CN101060435A - An open-type performance management system and its method - Google Patents

An open-type performance management system and its method Download PDF

Info

Publication number
CN101060435A
CN101060435A CNA2007100990355A CN200710099035A CN101060435A CN 101060435 A CN101060435 A CN 101060435A CN A2007100990355 A CNA2007100990355 A CN A2007100990355A CN 200710099035 A CN200710099035 A CN 200710099035A CN 101060435 A CN101060435 A CN 101060435A
Authority
CN
China
Prior art keywords
task
module
performance management
measurement
performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100990355A
Other languages
Chinese (zh)
Inventor
田涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNA2007100990355A priority Critical patent/CN101060435A/en
Publication of CN101060435A publication Critical patent/CN101060435A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

The disclosed open performance management system comprises: a man-machine interactive module for providing GUI for user operation, a communication module connecting with communication device and transmitting management between the device and management side, a task management module for providing support measurement type and processing man-machine module command and all tasks, and a task module for realizing the measurement. This invention reduces loading of development and maintenance greatly.

Description

A kind of open-type performance management system and method thereof
Technical field
The present invention relates to the communication equipment network management technology, particularly relate to a kind of open-type performance management system and method thereof in the communication equipment field.
Background technology
In opening of communication equipment safeguarded with day-to-day operation, equipment vendor and operator generally depended on webmaster the communication equipment in the network are effectively managed.Typical webmaster comprises configuration management, alarm management and three parts of performance management, wherein performance management can provide the real-time performance data monitoring function and the performance data report capability that can reflect the equipment performance index, allow the attendant in time control the equipment operation situation and analyze the remover apparatus fault, for the operation maintenance of network provides support.
Performance management through performance administrative model embodies, and a performance administrative model has been described a kind of measurement type on the equipment, describes content and comprises measuring object, measurement index etc., and typical performance management process flow as shown in Figure 1.On the form of expression, the real time data function for monitoring generally presents by showing real time data and draw real-time curve chart in monitor window, and the performance data report capability then saves as file by the data that equipment is reported and realizes.
The implementation of existing performance management is: adopt the vertically method of management, be the basic management unit promptly to measure type, after the user selects a kind of measurement type to start, equipment reports webmaster by the self-defined message interface with measurement data, webmaster is presented to the user after handling, the self-defined message interface all is that monitor window then needs to carry out manual drawing by the visual development instrument with in the present program of the form body of hard coded.
Though this implementation can satisfy the needs of performance management substantially, has the following disadvantages:
1. especially the field of wireless communication technical development is with rapid changepl. never-ending changes and improvements for communication field, new technology emerges in an endless stream, with WCDMA (Wideband Code Division Multiple Access, Wideband Code Division Multiple Access (WCDMA)) system is an example, HSDPA from the 3GPP Release 1999 to the R5 agreement (High Speed Downlink PacketAccess, high-speed downlink packet inserts) arrive HSUPA (the High Speed UplinkPacket Access of R6 agreement again, High Speed Uplink Packet inserts), only used for four years, new performance measurement type and new performance index just need be provided when new functional development, and the user's request of performance management changes fast; And above-mentioned implementation all is a hard coded owing to interface, code and interface definition close coupling, and each change of performance index all needs to repeat to write or revise code, causes flexibility and autgmentability poor.
2. every kind of measurement type all has functions such as real time data demonstration, data preservation, the code of different measuring type has certain similitude, above-mentioned implementation is owing to adopt single vertical management method, a kind of measurement type of every increase, all need to repeat to write similar function code, cause code sharing poor, difficult in maintenance, and the interface development workload is big, might cause the interface disunity that develops when many people develop.
3. in the performance management process, the user often only wishes to observe the properties of interest index, and this just need provide the measurement customization function, and above-mentioned implementation does not have customization function basically.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of open-type performance management system and method thereof, is used for solving the shortcoming that the autgmentability that prior art exists is poor, difficult in maintenance, lack the flexible customization function.
To achieve these goals, the invention provides a kind of open-type performance management system, be used for the network management of communication equipment, it is characterized in that, comprising:
One human-computer interaction module is used to provide the user measurement task to be carried out the graphical interfaces of operational processes;
One communication module is used for setting up communication with described communication equipment and is connected, and the performance management order is sent to described communication equipment, and transmits the message from described communication equipment;
One task management module connects described human-computer interaction module, is used for providing to described human-computer interaction module the measurement type of described communication equipment support, handles the user instruction that described human-computer interaction module transmits; Obtain the performance management model description of described measurement type by loading and analysis feature administrative model description document, create the measurement task corresponding according to described performance management model description again, and all measurement tasks are carried out unified management with described measurement type; And
