CN101127439A - 高压直流输电系统50Hz和100Hz保护整定方法 - Google Patents

高压直流输电系统50Hz和100Hz保护整定方法 Download PDF

Info

Publication number
CN101127439A
CN101127439A CNA200710029271XA CN200710029271A CN101127439A CN 101127439 A CN101127439 A CN 101127439A CN A200710029271X A CNA200710029271X A CN A200710029271XA CN 200710029271 A CN200710029271 A CN 200710029271A CN 101127439 A CN101127439 A CN 101127439A
Authority
CN
China
Prior art keywords
transmission system
protection
high voltage
direct current
hvdc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710029271XA
Other languages
English (en)
Other versions
CN100568657C (zh
Inventor
饶宏
傅闯
黎小林
方珂
陈建福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
Original Assignee
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Grid Technology Research Center of China Southern Power Grid Co Ltd filed Critical Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority to CNB200710029271XA priority Critical patent/CN100568657C/zh
Publication of CN101127439A publication Critical patent/CN101127439A/zh
Application granted granted Critical
Publication of CN100568657C publication Critical patent/CN100568657C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Direct Current Feeding And Distribution (AREA)

Abstract

本发明是一种高压直流输电系统50Hz和100Hz保护整定方法。50Hz保护整定方法包括有如下过程:1)50Hz保护输入量或100Hz保护输入量经过低通滤波器(1)滤波后得到50Hz分量或100Hz保护输入量;2)上述50Hz分量或100Hz保护输入量与比较器(2)中的定值比较,50Hz保护整定方法中,如果大于定值,经过延时时间T1启动降电流段,延时时间T1与极控和阀控冗余切换时间配合;到达延时时间T2,启动直流闭锁顺序,延时时间T2与换流阀的过应力能力配合,并与其它换流阀保护配合。100Hz保护整定方法中,上述100Hz分量与比较器(2)中的定值比较,如果大于定值,经过延时T后才启动直流闭锁顺序,延时T与交流系统故障时直流输电系统中承受应力最大的部件和交流系统相应定值配合。本发明不仅实现换流阀故障和交流系统故障的后备保护,并且在保证主设备安全的前提下,避免交直混合电网中多回直流同时降功率或者闭锁引起的系统失稳问题。

