CN101143675A - Elevator structure and its manufacturing method - Google Patents

Elevator structure and its manufacturing method Download PDF

Info

Publication number
CN101143675A
CN101143675A CNA2007100562032A CN200710056203A CN101143675A CN 101143675 A CN101143675 A CN 101143675A CN A2007100562032 A CNA2007100562032 A CN A2007100562032A CN 200710056203 A CN200710056203 A CN 200710056203A CN 101143675 A CN101143675 A CN 101143675A
Authority
CN
China
Prior art keywords
guide pipe
lifting appliance
captive joint
guiding
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100562032A
Other languages
Chinese (zh)
Other versions
CN100532236C (en
Inventor
贾广生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2007100562032A priority Critical patent/CN100532236C/en
Publication of CN101143675A publication Critical patent/CN101143675A/en
Application granted granted Critical
Publication of CN100532236C publication Critical patent/CN100532236C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to an elevator structure and a method of manufacturing the structure, in particular to an elevator structure supported by a steel structure pipe string and a method of manufacturing the structure, which consists of a steel structure shaft frame, a bottom base, a top base, a structured vertical post, a structured beam, a bearing and running guide pipe string, a bearing device, a balancing and positioning guide pipe string, a lifting device, a lifting device guide pipe and a hydraulic cylinder which are combined by connection, to realize a structure mode of a steel structure elevator which is combined with a guide pipe, a guide post and a guide sleeve which are well matched, and form a functional integrated overall structure. The invention can conduct structured running all-process balance control, positioning and guiding and prevent tilting, changes the mode of the separate structure for a guide device of the car to lift and run along a guide rail, has the advantages of being driven by hydraulic pressure, small area, low cost, simple structure, safety and reliability and stable running, can be designed as a sightseeing elevator, and is applicable in installation in villas, residence houses, airports, hotels and department stores.