One task module connects described communication module, described task management module, is used to realize described measurement task, and by described communication module finish and described communication equipment between interacting message and data processing.
Described open-type performance management system, wherein, described task management module comprises again:
One performance model administration module connects described performance task management module, is used to resolve described performance management model description file, manages described performance management model description, and provides query interface to described human-computer interaction module, described task module;
One performance task management module, connect described performance model administration module, the query interface that provides according to described performance model administration module obtains described performance management model description, and, preserve and manage described task instances according to described performance management model description establishment and the corresponding task instances of described measurement type; And
One performance task template administration module connects described performance task management module, is used to provide the function that imports and exports of the task template of creating the measurement task.
Described open-type performance management system, wherein, described task module comprises again:
One creates to guide module, is used to provide customization to select, and finishes the customization of measurement task with the guiding user;
One real time data display module connects described establishment to guide module, is used for according to user's customization situation dynamic creation monitor window and curve chart and shows real time data;
One data are preserved module, connect described establishment to guide module, are used for creating file and real time data being saved to local file according to user's task customized information; And
One message processing module, connect described real time data display module, described data preservation module, be used to finish the interacting message with communication equipment, handle the performance data that communication equipment reports, and offer described real time data display module and described data and preserve module and handle.
Described open-type performance management system, wherein, described customization is selected to comprise: measurement index customization, curve chart customization, file are preserved customization and/or information customization; Wherein, the content of described measurement index customization comprises basic index and user-defined counter; The content of described curve chart customization comprises curve color, curve title and curve; The content that described file is preserved customization comprises file preservation type, file storing path and filename; The content of described information customization comprises task start time, task dwell time, measurement data acquisition granularity and reports time granularity.
Described open-type performance management system, wherein, described task template comprises single task template and/or multitask template; Described single task template is the task template that comprises a mission bit stream, and described multitask template is the task template that comprises a plurality of mission bit streams.
Described open-type performance management system, wherein, described communication module adopts the TCP communication modes of near-end, or the IPOA communication modes of far-end.
Described open-type performance management system, wherein, described performance management model description comprises that message interface is described, curve chart is described, preserve file description and/or interface layout is described.
Described open-type performance management system, wherein, the performance management model description file that described performance management model description file is XML form, html format or INI form.
To achieve these goals, the present invention also provides a kind of open-type performance management method, is used for the network management of communication equipment, it is characterized in that, this method comprises:
The step of human-computer interaction module is set, is used to provide the user measurement task to be carried out the graphical interfaces of operational processes;
Set up the communication step of connecting with described communication equipment, be used for the performance management order is sent to described communication equipment, and forwarding is from the message of described communication equipment;
Load and analysis feature administrative model description document, obtain the step of the performance management model description of measuring type; And
Create the measurement task corresponding according to described performance management model description with described measurement type, and the step of on described graphical interfaces, described measurement task being operated and managing.
Described open-type performance management method wherein, also comprises the step that generates described performance management model description file.
Described open-type performance management method, wherein, described performance management model description comprises that message interface is described, curve chart is described, preserve file description and/or interface layout is described.
Described open-type performance management method, wherein, the performance management model description file that described performance management model description file is XML form, html format or INI form.
Described open-type performance management method, wherein, in the step of creating the measurement task corresponding with described measurement type, further comprise: task derives step and/or mission bit stream modify steps; The measurement task that described task derivation step is used for having created exports as template file, and described mission bit stream modify steps is used to the customized information of the task of revising.
Described open-type performance management method, wherein, step to described measurement task is operated and managed further comprises: the startability measuring process, handle data step that described communication equipment reports, stop the performance measurement step and/or task step is measured in deletion.
