CN101131069B - 突出煤层扒孔降温钻具及其钻进方法 - Google Patents
突出煤层扒孔降温钻具及其钻进方法 Download PDFInfo
- Publication number
- CN101131069B CN101131069B CN2006101118307A CN200610111830A CN101131069B CN 101131069 B CN101131069 B CN 101131069B CN 2006101118307 A CN2006101118307 A CN 2006101118307A CN 200610111830 A CN200610111830 A CN 200610111830A CN 101131069 B CN101131069 B CN 101131069B
- Authority
- CN
- China
- Prior art keywords
- drilling
- drill pipe
- drill
- coal seam
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 107
- 239000003245 coal Substances 0.000 title claims abstract description 60
- 238000001816 cooling Methods 0.000 title claims abstract description 36
- 238000000034 method Methods 0.000 title claims abstract description 23
- 239000003818 cinder Substances 0.000 claims abstract description 8
- 230000000694 effects Effects 0.000 claims abstract description 4
- 241001153678 Calyptra Species 0.000 claims 2
- 239000002893 slag Substances 0.000 abstract description 11
- 238000002485 combustion reaction Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000020169 heat generation Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000013021 overheating Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
一种突出煤层扒孔降温钻具及其钻进方法,其中钻具包括扒孔降温钻杆和连在该扒孔降温钻杆一端的防阻塞钻头组件,其外表面设有螺旋输送槽,使钻杆具有扒通钻孔的功能和带走钻杆摩擦热量,防阻塞钻头组件包括钻头件和单向阀构件,单向阀构件具有防止钻杆内孔被煤渣堵塞的功能。钻进方法包括以下步骤:首先为钻具提供外接高压气流源并启动钻机实现钻进;随后在因部分煤渣脱落并塞滞钻杆周围时变高转速为低转速速,并在钻机旋转时停止钻杆推进,使扒孔降温钻具实现扒孔动作,开通钻孔的排渣通道,且扒孔降温钻杆螺旋输送能及时带走钻杆摩擦热量。借此,可以改善突出煤层打钻的效果,同时钻杆上的螺旋输送槽使钻渣及时带走钻杆的摩擦热量。
Description
技术领域
本发明涉及一种用于煤矿突出煤层钻进的扒孔降温钻具以及使用该钻具进行钻进的方法。
背景技术
在煤矿工业领域中,对突出煤层进行开采前,需要先对突出煤层进行钻孔,以抽排煤层内的瓦斯气体。
目前,国内突出煤层抽放钻孔的施工普遍采用坑道液压钻机,其钻杆采用光面钢管制作,钻头处不设置单项阀,打钻时采用风力排渣,即高压风经钻杆内孔到达钻头,高压风把钻渣吹出钻孔。但是,采用以上方法在突出煤层钻进的过程中经常出现塌孔、煤炮和钻孔堵塞等现象,这些现象造成钻孔排渣通道堵塞,进而出现卡钻、钻杆丢失以及钻杆摩擦过度生热等现象(国内多次出现钻孔燃烧事故),因此,突出煤层的深孔钻进十分困难。
为解决突出煤层深孔钻进困难的问题,本申请人在另一份申请号为200510059889.1的专利申请中描述过一种“突出煤层保压钻进切缝设备与方法”,但是其施工工艺复杂,施工成本高。
此外,第01267191.6号专利中也描述了一种“软煤层高瓦斯深孔钻机用钻杆”,但是,这种钻杆由于钻杆和联结丝扣的强度匹配难以实现,使用受到很大限制;类似地,第02800916.9号专利申请(专利号)描述了一种“阶梯式管状钻杆和钻机”,然而,由于该设备庞大,所以在井下使用受空间的限制,切管状钻杆的回收困难。
因此,实有必要设计一种新的突出煤层扒孔降温钻具及其钻进方法,以克服上述缺陷。
发明内容
本发明的目的在于提供一种结构简单、并且在突出煤层钻进的过程中出现塌孔、煤炮和钻孔堵塞等现象时能较大程度地避免出现卡钻、钻杆丢失以及钻孔燃烧现象的钻具以及使用该种钻具的钻进方法。
为了实现上述目的,本发明的突出煤层扒孔降温钻具及其钻进方法分别采用如下设计:
一种突出煤层扒孔降温钻具,其包括扒孔降温钻杆和连在该扒孔钻杆一端的防阻塞钻头组件,所述扒孔降温钻杆设有用于通过高压气流的内孔,所述扒孔降温钻杆外表面设有螺旋输送槽,而所述防阻塞钻头组件包括钻头件和单向阀构件,所述单向阀构件安装在钻头件内部。
一种使用上述钻具在突出煤层中钻进的方法,包括如下步骤:
首先,为所述突出煤层扒孔降温钻具提供外接的高压气流源;
然后,启动钻机带动该突出煤层扒孔降温钻具实现钻进;
随后,在钻进过程中因部分煤层脱落而塞滞在钻杆周围时,调整钻机转速,变高转速为低转速速,并在钻机旋转的情况下停止钻杆推进,使得突出煤层扒孔降温钻具将在低速旋转的状态下开始扒孔动作,直至塞滞在钻杆周围的煤体煤渣通过所述螺旋输送槽向钻孔外部排出,开通排渣通道,使钻进恢复正常为止。
根据本发明的优选实施方式,所述螺旋输送槽的螺旋方向与正常钻进时钻机的旋转方向一致,所述钻头件与所述扒孔降温钻杆通过连螺纹联结,所述单向阀构件包括固定在所述连接管内部的阀套以及安装在所述阀套内的活动阀芯,该活动阀芯一端设有帽状体,该帽状体卡持在所述阀套外端。
通过使用本发明的突出煤层扒孔降温钻具及其钻进方法,可以改善突出煤层打钻的效果,实现突出煤层的深孔钻进,同时钻杆上的螺旋输送槽使钻渣及时带走钻杆的摩擦热量,使钻杆不至于过度发热,这对防止钻孔内瓦斯燃烧具有重要意义。
附图说明
下面,将结合附图对本发明的具体实施方式进行详细的说明,其中:
图1是本发明的突出煤层扒孔降温钻具的侧面局部剖视图;
图2是沿图1的A-A线的剖视图。
具体实施方式
请参阅图1,本发明的突出煤层扒孔降温钻具1包括扒孔降温钻杆10和设于扒孔降温钻杆10一端的防阻塞钻头组件12。
请结合参阅图1和图2,所述扒孔降温钻杆10具有内孔,以通过高压气流,而其外表面设有螺旋输送槽100,以向外部输送煤渣。所述螺旋旋输送槽100的成型方法有两种:一是在扒孔钻杆10外圆切削出螺旋输送槽100;二是在扒孔钻杆10外圆焊接螺旋钢带,形成螺旋输送槽100。该扒孔降温钻杆10上的螺旋输送槽100可以是单条或多条,并且其条数、宽度、深度和螺旋角等参数,可根据煤层条件、钻杆强度匹配等因素进行调整。在本实施例中,螺旋输送槽100为右螺旋,与钻机的的正旋方向相对应,这样钻孔堵塞时,扒孔降温钻杆10上的螺旋输送槽100将对堵塞段钻孔内的煤渣向钻孔口方向外扒,达到开通排渣通道的作用,并使与钻杆接触的煤渣处于流动状态及时带走钻杆摩擦所产生的热量。该扒孔降温钻杆10可以是焊接接头,也可以是螺纹联结接头,钻杆之间可通过螺纹实现多根联接。
所述防阻塞钻头组件12包括用于钻进的钻头120以及设于该钻头组件12内部的单向阀构件122。
请参阅图1,所述钻头120内部设有与扒孔降温钻杆10的内孔连通的中孔120a。此外,该钻头120优选通过一连接管121与所述扒孔降温钻杆10连接,并保证所述中孔120a与扒孔降温钻杆10的内腔保持连通,所述单向阀构件122即安装在所述连接管121内,以确保所述中孔120a与扒孔降温钻杆10之间只能单向导通,即只在朝向钻头120的方向导通。
所述单向阀构件122包括套设在所述连接管121内部的阀套1220以及安装在所述阀套1220内的活动阀芯1222,该活动阀芯1222一端设有帽状体1222a,该帽状体1222a卡持在所述阀套1220外端,以防止煤渣进入扒孔钻杆10的内孔。本领域的技术人员可以理解,除采用上述结构外,单向阀构件122还可以采用其所属领域常用的其他结构。
下面,将具体阐述应用本发明的突出煤层扒孔降温钻具1在突出煤层中进行深孔钻进的方法:
首先,为所述突出煤层扒孔降温钻具1提供外接的持续的高压气流源;
然后,启动钻机带动该突出煤层扒孔降温钻具1实现钻进;
在钻孔不堵塞的情况下,本发明的突出煤层扒孔降温钻具1正常钻进,由钻头120钻落的煤渣由所述扒孔降温钻杆10的内孔喷出的高压气流向外吹,然后在扒孔降温钻杆的旋转作用下沿着所述螺旋输送槽100向钻孔外部排出;
在继续钻进的过程中,常会发生钻孔堵塞,在钻孔堵塞之前,钻孔内会发出较大的响声(煤炮),而后钻孔内的部分煤层脱落并且塞滞在钻杆10周围,此外,煤炮的高压瓦斯的作用会产生高压气流并携带煤渣冲击钻杆10的内孔,但是借助单向阀构件122的止挡作用,避免了所述扒孔降温钻杆10的内孔被堵塞。此时,调整钻机转速,变高转速为低转速速,并在钻机旋转的情况下停止钻杆10推进,所述突出煤层扒孔降温钻具1将在低速旋转的状态下开始扒孔动作,使得塞滞在钻杆10周围的煤体通过所述螺旋输送槽100向钻孔外部排出,同时,继续为所述扒孔钻杆10的内孔供应高压气流,以帮助排出煤渣。
待钻孔口看到排渣顺畅后,即可继续正常的向前钻进,并在钻进一定深度后增加另一根钻杆10;再遇到因煤炮产生钻孔堵塞时,可以重复实施前面所述的操作过程。
通过使用本发明的突出煤层扒孔降温钻具及其钻进方法,可以改善突出煤层打钻的效果,实现突出煤层的深孔钻进。同时钻杆上的螺旋输送槽使钻渣及时带走钻杆的摩擦热量,使钻杆不至于过度发热,这对防止钻孔内瓦斯燃烧具有重要意义。
Claims (4)
1.一种突出煤层扒孔降温钻具,其包括扒孔降温钻杆和连在该扒孔钻杆一端的防阻塞钻头组件,所述扒孔降温钻杆设有用于通过高压气流的内孔,其特征在于,所述扒孔降温钻杆外表面设有螺旋输送槽,而所述防阻塞钻头组件包括钻头件和单向阀构件,所述单向阀构件安装在钻头件内部,所述钻头件与所述扒孔降温钻杆通过连接管螺纹联结,所述单向阀构件包括固定在所述连接管内部的阀套以及安装在所述阀套内的活动阀芯,该活动阀芯一端设有帽状体,该帽状体卡持在所述阀套外端。
