CN101144267B - 变电所的钢筋混凝土防洪墙体系 - Google Patents

变电所的钢筋混凝土防洪墙体系 Download PDF

Info

Publication number
CN101144267B
CN101144267B CN2007100714603A CN200710071460A CN101144267B CN 101144267 B CN101144267 B CN 101144267B CN 2007100714603 A CN2007100714603 A CN 2007100714603A CN 200710071460 A CN200710071460 A CN 200710071460A CN 101144267 B CN101144267 B CN 101144267B
Authority
CN
China
Prior art keywords
retaining wall
reinforced concrete
wall
flood
present
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100714603A
Other languages
English (en)
Other versions
CN101144267A (zh
Inventor
吴亮
黄达余
丘文千
祝昌团
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd
Original Assignee
Zhejiang Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Design Institute filed Critical Zhejiang Electric Power Design Institute
Priority to CN2007100714603A priority Critical patent/CN101144267B/zh
Publication of CN101144267A publication Critical patent/CN101144267A/zh
Application granted granted Critical
Publication of CN101144267B publication Critical patent/CN101144267B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

一种变电所钢筋混凝土防洪墙体系,它至少由挡土墙构成,所述的挡土墙由钢筋混凝土构成,挡土墙的内背后面填土构造;在该钢筋混凝土挡土墙的下部相连有横置于土壤内的防洪墙底板并构成整体防渗构造;所述的钢筋混凝土挡土墙的上面相接有钢筋混凝土围墙,在挡土墙的内侧填土中设置有连通场内窨井的排水用软式透水管;它具有减小土方回填,降低土方回填高度及其产生衍生压实、沉降问题;加快施工周期,提高施工质量,减少占地、降低费用等特点。