Adopting management system of the present invention and method, owing to taked open performance management platform, and is driving with performance management model description file, has thoroughly changed traditional performance management implementation; Realize that a kind of administrative model only need realize that the descriptor of this model gets final product, and, significantly reduced the workload of exploitation and maintainability management, and have unified man-machine interface without recompile.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Description of drawings
Fig. 1 is existing typical performance management process flow figure;
Fig. 2 is a performance management system schematic diagram of the present invention;
Fig. 3 is a performance management method flow chart of the present invention;
Fig. 4 is the newly-increased a kind of method flow diagram of measuring type of the present invention;
Fig. 5 is that the present invention revises a kind of method flow diagram of measuring type;
Fig. 6 is that performance management model file of the present invention is organized schematic diagram.
Embodiment
Below in conjunction with accompanying drawing technical scheme of the present invention is described in further detail:
Referring to shown in Figure 2, it is performance management system schematic diagram of the present invention, this performance management system is based on XML (Extensible Markup Language, extend markup language) open-type performance management system 100, this open-type performance management system 100 has adopted horizontal and vertical management to combine, method based on horizontal management, with the measurement task is the basic management unit, realized a performance management platform, this platform is driving with the performance management model description file of XML form, realize performance management function expansion and the no numeralization of safeguarding, comprised human-computer interaction module 10, communication module 20, task management module 30 and task module 40.
Human-computer interaction module 10 reads all measurement types of communication apparatus 300 supports of current maintenance from task management module 30, and provide graphical interfaces to measure the operations such as establishment, startup, deletion of task for user 200, operational order being translated into internal command after the operational order that receives user 200 sends to task management module 30 and handles, graphical interfaces can present with forms such as Tree control, list controls, has shown all measurement types that current service equipment is supported in the graphical interfaces.
Communication between communication module 20 management and the communication apparatus 300, communication modes can be TCP (the Transmission Control Protocol of near-end, transmission control protocol) IPOA of communication or far-end (IP OverATM) communication etc., it is responsible for the performance management order is sent to communication apparatus 300, and will give upper layer application from the forwards of communication apparatus 300.Wherein, ATM (Asynchronous Transfer Mode) is an asynchronous transfer mode.
Task management module 30 is the nucleus modules in the system, it provides the master data of measuring type to human-computer interaction module 10, processing is from the user instruction of human-computer interaction module 10, obtain the performance management model description of measuring type by loading and analysis feature administrative model description document, create corresponding measurement task according to the performance management model description again, and all types of measurement tasks are carried out unified management.
This master data comprises: measure typonym and measure type i D, human-computer interaction module 10 utilizes these data to generate the performance management navigation tree, operates for the user.
Task module 40 is minimum units of task management, the interface that it provides by task management module 30 obtains the description of performance management model under this measurement task, these descriptions comprise measurement index, curve chart, file preservation, interface layout etc., handle simultaneously from the order of task management module 30 and finish startup, check, preserve data, function such as stop, the measurement task that user 200 creates just corresponding a task instances, task instances is responsible for realizing all operations in this task life cycle.
Task management module 30 can be divided into performance model administration module 301, performance task management module 302 and performance task template administration module 303 again.
Performance model administration module 301 is responsible for analysis feature administrative model XML description document, manages the description of all properties administrative model and provides query interface to performance task management module 302; Performance model administration module 301 also provides query interface to human-computer interaction module 10, task module 40.
Performance task management module 302 is preserved and plot information according to message interface, interface layout, the file of the query interface inquiry specified performance administrative model that performance model administration module 301 provides, and utilize these information creating task instances, preserve task instances and it is managed;
Performance task template administration module 303 provides the function that imports and exports of template, the configuration information of the appointed task that performance task management module 302 is provided exports as task template, and the configuration information that also can read task from the task template file offers performance task management module 302 to create corresponding task instances.
User 200 can export as creating of task template file and import when using next time, the configuration information of a task can be exported as the single task template, also the configuration information of a plurality of tasks can be exported as the multitask template simultaneously, the configuration information of task is exactly the customized information to this task that user 200 finishes by task creation guide.
Task module 40 can be divided into establishment again and preserve module 404 4 parts to guide module 401, message processing module 402, real time data display module 403 and data, this four part has covered all features of a task, any one task instances all is made up of this four part, and their common cooperations are with the measurement function of the example of finishing the work.
