CN101082239A - Fixing technique for thistle wall board - Google Patents

Fixing technique for thistle wall board Download PDF

Info

Publication number
CN101082239A
CN101082239A CN 200710106008 CN200710106008A CN101082239A CN 101082239 A CN101082239 A CN 101082239A CN 200710106008 CN200710106008 CN 200710106008 CN 200710106008 A CN200710106008 A CN 200710106008A CN 101082239 A CN101082239 A CN 101082239A
Authority
CN
China
Prior art keywords
wallboard
worker
font
groove
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710106008
Other languages
Chinese (zh)
Inventor
岳斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200710106008 priority Critical patent/CN101082239A/en
Publication of CN101082239A publication Critical patent/CN101082239A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The installation technology of a light wall panel relates to the installation method of light hollow wall panel and light batten board in the building field. With the flexible combination of wall panel (1), H-shape connecting piece (2), double H-shape connecting piece (3), T-shape fastening piece (4), grooved strip (5), cushion strip (6) and fixing strip (7) etc., the technology which is suitable for the speed installation of the wall panel is provided to improve the engineering effect and the installation quality and avoid fracture after its installation. As the insulating treatment method in the inner and outer of the external wall, the installation technology is used to resolve the cracking problem caused by pasting insulating materials on the inner and outer of the external wall. The nails can be pegged into the wall for hanging objects after construction.