Description

变电所的钢筋混凝土防洪墙体系
技术领域
本发明涉及的是一种变电所竖向设计和建造中的土建防洪构造措施,尤其是一种变电所的钢筋混凝土防洪墙体系。
背景技术
目前220kV以上变电所的竖向设计,按规范要求,其所址场地设计标高要高出1%的高洪水位之上,同时在高填方区域做浆砌块石重力式挡土墙或放坡,这种设计方法经常碰到的问题是:
1)土方回填工程量大,以一个220kV变电所为例,其一般占地49亩,每1.0m高的填土需土方3.27万m3,费用约98万元,施工期近1个月;
2)浆砌块石重力式挡土墙,也以常规220kV变电所为例,其长度约766m,挡土墙每1.0m高,约需石方1.9m3,则整个围墙石方1445m3,费用22万元,工时近1个月,如果变电所在平原地区则取材困难,沿海地区当地质条件差时,重力式挡土墙的沉降问题更突显,如地基处理则费用、工期更陡增;
3)放坡存在的问题:各种挡墙存在一个高度的经济限制,放坡理论上不存在,一般用在高回填(5m以上)填土,但越高则放坡占地越大,不符合国家建设用地改革,同时高回填大放坡施工压实度要求高,边坡稳定及边坡水土保持的技术要求及费用也较高。
发明内容
本发明的目的在于克服上述存在的不足,而提供一种能保证变电所在发生1%高水位时,变电所场地内不进水,保持设备正常运行的变电所钢筋混凝土防洪墙体系。
本发明的目的是通过如下技术方案来完成的,它至少由挡土墙构成,所述的挡土墙由钢筋混凝土构成,挡土墙的墙后填土构造用特殊级配;在该钢筋混凝土挡土墙的下部相连有横置于土壤内的防洪墙底板并构成整体防渗构造。
所述的钢筋混凝土挡土墙的上面相接有钢筋混凝土围墙,在挡土墙的内侧填土中设置有连通场内窨井的排水用软式透水管。
本发明采用“钢筋砼防洪墙”设计体系后,工期可以节约,费用可以节省约40%,技术经济效果可观,同时景观也大为改善,有较好的推广应用价值。具有减小土方回填,降低土方回填高度及其产生衍生压实、沉降问题;加快施工周期,提高施工质量,减少占地、降低费用等特点。
附图说明
图1是本发明的设计构造示意图。
具体实施方式
下面将结合附图及实施例对本发明作详细的介绍:附图1所示,本发明所述的“钢筋混凝土防洪墙”作为其功能看是挡土墙与防洪墙的二合一,做为围墙的观感要求,其上部是高度为2.5m高的围墙,考虑0.5m超高水位,所以1%水位高是在其墙项下-0.50m处,不足的高度用填土方法来弥补,其对应构造为钢筋混凝土挡土墙,“钢筋砼防洪墙”在常态下为挡土墙,抵抗填土的侧压力,在1%洪水位发生时,上部的钢筋混凝土围墙单独抵抗外侧的水压力,与下部的钢筋混凝土挡土墙一起形成防洪墙,抵抗土压力和水压力,同时满足本身及总体抗渗要求。
本发明它至少由挡土墙构成,所述的挡土墙由钢筋混凝土构成,挡土墙的内背后面填土构造;在该钢筋混凝土挡土墙的下部相连有横置于土壤内的防洪墙底板并构成整体防渗构造。
所述的钢筋混凝土挡土墙的上面相接有钢筋混凝土围墙,在挡土墙的内侧填土中设置有连通场内窨井的排水用软式透水管。
本发明的相关防洪装置:a)大门处的防洪门,类似闸门,为电动双平开式,高度2.5m,宽4.5m,强度要求能抵抗2.0m的水头高并不发生渗漏;b)挡土墙背后填土构造,其土性及配合比执行特殊比例,能与防洪墙底板一起作为整体防渗构造;c)常规挡墙背后的“反滤层”的改进装置:因为防洪墙不能设置有与外界的连通管,故墙面的“反滤”必须反向设置,用软式透水管向场内窨井排水,汇集后经机械外排;d)阻隔外界连通构造:水工排水机械设逆止阀,电气的电缆埋管改进堵料性质与增加堵料长度,以抗抵2.0m高的水头。
附图1中所示的是:钢筋砼挡土墙共2050m3,费用约125万元,填方高度1.30m(其场地标高满足2%高洪水位),填方4.24万m3,127万元。防洪门、水工等构造措施:20万元。该单项工程共252万元,工期2.5个月
它与常规浆砌块石重力式挡土墙工程相比:采用“钢筋砼防洪墙”设计体系后,工期节约1.5个月,费用节省178万元(节省40%的费用),技术经济效果可现,同时景观也大为改善(高填方+围墙外观有时象堡垒),有推广价值,目前在我院设计的省内已有多个变电所正在推广运用。

Claims (1)

1.一种变电所钢筋混凝土防洪墙体系,它至少由挡土墙构成,所述的挡土墙由钢筋混凝土构成,挡土墙的内背后面填土构造;在该钢筋混凝土挡土墙的下部相连有横置于土壤内的防洪墙底板并构成整体防渗构造;所述的钢筋混凝土挡土墙的上面相接有钢筋混凝土围墙,在挡土墙的内侧填土中设置有连通场内窨井的排水用软式透水管。
CN2007100714603A 2007-09-28 2007-09-28 变电所的钢筋混凝土防洪墙体系 Expired - Fee Related CN101144267B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100714603A CN101144267B (zh) 2007-09-28 2007-09-28 变电所的钢筋混凝土防洪墙体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100714603A CN101144267B (zh) 2007-09-28 2007-09-28 变电所的钢筋混凝土防洪墙体系

Publications (2)

Publication Number Publication Date
CN101144267A CN101144267A (zh) 2008-03-19
CN101144267B true CN101144267B (zh) 2010-09-29

Family

ID=39206981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100714603A Expired - Fee Related CN101144267B (zh) 2007-09-28 2007-09-28 变电所的钢筋混凝土防洪墙体系

Country Status (1)

