CN101106734A - Task dispatching system and method for intelligent network system - Google Patents
Task dispatching system and method for intelligent network system Download PDFInfo
- Publication number
- CN101106734A CN101106734A CNA2007101405414A CN200710140541A CN101106734A CN 101106734 A CN101106734 A CN 101106734A CN A2007101405414 A CNA2007101405414 A CN A2007101405414A CN 200710140541 A CN200710140541 A CN 200710140541A CN 101106734 A CN101106734 A CN 101106734A
- Authority
- CN
- China
- Prior art keywords
- task
- control information
- current
- time
- carry out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a task scheduling system and method for intelligent network systems. The method includes the following steps: step S302, configure control information of a plurality of tasks, and add the scheduled tasks into the time list of system tasks; and step S304, schedule tasks according to the control information, and execute the a plurality of tasks in turn. The invention ensures that no repeated running of tasks would occur.
Description
Technical field
The present invention relates to the intelligent net system management, more specifically, relate to a kind of intelligent net system task scheduling system and method.
Background technology
Development along with intelligent network business, when new business continues to bring out, each professional task quantity also increases thereupon, from initial only collect day rent, monthly rent, to collecting of expenses such as follow-up set meal expense, new business rental expenses, CRBT rent, along with the enhancing of business function, professional pairing task quantity is also in continuous growth.
Because each task finally all is that user data is operated, these operations comprise deduct fees, call list and data derivation etc., to similar user data, have a lot of tasks need operate on it, as deduct fees, call list, data derive, and may all will use user data.The mode of disposing in the system task monitor call system task time list that present processing is to use system to carry of task, the concrete commissioning date of configuration task, running time etc. in the system task time list, read configuration by the system task monitoring program then, and judge whether it is current date, time, if satisfy service conditions, with regard to operation task and carry out corresponding operating, Fig. 1 shows flow chart of executing the task of the prior art in intelligent net system.
The problem that present processing mode exists is: for fixing the running time of each task setting, arrived the time that is provided with, task is operation automatically just, and no matter the ruuning situation of front task, even the task of front still off-duty finishes, new task also can be moved as usual, has so just caused the situation of the overlapping operation of task, may cause simultaneously giving that a user deducts fees, call list etc.; Simultaneously, no matter this mode is current task operation success or not, follow-up work to the time all can move in the same old way, can not support current task failure follow-up work that different processing modes is arranged, as no longer carrying out etc., therefore also be unfavorable for control to task.The problems referred to above are very easy to cause the consequence of failure, ticket confusion of deducting the fee, and so not only need to do engineering and deduct fees, mend ticket again, increase difficulty also might for the popularization of follow-up business.Carry out the initial stage in business, the task number is few, can be by the method that interlude between each task is elongated as far as possible, avoid the overlapping operation of task as far as possible, can be along with the development of business, the task number also constantly increases, and the interval between each task just can only be shortened, and therefore inevitably the problems referred to above can occur.
The another one problem that present processing mode exists is: owing to adopt the directly mode of management of system task monitoring program, when different business is provided with the task of oneself, can only be constantly in the system task time list continuous interpolation task, all professional shared tabulations task time, the task of different business all is placed in this tabulation, be deposited in together, safeguard all very trouble for system upgrade and task, because can not directly distinguish each professional pairing task separately, system upgrade, just can only adopt when maintenance relates to the task adjustment from the manual mode of searching one by one of whole task list, be very easy to omit.
Therefore, need a kind of solution that each business in the intelligent net system is dispatched, can solve the problem in the above-mentioned correlation technique.
Summary of the invention
The objective of the invention is to adopt the mode of task scheduling to manage each professional task of intelligent net system, directly task is managed thereby use unified task scheduling modules to replace original operating system.
According to an aspect of the present invention, provide a kind of intelligent net system task scheduling system, this system comprises: control module, the control information that is used to dispose a plurality of tasks; And scheduler module, be used for control information according to a plurality of tasks of control module, carry out this a plurality of tasks successively.
Control information comprises the information of whether carrying out follow-up work behind each mission failure in beginning time of implementation, priority and a plurality of task of each task in a plurality of tasks.