Establishment provides following customization selection function to guide module 401, finishes the customization of measurement task with the guiding user:
A1. measurement index customization: the user can only select the index of its care, also can user-defined counter, and user-defined counter is meant that this index is to obtain through after the simple addition subtraction multiplication and division computing by other basic index;
A2. curve chart customization: the user can customize the index of curve color, curve title, curve correspondence;
A3. file is preserved customization: the user can preserve type (can be the document format of any supports such as text-only file or Excel document), storing path, filename by customized file;
A4. out of Memory customization: comprise task start time, task dwell time, measurement data acquisition granularity and report time granularity;
Message processing module 402 is finished the interacting message with communication apparatus 300, handles performance data that communication apparatus 300 reports and data is offered real time data display module 403 and data are preserved module 404.With the mutual self-defined message interface of communication apparatus 300 not with in the present program of the form body of hard coded, but with certain rule description in performance management model XML description document, message processing module 402 is actually a general Message Processing platform like this, can describe with communication apparatus 300 according to the message interface in the performance management model XML description document and carry out the interacting message of various performance management models and resolve reported data automatically.
Real time data display module 403 is according to user 200 customization situation dynamic creation monitor window and curve chart and show real time data, and monitor window is easy to show that so that list control or other are any the control form of real time data presents.The interface layout of monitor window and curve chart is to generate according to the descriptor in the performance management model XML description document, the measurement index of only can explicit user 200 in the monitor window having selected.Performance administrative model may corresponding a plurality of monitor windows and curve chart, and this depends on the number of index message interface in the performance management model.The reported data of communication apparatus 300 drives refreshing of monitor window and curve chart, and the refresh cycle of monitor window and curve chart is exactly that the measurement data of user's 200 customizations reports time granularity.
Data are preserved the data that module 404 receives from message processing module 402, and real time data is preserved into local file, and preserving file type can be the document format of any supports such as text-only file or Excel document.
As can be seen from the above description, a kind of open-type performance management system based on XML adopted horizontal and vertical management combine, based on the method for horizontal management, to be that characteristic that all properties administrative model is total is abstract come out horizontal management, with OO method, adopting the measurement task is the basic management unit, each task instances corresponding again definite performance management model.This system is driving with the performance management model description file of XML form, has realized expansion of performance measurement function and the no numeralization of safeguarding.
Referring to shown in Figure 3, be performance management method flow chart of the present invention, this performance management method is based on the open-type performance management method of XML, and this process step is as follows:
Step S310, generate performance administrative model XML description document, performance management model XML description document has been described the measurement type of all supports on the communication apparatus 300 of the current maintenance of webmaster, every kind of performance management model has been described information such as the message interface of measuring type, interface layout, file preservation, curve chart respectively, and the organizational form of performance management model XML description document as shown in Figure 4;
Step S320, analysis feature administrative model XML description document, reading performance administrative model XIML description document also resolves to the data of description of measuring type, and data of description is resolved and is preserved by task management module 30;
Step S330, according to the data of description of measuring type, the measurement type that the communication apparatus 300 of current maintenance is supported is presented on the man-machine interface for user's operation; And
Step S340, task management, operation such as the user can create, starts, preserve data, stops to task on man-machine interface, deletion.
The above-mentioned S340 step may further comprise the steps:
B1. creation task can use task creation guide from the beginning to create or imports task according to the task template of prior derivation;
B2. startability is measured, can start-up by hand or start automatically;
B3. handle reported data;
B4. stop performance measurement, can stop by hand or stop automatically; And
B5. delete task.
In the above-mentioned S330 step, comprise data check, real time data is presented in monitor window and the curve chart, preserves data, data check is to carry out verification according to the span of the index of describing in the performance management model XML description document, if exceeded span, then this desired value is with red or other eye-catching color showing.
Said method comprises that also task derives step and mission bit stream modify steps.
Wherein, the task that task derivation step will have been created exports as template file and is provided with the back use, task template can be divided into single task template and multitask template, the single task template is meant the template that only comprises a mission bit stream, can select to create the task of the maximum number of this task type when importing, the multitask template is meant the template that comprises a plurality of mission bit streams;
Wherein, the mission bit stream modify steps can be revised the customized information of task, comprise customized information, task start/dwell time, the measurement data acquisition granularity that measurement index, curve chart, file are preserved and report information such as time granularity, could make amendment to the customized information of task when task only is in not starting state.