Description

The mounting process of Light trabs
Technical field
The present invention relates to building field, particularly the mounting method of light hollow wall plate and light sandwich wallboard.
Background technology
At present, various prefabricated panels in building construction, have been used in large quantities.Mainly contain gypsum hollow lath, cement hollow slat, GRC batten etc., the wallboard side is connected with wall column, and wallboard adopts channel-section steel plate, squared board or lumps of wood piece to be connected with wall column more, like this, can whitewash to wall body decoration and makes troubles.The method that the wallboard upper end is adopted as U-shaped (steel plate) card or angle steel cutting ferrule clamp body more connects, because the contraction of wallboard or cementing agent, and makes the installation quality of wallboard be difficult to guarantee, and, though the unit total amount of wallboard mostly is lower than even reaches 60kg/m 2The lightweight standard, but its specification is generally 600 * 3000 * 100-150mm, the total amount of every block of plate is generally at 50-100kg, under the not high situation of mechanization of building operation degree, mounting method exists inconvenience, and efficiency of construction is low, construction effect is poor, the problem that cost strengthens.
Because the limitation of existing wallboard mounting process, during on-the-spot the installation, be connected difficulty between plate and the plate, and back wall is installed can not stand the destruction that long-term difference variation causes to body of wall, wallboard seam crossing cracking problem is difficult to solve, so wallboard only can be installed and used at interior wall.
The way of existing thermal insulation adopts paste heat-preserving heat-barrier material inside and outside body of wall more, can not hang object at the body of wall ailing after the construction, not only increase difficulty of construction, and be easy to produce the hollowing cracking, seriously also can come off, the cost cost is relatively also high, and quality more is difficult to guarantee.
Summary of the invention
But the objective of the invention is the defective that exists at prior art and the connector and the wallboard mounting process of the flexible combination that designs.
By wallboard and connector flexible combination, the technology that can be fit to fast install wallboard is provided, to improve construction efficiency and body of wall installation quality, after being installed, wallboard do not produce the crack.And, propose this mounting process and install use at exterior wall, as the method that insulation inside and outside the exterior wall is handled, inside and outside body of wall, paste the problem that heat-insulating and noise-insulating material produces easy hollowing cracking to solve, and can hang object at the body of wall ailing after the construction.
The mounting process of Light trabs and connector, comprise wallboard, connector, connector is divided into " worker " font, adds perpendicular two " worker " font connectors, " T " font securing member, slot stick, bed course bar, a fixed strip that forms by " worker " word, it is used by slot stick (or bed course bar) and fixed strip, make the wallboard installing and locating accurate, construction effect is good, installs firmly.Again by using " worker " font or two " worker " font connector; And " T " font securing member installs, and it is stable that wallboard is docked with wall column, solves body of wall and is easy to generate problem of cracks.
Described when wallboard and wall column connection, selected wallboard is near the position at middle part; Also can " T " font securing member be installed earlier earlier at other positions on corresponding wall or post, wallboard passes connecting rod locking and forms fastening.
Described employed connector is to be made by the material with enough rigidity and intensity, can be that iron and steel, alloy steel, alloy aluminum are made; Or make by engineering plastics such as glass fiber reinforced plastic, polypropylene plastics, vinyon, polyvinyl chloride or its synthetic plastics material.
Described employed connector bed course bar, fixed strip are made by timber, steel, cement mortar, concrete or by engineering plastics such as glass fiber reinforced plastic, polypropylene plastics, vinyon, polyvinyl chloride or its synthetic plastics material, also can use other new materials with enough rigidity and intensity to make.
Described plate dock with plate install after, the seam crossing of two plates is pasted and is had enough tensile strength and material sticking effect.Can select sticking glass fiber mesh cloth or numb grid cloth, at plate and wall column butt joint place, equally, can select sticking glass fiber mesh cloth or numb grid cloth, also can use at the seam crossing metal lathing, also can use other materials to paste processing, to reach the effect of sealing joints and cracking resistance.
Describedly have the wallboard of groove at two sides, plate dock with plate install after, constitute the inner hollow column of a band sealing between the two plate seams, open an osculum in the seam crossing upper end of wallboard, need carry out grouting mortar or cementing agent to hollow column.The wallboard that has groove if not two sides does not just have this step.
The present invention designs according to framework house, this mounting method is convenient and swift, fixation, cost is low, efficiency of construction is high, can be widely used in the non-bearing internal partition wall in industry and the civilian construction, as party wall, locellus wall, internal partition wall, also can be used as the method that the inside and outside insulation of exterior wall is handled, cooperate this technology to install with original body of wall.