Scheduler module reads control information corresponding to current task from control module, and the beginning time of implementation in the control information and current date and current point in time compared judges whether to need to carry out current task, if then carry out current task.
After scheduler module executes current task, read the control information of next task from control module, and judge whether need to carry out next task, all be read and judge until the control information of a plurality of tasks.
Scheduler module judge the current time surpass for the current task setting the beginning time of implementation, current task was not performed the time, do not carry out current task and follow-up task.
Each task executions situation in a plurality of tasks that scheduler module will dispose in control module is saved in the journal file.
According to another aspect of the present invention, provide a kind of intelligent net system method for scheduling task, this method may further comprise the steps: step S302, and the control information of disposing a plurality of tasks, and scheduler task added in the system task time list; And step S304, scheduler task is carried out a plurality of tasks successively according to control information.
Control information comprises the information of whether carrying out follow-up work behind beginning time of implementation, priority and each a plurality of mission failure of each a plurality of task.
Step S302 may further comprise the steps: control module disposes the control information of a plurality of tasks; And scheduler module is added in the system task time list as scheduler task.
This method is further comprising the steps of: operating system timing scan system task time list, determine current will carrying out of task.
Step S302 is further comprising the steps of: scheduler module is configured to the day operation mode.
Step S304 may further comprise the steps: scheduler module reads the control information corresponding to current task, and the beginning time of implementation in the control information and current date and current point in time compared judge whether to need to carry out current task, if then carry out current task; And after scheduler module executes current task, read the control information of next task, and and judge whether need to carry out next task, all be read and judge until the control information of a plurality of tasks.
The current time surpass for the current task setting the beginning time of implementation, current task was not performed the time, do not carry out current task and follow-up task.
Under the situation of current task failure, continue to carry out follow-up work or stop to carry out follow-up work.
Compared with prior art, adopt the present invention, when needs are safeguarded existing task, only need to revise the control information in the control module, and no longer need all to revise the task in the system task tabulation at every turn; The present invention can control task the operation order, the task of assurance be one by one, operation successively, the situation of the overlapping operation of task can not take place, thereby avoided the problem of expense deduction failure, ticket confusion; Also can set timeout mechanism in the present invention, task is no longer carried out after having surpassed the stipulated time, and withdraws from automatically, thereby avoids influencing the appearance of calling problem; The present invention can also control task the processing mode of operation failure back follow-up work, can behind mission failure, continue to execute the task, also can stop task executions, perhaps the operating part task.Simultaneously, each professional task can use the control module of oneself to control, and different business is independent of each other, and can make that the maintenance of whole system task is more orderly, has reduced the probability of wrong generation.
Other features and advantages of the present invention will be set forth in the following description, and, partly from specification, become apparent, perhaps understand by implementing the present invention.Purpose of the present invention and other advantages can realize and obtain by specifically noted structure in the specification of being write, claims and accompanying drawing.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is a flow chart of executing the task in intelligent net system of the prior art;
Fig. 2 is the block diagram that illustrates according to intelligent net system task scheduling system of the present invention;
Fig. 3 is the flow chart that illustrates according to intelligent net system method for scheduling task of the present invention;
Fig. 4 is the flow chart that illustrates according to the intelligent net system method for scheduling task of first embodiment of the invention;
Fig. 5 is the block diagram that illustrates according to the intelligent net system task scheduling system of second embodiment of the invention; And
Fig. 6 is the flow chart that illustrates according to the intelligent net system method for scheduling task of second embodiment of the invention.
Embodiment
Describe embodiments of the invention in detail below in conjunction with accompanying drawing.
Fig. 2 is the block diagram that illustrates according to intelligent net system task scheduling system of the present invention.With reference to Fig. 2, intelligent net system task scheduling system 200 according to the present invention comprises: control module 202, the control information that is used to dispose a plurality of tasks; And scheduler module 204, be used for control information according to a plurality of tasks of control module, carry out this a plurality of tasks successively.
Control information comprises the information of whether carrying out follow-up work behind each mission failure in beginning time of implementation, priority and a plurality of task of each task in a plurality of tasks.
Scheduler module 204 reads control information corresponding to current task from control module 202, and the beginning time of implementation in the control information and current date and current point in time compared judge whether to need to carry out current task, if then carry out current task.