Description

高压直流输电系统50Hz和100Hz保护整定方法
技术领域:
本发明是一种高压直流输电系统50Hz和100Hz保护整定方法,属于高压直流输电系统50Hz和100Hz保护整定方法的创新技术。
背景技术:
高压直流输电技术对电网运行及发展具有重大意义,50Hz和100Hz保护是高压直输电系统的两种保护,其保护功能是在换流器触发脉冲故障、换流阀故障、换相失败故障和单相故障时保护换流阀。现有国内外高压直流输电工程中50Hz和100Hz保护的整定方法如下:
1)计算直流线路或极中性母线中50Hz和100Hz分量含量;
2)定值考虑因素:交直流系统背景谐波,换流器触发异常所产生的50Hz和100Hz分量,直流系统防止电流断续的最小电流要求,换流阀承受应力的能力,直流系统输送功率水平,直流线路谐波阻抗特性;
3)延时考虑因素:控制系统冗余系统切换时间,与其它保护的配合,交流系统故障最长清除时间;
4)延时方法采用定时限或者反时限;
5)保护动作:分为两段,第一段降功率或报警,第二段闭锁直流系统、跳交流断路器。
现有高压直流输电工程中50Hz和100Hz保护整定方法存在如下缺点:
1)50Hz保护和100Hz的整定原则主要考虑了换流阀的承受能力,没有考虑其它设备的过应力能力;
2)50Hz保护和100Hz保护的整定原则没有明确的区别,有些高压直流工程的50Hz保护和100Hz保护采用了相同动作特性和延时。
3)交流系统故障最长清除时间一般为600ms,最长的也不超过1500ms。因此,在交流系统发生不对称故障,快速保护拒动或者断路器失灵时,故障切除时间较长,可能导致交直流并联运行系统中多回直流100Hz保护动作并闭锁,对电网安全产生灾难性影响。
因此,现有100Hz保护整定方法没有充分考虑交直流并联运行系统的特点,不能充分利用高压直流输电系统主设备的过应力能力以增强电网在交流系统故障时的稳定性。
发明内容:
本发明的目的在于考虑上述问题而提供一种将其主要作为阀故障的后备保护,定值与阀设备承受能力配合的高压直流输电系统50Hz保护整定方法。
本发明的另一目的在于考虑上述问题而提供一种在保证主设备安全的前提下,能够根据高压直流输电系统主设备过应力承受能力决定保护动作定值和时间的高压直流输电系统100Hz保护整定方法。
本发明高压直流输电系统50Hz保护整定方法,包括有如下过程:
1)50Hz保护输入量经过低通滤波器滤波后得到50Hz分量;
2)上述50Hz分量与比较器中的定值比较,如果大于定值,经过延时时间T1启动降电流段,延时时间T1与极控和阀控冗余切换时间配合;到达延时时间T2,启动直流闭锁顺序,延时时间T2与换流阀的过应力能力配合,并与其它换流阀保护配合。
上述过程1)中50Hz保护输入量是直流线路电流,或换流阀高压侧电流,或换流阀低压侧电流。
本发明高压直流输电系统100Hz保护整定方法,包括有如下过程:
1)100Hz保护输入量经过低通滤波器滤波后得到100Hz分量;
2)上述100Hz分量与比较器中的定值比较,如果大于定值,经过延时T后才启动直流闭锁顺序,延时T与交流系统故障时直流输电系统中承受应力最大的部件和交流系统相当定值配合。
上述过程2)中确定交流系统故障时直流输电系统中承受应力最大的部件及确定延时时间T的方法包括如下步骤:
1)建立包含主设备详细模型的高压直流输电系统仿真系统;
2)通过理论分析和仿真系统的计算,找到交流系统故障时直流输电系统中承受应力最大的部件;
3)确定引起高压直流输电系统主设备应力最大的最严酷的工况;
4)对最严酷工况下最薄弱部件承受的应力进行验算;
5)根据验算的结果和交流系统相关定值确定100Hz保护的动作行为和延时时间T。
上述交流系统故障时直流输电系统中承受应力最大的部件是3次交流滤波器的阻尼电阻器。
上述过程1)中100Hz保护输入量是直流线路电流,或换流阀高压侧电流,或换流阀低压侧电流。
本发明由于采用将50Hz和100Hz保护分开整定,50Hz保护主要作为阀故障的后备保护,定值与阀设备承受能力配合;100Hz保护主要作为交流系统后备保护,定值与交流系统的有关定值和直流主设备过应力能力配合的方法,因此,其不仅实现阀故障的后备保护,并且在保证主设备安全的前提下,能够根据高压直流输电系统主设备过应力承受能力决定100Hz保护动作定值和时间,从而在交流系统不对称故障持续时间较长时,避免交电网中多回直流同时降功率或者闭锁,以克服现有技术中的不足之处。本发明可以应用交直流并联运行和直流多落点的电力系统,具有良好的应用前景。
附图说明:
图1为本发明实施例中50Hz保护整定方法的原理示意图。
图2为实施例中高压直流输电工程中交流滤波电阻器容热量与交流不对称故障持续时间的关系。
图3为本发明实施例中100Hz保护整定方法的原理示意图。
具体实施方式:
实施例:
本发明高压直流输电系统50Hz保护整定方法的原理图如图1所示,包括有如下过程:
1)50Hz保护输入量经过低通滤波器1滤波后得到50Hz分量,50Hz保护输入量是直流线路电流IdL,或换流阀高压侧电流IdH,或换流阀低压侧电流IdN。
2)上述50Hz分量与比较器2中的定值比较,如果大于定值,经过延时时间T1启动降电流段,延时时间T1与极控和阀控冗余切换时间配合;到达延时时间T2,启动直流闭锁顺序,延时时间T2与换流阀的过应力能力配合,并与其它换流阀保护配合。
本实施例中,上述过程2)中启动降电流段为降至额定电流的30%。上述过程2)中极控和阀控冗余切换时间为150ms~300ms。上述过程2)中延时时间T1为150ms~300ms,T2为650ms~1000ms。
本发明高压直流输电系统50Hz保护整定方法的原理图如图3所示,包括有如下过程:
1)100Hz保护输入量经过低通滤波器1滤波后得到100Hz分量;100Hz保护输入量是直流线路电流IdL,或换流阀高压侧电流IdH,或换流阀低压侧电流IdN。
2)上述100Hz分量与比较器2中的定值比较,如果大于定值,经过延时T后才启动直流闭锁顺序,延时T与交流系统故障时直流输电系统中承受应力最大的部件的耐受能力和交流系统相应定值相配合,延时时间T一般为700ms~3000ms。
上述过程2)中确定交流系统故障时直流输电系统中承受应力最大的部件及确定延时时间T的方法包括如下步骤:
1)建立包含主设备详细模型的高压直流输电系统仿真系统;
2)通过理论分析和仿真系统的计算,找到交流系统故障时直流输电系统中承受应力最大的部件;
3)确定引起高压直流输电系统主设备应力最大的最严酷的工况;
4)对最严酷工况下最薄弱部件承受的应力进行验算;
5)根据验算的结果和交流系统相关定值确定100Hz保护的动作行为和延时时间T。
本实施例中,经过理论分析和仿真计算,发现3次交流滤波器的阻尼电阻器承受的应力最大,在换流变压器进线端发生单相接地短路故障时电阻器的发热最厉害,并确定延时时间T为3000ms。利用仿真系统计算交流滤波电阻器容热量与交流不对称故障持续时间的关系如图2所示。上述过程2)中100Hz分量与定值比较,100Hz分量大于定值,经过延时3000ms后才启动直流闭锁顺序,与3次交流滤波器的阻尼电阻器和交流系统相当定值配合。