Description

Structure of a kind of elevator and preparation method thereof
Technical field:
The present invention relates to structure of a kind of elevator and preparation method thereof, structure of the elevator that particularly a kind of steel structure tubing string cooperates and preparation method thereof belongs to the mechanical elevating technical field.
Background technology: existing elevator all is to be cooperated by guide rail and guide piece that metal material processing becomes, affects the cab body to move along lifting rail by tow chain.Its shortcoming is: complex structure, and area occupied is big, and the additional configurations parts are many, processing and assembling complexity, cost height.
Summary of the invention:
The present invention relates to structure of a kind of elevator and preparation method thereof, structure of the elevator that particularly a kind of steel structure tubing string cooperates and preparation method thereof, changed the split respective outer side edges form of existing elevator cage body guide piece, realized a kind of incorporate steel structure hydraulic pressure elevator integral structure along the lifting rail operation.
Making assemble flow of the present invention is as follows:
Material selection → parts making → Installation and Debugging → finished product.
Of the present inventionly finish by following steps:
One, parts are made:
1, select shape to make measure-alike bottom base and the top base of frame, carrier bar is captiveed joint in the top base middle part with frame, captive joint fixed pulley on the carrier bar.
2, select shape to make structural upright, each layer structure crossbeam and the hoistway framed structure of design length.
3, select shape to make design length weight counterbalance operation guiding tubing string, guide pipe, positioning and guiding balance control guiding tubing string, lifting appliance guide pipe; Guide pipe internal diameter and carrying operation guiding tubing string crest clearance frictional fit, lifting appliance guide pipe internal diameter and positioning and guiding balance control guiding tubing string crest clearance frictional fit.
4, select shape to make counter weight device, the both sides captive joint guide pipe and the tow chain adaptor union of the centre of length.
5, select shape to make lifting appliance, the matrix arm end of lifting appliance is captive joint lifting appliance guide pipe respectively, above captive joint tow chain connecting device.
Two, Installation and Debugging:
Bottom base is placed on the installation site accurately, adjusts the vertical parallel position, captive joint two or four main bodys tubing strings that lead above the bottom base and below the top base; Counter weight device is enclosed within on two weight counterbalance operations guiding tubing strings by the guide pipe on the counter weight device, and the two ends by weight counterbalance operation guiding tubing string are respectively with above bottom base one side frame and below the frame of top base the same side together, captive joint; Lifting appliance is enclosed within on two positioning and guiding balance control guiding tubing strings by the lifting appliance guide pipe of the matrix arm end of lifting appliance, two ends by two positioning and guiding balance controls guiding tubing strings are respectively with the counter weight device homonymy or above opposite side bottom base one side frame and below the frame of top base the same side together, captive joint; Captive joint with carrying cab body top below the lifting appliance guide pipe top captive joint brake gear, lifting appliance; Of inboard the captiveing joint of each layer structure crossbeam with each construction profile column of hoistway framed structure; Bottom base is captiveed joint with building with ground respectively with top base; Tow chain one end is captiveed joint with the connecting device on carrying cab body top, captives joint with the adaptor union on the counter weight device by the fixed pulley on the cooresponding top base, motor towing machine; The motor towing machine drives tow chain traction carrying cab body lifting operation.
Good effect of the present invention is: by steel structure hoistway framework, bottom base, top base, structural upright, the structure crossbeam, weight counterbalance operation guiding tubing string, counter weight device, guiding balance positioning and guiding tubing string, lifting appliance, the lifting appliance guide pipe, the combination of motor towing machine, realized a kind of conduit, guide pillar, the structural pattern of the steel structure elevator of working in coordination between guide pin bushing, constituted functional integral structure, has the omnidistance balance control of structural operation, positioning and guiding, stop to tilt, changed the form of cab body guide piece along the split respective outer side edges of lifting rail operation, counter weight device, the lifting appliance lifting moves omnidistance balance control, area occupied is little, low-cost, simple in structure, safe and reliable, operate steadily, can be designed to various sightseeing elevators, be applicable to villa, dwelling house, the airport, the hotel, the market, install and use.
Description of drawings:
Fig. 1 is the construction profile schematic diagram; Fig. 2 is the Facad structure schematic diagram.
1, bottom base; 2, main body guiding tubing string; 3, counter weight device; 4, guide pipe; 5, weight counterbalance operation guiding tubing string; 6, lifting appliance; 7, matrix arm; 8, motor towing machine; 9, top base; 10, frame; 11, lifting appliance guide pipe; 12, positioning and guiding balance control guiding tubing string; 13, brake gear; 14, carrying cab body; 15, each layer structure crossbeam; 16, hoistway framed structure; 17, tow chain; 18, fixed pulley; 19, adaptor union.
The specific embodiment:
Embodiment 1
The steel house elevator:
One, component design is made:
1, gets length 1500mm * width 200mm * height 100mm shape and make bottom base and top base, getting length 1100mm * width 200mm * height 100mm makes the top base middle part and captives joint carrier bar with frame, captive joint diameter 200mm fixed pulley on the carrier bar.
2, getting length 20000mm * width 150mm * height 150mm shape makes structural upright, gets length 1200mm * width 150mm * height 150mm and make each layer structure crossbeam.
3, get length 19700mm * external diameter 120mm metal pipe material and make weight counterbalance operation guiding tubing string; Get length 300mm * internal diameter 122mm metal pipe material and make guide pipe; Get length 17700mm * external diameter 120mm metal pipe material and make positioning and guiding balance control guiding tubing string; Get length 300mm * internal diameter 122mm metal pipe material and make the lifting appliance guide pipe.
4, get shape and make counter weight device, the both sides captive joint length 300mm * internal diameter 122mm guide pipe and the tow chain adaptor union of the centre of length.
5, get length 1400mm * width 150mm * height 60mm shape and make lifting appliance, the matrix arm end of lifting appliance is captive joint length 300mm * internal diameter 122mm lifting appliance guide pipe respectively, above captive joint tow chain connecting device.
Two, Installation and Debugging:
On bottom base 1 with top base 9 below captive joint four main bodys guiding tubing strings 2; The guide pipes 4 that counter weight device logical 3 is crossed on the counter weight device 3 are enclosed within on two weight counterbalance operations guiding tubing strings 5, and the two ends by weight counterbalance operation guiding tubing string 5 are respectively with above bottom base 1 one side frames and below top base 9 the same side frames 10 together, captive joint; Lifting appliance 6 is enclosed within on two positioning and guiding balance control guiding tubing strings 12 by the lifting appliance guide pipe 11 of matrix arm 7 ends of lifting appliance 6, two ends by two positioning and guiding balance controls guiding tubing strings 12 are respectively with above bottom base 1 frame of counter weight device 3 homonymies and below top base 9 frames together, captive joint; Captive joint with carrying cab body 14 tops below the lifting appliance guide pipe 11 top captive joint brake gears 13, lifting appliance 6; Captive joint each layer structure crossbeam 15 in the position of height 2200mm upwards on each layer ground with hoistway framed structure 16 the inboard of each construction profile column 2; Bottom base 1 is captiveed joint with building with ground respectively with top base 9; Tow chain 17 1 ends are captiveed joint with the connecting device on carrying cab body 14 tops, captive joint with the adaptor union 19 on the counter weight device 3 by the fixed pulley 18 on the cooresponding top base 9, motor towing machine 8; Motor towing machine 8 drives tow chain 17 traction carrying cab bodies 14 liftings operation.The check debugging is qualified, the steel house elevator.
Embodiment 2
Steel structure villa sightseeing elevator:
One, component design is made:
1, gets length 1200mm * width 200mm * height 100mm and 600mm * width 200mm * height 100mm shape and make bottom base and top base, get length 800mm * width 200mm * height 100mm and length 600mm * width 200mm * height 100mm and make the top base middle part and captive joint carrier bar with frame, captive joint diameter 160mm fixed pulley below the carrier bar.
2, getting length 9000mm * width 100mm * height 100mm shape makes structural upright, gets length 1100mm * width 100mm * height 100mm and length 900mm * width 100mm * height 100mm makes each layer structure crossbeam.
3, get length 8700mm * external diameter 60mm metal pipe material and make weight counterbalance operation guiding tubing string; Get length 300mm * internal diameter 62mm metal pipe material and make guide pipe; Get length 8700mm * external diameter 60mm metal pipe material and make positioning and guiding balance control guiding tubing string; Get length 300mm * internal diameter 62mm metal pipe material and make the lifting appliance guide pipe.
4, get shape and make counter weight device, the both sides captive joint length 300mm * internal diameter 62mm guide pipe and the tow chain adaptor union of the centre of length.
5, get length 900mm * width 120mm * height 50mm shape and make lifting appliance, the matrix arm end of lifting appliance is captive joint external diameter 72mm lifting appliance guide pipe respectively, above captive joint tow chain connecting device.
Two, Installation and Debugging:
On bottom base 1 with top base 9 below captive joint four main bodys guiding tubing strings 2; The guide pipes 4 that counter weight device logical 3 is crossed on the counter weight device 3 are enclosed within on two weight counterbalance operations guiding tubing strings 5, and the two ends by weight counterbalance operation guiding tubing string 5 are respectively with above bottom base 1 one side frames and below top base 9 the same side frames 10 together, captive joint; Lifting appliance 6 is enclosed within on two positioning and guiding balance control guiding tubing strings 12 by the lifting appliance guide pipe 11 of matrix arm 7 ends of lifting appliance 6, two ends by two positioning and guiding balance controls guiding tubing strings 12 are respectively with above bottom base 1 frame of counter weight device 3 homonymies and below top base 9 frames together, captive joint; Captive joint with carrying cab body 14 tops below the lifting appliance guide pipe 11 top captive joint brake gears 13, lifting appliance 6; Captive joint each layer structure crossbeam 15 in the position of height 2200mm upwards on each layer ground with hoistway framed structure 16 the inboard of each construction profile column 2; Bottom base 1 is captiveed joint with building with ground respectively with top base 9; Tow chain 17 1 ends are captiveed joint with the connecting device on carrying cab body 14 tops, captive joint with the adaptor union 19 on the counter weight device 3 by the fixed pulley 18 on the cooresponding top base 9, motor towing machine 8; Motor towing machine 8 drives tow chain 17 traction carrying cab bodies 14 liftings operation.The sealing of glass curtain, the check debugging is qualified, steel structure villa sightseeing elevator.
Embodiment 3
Steel structure hall sightseeing elevator:
One, component design is made:
1, gets length 2000mm * width 200mm * height 100mm shape and make bottom base and top base, get length 1600mm * width 200mm * height 100mm and make the top base middle part and captive joint carrier bar with frame, captive joint diameter 200mm fixed pulley below the carrier bar.
2, getting length 15000mm * width 150mm * height 150mm shape makes structural upright, gets length 1200mm * width 150mm * height 150mm and make each layer structure crossbeam.
3, get length 14700mm * external diameter 120mm metal pipe material and make weight counterbalance operation guiding tubing string; Get length 300mm * internal diameter 122mm metal pipe material and make guide pipe; Get length 14700mm * external diameter 120mm metal pipe material and make positioning and guiding balance control guiding tubing string; Get length 300mm * internal diameter 122mm metal pipe material and make the lifting appliance guide pipe.
4, get shape and make counter weight device, the both sides captive joint length 300mm * internal diameter 122mm guide pipe and the tow chain adaptor union of the centre of length.
5, get length 1600mm * width 150mm * height 60mm shape and make lifting appliance, the matrix arm end of lifting appliance is captive joint internal diameter 122mm lifting appliance guide pipe respectively, above captive joint tow chain connecting device.
Two, Installation and Debugging:
On bottom base 1 with top base 9 below captive joint four main bodys guiding tubing strings 2; The guide pipes 4 that counter weight device logical 3 is crossed on the counter weight device 3 are enclosed within on two weight counterbalance operations guiding tubing strings 5, and the two ends by weight counterbalance operation guiding tubing string 5 are respectively with above bottom base 1 one side frames and below top base 9 the same side frames 10 together, captive joint; Lifting appliance 6 is enclosed within on two positioning and guiding balance control guiding tubing strings 12 by the lifting appliance guide pipe 11 of matrix arm 7 ends of lifting appliance 6, two ends by two positioning and guiding balance controls guiding tubing strings 12 are respectively with above bottom base 1 frame of counter weight device 3 homonymies and below top base 9 frames together, captive joint; Captive joint with carrying cab body 14 tops below the lifting appliance guide pipe 11 top captive joint brake gears 13, lifting appliance 6; Captive joint each layer structure crossbeam 15 in the position of height 2200mm upwards on each layer ground with hoistway framed structure 16 the inboard of each construction profile column 2; Bottom base 1 is captiveed joint with building with ground respectively with top base 9; Tow chain 17 1 ends are captiveed joint with the connecting device on carrying cab body 14 tops, captive joint with the adaptor union 19 on the counter weight device 3 by the fixed pulley 18 on the cooresponding top base 9, motor towing machine 8; Motor towing machine 8 drives tow chain 17 traction carrying cab bodies 14 liftings operation, the sealing of glass curtain, and the check debugging is qualified, steel structure hall sightseeing elevator.