Referring to shown in Figure 4, be the newly-increased a kind of method flow diagram of measuring type of the present invention, in conjunction with Fig. 1, this flow process comprises the steps:
Step S410 at first realizes newly-increased measurement type on communication apparatus 300;
Step S420 makes up corresponding performance management model according to newly-increased message interface information, users' interfaces layout and the curve chart demand of measuring type, and increase this performance management model in performance management model description file;
Step S430, after performance management system 100 operations, task management module 30 loads the performance management model description file that has increased the performance management model newly;
Step S440, performance management system 100 is by communication module 20 incoming communication equipment 300;
Step S450, human-computer interaction module 10 obtains measuring type information from task management module 30 and generates the performance management navigation tree, has comprised newly-increased measurement type in the navigation tree;
In this step, do as one likes can model management module 301 provide the newly-increased query function of measuring type information to human-computer interaction module 10;
Step S460, user 200 creates the measurement task by human-computer interaction module 10 at newly-increased measurement type and the measurement task is managed, in this process, the human-computer interaction module 10 realization task management of cooperating with task management module 30, task module 40, communication module 20;
In this step, performance model administration module 301 provides the query function of newly-increased performance management model to performance task management module 302, task module 40;
In this step, performance task management module 302 can be created the task instances of newly-increased measurement type according to newly-increased performance management model information and it is managed;
In this step, 303 pairs of newly-increased configuration informations of measuring the task instances of type of performance task template administration module import and export operation;
In this step, create to guide module 401 and carry out the customization of mission bit stream according to the newly-increased information guide user who measures type;
In this step, message processing module 402 is described according to the message interface of newly-increased performance management model, is undertaken mutual and resolves reported data by communication module 20 and communication apparatus 300;
In this step, the interface layout of the newly-increased performance management model of real time data display module 403 bases is described, curve chart is described and message interface is described, and the real time data that message processing module 402 is sent is shown in the measurement monitor window;
In this step, data are preserved module 404 and are described according to the file preservation description and the message interface of newly-increased performance management model, and the real time data that message processing module 402 is sent is saved in the local file.
Referring to shown in Figure 5, for the present invention revises a kind of method flow diagram of measuring type, in conjunction with Fig. 1, this flow process comprises the steps:
Step S510, if revise be message interface information then at first on communication apparatus 300, realize the modification of this measurement type; Other is revised does not need communication apparatus 300 to participate in;
Step S520 will revise in the respective performances administrative model of information updating in the performance management model description file;
Step S530, after performance management system 100 operations, task management module 30 loads amended performance management model description file;
In this step, performance model administration module 301 is responsible for loading amended performance management model description file;
Step S540, performance management system 100 is by communication module 20 incoming communication equipment 300;
Step S550, human-computer interaction module 10 obtains measuring type information from task management module 30 and generates the performance management navigation tree, comprised the measurement type of having revised in the navigation tree;
In this step, performance model administration module 301 provides the query function of amended measurement type information to human-computer interaction module 10;
Step S560, the user can manage at amended measurement type establishment measurement task and to task by human-computer interaction module 10, in this process, the human-computer interaction module 10 realization task management of cooperating with task management module 30, task module 40, communication module 20;
In this step, performance model administration module 301 provides the query function of amended performance management model to performance task management module 302, task module 40;
In this step, performance task management module 302 manages according to amended performance management model information creation task example and to it;
In this step, the configuration information that 303 pairs of performance task template administration modules have been revised the task instances of performance management model imports and exports operation;
In this step, create to guide module 401 and carry out the customization of mission bit stream according to amended measurement type information guiding user;
In this step, message processing module 402 is described according to the message interface of amended performance management model, is undertaken mutual and resolves reported data by communication module 20 and communication apparatus 300;
In this step, real time data display module 403 describes according to interface layout description, the curve chart of amended performance management model and message interface is described, and the real time data that message processing module 402 is sent is shown in the measurement monitor window;
In this step, data are preserved module 404 and are preserved description and message interface description according to the file of amended performance management model, and the real time data that message processing module 402 is sent is saved in the local file.