Now the present invention is described in further detail in conjunction with the accompanying drawings, but content of the present invention is not limited to shown in the accompanying drawing.
Description of drawings
Fig. 1 is the structural representation that adopts a kind of Light trabs embodiment of mounting process formation of the present invention.
Fig. 2 is that the present invention uses " worker " font connector structural representation.
Fig. 3 be the present invention use be two " worker " font connector structural representations.
Fig. 4 be the present invention use for " T " font fastener constructions schematic diagram.
Fig. 5 be the present invention use be slot stick connector structural representation.
Fig. 6 is the bed course bar connector structural representation that the present invention uses.
Fig. 7 is the fixed strip connector structural representation that the present invention uses.
Fig. 8 is the structural representation of the another kind of embodiment of the present invention of using of the present invention.
Fig. 9 is the enlarged drawing at A place among Fig. 8.
Figure 10 is the enlarged drawing at B place among Fig. 8.
Figure 11 is the enlarged drawing at C place among Fig. 8.
Description of symbols among the figure: 1 is the precast hollow wallboard; 2 is " worker " font connector; 3 is two " worker " font connectors; 4 is " T " font securing member; 5 is slot stick; 6 bed course bars; 7 fixed strips; 8 is the fiberglass gridding cloth bar; 9 for installing the pipe that circuits such as electric wire use; 10 is body of wall or cylinder; 11 is extruded sheet; 12 mortar or cementing agents for the seam crossing perfusion; 13 is the groove of wallboard periphery; 41 is the lining bar of " T " font securing member; 42 is clamp nut.
The specific embodiment
Below in conjunction with accompanying drawing 1~11, the body of wall that describes activities of the present invention in detail and assemble by the present invention.
Embodiment 1: use connector 5 and 7 and Light trabs 1 combined installation:
When wallboard 1 and wall column 10 connections, earlier press structural requirement and use setscrew (or other fixtures) fixed groove bar 5, again on the structural beams or use setscrew (or other fixtures) to install and fix bar 7 formation by structural requirement on the floor of ceiling and fix on flooring or ground; Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the groove of wallboard 1 upper surface is stuck on the described fixed strip 7, the bottom with wallboard 1 embeds in the slot stick 5 again, forms inserted connection.Progress along with the wallboard installation, poling 9 is installed in plate body, butt joint place at plate and wall column joint and two wallboards, want in case of necessity sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth), after wallboard is installed well, an osculum is opened in upper end, butt joint place at wallboard, and the inner hollow column that constitutes a band sealing between the two plate seams is carried out grouting mortar or cementing agent 12.Double orifice plate or the wallboard bigger for the gauge of wallboard need be superimposed with the wallboard installation, or wallboard groove along its length is non-reducing groove, this wallboard is after installation, when carrying out not having the function of locking two adjacent wallboards behind grouting mortar or the cementing agent, should want sticking glass fiber mesh cloth 8.And for the single row of holes wallboard, or wallboard groove along its length is to have a reducing groove, and this wallboard when carrying out having the function of locking two adjacent wallboards behind grouting mortar or the cementing agent, does not just need sticking glass fiber mesh cloth 8 after installation.
Peripheral end face at described wallboard 1 is provided with groove 13, and the notch width of described slot stick 5 matches with the thickness of wallboard 1.The cross section rectangle of described fixed strip 7, trapezoidal, semicircle or U-shaped (being circular arc), its width matches with groove 13 width on the base of described wallboard 1.
Embodiment 2: use connector 2,3 and 7 and Light trabs 1 combined installation:
At wallboard 1 during, form and fix using setscrew (or other fixtures) to install and fix bar 7 by structural requirement on the structural beams or on the floor of ceiling with wall column 10 connections; Then according to the height of the wallboard that will install, selected wallboard is near position, upper end and position, bottom (with the distance of end maintenance 100-1000mm); Pressing structural requirement on corresponding wall or post 10 uses setscrew (or other fixtures) that " worker " font connector 2 is installed; Also can select for use two " worker " font connectors 3 to use.Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the groove of wallboard 1 upper surface is stuck on the described fixed strip 7, form inserted connection, flooring or ground are directly dropped in the wallboard bottom, the use cushion block pad that also has is in the wallboard bottom, and the lateral grooves of wallboard forms inserted connections with " worker " font connector 2 or two " worker " font connectors 3 of use again.Progress along with the wallboard installation, poling 9 is installed in plate body, the seam crossing of two plates is wanted sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth) in case of necessity, dock the seam crossing of installing with wall column at plate, equally, wallboard 1 is wanted sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth) in case of necessity with the seam crossing of wall column 10.Before grouting, (when installing, use wallboard cushion block to correct the height of wallboard at the bottom of will using the real plate of cement mortar (mixing micro-expanding agent) or pea gravel concreten (mixing micro-expanding agent) embedding earlier, with the verticality that guarantees wallboard and the planeness between the adjacent wall board), be in the milk after possessing certain intensity Deng material, after wallboard installs, constitute the inner hollow column of a band sealing between the two plate seams, open an osculum, need carry out grouting mortar or cementing agent 12 hollow column in the seam crossing upper end of wallboard.