After scheduler module 204 executes current task, read the control information of next task from control module 202, and judge whether need to carry out next task, all be read and judge until the control information of a plurality of tasks.
Scheduler module 204 judge the current time surpass for the current task setting the beginning time of implementation, current task was not performed the time, do not carry out current task and follow-up task.
Under the situation of current task failure, scheduler module 204 continues to carry out follow-up work, or stops to carry out follow-up work.
Each task executions situation in a plurality of tasks that scheduler module 204 will dispose in control module is saved in the journal file.
Fig. 3 is the flow chart that illustrates according to intelligent net system method for scheduling task of the present invention.With reference to Fig. 3, intelligent net system method for scheduling task according to the present invention may further comprise the steps:
Step S302, the control information of disposing a plurality of tasks, and scheduler task added in the system task time list; And step S304, scheduler task is carried out a plurality of tasks successively according to control information.
Control information comprises the information of whether carrying out follow-up work behind beginning time of implementation, priority and each a plurality of mission failure of each a plurality of task.
Step S302 may further comprise the steps: control module disposes the control information of a plurality of tasks; And scheduler module is added in the system task time list as scheduler task.
This method is further comprising the steps of: operating system timing scan system task time list, determine current will carrying out of task.
Step S302 is further comprising the steps of: scheduler module is configured to the day operation mode.
Step S304 may further comprise the steps: scheduler module reads the control information corresponding to current task, and the beginning time of implementation in the control information and current date and current point in time compared judge whether to need to carry out current task, if then carry out current task; And after scheduler module executes current task, read the control information of next task, and and judge whether need to carry out next task, all be read and judge until the control information of a plurality of tasks.
The current time surpass for the current task setting the beginning time of implementation, current task was not performed the time, do not carry out current task and follow-up task.
Under the situation of current task failure, continue to carry out follow-up work or stop to carry out follow-up work.
Fig. 4 is the flow chart that illustrates according to the intelligent net system method for scheduling task of first embodiment of the invention.With reference to Fig. 4, the intelligent net system method for scheduling task of present embodiment may further comprise the steps:
Step S402, configuration needs the mission bit stream of operation in task control module,
Wherein, the path of the task that configuration task information comprises the running time of configuration task, specifically will carry out, task run parameter etc., wherein task execution time need not define in strict accordance with the mode of operating system, can be self-defined and task scheduling modules between interface rules, according to the self-defining regular configuration operation time, can get final product for task scheduling modules identification, can be more flexible when disposing.To guarantee the correctness of the content that disposes during configuration, will exist that the task run time of configuration will meet the interface specification of definition etc. as the task of configuration;
Step S404 is transferred to task scheduling modules on the server that will carry out the task scheduling management, and this module is the core of whole task scheduling management;
Step S406, task scheduling modules is joined in the system task time list as task, the configuration schedules task is the day operation mode in system task, and scheduler module is controlled what task of concrete execution and task executions order, no longer is related with system task; And
Step S408, task scheduling modules in the operating system calling task time list, scheduler module can be automatically according to the information of control module configuration and according to task run order of priority that is disposed and task executions time, carrying out the user in proper order, successively and being disposed of task;
In this embodiment, by the task scheduling mode task is managed, make that only needing task scheduling modules in the system task tabulation gets final product, and no longer need dispose concrete task in system task, specific tasks information disposes in control module and gets final product.
Describe the second embodiment of the present invention in detail below in conjunction with Fig. 5 and Fig. 6.
Fig. 5 is the block diagram of the intelligent net system task scheduling system in the present embodiment, be divided into two parts, first is the task scheduling system module, second portion is a task control module, can support a plurality of task control modules in order to represent scheduler module, adopted the method for expressing according to the traffic differentiation control module among the figure, expression the present invention can support the task of a plurality of business is dispatched.
Task scheduling modules is responsible for the content in the calling task control module, and moves one by one according to disposing in the control module of task; Task and relevant information that the task control module configuration will be carried out are used for the task scheduling modules scheduling.