Claims (2)

1. structure of an elevator and preparation method thereof, structure of the elevator that particularly a kind of steel structure tubing string cooperates and preparation method thereof is characterized in that:
1) select shape to make bottom base and top base, carrier bar is captiveed joint in the top base middle part with frame, captive joint fixed pulley on the carrier bar; Select shape to make structural upright, each layer structure crossbeam and the hoistway framed structure of design length; Select shape to make design length weight counterbalance operation guiding tubing string, guide pipe, positioning and guiding balance control guiding tubing string, lifting appliance guide pipe; Guide pipe internal diameter and carrying operation guiding tubing string crest clearance frictional fit, lifting appliance guide pipe internal diameter and positioning and guiding balance control guiding tubing string crest clearance frictional fit; Select shape to make counter weight device, the both sides captive joint guide pipe and the tow chain adaptor union of the centre of length; Select shape to make lifting appliance, the matrix arm end of lifting appliance is captive joint lifting appliance guide pipe respectively, above captive joint tow chain connecting device;
2) on bottom base with top base below captive joint two or four main bodys guiding tubing strings; Counter weight device is enclosed within on two weight counterbalance operations guiding tubing strings by the guide pipe on the counter weight device, and the two ends by weight counterbalance operation guiding tubing string are respectively with above bottom base one side frame and below the frame of top base the same side together, captive joint; Lifting appliance is enclosed within on two positioning and guiding balance control guiding tubing strings by the lifting appliance guide pipe of the matrix arm end of lifting appliance, two ends by two positioning and guiding balance controls guiding tubing strings are respectively with the counter weight device homonymy or above opposite side bottom base one side frame and below the frame of top base the same side together, captive joint; Captive joint with carrying cab body top below the lifting appliance guide pipe top captive joint brake gear, lifting appliance; Of inboard the captiveing joint of each layer structure crossbeam with each construction profile column of hoistway framed structure; Bottom base is captiveed joint with building with ground respectively with top base; Tow chain one end is captiveed joint with the connecting device on carrying cab body top, by the adaptor union captive joint on the fixed pulley on the top base, motor towing machine, the counter weight device; Tow chain traction carrying cab body lifting operation.
2. the product that obtains according to the described method of claim 1.
CNB2007100562032A 2007-10-22 2007-10-22 Elevator structure and its manufacturing method Expired - Fee Related CN100532236C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100562032A CN100532236C (en) 2007-10-22 2007-10-22 Elevator structure and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100562032A CN100532236C (en) 2007-10-22 2007-10-22 Elevator structure and its manufacturing method