Referring to shown in Figure 6, it is performance management model description file organization schematic diagram of the present invention, the elementary cell of this performance management model description file organization is the performance management model, the data of description of performance management model by message interface describe, curve chart is described, preserve file description, interface layout is described four parts and formed, performance administrative model just corresponding a certain measurement type of equipment support.Though performance management model description file of the present invention shows with the XML form, but be not limited to the XML form, any text that is described with this organizational form can be as the driving of performance management system, as HTML (Hypertext Markup Language, Hypertext Markup Language), the file of INI forms such as (Initialization File, initialization is provided with file).
A typical performance management model description is as follows:
<PerMod?pername=″″measid=″″measobj=″″tasknum=″″>
<Message>
<msg?msgid=″″msgtype=″″msgname=″″>
<field?type=″″fieldname=″″msgbodyidx=″″displayidx=″″dataype=″″minvalue=″″maxvalue=″″childnum=″″>
<formula>value/10.0</formula>
<format>%.1f</format>
</field>
……
</msg>
……
</Message>
<Graphics>
<graph?graphid=″″graphname=″″xtitle=″″ytitle=″″ystartcdn=″″yendcdn=″″>
<curve?msgid=″″msgbodyidx=″″color=″″/>
……
</graph>
……
</Graphics>
<Filetype>
<file?fileid=″″filename=″″>
<content?msgid=″″msgbodyidx=″″/>
……
</file>
……
</Filetype>
<Gui>
<tab?title=″″>
<ctrl?type=″″contentid=″″idx=″″left=″″top=″″right=″″bottom=″″/>
……
</tab>
……
</Gui>
</PerMod>
The PerMod element definition performance administrative model, attribute pername represents the title of performance management model, attribute measid represents ID number of performance management model of internal distribution, attribute measobj represents the measuring object classification of this performance management model, and attribute tasknum represents the task instances number of the maximum that this performance management model is allowed.
The PerMod element comprises Message, Graphics, four daughter elements of Filetype, Gui, has described message interface, curve chart, preservation file, interface layout respectively, below explanation respectively:
The c1.Message element has been described message interface, its basic composition element is msg, msg just corresponding a message interface, the attribute msgid of msg represents ID number of message, msgtype represents type of message ID, type of message can be divided into request message, reporting message etc., and msgname represents message name; The basic composition element of msg is field, the field correspondence the field in the message interface, for reporting message, field promptly is a measurement index, type represents field type, fieldname represents field name, msgbodyidx represents the order of this field in message body, datatype represents the data type of this field, field can be child node type or father node type, the field of father node type has the childnum attribute, childnum represents that what fields followed by this field are its child nodes, the father node type is exclusively used in the cycle field of expression in the message interface, the minimum value that minvalue and maxvalue can specific fields, maximum, displayidx can the DISPLAY ORDER of specific field on monitor window; The field element also comprises formula and format daughter element, and formula has described the computing formula of this field, the formatted text when format represents this field demonstration;
The c2.Graphics element has been described curve chart, its basic composition element is graph, graph just corresponding a curve chart on the interface, graphid represents ID number of curve, graphname represents the curve title, and xtitle represents the X-axis title, and ytitle represents the Y-axis title, ystartcdn represents the Y-axis starting point coordinate, and yendcdn represents the Y-axis terminal point coordinate; Graph is made up of the curve element, and a curve has described a curve in the curve chart, the msgid of curve and msgbodyidx attribute description this curve representation be which field value in which message, color represents the color of curve;
The c3.Filetype element has been described the file of preserving, and its basic composition element is file, file just corresponding a file, fileid represents ID number of file, filename represents file name; File is made up of the content element, the msgid attribute of content and msgbodyidx attribute description this file preserves is which field value of which message, if the msgbodyidx value is 0, then all field values of message body are preserved in expression, if corresponding field is the father node type, then the value of all affiliated child nodes of this father node is only preserved in expression;
The c4.Gui element has been described interface layout, and its basic composition element is tab, and tab correspondence a tab page or leaf in the monitor window, and title represents the title of tab page or leaf; Tab is made up of the ctrl element, comprises one or more ctrl among the tab, and ctrl represents control, and type represents the control type, can be list control, curve chart etc.If list control, then contentid and idx attribute description the real time data in this control be which field in which message, the idx value is to represent all field values of display message body at 0 o'clock, if corresponding field is the father node type, then expression only shows the value of all child nodes that this father node is affiliated; If curve chart, then that the appointment of contentid attribute is graphid.Left, top, right, bottom attribute description the window size of this control account for the ratio of whole tab page or leaf.
When the newly-increased a kind of measurement type of the equipment of safeguarding, only need increase the performance management model description of this measurement type correspondence according to above-mentioned information organization mode, just can in the performance management system of webmaster, support this measurement type, and need not to write any code, same, when the measurement type is revised to some extent, also only need in performance management model description file, revise corresponding performance management model description and get final product.Based on this specific character, performance management system and management method that the present invention is proposed are called open performance management system and management method.
Certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection range of the appended claim of the present invention.