Described two " worker " font connector 3 is than " worker " font connector more than 2 one vertical link, as shown in Figure 3.
Embodiment 3: use connector 2,3,5 and 7 and Light trabs 1 combined installation:
On the basis of embodiment 2, in the bottom embedding slot stick 5 with wallboard 1.Other processing steps are identical.
Embodiment 4, use connector 2,3,4,6 and 7 with the combined installation of Light trabs: when wallboard 1 and wall column 10 connections, earlier use setscrew (or other fixtures) that bed course bar 6 is installed by structural requirement and fixed, again on the structural beams or use setscrew (or other fixtures) to install and fix bar 7 formation by structural requirement on the floor of ceiling and fix on flooring or ground; Then according to the height of the wallboard 1 that will install, selected wallboard is near position, upper end and position, bottom (with the distance of end maintenance 100-1000mm); Pressing structural requirement on corresponding wall or post 10 uses setscrew (or other fixtures) that " worker " font connector 2 is installed; Also can select for use two " worker " font connectors 3 to use.Selected wallboard 1 is near the position at middle part; " T " font securing member 4 is installed earlier on corresponding wall or post earlier.Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the groove of wallboard 1 upper surface is stuck on the described fixed strip 7, make the groove 13 of wallboard 1 lower end be enclosed within bed course bar 6 on, form inserted connection, wallboard is locked after passing the connecting rod of " T " font securing member 4 again, and the lateral grooves of wallboard is again with " worker " font 2 or use two " worker " font connectors to form inserted the connection.Along with the progress that wallboard is installed, poling 9 is installed in plate body, at the butt joint place of plate and wall column joint and two wallboards, wants sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth) in case of necessity.Before grouting, (when installing, use wallboard cushion block to correct the height of wallboard at the bottom of will using the real plate of cement mortar (mixing micro-expanding agent) or pea gravel concreten (mixing micro-expanding agent) embedding earlier, with the verticality that guarantees wallboard and the planeness between the adjacent wall board), after the material at the bottom of the real plate of embedding possesses certain intensity, an osculum is opened in upper end, butt joint place at wallboard, and the inner hollow column that constitutes a band sealing between the two plate seams is carried out grouting mortar or cementing agent 12.
" T " font securing member 4 generally is applied in the occasion of the wallboard that superposes again on big height wallboard or the wallboard, is beneficial to improve the stability after wallboard is installed.
The cross section of bed course bar 6 is divided into shapes such as rectangle, trapezoidal, semicircle or circular arc for approximate convex or the cross section first half, its top just in time embeds in the groove 13 of wallboard 1 lower surface.
Embodiment 5, use connector 6 and 7 and the combined installation of Light trabs:
When wallboard 1 and wall column 10 connections, earlier use setscrew (or other fixtures) that bed course bar 6 is installed by structural requirement and fixed, again on the structural beams or use setscrew (or other fixtures) to install and fix bar 7 formation by structural requirement on the floor of ceiling and fix on flooring or ground; Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the groove 13 of wallboard 1 upper surface is stuck on the described fixed strip 7, form and 7 inserted connections of fixed strip, and wallboard bottom groove 13 is enclosed within on the bed course bar 6, and the progress of installing along with wallboard, poling 9 is installed in plate body, at the butt joint place of plate and wall column joint and two wallboards, want sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth) in case of necessity.After wallboard is installed well, open an osculum in the upper end, butt joint place of wallboard, the inner hollow column that constitutes a band sealing between the two plate seams is carried out grouting mortar or cementing agent 12.
Embodiment 6, use connector 2,3,4,5 and 7 and Light trabs 1 combined installation:
When wallboard 1 and wall column 10 connections, earlier press structural requirement and use setscrew (or other fixtures) fixed groove bar 5, again on the structural beams or use setscrew (or other fixtures) to install and fix bar 7 formation by structural requirement on the floor of ceiling and fix on flooring or ground; Follow height according to the wallboard 1 that will install, selected wallboard 1 uses setscrew (or other fixtures) installation " worker " font connector 2 or selects two " worker " font connectors 3 for use by structural requirement on corresponding wall or post 10 near position, upper end and position, bottom (with the distance of end maintenance 100-1000mm).Selected wallboard 1 is installed " T " font securing member 4 earlier near the position at middle part on corresponding wall or post 10.Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the groove of wallboard 1 upper surface is stuck on the described fixed strip 7, and wallboard 1 bottom embeds in the slot stick 5, forms inserted connection, wallboard 1 is locked after passing the connecting rod of " T " font securing member 4.The groove 13 on one vertical limit of wallboard 1 forms inserted connections with " worker " font connector 2 or two " worker " font connectors 3 of use again.Along with the progress that wallboard is installed, poling 9 is installed in plate body, at the butt joint place of plate and wall column joint and two wallboards, wants sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth) in case of necessity.After wallboard is installed well, open an osculum in the upper end, butt joint place of wallboard, the inner hollow column that constitutes a band sealing between the two plate seams is carried out grouting mortar or cementing agent 12.