Country Link
CN (1) CN101144267B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452661A (zh) * 2014-11-13 2015-03-25 浙江省电力设计院 一种用于海岸柔性直流换流站和变电站的复合防浪防渗墙及建造方法
CN107059801A (zh) * 2017-05-16 2017-08-18 佛山科学技术学院 一种不锈钢钢筋混凝土水坝
CN110984216A (zh) * 2019-11-22 2020-04-10 上海市建工设计研究总院有限公司 水平t字形钢筋混凝土挡土墙及其施工方法
CN112583046A (zh) * 2020-11-20 2021-03-30 国网山东省电力公司惠民县供电公司 一种远程控制电力调控系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5536113A (en) * 1994-05-16 1996-07-16 North Star Concrete Of Ohio, Inc. Precast concrete wingwall
CN2306290Y (zh) * 1997-09-29 1999-02-03 杨嗣河 组合式预制混凝土围墙
CN2554225Y (zh) * 2002-06-17 2003-06-04 云南玉元公路建设指挥部 座椅式公路护栏

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5536113A (en) * 1994-05-16 1996-07-16 North Star Concrete Of Ohio, Inc. Precast concrete wingwall
CN2306290Y (zh) * 1997-09-29 1999-02-03 杨嗣河 组合式预制混凝土围墙
CN2554225Y (zh) * 2002-06-17 2003-06-04 云南玉元公路建设指挥部 座椅式公路护栏

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
祝昌团等.提高变电所抵御台风能力的对策.浙江建筑23 11.2006,23(11),73-75.
祝昌团等.提高变电所抵御台风能力的对策.浙江建筑23 11.2006,23(11),73-75. *

Also Published As

Publication number Publication date
CN101144267A (zh) 2008-03-19

Similar Documents

Publication Publication Date Title
CN103215960B (zh) 高聚物垂直支护体系注浆方法
CN103758113B (zh) 一种格栅围箍抗液化地基加固方法
CN101096852B (zh) 一种地下建筑物抗浮的方法
CN102926376B (zh) 一种围海造地区域软土地基处理方法
CN103147614B (zh) 多层结构水池及其构建方法
CN107587516A (zh) 一种跟进式高效止水阻砂降水复合系统及其施工方法
CN201485823U (zh) 一种水工沥青混凝土面板的防渗结构
CN101144267B (zh) 变电所的钢筋混凝土防洪墙体系
CN107299650A (zh) 一种远距离沉井排土纠偏方法
CN113818402A (zh) 黏土心墙堆石坝的补强加固结构及其施工方法
CN103967015B (zh) 一种深基坑止水开挖方法及其结构
CN216275518U (zh) 黏土心墙堆石坝的补强加固结构
CN208934002U (zh) 一种挡墙结构
CN202730785U (zh) 用于地下结构抗浮的盲沟排水结构
CN101591906A (zh) 一次插管、多遍真空井点降水动力固结的地基处理方法
CN206346222U (zh) 利用人行道地下空间建造的综合管廊
CN103790150B (zh) 一种基于双井组合式回灌的沉降控制方法
CN203113863U (zh) 多层结构水池
CN106277687A (zh) 模压玻璃钢化粪池的安装方法
CN207228130U (zh) 一种城市综合管廊基坑回填处理组合系统
CN207048004U (zh) 一种用于污水处理系统的粗格栅沉井
CN205000287U (zh) 地下水长期变动区的防渗面板结构
CN205134305U (zh) 一种用于细粒尾矿地基上筑坝的装置
Sieminska-Lewandowska et al. The effect of deep excavation on surrounding ground and nearby structures
Wu et al. Research on Anti-Seepage Technology of Basement in Soft Soil Area by Drainage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP ZHEJIANG ELECTRIC P

Free format text: FORMER NAME: ZHEJIANG PROV. ELECTRIC POWER DESIGN INST.

CP03 Change of name, title or address

Address after: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee after: Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd

Address before: 310011 No. 69, false Hill Road, Shangcheng District, Zhejiang, Hangzhou

Patentee before: Zhejiang Electric Power Design Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100929

Termination date: 20150928

EXPY Termination of patent right or utility model