CN101041972A - Fundamental method technology for contamination collection and treatment - Google Patents

Fundamental method technology for contamination collection and treatment Download PDF

Info

Publication number
CN101041972A
CN101041972A CNA2006100313815A CN200610031381A CN101041972A CN 101041972 A CN101041972 A CN 101041972A CN A2006100313815 A CNA2006100313815 A CN A2006100313815A CN 200610031381 A CN200610031381 A CN 200610031381A CN 101041972 A CN101041972 A CN 101041972A
Authority
CN
China
Prior art keywords
sewage
pool
section
pollution
main pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006100313815A
Other languages
Chinese (zh)
Other versions
CN101041972B (en
Inventor
曾民先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200610031381A priority Critical patent/CN101041972B/en
Publication of CN101041972A publication Critical patent/CN101041972A/en
Application granted granted Critical
Publication of CN101041972B publication Critical patent/CN101041972B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/30Wastewater or sewage treatment systems using renewable energies
    • Y02W10/37Wastewater or sewage treatment systems using renewable energies using solar energy

Abstract

The invention relates to a method for collecting and treating sewage, wherein its sewage collecting project and treating project are connected with a large sewage treating industry by long main tube end-to-end. The long main tube is built along the bands of river and lake with serious pollution, to collect the sewages from small tube and branch tube of city and country. The large sewage treating industry is started from a water outlet pool at the outlet of the main tube, to connect with a water fallen section, a reaction deposition section, a shallow solar pool wide-top coffer section which side flows, an overflow filter section with water inlet gates respectively arranged before two depositing pools and brush gates at tails, connect with a mud groove and a three-compartment mud drying pool. The invention uses chlorine dioxide, oxygen and aluminum salt coagulant, via the sealed turbulent flow of long main tube and the deposit pool to completely mix, react and catalyze to degrade the pollutants in the sewage, while generated mud is deposited in pool. The inventive treating industry can treat 1million m3/d sewage in one day, with few devices, few operation, and saved cost.

