and is correctly finished, and and if only if determine the hardware diagnostic of carrying out when the result is the power supply of determining in having started this messaging device and handle when correctly having finished, described outage initialization process portion just carries out hardware diagnostic during the power supply in cutting off this messaging device and handles.
4. messaging device as claimed in claim 1 also comprises:
Notice portion, the result that the hardware diagnostic of carrying out when the power supply that cuts off in described outage initialization process portion in this messaging device is handled are when finding fault, and this notice portion gives notice to predetermined remote monitoring center; Wherein
When described notice portion exercise notice was handled, described outage control part on opportunity postponed section sometime with the dump in this messaging device opportunity, can finish this notifier processes during this time period.
5. messaging device as claimed in claim 1 also comprises:
Setting operation portion by carrying out scheduled operation by the operator, omits the execution that hardware diagnostic is handled when making it possible to cut off power supply in this messaging device in described outage initialization process portion.
6. messaging device as claimed in claim 1, wherein said outage initialization process portion is disposed by second control part, described second control part separates configuration with first control part that disposes for the basic function of carrying out this messaging device, and described second control part is configured to state and the operation in order to monitor this messaging device.
7. messaging device as claimed in claim 1, be provided for notifying the traffic handling time of fault when wherein in this hardware diagnostic is handled, detecting fault, and described outage control part on opportunity cuts off the power supply in this messaging device after this traffic handling time of process.
8. messaging device as claimed in claim 1 also comprises:
Be configured to be used for the parts of the execution that the omission hardware diagnostic is handled when cutting off the power supply of this messaging device.
9. one kind is used for the state of monitor message treatment facility and the opertaing device of operation, comprising:
Energising initialization process portion, the hardware diagnostic of carrying out when its power supply in this messaging device is activated in initialization process is handled;
Outage initialization process portion carries out hardware diagnostic and handles when its power supply in this messaging device is cut off; With
Outage control part on opportunity, it controls the dump opportunity in this messaging device so that finish to handle by the hardware diagnostic that described outage initialization process portion carries out and the signalling trouble processing after carry out dump in this messaging device.
10. opertaing device as claimed in claim 9, the dump in the I/O portion of wherein said outage initialization process portion and this messaging device are handled and are carried out the hardware diagnostic processing concurrently.
11. opertaing device as claimed in claim 9, whether the hardware diagnostic that wherein said outage initialization process portion carries out when determining power supply in having started this messaging device is handled and is correctly finished, and and if only if determine the hardware diagnostic of carrying out when the result is the power supply of determining in having started this messaging device and handle when correctly having finished, described outage initialization process portion just carries out hardware diagnostic during the power supply in cutting off this messaging device and handles.
12. opertaing device as claimed in claim 9 also comprises:
Notice portion, the result that the hardware diagnostic of carrying out when the power supply that cuts off in described outage initialization process portion in this messaging device is handled are when finding fault, and this notice portion gives notice to predetermined remote monitoring center; Wherein
When described notice portion exercise notice was handled, described outage control part on opportunity postponed section sometime with the opportunity of the dump in this messaging device, can finish this notifier processes during this time period.
13. opertaing device as claimed in claim 9 also comprises:
Setting operation portion by carrying out scheduled operation by the operator, omits the execution that hardware diagnostic is handled when making it possible to cut off power supply in this messaging device in described outage initialization process portion.
14. opertaing device as claimed in claim 9, be provided for notifying the traffic handling time of fault when wherein in this hardware diagnostic is handled, detecting fault, and described outage control part on opportunity cuts off the power supply in this messaging device after this traffic handling time of process.
15. opertaing device as claimed in claim 9 also comprises:
Be configured to be used for the parts of the execution that the omission hardware diagnostic is handled when cutting off the power supply of this messaging device.
16. one kind is used for the state of monitor message treatment facility and the control method of operation, comprises the steps:
Energising initialization process step, the hardware diagnostic of carrying out when the power supply in this messaging device is activated in the initialization process is handled;
Outage initialization process step is carried out hardware diagnostic and is handled when the power supply in this messaging device is cut off; With
Outage controlled step on opportunity, wherein control the dump opportunity in this messaging device, so that after hardware diagnostic processing that finishes to carry out and signalling trouble processing, carry out the dump in this messaging device by described outage initialization process step.