2.根据权利要求1所述的突出煤层扒孔降温钻具,其特征在于,所述螺旋输送槽的螺旋方向与正常钻进时钻机的旋转方向一致。
3.一种使用根据权利要求1所述的突出煤层扒孔降温钻具的钻进方法,包括以下步骤:
首先,为所述突出煤层扒孔降温钻具提供外接的高压气流源;
然后,启动钻机带动该突出煤层扒孔降温钻具实现钻进;
随后,在钻进过程中因部分煤层脱落而塞滞在钻杆周围时,调整钻机转速,变高转速为低转速,并在钻机旋转的情况下停止钻杆推进,使得突出煤层扒孔降温钻具将在低速旋转的状态下开始扒孔动作,直至塞滞在钻杆周围的煤体煤渣通过所述螺旋输送槽向钻孔外部排出,开通排渣通道使钻进恢复正常为止。
4.根据权利要求3所述的钻进方法,其特征在于,所述螺旋输送糟的螺旋方向与正常钻进时钻机的旋转方向一致。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2006101118307A CN101131069B (zh) | 2006-08-25 | 2006-08-25 | 突出煤层扒孔降温钻具及其钻进方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2006101118307A CN101131069B (zh) | 2006-08-25 | 2006-08-25 | 突出煤层扒孔降温钻具及其钻进方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101131069A CN101131069A (zh) | 2008-02-27 |
| CN101131069B true CN101131069B (zh) | 2010-09-15 |
Family
ID=39128463
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2006101118307A Expired - Fee Related CN101131069B (zh) | 2006-08-25 | 2006-08-25 | 突出煤层扒孔降温钻具及其钻进方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101131069B (zh) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100591893C (zh) * | 2008-05-27 | 2010-02-24 | 河南理工大学 | 用于消除突出煤层抽采盲区的沿顶钻孔施工方法 |
| CN101280667B (zh) * | 2008-06-05 | 2012-02-29 | 山西潞安矿业(集团)有限责任公司 | 用于瓦斯抽采钻孔施工的低螺旋耐磨钻杆及其加工工艺 |
| CN101566049B (zh) * | 2009-05-21 | 2012-07-25 | 河南理工大学 | 异型多棱刻槽钻杆 |
| CN102116168B (zh) * | 2011-01-26 | 2012-12-05 | 河南理工大学 | 低渗透、松软煤层抽采瓦斯系统及方法 |
| CN102199991B (zh) * | 2011-05-05 | 2013-07-03 | 河南理工大学 | 松软煤岩层钻固一体化装置与方法 |
| CN103321670B (zh) * | 2013-07-10 | 2015-03-18 | 四川大学 | 内置式钻杆温控自动闭风阻燃装置 |
| CN104405289B (zh) * | 2014-11-19 | 2016-05-25 | 吉林大学 | 用于冰雪层钻进的热熔钻头 |
| CN105464589B (zh) * | 2016-01-11 | 2017-11-17 | 河南理工大学 | 用于软煤岩降阻散热仿生钻进方法及钻杆 |
| CN108119064B (zh) * | 2017-12-15 | 2019-08-27 | 武汉科技大学 | 一种快速降温打孔设备 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN85200953U (zh) * | 1985-04-01 | 1986-01-15 | 天津市冶金实验厂 | 煤矿用中空螺纹钻杆 |
| US4635725A (en) * | 1984-12-10 | 1987-01-13 | Burroughs Thomas C | Method and apparatus for gravel packing a well |
| EP0543140A2 (de) * | 1991-11-21 | 1993-05-26 | Gu Tiefbau Ag | Bohrvorrichtung für den Tiefbau sowie Verfahren zum Herstellen von stabilisierenden Säulen oder ähnlichen Gebilden in Erdreich |