Embodiment 7, use connector 2~7 and Light trabs 1 combined installation: on the basis of embodiment 6, install bed course bar 6 additional, be embedded in the height that bed course bar 6 increases wallboard 1 at slot stick 5, so that help the wallboard of setting height(from bottom) deficiency, and the body of wall that stack is installed to wallboard improves stability.
Embodiment 8, use connector 2 or 3 and Light trabs 1 combined installation:
Height according to the wallboard that will install, selected wallboard is pressed structural requirement and is used setscrew (or other fixtures) that " worker " font connector 2 is installed near position, upper end and position, bottom (with the distance of end maintenance 100-1000mm) on corresponding wall or post 10; Also can select for use two " worker " font connectors 3 to use.Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the lateral grooves of wallboard forms inserted connections with " worker " font 2 or two " worker " font connectors 3 of use again.Along with the progress that wallboard is installed, poling 9 is installed in plate body, at the butt joint place of plate and wall column joint and two wallboards, wants sticking glass fiber mesh cloth 8 (or flaxen fiber grid cloth) in case of necessity.Before grouting, (when installing, use wallboard cushion block to correct the height of wallboard at the bottom of will using the real plate of cement mortar (mixing micro-expanding agent) or pea gravel concreten (mixing micro-expanding agent) embedding earlier, with the verticality that guarantees wallboard and the planeness between the adjacent wall board), after the material at the bottom of the real plate of embedding possesses certain intensity, an osculum is opened in upper end, butt joint place at wallboard, and the inner hollow column that constitutes a band sealing between the two plate seams is carried out grouting mortar or cementing agent 12.
Embodiment 9, use connector 2,3,6,7 and Light trabs 1 combined installation:
When plate and wall column connection, earlier bed course bar 6 is installed at flooring (or ground), form fixing installing and fixing bar 7 on the structural beams or on the floor of ceiling again; Then according to the height of the wallboard that will install, selected wallboard is near position, upper end and position, bottom; " worker " font connector 2 is installed on corresponding wall or post, also can be selected for use two " worker " font connectors 3 to use; Before the formal installation of wallboard, check whether the side slotted eye of wallboard has filling,, and earlier extruded sheet 11 is inserted in the wallboard according to the wallboard size if there is omission will use special-purpose member (resembling bottle stopper) jam-pack (so that last grouting can not run off); Then, wallboard is holded up, the groove 13 of wallboard 1 upper surface is stuck on the described fixed strip 7, again wallboard bottom groove is inserted in the bed course bar 6, form inserted connection, the lateral grooves of wallboard forms inserted the connection with " worker " font connector 2 (or two " worker " font connector 3) connector.
In addition, the present invention can also with connector 4,5,7 and wallboard 1 constitute body of wall (as shown in Figure 1), its mounting process is same as the previously described embodiments.
The effect of described extruded sheet 11 is to play effect heat insulation, sound insulation, and extruded sheet 11 can use also and can not use.
Bed course bar of the present invention (6) also can be used for increasing the height of end (whether should delete) wallboard 1 except the effect with fixing wallboard 1, be beneficial to install.
The present invention uses the number of " worker " font connector 2 or two " worker " font connector 3 not limit, can be according to the height increase and decrease of body of wall.
Connector 2~5th used in the present invention is made by the material with enough rigidity and intensity, can be that iron and steel, alloy steel, alloy aluminum are made; Or make by engineering plastics such as glass fiber reinforced plastic, polypropylene plastics, vinyon, polyvinyl chloride or its synthetic plastics material.
Employed connector bed course bar 6, fixed strip 7 are made by timber, steel, cement mortar, concrete or by engineering plastics such as glass fiber reinforced plastic, polypropylene plastics, vinyon, polyvinyl chloride or its synthetic plastics material, also can use other new materials with enough rigidity and intensity to make.
Described wallboard dock with wallboard install after, the seam crossing of two plates is pasted and is had enough tensile strength and material sticking effect.Can select sticking glass fiber mesh cloth or numb grid cloth, at plate and wall column butt joint place, can select sticking glass fiber mesh cloth or numb grid cloth equally, also can use at the seam crossing metal lathing, also can use other materials to paste processing, to reach the effect of sealing joints and cracking resistance.