Fig. 6 is that the task with single business is an example, describes the concrete processing procedure that the present invention dispatches the task of business, and as shown in Figure 6, task scheduling and managing method processing procedure of the present invention may further comprise the steps:
Step S602, the task control module configuration is as professional task control information such as CRBT, PHS, GSM, the information such as processing mode of follow-up work behind the priority that the date that the task that mainly is provided with is carried out, task are carried out, the mission failure, different business can dispose task control module separately, also can a shared control module, but only need a task scheduling modules to get final product;
Step S604, task scheduling modules is added in the system task time list, wherein, the system task time list is the mission bit stream of operating system configuration, the task monitor meeting timing scan of operating system, and judge whether the task that current date, time point need be carried out, if the current task of needing execution is arranged, the system task monitoring program will be equipped with the system resource that this required by task is wanted, and then carry out this task;
Task scheduling modules is according to the control information in the task control module, the execution date of setting according to control module, carry out information such as order of priority and carry out task in the control module in proper order, and judgement task executions situation, according to implementation status, determine the ruuning situation of follow-up work jointly in conjunction with the configuration information of control module then;
Step S606, system task monitoring program timing scan system task time list is sought the current task of needing execution, and is provided resource to execute the task, and wherein, the system task monitoring program is the resident function program of waiting for of operating system;
Step S608, task scheduling modules reads the mission bit stream that disposes in the task control module, uses for subsequent treatment;
Step S610, task scheduling modules judges whether to surpass limiting time, if the current time does not surpass this limiting time, then execution in step S612 if the current time has surpassed this limiting time, waits regular traffic for fear of the influence calling, to stop to execute the task, i.e. execution in step S620;
Step S612, task scheduling modules judges whether to carry out current task, if current task needs operation, execution in step S614 then, otherwise return execution in step S608;
Step S614 carries out current task;
Step S616, task scheduling modules judges whether the execution current task is successful, is mainly used to carry out the control of task run situation, if task runs succeeded, then returns execution in step S608, continues to carry out follow-up work; Otherwise execution in step S618 carries out corresponding operating according to configuration, as stops execution, misregistration mission bit stream of follow-up work etc.;
Step S618, task scheduling modules judges whether to continue to carry out other tasks, is mainly used to judge how current task operation failure back follow-up work is operated, if control module is configured to continue to carry out, then return execution in step S608, continue to carry out follow-up work, otherwise forward step S620 to; And
Step S620 all is finished or task is carried out and to be made mistakes and control documents indicates and staggers the time when withdrawing from task in task, stops the operation of task.
By implementing the present invention, when needs are safeguarded existing task, only need to revise the control information in the control module, and no longer need all to revise the task in the system task tabulation at every turn; The present invention can control task the operation order, the task of assurance be one by one, operation successively, the situation of the overlapping operation of task can not take place, thereby avoided the problem of expense deduction failure, ticket confusion; Also can set timeout mechanism in the present invention, task is no longer carried out after having surpassed the stipulated time, and withdraws from automatically, thereby avoids influencing the appearance of calling problem; The present invention can also control task the processing mode of operation failure back follow-up work, can behind mission failure, continue to execute the task, also can stop task executions, perhaps the operating part task.Simultaneously, each professional task can use the control module of oneself to control, and different business is independent of each other, and can make that the maintenance of whole system task is more orderly, has reduced the probability of wrong generation.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (15)
1. an intelligent net system task scheduling system is characterized in that, comprising:
Control module, the control information that is used to dispose a plurality of tasks; And
Scheduler module is used for the control information according to described a plurality of tasks of described control module, carries out described a plurality of task successively.
2. system according to claim 1 is characterized in that, described control information comprises the information of whether carrying out follow-up work behind beginning time of implementation, priority and each the described a plurality of mission failure of each described a plurality of task.
3. system according to claim 2, it is characterized in that, described scheduler module reads control information corresponding to current task from described control module, and the described beginning time of implementation in the described control information and current date and current point in time compared judge whether to need to carry out described current task, if then carry out described current task.
4. system according to claim 3, it is characterized in that, after described scheduler module executes described current task, read the control information of next task from described control module, and judge whether need to carry out described next task, all be read and judge until the control information of described a plurality of tasks.
5. system according to claim 4 is characterized in that, described scheduler module judge the current time surpass for described current task setting the beginning time of implementation, described current task was not performed the time, do not carry out described current task and follow-up task.