| CN1079021A (zh) * | 1992-05-19 | 1993-12-01 | 阿拉斯·科普克·罗克德克公司 | 钻杆 |
| EP0657616B1 (de) * | 1992-09-29 | 1998-07-08 | Ingrid Dr. Klemm | Schneckenbohrvorrichtung für Pfahlgründungen |
-
2006
- 2006-08-25 CN CN2006101118307A patent/CN101131069B/zh not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4635725A (en) * | 1984-12-10 | 1987-01-13 | Burroughs Thomas C | Method and apparatus for gravel packing a well |
| CN85200953U (zh) * | 1985-04-01 | 1986-01-15 | 天津市冶金实验厂 | 煤矿用中空螺纹钻杆 |
| EP0543140A2 (de) * | 1991-11-21 | 1993-05-26 | Gu Tiefbau Ag | Bohrvorrichtung für den Tiefbau sowie Verfahren zum Herstellen von stabilisierenden Säulen oder ähnlichen Gebilden in Erdreich |
| CN1079021A (zh) * | 1992-05-19 | 1993-12-01 | 阿拉斯·科普克·罗克德克公司 | 钻杆 |
| EP0657616B1 (de) * | 1992-09-29 | 1998-07-08 | Ingrid Dr. Klemm | Schneckenbohrvorrichtung für Pfahlgründungen |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101131069A (zh) | 2008-02-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104314482B (zh) | 用于松软煤层钻进封闭式螺旋护孔钻具及其使用方法 | |
| CN106988776B (zh) | 松软破碎煤层钻孔护孔施工方法 | |
| US10914122B2 (en) | Liquid injection type reamer bit | |
| CN101586441A (zh) | 高压水射流煤层钻扩孔系统和方法 | |
| CN103924938B (zh) | 一种煤矿井下瓦斯抽采孔清孔钻头、清孔装置及清孔方法 | |
| WO2018107712A1 (zh) | 一种钻机钻直孔钻进方法 | |
| CN101131069B (zh) | 突出煤层扒孔降温钻具及其钻进方法 | |
| CN106639877B (zh) | 变轨迹钻进方法及装置 | |
| CN114000873A (zh) | 一种煤层钻切冲一体化设备及其扩孔方法 | |
| CN106703720A (zh) | 一种钢丝传动的钻井装置 | |
| CN112554781B (zh) | 一种煤层瓦斯抽采钻孔坍塌的疏导复抽方法 | |
| CN105604481A (zh) | 用于软煤层钻进的多动力源组合钻具及其使用方法 | |
| CN202220557U (zh) | 冲击挤压跟管钻具 | |
| CN212105742U (zh) | 一种松软突出煤层钻机钻具系统 | |
| WO2003106806A1 (en) | A device and a method for drilling and completing a horizontal wellbore | |
| CN204266948U (zh) | 用于松软煤层钻进封闭式螺旋护孔钻具 | |
| CN101280667B (zh) | 用于瓦斯抽采钻孔施工的低螺旋耐磨钻杆及其加工工艺 | |
| CN205778536U (zh) | 一种煤层钻进射流排渣防堵工具 | |
| CN105927149B (zh) | 一种快速穿透煤矸石的煤层钻孔打钻装置与方法 | |
| CN212177041U (zh) | 一种使用方便的地质扩孔器 | |
| CN205823155U (zh) | 一种快速穿透煤矸石的煤层钻孔打钻装置 | |
| CN201024895Y (zh) | 钻进方向可调的高压气射流钻具 | |
| CN111720058A (zh) | 一种水动力扩孔装置及方法 | |
| CN117759159A (zh) | 一种复杂顶板大直径钻孔压裂瓦斯抽采装置 | |
| CN210948504U (zh) | 一种井下钻头 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100915 Termination date: 20140825 |
|
| EXPY | Termination of patent right or utility model |