Description

A kind of basic method technology of receiving dirt, pollution treatment
Technical field
Be a kind of receipts, control the large tracts of land greasy dirt that breaks leakage on land town domestic sewage, industrial wastewater and the water surface because of oil carrier, because of a large amount of poisonous emulsion that does not spread apart as yet that the chemical plant blast flows into, all belong to the associated field of same basic improvement method and technology of a total design of the present invention.
Background technology
China's environment pollution, the pollution of especially a lot of rivers and lakes is extremely serious, much is the long stream in Heisui River, and millions of people are anxious, and blue mountains and green waters in the past is seriously damaged.This is that China payes attention to developing the economy, and the heavy cost that not have simultaneously enough attention ecological environmental protections to pay be not a fritter or several, but more than half Chinese most of area is all seriously contaminated, because of a variety of causes, has become and can't effectively control.It is rotten to cause soil, underground water to degenerate, and the impotable area of well water river is a lot, has a strong impact on people's life health and social stability.Prior art, land are by building all size Wastewater Treatment Plant, but because of being subjected to technology, investment limitation, are unable to catch up with polluting the speed that development need is administered, and still have large amount of sewage flowing to river, lake, sea.Need innovation study intensively out reliable efficiently, can large tracts of land administer, transform administer, can energy-conservationly significantly reduce investment outlay and the basic method technology of equipment, to control China's caused more and more serious pollution problem, especially to the pollution of water environment because of economy develops rapidly.China's Shandong Huang Island bursts out into oil tank oil depot group serial blast in one's early years, and greasy dirt has dyed whole Jiaozhou Bay, suffers heavy losses.Serious marine pollution incident had in various degree all successively taken place in waters such as Huangpu River upstream, Bohai Sea Gulf, the mouth of the Zhujiang River, entrance of Changjiang River, Song Hua River recently, Xiang River, Bei Jiang, section, Gongyi, the Yellow River in recent years, and also mostly is to cause tremendous loss.Prior art all is just to have collected some simple and easy ships manually to receive greasy dirt after serious water environment pollution incident has taken place temporarily.This backward situation utmost point need change.And the little contamination accident in China town and country is more, enter polluted river water arbitrarily; accumulate over a long period; also serious pollution of water environment; need to perfect the legal system; improve whole people's environmental consciousness; can set up environmental protection day or enviromental protection week; organize to propagandize " protection environment; Everybody is responsible " and all pay attention to participating in environmental protection to arouse masses; it is required that this does not still administer environmental protection; also be that the vast harmonious society of the construction new rural area of doctrine is required, from now on along with economic great development, it will be more and more serious requiring the task of governance and protection China ecological environment.
Summary of the invention
The present invention proposes a kind of land town domestic sewage of can receiving, control, industrial wastewater, and receiving, harness the river upward again, the large tracts of land greasy dirt dyes, the basic method technology of the poisonous emulsion pollution that does not spread apart as yet of chemical industry.
Basic method of the present invention is to propose to set up each bar than severe contamination river, lake are the pollution treatment committee of unit greatly, this river, lake basin pollution control are responsible for, accountability is with clearly defined objective, so that dirty rheology is cleaned, the recovery blue mountains and green waters is a sacred duty, this is very important, because China's severe environmental pollution is not a trifle thing, and a problem of leaning on administrative inspection to solve.The leader only checks and supervises each pollution sources unit of order, each factory oneself to go to have administered pollution that long-term fact proved, because of various complicated reasons, does not have the effect that Ying Youneng administers more and more serious environment pollution at all.When each bigger seriously polluted river or lake, set up the pollution treatment committee, plan as a whole this river, these lake basin pollution treatment all our undertakings, directly under State Environmental Protection Administration, authorize absolute authority, directly carry out national environmental protection act, each side's approval project verification in the affiliated basin is not conformed to the last right of veto by one vote of having of environmental protection, factory opened the door whether enough to produce that environmental protection has direct inspection power of approval, the most important thing is that each basin pollution treatment committee itself is a pollution treatment Construction unit, initiatively pollution treatment, initiatively to this river, lake basin complete investigation planning, set up the key technology of training pollution treatment troop, want thoroughly to cure pollution, will be determined to exert, it is difficult to overcome, as building highway and hydraulic engineering, drop into enough fund technology, initiatively start to build the pollution treatment major project, to drive comprehensive pollution treatment, non-this does not touch, transform and administer bad various serious existing " score " pollution, can not just pollute to build on the basis of not curing and administer good new pollution engineering, will make in order exactly and set up effectual pollution treatment institutional structure rationally, put forth effort tenacious improvement and transformation and administered the serious pollution problem of China's ecological environment in " score ".