Claims (14)

1, a kind of open-type performance management system is used for the network management of communication equipment, it is characterized in that, comprising:
One human-computer interaction module is used to provide the user measurement task to be carried out the graphical interfaces of operational processes;
One communication module is used for setting up communication with described communication equipment and is connected, and the performance management order is sent to described communication equipment, and transmits the message from described communication equipment;
One task management module connects described human-computer interaction module, is used for providing to described human-computer interaction module the measurement type of described communication equipment support, handles the user instruction that described human-computer interaction module transmits; Obtain the performance management model description of described measurement type by loading and analysis feature administrative model description document, create the measurement task corresponding according to described performance management model description again, and all measurement tasks are carried out unified management with described measurement type; And
One task module connects described communication module, described task management module, is used to realize described measurement task, and by described communication module finish and described communication equipment between interacting message and data processing.
2, open-type performance management system according to claim 1 is characterized in that, described task management module comprises again:
One performance model administration module connects described performance task management module, is used to resolve described performance management model description file, manages described performance management model description, and provides query interface to described human-computer interaction module, described task module;
One performance task management module, connect described performance model administration module, the query interface that provides according to described performance model administration module obtains described performance management model description, and, preserve and manage described task instances according to described performance management model description establishment and the corresponding task instances of described measurement type; And
One performance task template administration module connects described performance task management module, is used to provide the function that imports and exports of the task template of creating the measurement task.
3, open-type performance management system according to claim 2 is characterized in that, described task module comprises again:
One creates to guide module, is used to provide customization to select, and finishes the customization of measurement task with the guiding user;
One real time data display module connects described establishment to guide module, is used for according to user's customization situation dynamic creation monitor window and curve chart and shows real time data;
One data are preserved module, connect described establishment to guide module, are used for creating file and real time data being saved to local file according to user's task customized information; And
One message processing module, connect described real time data display module, described data preservation module, be used to finish the interacting message with communication equipment, handle the performance data that communication equipment reports, and offer described real time data display module and described data and preserve module and handle.
4, open-type performance management system according to claim 3 is characterized in that, described customization is selected to comprise: measurement index customization, curve chart customization, file are preserved customization and/or information customization; Wherein, the content of described measurement index customization comprises basic index and user-defined counter; The content of described curve chart customization comprises curve color, curve title and curve; The content that described file is preserved customization comprises file preservation type, file storing path and filename; The content of described information customization comprises task start time, task dwell time, measurement data acquisition granularity and reports time granularity.
According to claim 2,3 or 4 described open-type performance management systems, it is characterized in that 5, described task template comprises single task template and/or multitask template; Described single task template is the task template that comprises a mission bit stream, and described multitask template is the task template that comprises a plurality of mission bit streams.
According to claim 1,2,3 or 4 described open-type performance management systems, it is characterized in that 6, described communication module adopts the TCP communication modes of near-end, or the IPOA communication modes of far-end.
According to claim 1,2,3 or 4 described open-type performance management systems, it is characterized in that 7, described performance management model description comprises that message interface is described, curve chart is described, preserve file description and/or interface layout is described.
8, according to claim 1,2,3 or 4 described open-type performance management systems, it is characterized in that the performance management model description file that described performance management model description file is XML form, html format or INI form.
9, a kind of open-type performance management method is characterized in that, this method comprises:
The step of human-computer interaction module is set, is used to provide the user measurement task to be carried out the graphical interfaces of operational processes;
Set up the communication step of connecting with described communication equipment, be used for the performance management order is sent to described communication equipment, and forwarding is from the message of described communication equipment;
Load and analysis feature administrative model description document, obtain the step of the performance management model description of measuring type; And
Create the measurement task corresponding according to described performance management model description with described measurement type, and the step of on described graphical interfaces, described measurement task being operated and managing.
10, open-type performance management method according to claim 9 is characterized in that, also comprises the step that generates described performance management model description file.
11, open-type performance management method according to claim 9 is characterized in that, described performance management model description comprises that message interface is described, curve chart is described, preserve file description and/or interface layout is described.
12, according to claim 9,10 or 11 described open-type performance management methods, it is characterized in that the performance management model description file that described performance management model description file is XML form, html format or INI form.
13, according to claim 9,10 or 11 described open-type performance management methods, it is characterized in that, in the step of creating the measurement task corresponding with described measurement type, further comprise: task derives step and/or mission bit stream modify steps; The measurement task that described task derivation step is used for having created exports as template file, and described mission bit stream modify steps is used to the customized information of the task of revising.
14, according to claim 9,10 or 11 described open-type performance management methods, it is characterized in that, step to described measurement task is operated and managed further comprises: the startability measuring process, handle data step that described communication equipment reports, stop the performance measurement step and/or task step is measured in deletion.
CNA2007100990355A 2007-05-09 2007-05-09 An open-type performance management system and its method Pending CN101060435A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100990355A CN101060435A (en) 2007-05-09 2007-05-09 An open-type performance management system and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100990355A CN101060435A (en) 2007-05-09 2007-05-09 An open-type performance management system and its method