17. control method as claimed in claim 16, the dump in the I/O portion of wherein said outage initialization process step and this messaging device are handled and are carried out the hardware diagnostic processing concurrently.
18. control method as claimed in claim 16, whether the hardware diagnostic of carrying out when wherein said outage initialization process step is determined power supply in having started this messaging device is handled is correctly finished, and and if only if determine the hardware diagnostic of carrying out when the result is the power supply of determining in having started this messaging device and handle when correctly having finished, described outage initialization process step is just carried out hardware diagnostic during the power supply in cutting off this messaging device and is handled.
19. control method as claimed in claim 16 also comprises the steps:
Notifying process, the result that the hardware diagnostic of carrying out when the power supply that cuts off in described outage initialization process step in this messaging device is handled are when finding fault, and this notifying process is given notice to predetermined remote monitoring center; Wherein
When described notifying process exercise notice was handled, described outage controlled step on opportunity postponed the dump opportunity in this messaging device, so that can finish this notifier processes.
20. control method as claimed in claim 16 also comprises the steps:
The setting operation step by carrying out scheduled operation by the operator, makes it possible to omit the execution that hardware diagnostic is handled when described cut-out initialization process step is cut off power supply in this messaging device.
21. control method as claimed in claim 16, wherein said outage initialization process step is carried out by second control part, described second control part separates configuration with first control part that disposes for the basic function of carrying out this messaging device, and described second control part is configured to state and the operation in order to monitor this messaging device.
22. control method as claimed in claim 16, be provided for notifying the traffic handling time of fault when wherein in this hardware diagnostic is handled, detecting fault, and described outage controlled step on opportunity is cut off the power supply in this messaging device after this traffic handling time of process.
23. control method as claimed in claim 16 also comprises the steps:
The step that is used for the execution that the omission hardware diagnostic is handled when cutting off the power supply of this messaging device.
24. one kind includes the control program that makes computing machine carry out the instruction of following steps, this control program is configured to the operation in order to the control information treatment facility, and performed step comprises:
Energising initialization process step, the hardware diagnostic of carrying out when the power supply in this messaging device is activated in initialization process is handled;
Outage initialization process step is carried out hardware diagnostic and is handled when the power supply in this messaging device is cut off; With
Outage controlled step on opportunity, wherein control the dump opportunity in this messaging device, so that after hardware diagnostic processing that finishes to carry out and signalling trouble processing, carry out the dump in this messaging device by described outage initialization process step.
25. a messaging device that disposes a plurality of assemblies comprises:
Initialization section is carried out the initialization process of this messaging device when its power supply in this messaging device is cut off; With
Whether determination portion, determining in initialization process has any assembly to break down in described a plurality of assemblies.
26. messaging device as claimed in claim 25 also comprises:
Notice portion, it is notified when described determination portion is determined to have any assembly to break down in described a plurality of assembly and fault occurred.
27. messaging device as claimed in claim 25 also comprises:
Power control part cuts off the power supply in the described messaging device after finishing initialization process, and at the described notice portion exercise notice processing delay dump in this messaging device late, until finishing notifier processes.
28. messaging device as claimed in claim 25, carry out the initialization process of this messaging device during the power initiation of wherein said initialization section in this messaging device, and when in that power initiation is in service when determining to break down in described assembly, described initialization section is not carried out initialization process when cutting off the power supply of described messaging device.
29. a control method that disposes the messaging device of a plurality of assemblies comprises the steps:
Initialization step is carried out the initialization process of this messaging device when the power supply in this messaging device is cut off; With
Whether determining step, determining in initialization process has any assembly to break down in described a plurality of assemblies.
30. the control method of messaging device as claimed in claim 29 also comprises the steps:
Notifying process, fault has appearred in notice when described determining step is determined to have any assembly to break down in described a plurality of assembly.