6. system according to claim 1 is characterized in that, described scheduler module is saved in each described a plurality of task executions situation in the journal file.
7. an intelligent net system method for scheduling task is characterized in that, may further comprise the steps:
Step S302, the control information of disposing a plurality of tasks, and scheduler task added in the system task time list; And
Step S304, described scheduler task is carried out described a plurality of task successively according to described control information.
8. method according to claim 7 is characterized in that, described control information comprises the information of whether carrying out follow-up work behind beginning time of implementation, priority and each the described a plurality of mission failure of each described a plurality of task.
9. method according to claim 8 is characterized in that, described step S302 may further comprise the steps:
Control module disposes the control information of described a plurality of tasks; And
Scheduler module is added in the described system task time list as described scheduler task.
10. method according to claim 9 is characterized in that, and is further comprising the steps of:
The described system task time list of operating system timing scan is determined current will carrying out of task.
11. method according to claim 10 is characterized in that, described step S302 is further comprising the steps of: described scheduler module is configured to the day operation mode.
12. method according to claim 11 is characterized in that, described step S304 may further comprise the steps:
Described scheduler module reads the control information corresponding to current task, and the described beginning time of implementation in the described control information and current date and current point in time compared judge whether to need to carry out described current task, if then carry out described current task; And
After described scheduler module executes described current task, read the control information of next task, and judge whether need to carry out described next task, all be read and judge until the control information of described a plurality of tasks.
13. method according to claim 12 is characterized in that, the current time surpass for described current task setting the beginning time of implementation, described current task was not performed the time, do not carry out described current task and follow-up task.
14. method according to claim 12 is characterized in that, under the situation of described current task failure, continues to carry out follow-up work.
15. method according to claim 12 is characterized in that, under the situation of described current task failure, stops to carry out follow-up work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101405414A CN101106734B (en) | 2007-08-09 | 2007-08-09 | Task dispatching system and method for intelligent network system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101405414A CN101106734B (en) | 2007-08-09 | 2007-08-09 | Task dispatching system and method for intelligent network system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101106734A true CN101106734A (en) | 2008-01-16 |
CN101106734B CN101106734B (en) | 2010-12-08 |
Family
ID=39000364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007101405414A Expired - Fee Related CN101106734B (en) | 2007-08-09 | 2007-08-09 | Task dispatching system and method for intelligent network system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101106734B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101378410B (en) * | 2008-09-27 | 2011-07-13 | 中兴通讯股份有限公司 | Intelligent service management system and method for controlling operation rate of management genus instruction thereof |
CN102521695A (en) * | 2011-12-07 | 2012-06-27 | 中兴通讯股份有限公司 | Operation method and device for card status |
CN103092693A (en) * | 2013-01-30 | 2013-05-08 | 深圳联友科技有限公司 | Task scheduling method and system for computer |
CN103516791A (en) * | 2013-09-16 | 2014-01-15 | 北京电视台 | File transmission method and system |
CN106155806A (en) * | 2015-04-14 | 2016-11-23 | 腾讯科技(深圳)有限公司 | A kind of multi-task scheduling method and server |
CN110182528A (en) * | 2019-04-11 | 2019-08-30 | 上海快仓智能科技有限公司 | Go out warehousing control method and handling system for shelf array |
CN111562974A (en) * | 2020-04-30 | 2020-08-21 | 苏州亿歌网络科技有限公司 | Method, device and equipment for acquiring offline data and storage medium |
CN112996132A (en) * | 2021-05-10 | 2021-06-18 | 新华三技术有限公司 | Dynamic scheduling method, device and equipment applied to 5G physical layer |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6243735B1 (en) * | 1997-09-01 | 2001-06-05 | Matsushita Electric Industrial Co., Ltd. | Microcontroller, data processing system and task switching control method |