One of essential technique of the present invention, be to propose along being built long main pipe by limit, riverbank, severe contamination river, loke shore limit, each pollutes the source region, factory district oneself transformation improvement is built up smaller branch pipe sewage is sent into main pipe, and all have stream, the little Heisui River bank that sewage flows out to build up branched pipe in general city, collection earlier flows to each bar smaller branch pipe sewage of little stream and sends into main pipe again, promptly use long main pipe broad the outer suburbs, cities and towns, each contaminated area of founding a capital, not building Wastewater Treatment Plant is together in series.All smaller branch pipe, branched pipe, main pipe all require high fine and close non-leakage reinforced concrete pipe, cast iron pipe or special anticorrosion steel pipe, comprise joint, so that sewage is non-leakage outside pipe in soil and the river in the pipe, this is will pollute the technological core of controlling to China one of to require, being determined not to be afraid of dirty not being afraid of toil overcomes difficulties, meticulous assaulting fortified position as long as the reliable method technology is arranged, just can be controlled the serious pollution problem of China comprehensively.For each sewer of cities and towns, clear one by one, rainwater and sanitary sewage separately, sewage is collected with steel bar concrete garden well earlier, from the garden well stretch out smaller branch pipe again, branched pipe is sent into main pipe.Main pipe along the river, seashore limit, lake builds, can save useful land area and avoid the just excavated volume of landform, be convenient to tackle each bar sewage in the row of collection Xiang He, lake, sea, also do not miss for one, more be to become the door hurdle of thinking any Pai He, lake, extra large sewage from now on.Build long main pipe, could touch to transform and administer good existing severe contamination problem, could collect large tracts of land sewage, just can build ultra-large type high-efficiency sewage treatment plant, could administer the target fast, that reached province of producing effects.What of each pollution sources sewage that main pipe can will insert according to river, place, loke shore perform design together, and leave the flange branch pipe connection that development in the future inserts.Main pipe sectional or full section are built, and be less as the opposite bank pollution sources, can establish branched pipe and collect crane span structure again and cross the river and send in this bank main pipe.Smaller branch pipe, branched pipe sewage are sent into main pipe after generally only removing sand, removing the gred, some can be established the well pump room and squeeze in the main pipe with flexible pipe from main pipe regulating water level regulating the qi flowing in the channels well head, but height contains many metals sewage such as cadmium wants (as build tailing pit and handle) after the specially treated, just sends into main pipe.Main pipe is transported to Wastewater Treatment Plant with the flow velocity gravity current that the end longitudinal gradient of needs forms about 1~1.5m/s, and some pipeline section can form pressure current and carries sometimes, is regulated by the regulating water level well, regulates Jing Yuanding and will exceed the river extreme high water.The main pipe terminal should be selected in certain area shallow water river bend, river protective embankment place, so that build autonomous innovation ultra-large type of the present invention Wastewater Treatment Plant.The present invention proposes along the river, loke shore is built long main pipe, also has another big purposes, promptly, water surface generation oil carrier leaks out a large amount of greasy dirts when being hit, or because of the blast of chemical plant on the bank flow into but during the severe contamination disaster events such as a large amount of poisonous emulsions that do not scatter as yet or impaled, available receipts oil, dirty equipment collect to squeeze into carries (see below and state) in the main pipe, therefore bank is built long main pipe, also is to tackle the necessary equipment of above-mentioned disaster on the water surface.
Two of essential technique of the present invention, it is a kind of autonomous innovation ultra-large type of proposition Wastewater Treatment Plant, be to go into the discharge bay section after the main pipe outlet concrete the composition, connect drop-down section, connect the long settling pool section of highly effective reaction, connect the shallow solar pond broad crested weir section that cross-current is crossed, connect and be scattering into natural biological purification stabilization pond after the filtering bodies section is gone in the overflow of thin-walled crest of weir, so that just discharging after real up to standard the exceeding standard.Be that long distance adds nontoxic chlorine dioxide effective catalyst (liquid) and aluminium salt inorganic coagulant through regulating water level regulating the qi flowing in the channels well head before the main pipe outlet, black smelly serious as sewage, also available bend pipe shower nozzle adds oxygen, utilize in the pipeline section inner sealing, normal temperature, turbulent condition of the quite long distance of main pipe fully all contaminations in the mixed catalytic oxidation reaction degradation of sewage, the virus that disappears, sterilization.This autonomous innovation ultra-large type Wastewater Treatment Plant that main pipe outlet back is built, specific design is: main pipe outlet top will be lower than about the 1.5m of discharge bay underwater, make gush shape energy dissipating at a slow speed to flow out main pipe, the discharge bay lower exit wide will with the long settling pool beam overall of wing-rooms on either side of a one-story house with wide, be to fall into the long settling pool of wing-rooms on either side of a one-story house sewage behind the discharge bay with drop (falling about poor 1.5m), establish dull and stereotyped control inlet gate at preceding drop top bank, so that a railway carriage or compartment short time cuts off the water when washing, the short time enlargement discharge operation that does as usual of another railway carriage or compartment, two sintering TiO of device on the drop wall 2The rotating cylinder of blade, last rotating cylinder diameter is little, following rotating cylinder diameter is big, drop stream impulsion rotating cylinder, it is oxygen-doped that dispersed gas is filled in the sputter of current intersection, after evenly being scattering into the long settling pool water surface, sewage advances at a slow speed in settling pool, the general depth of water 3m of settling pool, the rectangular cross section size is controlled at about 0.3m/s according to sewage velocity of approach in settling pool and decides, and continues to make pollutant in the wastewater efficient reaction degradation of sewage, and the mud that produces sinks in the pond gradually, make the dephosphorization of wastewater efficient denitrification, remove