31. the control method of messaging device as claimed in claim 29 also comprises the steps:
The power supply controlled step is cut off the power supply in the described messaging device after finishing initialization process, and at the described notifying process exercise notice processing delay dump in this messaging device late, until finishing notifier processes.
32. the control method of messaging device as claimed in claim 29, wherein:
Carry out the initialization process of this messaging device during the power initiation of described initialization step in this messaging device, and when in that power initiation is in service when determining to break down, do not carry out initialization process during the power supply of described initialization step in cutting off described messaging device in described assembly.
33. one kind includes the control program that makes computing machine carry out the instruction of following steps, this control program is configured to the operation in order to the control information treatment facility, and this messaging device disposes a plurality of assemblies, and performed step comprises:
Initialization step is carried out the initialization process of this messaging device when the power supply in this messaging device is cut off; With
Whether determining step, determining in initialization process has any assembly to break down in described a plurality of assemblies.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006263124 | 2006-09-27 | ||
JP2006263124A JP4836732B2 (en) | 2006-09-27 | 2006-09-27 | Information processing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101154170A true CN101154170A (en) | 2008-04-02 |
CN100545814C CN100545814C (en) | 2009-09-30 |
Family
ID=38792473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007101028875A Expired - Fee Related CN100545814C (en) | 2006-09-27 | 2007-05-11 | Messaging device and opertaing device thereof, control method |
Country Status (5)
Country | Link |
---|---|
US (1) | US7716526B2 (en) |
EP (1) | EP1906309A3 (en) |
JP (1) | JP4836732B2 (en) |
KR (1) | KR100899582B1 (en) |
CN (1) | CN100545814C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107111542A (en) * | 2015-03-23 | 2017-08-29 | 株式会社东芝 | Information processor |
CN109949516A (en) * | 2019-03-26 | 2019-06-28 | 浪潮金融信息技术有限公司 | A kind of primary assay of the silver doctor sub- equipment end slogan of equipment automatic identification |
CN111381535A (en) * | 2018-12-25 | 2020-07-07 | 佳能株式会社 | Information processing apparatus, control method for information processing apparatus, and storage medium |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI303318B (en) * | 2006-10-18 | 2008-11-21 | Asustek Comp Inc | Testing apparatus and method for testing boot and shut-down process of computer system |
JP5141381B2 (en) * | 2008-06-02 | 2013-02-13 | 富士通株式会社 | Information processing apparatus, error notification program, and error notification method |
JP2010176541A (en) * | 2009-01-30 | 2010-08-12 | Hitachi Automotive Systems Ltd | Electronic control device for vehicle |
JP5839018B2 (en) | 2013-11-07 | 2016-01-06 | カシオ計算機株式会社 | Information terminal, communication system, server, communication method and program |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6431235A (en) * | 1987-07-27 | 1989-02-01 | Hitachi Ltd | Initial self-diagnosis control device for data processor |
JPH0229833A (en) * | 1988-07-20 | 1990-01-31 | Nec Field Service Ltd | Maintenance diagnostic system |
JP3010737B2 (en) * | 1990-11-30 | 2000-02-21 | セイコーエプソン株式会社 | Data backup and restoration method for information processing equipment |
JPH087011A (en) * | 1994-06-15 | 1996-01-12 | Fujitsu Ltd | Automatic transaction device |
US6467054B1 (en) * | 1995-03-13 | 2002-10-15 | Compaq Computer Corporation | Self test for storage device |
JPH10207733A (en) | 1997-01-24 | 1998-08-07 | Oki Inf Syst | Electronic equipment |
JP2001142839A (en) * | 1999-11-18 | 2001-05-25 | Hitachi Ltd | Information processor |
WO2002095556A1 (en) * | 2001-05-18 | 2002-11-28 | Fujitsu Limited | Apparatus having stand-by mode, program, and control method for apparatus having stand-by mode |