Publications (1)

Publication Number Publication Date
CN101060435A true CN101060435A (en) 2007-10-24

Family

ID=38866339

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100990355A Pending CN101060435A (en) 2007-05-09 2007-05-09 An open-type performance management system and its method

Country Status (1)

Country Link
CN (1) CN101060435A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010078726A1 (en) * 2009-01-09 2010-07-15 中兴通讯股份有限公司 Method and system for base station software management
WO2010121469A1 (en) * 2009-04-21 2010-10-28 中兴通讯股份有限公司 Information collecting device of deep packet inspection linkage device group and method thereof
WO2011017947A1 (en) * 2009-08-11 2011-02-17 中兴通讯股份有限公司 Performance management implementation method and network management system
CN104202181A (en) * 2014-08-20 2014-12-10 烽火通信科技股份有限公司 Network equipment performance management device and method based on command lines
CN108132818A (en) * 2016-11-30 2018-06-08 阿里巴巴集团控股有限公司 Interface processing method and the electronic device for performing this method
CN110008101A (en) * 2019-04-04 2019-07-12 网易(杭州)网络有限公司 Client performance evaluation method, device, storage medium and electronic equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010078726A1 (en) * 2009-01-09 2010-07-15 中兴通讯股份有限公司 Method and system for base station software management
WO2010121469A1 (en) * 2009-04-21 2010-10-28 中兴通讯股份有限公司 Information collecting device of deep packet inspection linkage device group and method thereof
WO2011017947A1 (en) * 2009-08-11 2011-02-17 中兴通讯股份有限公司 Performance management implementation method and network management system
CN101997702B (en) * 2009-08-11 2013-01-16 中兴通讯股份有限公司 Implementation method of performance management and network management system
US8892730B2 (en) 2009-08-11 2014-11-18 Zte Corporation Performance management implementation method and network management system
EP2442491A4 (en) * 2009-08-11 2016-04-27 Zte Corp Performance management implementation method and network management system
CN104202181A (en) * 2014-08-20 2014-12-10 烽火通信科技股份有限公司 Network equipment performance management device and method based on command lines
CN104202181B (en) * 2014-08-20 2018-01-02 烽火通信科技股份有限公司 Performance of network equipments managing device and method based on order line
CN108132818A (en) * 2016-11-30 2018-06-08 阿里巴巴集团控股有限公司 Interface processing method and the electronic device for performing this method
CN110008101A (en) * 2019-04-04 2019-07-12 网易(杭州)网络有限公司 Client performance evaluation method, device, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
CN101060435A (en) An open-type performance management system and its method
CN1229715C (en) Information control system and information processing method
CN1392992A (en) System and method for project management
CN1680959A (en) Process editing apparatus and method and process management apparatus and method
CN1609796A (en) Design of application programming interfaces (APIs)
CN1627257A (en) Framework for creating modular web applications
CN1661598A (en) Collaboration server, collaboration system, and method and program for collaboration server and system
CN101030204A (en) Access server and method for generating client interface on client terminals
CN1968133A (en) Equipment configuration information management method and its system
CN1639696A (en) System and method for concurrent multimodal communication session persistence
CN1615480A (en) Translating configuration files among network devices
CN1790339A (en) Simulative operation system human-computer interaction implementation method based on browser
CN1976352A (en) Method and system for providing supporting of long-distance software application
CN1745370A (en) Information processing device, content management method, content information management method, and computer program
CN1820514A (en) System architecture method and computer program product for managing telecommunication networks
CN1682186A (en) Technology independent information management
CN1960507A (en) Information sharing between users of handsets, and search method
CN1299467C (en) Equipment and method for managing network apparatus
CN109495763A (en) Virtual objects, which record, determines method, apparatus, server and storage medium
CN1822596A (en) Data processing method in customer/server frame
CN1545653A (en) Methods and device for interfacing communication between devices on different networks
CN1658601A (en) Gateway and gateway setting tool
CN1414495A (en) Data base management system and data base
Parkinson Building successful collaborations: Guide to collaboration among non-profit agencies and between non-profit agencies and businesses
CN1284093C (en) Security hole diagnosis system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20071024