Claims (10)

1, a kind of mounting process of Light trabs is characterized in that: may further comprise the steps:
1. at flooring or floor mounted slot stick (5);
2. installing and fixing bar (7) on the structural beams or on the floor of ceiling;
3. the groove with wallboard (1) upper surface is stuck on the described fixed strip (7), the bottom of wallboard (1) is inserted in the slot stick (5) again, forms inserted connection;
Have at least the end face of an opposite side to be provided with groove at described wallboard (1), the notch width of described slot stick (5) matches with the thickness of wallboard (1), the bottom of described fixed strip (7) or all embed in the groove of periphery of described wallboard (1).
2, the mounting process of Light trabs according to claim 1, it is characterized in that: in described step 1. and 2., then according to the height of the wallboard that will install, near the wall of the position of wallboard upper end and bottom or post, " worker " font connector (2) or two " worker " font connector (3) are being installed respectively; Carry out described step 3. then; Groove with two vertical limit end faces of wallboard forms inserted the connection with the outer end of described " worker " font (2) or two " worker " font connector (3) at last; The width of the outer end of described " worker " font (2) or two " worker " font connector (3) just in time embeds in the groove of described wallboard (1) periphery.
3, the mounting process of Light trabs according to claim 2, it is characterized in that: after " worker " font connector (2) or two " worker " font connector (3) are installed, again on the top of approximately " T " font securing member (4) being installed on the wall of the position at middle part or the post corresponding to described wallboard, then described wallboard is passed the connecting rod of " T " font securing member (4), end at this connecting rod is provided with screw thread, and a lining bar (41) is installed, and form fastening by nut (42) locking.
4, a kind of mounting process of Light trabs is characterized in that: may further comprise the steps:
1. at flooring or floor mounted bed course bar (6), match with the groove of described wallboard (1) periphery in the cross section of this bed course bar (6); Have at least the end face of an opposite side to be provided with groove at described wallboard (1);
2. installing and fixing bar (7) on the structural beams or on the floor of ceiling;
3. the groove with wallboard (1) upper surface is stuck on the described fixed strip (7), and the bottom with wallboard (1) places on the bed course bar (6) again, and the top of bed course bar (6) is embedded in the groove of groove wallboard (1) lower end, forms inserted connection.
5, the mounting process of Light trabs according to claim 4, it is characterized in that: in described step 1. and 2., then according to the height of the wallboard that will install, near the wall of the position of wallboard upper end and bottom or post, " worker " font connector (2) or two " worker " font connector (3) are being installed respectively; Carry out described step 3. then; Groove with two vertical limit end faces of wallboard forms inserted the connection with the outer end of described " worker " font (2) or two " worker " font connector (3) at last.
6, the mounting process of Light trabs according to claim 5, it is characterized in that: on the top of approximately " T " font securing member (4) being installed on the wall of the position at middle part or the post corresponding to described wallboard, then described wallboard is passed the connecting rod of " T " font securing member (4), end at this connecting rod is provided with screw thread, and a lining bar (41) is installed, and form fastening by nut (42) locking.
7, the mounting process of Light trabs according to claim 6 is characterized in that: at flooring or floor mounted slot stick (5), the bottom and the bed course bar (6) of described wallboard (1) inserted in this slot stick (5).
8, a kind of mounting process of Light trabs is characterized in that: may further comprise the steps:
1. according to the height of the wallboard that will install (1), corresponding to installing two or near wall between the position of wallboard upper end and bottom or post more than two " worker " font connectors (2) or two " worker " font connector (3); Have at least the end face of an opposite side to be provided with groove at described wallboard (1);
2. the end face groove with a vertical limit of described wallboard (1) forms inserted the connection with the outer end of described " worker " font (2) or two " worker " font connector (3).
9, the mounting process of Light trabs according to claim 8 is characterized in that: at first installing and fixing bar (7) on the structural beams or on the floor of ceiling; Flooring or ground are directly dropped in the bottom of wallboard (1), and the groove with wallboard (1) upper surface is stuck on the described fixed strip (7) again, forms inserted connection.
10, according to the mounting process of any one described Light trabs of claim 1~9, it is characterized in that: the seam crossing between described adjacent wall board, and the seam crossing of wallboard and wall column is pasted the adhesives with enough tensile strength and sticking effect, so that between above-mentioned seam, form the planeness close with wallboard, open an osculum, grouting mortar or cementing agent in described seam crossing in the seam crossing upper end.
CN 200710106008 2006-05-29 2007-05-28 Fixing technique for thistle wall board Pending CN101082239A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710106008 CN101082239A (en) 2006-05-29 2007-05-28 Fixing technique for thistle wall board