GB0216742D0 (en) * | 2002-07-18 | 2002-08-28 | Ricardo Consulting Eng | Self-testing watch dog system |
US7228457B2 (en) * | 2004-03-16 | 2007-06-05 | Arm Limited | Performing diagnostic operations upon a data processing apparatus with power down support |
US7337368B2 (en) * | 2004-06-07 | 2008-02-26 | Dell Products L.P. | System and method for shutdown memory testing |
JP2006227856A (en) * | 2005-02-17 | 2006-08-31 | Hitachi Ltd | Access controller and interface mounted on the same |
-
2006
- 2006-09-27 JP JP2006263124A patent/JP4836732B2/en not_active Expired - Fee Related
-
2007
- 2007-04-18 EP EP07106380A patent/EP1906309A3/en not_active Withdrawn
- 2007-04-26 US US11/790,670 patent/US7716526B2/en not_active Expired - Fee Related
- 2007-05-11 CN CNB2007101028875A patent/CN100545814C/en not_active Expired - Fee Related
- 2007-05-11 KR KR1020070046020A patent/KR100899582B1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107111542A (en) * | 2015-03-23 | 2017-08-29 | 株式会社东芝 | Information processor |
CN111381535A (en) * | 2018-12-25 | 2020-07-07 | 佳能株式会社 | Information processing apparatus, control method for information processing apparatus, and storage medium |
CN109949516A (en) * | 2019-03-26 | 2019-06-28 | 浪潮金融信息技术有限公司 | A kind of primary assay of the silver doctor sub- equipment end slogan of equipment automatic identification |
Also Published As
Publication number | Publication date |
---|---|
CN100545814C (en) | 2009-09-30 |
EP1906309A3 (en) | 2012-01-18 |
EP1906309A2 (en) | 2008-04-02 |
KR20080028751A (en) | 2008-04-01 |
JP4836732B2 (en) | 2011-12-14 |
JP2008083996A (en) | 2008-04-10 |
US20080077823A1 (en) | 2008-03-27 |
KR100899582B1 (en) | 2009-05-27 |
US7716526B2 (en) | 2010-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100545814C (en) | Messaging device and opertaing device thereof, control method | |
US7716520B2 (en) | Multi-CPU computer and method of restarting system | |
CN112948157A (en) | Server fault positioning method, device and system and computer readable storage medium | |
JP2012178014A (en) | Failure prediction/countermeasure method and client server system | |
JPH0526214B2 (en) | ||
Mendiratta | Reliability analysis of clustered computing systems | |
US7886202B2 (en) | System and methods for recording, displaying, and reconstructing computer-based system and user events | |
KR100605031B1 (en) | A method for upgrading and restoring embeded systems by using usb memory device | |
CN111488246A (en) | CP L D upgrading method and device, electronic equipment and readable storage medium | |
CN110968456B (en) | Method and device for processing fault disk in distributed storage system | |
US7533297B2 (en) | Fault isolation in a microcontroller based computer | |
CN115470056A (en) | Method, system, device and medium for troubleshooting power-on starting of server hardware | |
CN117311769B (en) | Server log generation method and device, storage medium and electronic equipment | |
CN112181702A (en) | Thread monitoring method and device | |
JP5574364B2 (en) | Production device operation status management system and production device operation status management method | |
JP3448197B2 (en) | Information processing device | |
KR101408447B1 (en) | Apparatus and method for controlling power of ATM/CD | |
CN110703722A (en) | Control system, control device, and storage medium | |
JP2002215261A (en) | System and method to switch clock of computer system | |
CN110476153A (en) | The method and electronic equipment of access instruction SRAM | |
JP3620984B2 (en) | Computer automatic schedule control system, recording medium therefor, and computer automatic schedule control method | |
TW498276B (en) | Method and system for fast on site deployment of computer equipment in a network computer environment | |
CN117992262A (en) | Fault processing method, sample analyzer and computer readable storage medium thereof | |
CN117891671A (en) | Medical service terminal supervision method, system, electronic equipment and storage medium | |
CN116661393A (en) | Oil product mobile equipment management method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090930 Termination date: 20150511 |
|
EXPY | Termination of patent right or utility model |