Publications (2)

Publication Number Publication Date
CN101143675A true CN101143675A (en) 2008-03-19
CN100532236C CN100532236C (en) 2009-08-26

Family

ID=39206436

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100562032A Expired - Fee Related CN100532236C (en) 2007-10-22 2007-10-22 Elevator structure and its manufacturing method

Country Status (1)

Country Link
CN (1) CN100532236C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101613047B (en) * 2008-06-25 2013-01-09 株式会社日立制作所 Balanced weight frame structure of lift and balance weight device which use it
CN105173966A (en) * 2015-09-30 2015-12-23 福建快科城建增设电梯股份有限公司 Modularization steel structure elevator with modularization electrical connection structure and installing method
CN105217419A (en) * 2014-06-17 2016-01-06 郑永如 Pedestrian stairway installs belt elevator additional

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102180397A (en) * 2011-05-30 2011-09-14 张凡 Module-type steel structure lift shaft

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101613047B (en) * 2008-06-25 2013-01-09 株式会社日立制作所 Balanced weight frame structure of lift and balance weight device which use it
CN105217419A (en) * 2014-06-17 2016-01-06 郑永如 Pedestrian stairway installs belt elevator additional
CN105173966A (en) * 2015-09-30 2015-12-23 福建快科城建增设电梯股份有限公司 Modularization steel structure elevator with modularization electrical connection structure and installing method

Also Published As

Publication number Publication date
CN100532236C (en) 2009-08-26

Similar Documents

Publication Publication Date Title
CN205241002U (en) Corridor jib seat elevator
CN105113983B (en) Intelligent oil rig
CN102070059A (en) Hydraulic speed limiting elevator
CN102987991B (en) Single-rail window wiping machine
CN100532236C (en) Elevator structure and its manufacturing method
CN105293315B (en) A kind of hanging device of assembled architecture prefabricated components
CN103626011B (en) Built-in home elevator
CN106436759A (en) Assembly trolley for open-cut subway station formed by assembling prefabricated parts
CN104895532A (en) Chain transmission reversing and short support double long-stroke oil pumping machine and using method thereof
CN200982092Y (en) Double layer hydraulic stereo parking apparatus
CN103251350A (en) Roof rail-type window-cleaning machine
CN200967697Y (en) Structure of direct-acting hydraulic family elevator
CN200975121Y (en) Structural of direct-acting hydraulic double-layer underground Stereo parking device
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN200949323Y (en) Hydraulic double-layer lifting and transverse moving device for parking area
CN100564223C (en) Structure of a kind of hydraulic elevator and preparation method thereof
CN104295132B (en) Vertical-lifting multi-storied garage Novel hoisting device
CN201292825Y (en) Full-balance type hydraulic transmission oil pumping unit
CN100532238C (en) Structure of steel structure hydraulic pressure lift elevator and manufacturing method thereof
CN100532237C (en) Steel structure hydraulic elevator structure and its manufacturing method
CN2931667Y (en) Manned operation elevator used in high-rises exterior wall
CN113443535B (en) Down extending type lifting equipment for well construction and mounting method thereof
CN2934168Y (en) Structure of single-cylinder hydraulic magnification type multiple-layer residential building elevator
CN105173983A (en) People and goods dual-purpose vertical-transportation building construction elevator
CN200955271Y (en) Hydraulic 3-D parking apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090826

Termination date: 20111022