Claims (10)

1.一种高压直流输电系统50Hz保护整定方法,其特征在于包括有如下过程:
1)50Hz保护输入量经过低通滤波器(1)滤波后得到50Hz分量;
2)上述50Hz分量与比较器(2)中的定值比较,如果大于定值,经过延时时间T1启动降电流段,延时时间T1与极控和阀控冗余切换时间配合;到达延时时间T2,启动直流闭锁顺序,延时时间T2与换流阀的过应力能力配合,并与其它换流阀保护配合。
2.根据权利要求1所述的高压直流输电系统50Hz保护整定方法,其特征在于上述过程2)中启动降电流段为降至额定电流的30%~70%。
3.根据权利要求1所述的高压直流输电系统50Hz保护整定方法,其特征在于上述过程2)中极控和阀控冗余切换时间为150ms~300ms。
4.根据权利要求1所述的高压直流输电系统50Hz保护整定方法,其特征在于上述过程2)中延时时间T1为150ms~300ms,T2为650ms~1000ms,T2由阀的过应力能力决定。
5.根据权利要求1所述的高压直流输电系统50Hz保护整定方法,其特征在于上述过程1)中50Hz保护输入量是直流线路电流(IdL),或换流阀高压侧电流(IdH),或换流阀低压侧电流(IdN)。
6.一种高压直流输电系统100Hz保护整定方法,其特征在于包括有如下过程:
1)100Hz保护输入量经过低通滤波器(1)滤波后得到100Hz分量;
2)上述100Hz分量与比较器(2)中的定值比较,如果大于定值,经过延时T后才启动直流闭锁顺序,延时T与交流系统故障时直流输电系统中承受应力最大的部件和交流系统相应定值配合。
7.根据权利要求6所述的高压直流输电系统100Hz保护整定方法,其特征在于上述过程2)中确定交流系统故障时直流输电系统中承受应力最大的部件及确定延时时间T的方法包括如下步骤:
1)建立包含主设备详细模型的高压直流输电系统仿真系统;
2)通过理论分析和仿真系统的计算,找到交流系统故障时直流输电系统中承受应力最大的部件;
3)确定引起高压直流输电系统主设备应力最大、最严酷的工况;
4)对最严酷工况下最薄弱部件承受的应力进行验算;
5)根据验算的结果和交流系统保护相关定值确定100Hz保护的动作行为和延时时间T。
8.根据权利要求7所述的高压直流输电系统100Hz保护整定方法,其特征在于上述交流系统故障时直流输电系统中承受应力最大的部件是3次交流滤波器的阻尼电阻器。
9.根据权利要求8所述的高压直流输电系统50Hz和100Hz保护整定方法,其特征在于上述过程2)中延时时间T为700ms~3000ms。
10.根据权利要求6所述的高压直流输电系统100Hz保护整定方法,其特征在于上述过程1)中100Hz保护输入量是直流线路电流(IdL),或换流阀高压侧电流(IdH),或换流阀低压侧电流(IdN)。
CNB200710029271XA 2007-07-20 2007-07-20 高压直流输电系统50Hz和100Hz保护整定方法 Active CN100568657C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200710029271XA CN100568657C (zh) 2007-07-20 2007-07-20 高压直流输电系统50Hz和100Hz保护整定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200710029271XA CN100568657C (zh) 2007-07-20 2007-07-20 高压直流输电系统50Hz和100Hz保护整定方法

Publications (2)

Publication Number Publication Date
CN101127439A true CN101127439A (zh) 2008-02-20
CN100568657C CN100568657C (zh) 2009-12-09

Family

ID=39095401

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200710029271XA Active CN100568657C (zh) 2007-07-20 2007-07-20 高压直流输电系统50Hz和100Hz保护整定方法

Country Status (1)