COD and lead height, degraded all contaminations rate height.The upper strata is flowed than clear water and is laterally flow through shallow solar pond broad crested weir section at a slow speed, and the depth of water is (about 30cm) approximately, and the certainly thin cobble that embedding is completely exposed in the base concrete of pond is provided with the upright net of arranging of at interval uniform in length and breadth stainless steel wire in the pond, all spray the sharp type TiO of admiring of molecular sieve nanoscale 2Semiconductor catalyst, pollutant in the further degradation of sewage of sun natural light irradiation (shine with spotlight evening) photochemical catalytic oxidation sterilization, current after the degraded become drop to go into to drop through the overflow of thin-walled crest of weir, and the close-up attaching on the skew wall framework is the filtering bodies of main material with quartz sand, activated carbon, further filter again in the sterilization degradation of sewage behind the pollutant, be scattering into the following natural biological stabilization pond water surface, make and further purify the discharging again that exceeds standard up to standard again.Filtering bodies also all sprays TiO to paste close steel screen layer in the corrosion resistant plate shell 2Filtering bodies has the spill gool, afterbody has gate control, control sluice is to close mud etc. to be fallen within the groove store at ordinary times, and at the bottom of the spill gool longitudinal gradient and sharp-crested weir to flow the top longitudinal gradient downstream identical, when reducing water level towards mud with the long settling pool of box lunch, utilization is located at People's Bank of China's service bridge of thin-walled weir crest, fill the washing and filtering body with water under high pressure, be that each the square filtering bodies in the framework is fallen excessive flushing, at this moment gool afterbody gate is opened, so that flushings such as the interior mud foreign material of gool are walked, has washed late gate and has closed.Mud also pours in the settling pool and washes away well in the shallow solar pond that adverse slope is arranged of holding concurrently simultaneously.
Flushing for mud in the long settling pool is because of being provided with the vertical degree in 3% end at the bottom of the pond, the pond tail is provided with sluice gate, when needs wash, regulating gate closes to lock and goes out stream on the preceding drop of the customs director of the elder generation settling pool bank, opens pond tail slide brush gate again, and the pool inner water position is lowered into torrent rapidly, the thick mud that becomes silted up in the pond can be gone out soon, dense mud flow steep canal behind hushgate flows away, and is transported in regular turn to gather in the mud mummifying pool of forming in three railway carriage or compartments and deposits pending transhipment utilization, as doing fertilizer use etc. by analysis.
The general present municipal sewage plant that has, the capacity of disposing of sewage is little, and general day disposes of sewage and has only several ten thousand to tens0000 m 3About/d, relative also relative complex of big, the technical pattern of construction investment, the improvement contaminated area that is covered is also little, and this is that restriction China respectively pollutes the source region, builds the reason place of Wastewater Treatment Plant's difficulty.This autonomous innovation ultra-large type Wastewater Treatment Plant carries sewage quantity big because of adopting long trunk pipe range to collect apart from large tracts of land, adopts hydraulic engineering design experiences and sewage disposal technology to require to combine, and designing disposes of sewage day can reach 800,000 m 3, 1,000,000 m 3About all can realize smoothly, as with 1,000,000 m 3/ d is an example, and the per second flow is a 11.6m also 3/ s, design is easy to realization to main pipe for this, and the pipe flow area is also little, furthermore full main pipe is ascending, begins long little apart from flow in the pipe.The every railway carriage or compartment of wing-rooms on either side of a one-story house settling pool design discharge also is 5.8m 3/ s, wide 6 meters as long 50 meters of tentative settling pool, 3 meters of the depth of waters, mean flow rate is only at 0.32m 3About/s.As decide shallow solar pond broad crested weir, the long 40m of sharp-crested weir of cross-current warp, an overflow discharge per unit width 0.145m 3/ s, depth of water flowing over weir is also little on the sharp-crested weir, all can realize smoothly.The innovation type Wastewater Treatment Plant we can say that a pond equals many ponds, it is big that the contaminated regional area of improvement is administered and transformed to topped energy, this counter investment much less, total steel bar concrete amount is also little, the operation workload is littler, and the equipment of disposing of sewage is few, energy-conservationly need not build sludge dewatering workshop and machinery, can realize automation mechanized operation, the water treatment effect is efficiently thorough.
The severe contamination incident that the end of last year, the blast of Song Hua River Yin Jilin a pair of benzene chemical plant caused; again rung alarm bell to China; China's water resource lacks; will pay attention to Three Gorges from now on; Xiao Langdi; the south water to north and important river; the protection in lake; pollution must not; must there be the vigilant eye of being responsible for to treat; as along limit, riverbank, cities and towns; after building up the innovation ultra-large type Wastewater Treatment Plant about long main pipe of the present invention and day processing 1,000,000 m3/d; when the pollution that serious greasy dirt dyes or the poisonous emulsion of chemical industry is not scattered as yet takes place in above-mentioned waters; will in time receive greasy dirt equipment (spending the greasy dirt time can be not oversize) with the advanced greasy dirt that encloses; receive to remove above-mentioned pollutant from the water surface, squeeze on the bank in the main pipe and sewage is carried together; during long settling pool can before and after gate all open; reduce water level and be delivered directly in the former mud mummifying pool in a railway carriage or compartment in three railway carriage or compartments and store, again the chemistry oil that disappears; dirt is in order to protect water resource; when serious pollution disaster incident takes place in above-mentioned important waters, the way that tackles has just been arranged.On the riverbank that does not have cities and towns, also will build