KR20020035580A (en) * | 2000-06-27 | 2002-05-11 | 요트.게.아. 롤페즈 | Method of determining a schedule, scheduler and system |
CN1940858B (en) * | 2005-09-26 | 2011-06-15 | 深圳市朗科科技股份有限公司 | Method of Multi-task realization of media player |
-
2007
- 2007-08-09 CN CN2007101405414A patent/CN101106734B/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101378410B (en) * | 2008-09-27 | 2011-07-13 | 中兴通讯股份有限公司 | Intelligent service management system and method for controlling operation rate of management genus instruction thereof |
CN102521695B (en) * | 2011-12-07 | 2018-01-02 | 中兴通讯股份有限公司 | The operating method and device of card-like state |
CN102521695A (en) * | 2011-12-07 | 2012-06-27 | 中兴通讯股份有限公司 | Operation method and device for card status |
CN103092693A (en) * | 2013-01-30 | 2013-05-08 | 深圳联友科技有限公司 | Task scheduling method and system for computer |
CN103092693B (en) * | 2013-01-30 | 2016-08-31 | 深圳联友科技有限公司 | A kind of method for scheduling task for computer and system |
CN103516791A (en) * | 2013-09-16 | 2014-01-15 | 北京电视台 | File transmission method and system |
CN106155806A (en) * | 2015-04-14 | 2016-11-23 | 腾讯科技(深圳)有限公司 | A kind of multi-task scheduling method and server |
CN106155806B (en) * | 2015-04-14 | 2020-08-11 | 腾讯科技(深圳)有限公司 | Multitask scheduling method and server |
CN110182528A (en) * | 2019-04-11 | 2019-08-30 | 上海快仓智能科技有限公司 | Go out warehousing control method and handling system for shelf array |
CN110182528B (en) * | 2019-04-11 | 2020-12-18 | 上海快仓智能科技有限公司 | Warehouse-in and warehouse-out control method and conveying system for shelf array |
CN111562974A (en) * | 2020-04-30 | 2020-08-21 | 苏州亿歌网络科技有限公司 | Method, device and equipment for acquiring offline data and storage medium |
CN112996132A (en) * | 2021-05-10 | 2021-06-18 | 新华三技术有限公司 | Dynamic scheduling method, device and equipment applied to 5G physical layer |
CN112996132B (en) * | 2021-05-10 | 2021-08-24 | 新华三技术有限公司 | Dynamic scheduling method, device and equipment applied to 5G physical layer |
Also Published As
Publication number | Publication date |
---|---|
CN101106734B (en) | 2010-12-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101106734B (en) | Task dispatching system and method for intelligent network system | |
CN101882089B (en) | Method for processing business conversational application with multi-thread and device thereof | |
CN110489143A (en) | FOTA firmware remote update system and its method on new-energy automobile | |
US6650946B2 (en) | Apparatus and method for planning and controlling production sequences | |
US9201669B2 (en) | Systems and methods for mobility server administration | |
CN103645909A (en) | Handling method and device for timed task | |
EP2352093A1 (en) | Method and system for clearing log files of service system | |
CN111240935B (en) | Automatic intelligent operation and maintenance system and operation and maintenance method | |
US8788082B2 (en) | Method and a system for executing a scheduled production process | |
CN105260248A (en) | Task scheduling system with dynamic regulation function and scheduling method | |
US9430219B2 (en) | Revision safe upgrade in a hybrid cloud landscape | |
CN110611707A (en) | Task scheduling method and device | |
CN109656693A (en) | Method for scheduling task, device, server and storage medium | |
CN114461357A (en) | Remote sensing satellite raw data real-time processing flow scheduling engine | |
CN116205774A (en) | Digital processing system for passenger service and flight guarantee of terminal boarding gate | |
CN100414499C (en) | Method for controlling a software maintenance process in a software system landscape and computer system | |
CN116661978B (en) | Distributed flow processing method and device and distributed business flow engine | |
CN102447798B (en) | Recharge-for-recovery method and device | |
CN101431744A (en) | Method for asynchronous payment arrival of mobile phone account | |
CN101472258A (en) | Method and device for scheduling home location register instruction by business operation support system | |
CN114244894A (en) | Halt and recovery service processing method and system, computer storage medium and electronic equipment | |
CN114327407A (en) | Unmanned operation and maintenance method and system | |
CN114331099A (en) | Intensive business processing system and method | |
CN111062624A (en) | Task management platform and method for automatic distribution and push | |
CN111193620A (en) | Mobile work order processing method and system based on call center |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101208 Termination date: 20170809 |