Country Link
CN (1) CN100568657C (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101534009B (zh) * 2009-04-24 2011-12-07 华南理工大学 交直流互联电网的工频变化量方向保护动作特性分析方法
CN101841151B (zh) * 2009-03-20 2012-07-18 南京南瑞继保电气有限公司 一种自动切换工频保护定值的方法
CN101841148B (zh) * 2009-03-20 2012-07-18 南京南瑞继保电气有限公司 一种判断换流阀丢失脉冲故障的方法
CN103248018A (zh) * 2013-05-10 2013-08-14 南京南瑞继保电气有限公司 一种高压直流输电工程的直流保护实现方法
CN103257585A (zh) * 2013-03-29 2013-08-21 国家电网公司 一种过流保护仿真装置
CN103336208A (zh) * 2013-06-27 2013-10-02 华南理工大学 交直流输电系统自适应100Hz保护判据的方法
CN103840424A (zh) * 2014-03-20 2014-06-04 国家电网公司 自动整定定值的线路微机保护实现方法
CN104022494A (zh) * 2014-06-21 2014-09-03 中国能源建设集团广东省电力设计研究院 柔性直流输电换流站断路器的交直流配合保护方法及装置
CN105006803A (zh) * 2015-07-28 2015-10-28 中国南方电网有限责任公司超高压输电公司检修试验中心 基于高压侧电流有效值的交流滤波器差动保护方法
CN105356493A (zh) * 2015-09-30 2016-02-24 国网浙江省电力公司金华供电公司 特高压直流闭锁受端处置方法
CN105913333A (zh) * 2016-04-07 2016-08-31 中国南方电网有限责任公司 考虑换流变空投直流50Hz保护性能评估方法及系统
CN103840424B (zh) * 2014-03-20 2016-11-30 国家电网公司 自动整定定值的线路微机保护实现方法
CN106532666A (zh) * 2016-12-30 2017-03-22 南京南瑞继保电气有限公司 一种适用于受端分层特高压直流阀组谐波保护方法
CN106849031A (zh) * 2017-04-06 2017-06-13 华北电力大学 一种交直流混合微电网协同保护配合方案
CN107863752A (zh) * 2016-09-22 2018-03-30 南方电网科学研究院有限责任公司 一种直流输电系统的50Hz谐波保护的改进方法
CN111725790A (zh) * 2020-06-04 2020-09-29 南方电网科学研究院有限责任公司 一种多端直流输电系统的100Hz保护控制方法和装置

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103268429B (zh) * 2013-06-07 2015-04-15 中国南方电网有限责任公司超高压输电公司 一种高压直流输电系统100Hz保护的性能评价方法与系统
CN103762561B (zh) * 2014-01-10 2015-11-18 南方电网科学研究院有限责任公司 高压直流输电系统直流差动保护整定方法

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101841151B (zh) * 2009-03-20 2012-07-18 南京南瑞继保电气有限公司 一种自动切换工频保护定值的方法
CN101841148B (zh) * 2009-03-20 2012-07-18 南京南瑞继保电气有限公司 一种判断换流阀丢失脉冲故障的方法
CN101534009B (zh) * 2009-04-24 2011-12-07 华南理工大学 交直流互联电网的工频变化量方向保护动作特性分析方法
CN103257585A (zh) * 2013-03-29 2013-08-21 国家电网公司 一种过流保护仿真装置
CN103248018A (zh) * 2013-05-10 2013-08-14 南京南瑞继保电气有限公司 一种高压直流输电工程的直流保护实现方法
CN103336208A (zh) * 2013-06-27 2013-10-02 华南理工大学 交直流输电系统自适应100Hz保护判据的方法
CN103336208B (zh) * 2013-06-27 2016-01-20 华南理工大学 交直流输电系统自适应100Hz保护判据的方法
CN103840424B (zh) * 2014-03-20 2016-11-30 国家电网公司 自动整定定值的线路微机保护实现方法
CN103840424A (zh) * 2014-03-20 2014-06-04 国家电网公司 自动整定定值的线路微机保护实现方法
CN104022494A (zh) * 2014-06-21 2014-09-03 中国能源建设集团广东省电力设计研究院 柔性直流输电换流站断路器的交直流配合保护方法及装置
CN104022494B (zh) * 2014-06-21 2017-09-19 中国能源建设集团广东省电力设计研究院有限公司 柔性直流输电换流站断路器的交直流配合保护方法及装置
CN105006803B (zh) * 2015-07-28 2017-08-25 中国南方电网有限责任公司超高压输电公司检修试验中心 基于高压侧电流有效值的交流滤波器差动保护方法
CN105006803A (zh) * 2015-07-28 2015-10-28 中国南方电网有限责任公司超高压输电公司检修试验中心 基于高压侧电流有效值的交流滤波器差动保护方法
CN105356493A (zh) * 2015-09-30 2016-02-24 国网浙江省电力公司金华供电公司 特高压直流闭锁受端处置方法
CN105913333A (zh) * 2016-04-07 2016-08-31 中国南方电网有限责任公司 考虑换流变空投直流50Hz保护性能评估方法及系统
CN107863752A (zh) * 2016-09-22 2018-03-30 南方电网科学研究院有限责任公司 一种直流输电系统的50Hz谐波保护的改进方法
CN106532666A (zh) * 2016-12-30 2017-03-22 南京南瑞继保电气有限公司 一种适用于受端分层特高压直流阀组谐波保护方法
CN106532666B (zh) * 2016-12-30 2019-02-15 南京南瑞继保电气有限公司 一种适用于受端分层特高压直流阀组谐波保护方法
CN106849031A (zh) * 2017-04-06 2017-06-13 华北电力大学 一种交直流混合微电网协同保护配合方案
CN111725790A (zh) * 2020-06-04 2020-09-29 南方电网科学研究院有限责任公司 一种多端直流输电系统的100Hz保护控制方法和装置
CN111725790B (zh) * 2020-06-04 2022-06-21 南方电网科学研究院有限责任公司 一种多端直流输电系统的100Hz保护控制方法和装置