long main pipe, but its end is to build dirty pond of oil storage separately and silting thing, dyes when greasy dirt takes place, be used to carry the collection greasy dirt to go to the dirty pond of special-purpose oil storage, when not having the greasy dirt hair dyeing to give birth to, the sand that is used for dredging under the transporting water goes to the sand yard, and silt silts up seriously under water, it is the key that changes river channel ecology, from now on will enough pay attention to, and not wait Three Gorges, Xiao Langdi to suffer just improvement of disaster revenge because of silt causes disaster, that is just late.Water is mistake from the storehouse, and silt is mistake from pipe on the bank, is Chinese needed in the high concentration of sediment characteristics.The big reservoir of China, the power station is for taking precautions against natural calamities, country and relevant important department leader, to conscientiously pay attention to the Application and Development of national autonomous innovation intellectual property patent, please develop: " a kind of oil enclosure and oil collecting device " (patent of invention ZL01106903.1 with fence and oil-collecting device, improved ZL2004100230584) and " the oily dredge boat of a kind of multiduty receipts " (the improved ZL01106902.3 of the patent No.: ZL96235015.X) from now on, each important river of China, coastal each important port management unit, Three Gorges, the Danjiangkou, in a single day important run unit such as Xiao Langdi will be paid attention to exploitation with long-range eye and store the foregoing invention patent equipment, is to be unable to cope with or else just to be used for when serious marine pollution incident taking place.Pay attention to taking precautions against natural calamities, this is national affairs.
The overflow of above-mentioned autonomous innovation ultra-large type of the present invention Wastewater Treatment Plant; filtering technique and design also can be used for such as south water to north water channel; total feeding conduit end, city place removes silt particle, sterilization, filtration sterilization; the high standard life cleaning water source of removing various dirty foreign material generates factory; with the protection people's that increase water quality hygiene and health, significant equally.
Description of drawings:
Fig. 1 is that the present invention receives dirt, pollution treatment project general arrangement schematic diagram
Fig. 2 is that autonomous innovation ultra-large type of the present invention Wastewater Treatment Plant arranges schematic diagram
Fig. 3 is that schematic diagram is arranged in autonomous innovation ultra-large type of the present invention Wastewater Treatment Plant cross section
Fig. 4 is that the present invention is used for life cleaning water source generation factory layout schematic diagram on the urban water supply road
Among the figure, 1, spill gool 15, spill gool tail gate 16, the steep canal 17 of mud, mud mummifying pool under main pipe 2, smaller branch pipe 3, branched pipe 4, well pump room 5, regulating water level regulating the qi flowing in the channels well 6, discharge bay 7, control intake gate 8, rotating cylinder 9, highly effective reaction settling pool 10, hushgate 11, shallow solar pond broad crested weir 12, sharp-crested weir 13, filtering bodies 14, the filtering bodies
The specific embodiment
The river or the lake that are a suitable big or small severe contamination of selection are pilot, set up the pollution treatment committee, form keen-witted and capable leading group, and target is that thoroughly improvement of affiliated river full basin pollution, transformation are administered.The input that corresponding investment and technical force are arranged, start to carry out the investigation in full basin earlier, receive dirty by patent of the present invention, pollution treatment basic method technology performs planning and designing, and perform this river pollution treatment major project letter of invitation to tender and call for bid, by planning and designing, after the high standard construction supervises existing each pollution sources unit's transformation to administer pollution simultaneously, smaller branch pipe (2), branched pipe (3) is built up, each contact by design is sent into main pipe (1), not enough governance standard, the inaccurate access, the following new pollution sources unit that builds will insert, after being enough pollution control standards, can insert from the joint flange arm of reserving, or build the water pump well house and squeeze into from regulating water level well garden well head with flexible pipe again.When this pilot is administered, after engineering is comparatively fast thoroughly built up, summing up experience, all start to administer in each bar severe contamination river, the whole nation, lake, sea again, construction is to administer the serious pollution problem portion in the whole nation, keep, after pollution treatment large-engineering in all parts of the country was built up, from then on China earlier built the passive situation of afterwards administering by the past, and developing the economy after becoming has been the active situation of building after the first pollution treatment again.Because riverbank length of side main pipe and ultra-large type Wastewater Treatment Plant by planning have built up.
Accompanying drawing 1 is to illustrate three urban districts, long strain pool, Hunan to develop to be linked to be a big urban district, central authorities have decided the Rise of Central Region strategy, will develop on a large scale, rise now and be the economy of building a Harmonious Society, will pay attention to administering earlier polluting, after the policy for preparedness against war of developing the economy, can not only heavyly again develop the economy earlier to administer again and pollute, the Xiang River basin is polluted and will be administered certainly.The committee of establishment Xiang River pollution treatment in good time is responsible for section, long strain Tan San city now earlier and administers, and accompanying drawing 1 is to illustrate along limit, Xiang River riverbank to use long main pipe, and three cities are together in series, and builds (1,000,000 m of ultra-large type Wastewater Treatment Plant in the downstream 3/ d), be to perform planning and designing earlier, bid construction again to launch both existing the pollution to be transformed improvement, can meet the economic pollution treatment that will develop on a large scale of three cities to get ready again.
Annotate: accompanying drawing 1 long main pipe is not because of investigating temporary transient not shown each smaller branch pipe.