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200610019260 2006-05-29
CN200610019260.9 2006-05-29
CN 200710106008 CN101082239A (en) 2006-05-29 2007-05-28 Fixing technique for thistle wall board

Publications (1)

Publication Number Publication Date
CN101082239A true CN101082239A (en) 2007-12-05

Family

ID=38911991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710106008 Pending CN101082239A (en) 2006-05-29 2007-05-28 Fixing technique for thistle wall board

Country Status (1)

Country Link
CN (1) CN101082239A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864848A (en) * 2010-07-05 2010-10-20 李全瑞 Multifunctional building with variable style
CN102966202A (en) * 2012-11-06 2013-03-13 张息清 Ceramsite concrete wall panel system and installation process thereof
CN103352522A (en) * 2013-06-29 2013-10-16 内蒙古电力勘测设计院 Deformable joining method and deformable joining structure between masonry wall and metal wall
CN103899007A (en) * 2012-12-28 2014-07-02 德胜(苏州)洋楼有限公司 Land-subsidence-resistant multilayer brick wall
CN103924714A (en) * 2014-03-18 2014-07-16 昆山生态屋建筑技术有限公司 Wire mesh integral-frame building wall and manufacture process thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864848A (en) * 2010-07-05 2010-10-20 李全瑞 Multifunctional building with variable style
CN102966202A (en) * 2012-11-06 2013-03-13 张息清 Ceramsite concrete wall panel system and installation process thereof
CN103899007A (en) * 2012-12-28 2014-07-02 德胜(苏州)洋楼有限公司 Land-subsidence-resistant multilayer brick wall
CN103899007B (en) * 2012-12-28 2016-05-18 德胜(苏州)洋楼有限公司 Anti-earth subsidence formula layer brick body of wall
CN103352522A (en) * 2013-06-29 2013-10-16 内蒙古电力勘测设计院 Deformable joining method and deformable joining structure between masonry wall and metal wall
CN103352522B (en) * 2013-06-29 2015-12-23 内蒙古电力勘测设计院有限责任公司 Build a wall and deformable marching method between metal wall and deformable connected structure
CN103924714A (en) * 2014-03-18 2014-07-16 昆山生态屋建筑技术有限公司 Wire mesh integral-frame building wall and manufacture process thereof
CN103924714B (en) * 2014-03-18 2016-09-07 昆山生态屋建筑技术有限公司 A kind of steel wire entirety building of skeleton construction body of wall and manufacture craft thereof

Similar Documents

Publication Publication Date Title
CN107100299B (en) Composite outer wall with disassembly-free formwork and construction method thereof
CN100464043C (en) Bound-type composite heat-insulation wall with support body
CN108797847B (en) Assembled steel frame infilled wall structure system and construction method thereof
CN109322392B (en) Light steel house and construction method thereof
CN107044179B (en) Decorative panel and template integrated heat-preservation decorative composite wall and construction method thereof
CN106168067A (en) A kind of construction method of light steel keel partition
CN210767489U (en) Assembled integral type large plate
CN202611016U (en) Thermal insulating wall on concrete overhanging eaves board
CN101476361B (en) Inner partition plate system and its construction method
CN110130546B (en) Assembled anti-seismic inner partition wall and installation method thereof
CN101082239A (en) Fixing technique for thistle wall board
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN103243847B (en) Prefabricating assembling type cold molding steel floor system and construction method thereof
CN211597122U (en) Anti-drop rock wool heated board fixed knot constructs
CN109057099B (en) Steel structure engineering precast concrete composite integrated partition wall and manufacturing and using methods thereof
CN204081148U (en) Assembled wall panels
CN201078039Y (en) Assembly type light wall
CN107217783B (en) Assembled integral external wall panel
CN110670765B (en) Indoor seamless splicing secondary light partition wall system and rapid construction method of partition wall
CN112709341A (en) Construction method for simultaneously building heat preservation and masonry
CN219060418U (en) Light prefabricated composite heat-insulating external wall panel and wall structure
CN218522008U (en) Evaporate and press light aerated concrete slab outer wall structure
CN217652119U (en) Slim glass fiber reinforced cement board furred ceiling structure
CN204001289U (en) There is the light steel keel partition that carries the arm of encorbelmenting
CN101498148A (en) Composite heat insulating walling fastening bolt and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20071205