Also Published As

Publication number Publication date
CN100568657C (zh) 2009-12-09

Similar Documents

Publication Publication Date Title
CN100568657C (zh) 高压直流输电系统50Hz和100Hz保护整定方法
Telukunta et al. Protection challenges under bulk penetration of renewable energy resources in power systems: A review
WO2019119886A1 (zh) 一种串联补偿器及控制方法
CN110233490A (zh) 避免连续换相失败的直流输电故障恢复控制方法及系统
CN110783942B (zh) 一种mmc型柔性直流电网的故障限流控制方法及系统
CN104917365B (zh) 一种限流方法及限流装置
CN102545379B (zh) 单元接线下10kV备自投自适应上级安自装置投退方法
CN109713648B (zh) 快速切除不完整内桥接线死区故障的继电保护方法
Kuchanskyy Application of controlled shunt reactors for suppression abnormal resonance overvoltages in assymetric modes
CN107342582B (zh) 一种环网状柔性直流输电系统的平波电抗器参数设计方法
CN110350496B (zh) 一种多端柔性直流电网故障限流方法及装置
CN109038516B (zh) 一种用于直流配电网线路的加速保护方法
CN109586241A (zh) 继电保护整定计算系统的计算方法
CN106571620A (zh) 一种双端柔性直流输电系统直流线路接地短路的故障判定方法
Raju et al. Evaluation of Passive Islanding Detection Methods for Line to Ground Unsymmetrical Fault in Three Phase Microgrid Systems: Microgrid Islanding Detection Method
CN111509692A (zh) 一种复用并联无功补偿的接地故障全补偿系统及方法
Deshmukh et al. Analysis of distance protection performance for line employing UPFC
CN108964112B (zh) 小汽轮发电机接入高压厂用电系统的接线结构及其运行方法
Shameem et al. Improving Transient Stability of a Distribution Network by using Resonant Fault Current Limiter
CN111509689B (zh) 一种复用并联无功补偿的接地故障全补偿系统及方法
CN103457239B (zh) 高频不间断电源短路的保护方法
CN110165641B (zh) 柔性直流输电系统中直流断路器的重合方法
CN108767888B (zh) 柔性直流输电限流电阻反时限保护方法
Abdolrasol et al. Hybrid anti-islanding algorithm for utility interconnection of distributed generation
Sharma et al. Application of solid state fault current limiter on express feeder for voltage sag mitigation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CSG ELECTRIC POWER RESEARCH INSTITUTE CO., LTD.

Free format text: FORMER OWNER: SOUTHERN POWER GRID TECHNOLOGY RESEARCH CENTER

Effective date: 20111026

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 528311 GUANGZHOU, GUANGDONG PROVINCE TO: 510050 GUANGZHOU, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20111026

Address after: 510050, Guangdong, Guangzhou, Yuexiu District Dongfeng East Road, Qi Gang, No. 6, No. 8, West Tower, 13-20 floor

Patentee after: China South Power Grid International Co.,Ltd.

Address before: 528311 Guangdong city of Guangzhou province Tianhe District Pearl River Metro Chinese Sui Road No. 6

Patentee before: Southern Power Grid Technology Research Center