Claims (4)

1, the present invention is that a kind of receipts are dirty, the basic method technology of pollution treatment, its pollution treatment major project connects autonomous innovation ultra-large type Wastewater Treatment Plant two parts by long main pipe end and forms, feature of the present invention is that described long main pipe (1) is along seriously polluted river, the lake, the seashore limit is built, go to treatment plant with the poisonous emulsion that does not spread apart as yet of collect carrying large tracts of land greasy dirt that the large amount of sewage that each pollution sources smaller branch pipe (2) branched pipe (3) of vast contaminated area sends here and the water surface leak because of oil carrier bumps against or chemical plant blast to flow into, the equal echelon of each regulating water level regulating the qi flowing in the channels Jing Yuanding of main pipe exceeds extreme high water, the autonomous innovation ultra-large type Sewage Plant of building, be to pick out pond (6) section in regular turn from the main pipe outlet, on tipping has, the drop-down section of following rotating cylinder (8), connect the long settling pool of highly effective reaction (9) section, connect shallow wide solar pond broad crested weir (11) section that cross-current is crossed, connect by the sharp-crested weir overflow and go into filtering bodies (13) section, there is control inlet gate (7) tail that sluice gate (10) is arranged before the wherein long settling pool, hushgate, after connect the steep canal of mud (16), connect mud mummifying pool (17), form the innovation ultra-large type Wastewater Treatment Plant together.
2, according to claim 1ly receive basic method technology dirty, pollution treatment, to go into behind the long settling pool (9) be cross-current through shallow solar pond broad crested weir (11), go into to have under the filtering bodies tail gate (15) but the spill gool (14) of the dirty foreign material periodic flushing of mud that falls of control from sharp-crested weir (12) overflow again to it is characterized in that sewage.
3, the basic method technology of receiving dirt, pollution treatment according to claim 1, it is characterized in that described autonomous innovation ultra-large type Wastewater Treatment Plant, also can change a little and be used for being built on the total water channel of urban water supply except that silt, sterilization, sterilize, go the life cleaning water source of organic dirty foreign material to generate factory.
4, according to claim 1ly receive basic method technology dirty, pollution treatment, it is characterized in that described main pipe (1) also can build the bank, section away from cities and towns in, its end is to build dirty treatment pond of oil storage and silting field.
CN200610031381A 2006-03-22 2006-03-22 Method technology for contamination collection and treatment Expired - Fee Related CN101041972B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610031381A CN101041972B (en) 2006-03-22 2006-03-22 Method technology for contamination collection and treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610031381A CN101041972B (en) 2006-03-22 2006-03-22 Method technology for contamination collection and treatment

Publications (2)

Publication Number Publication Date
CN101041972A true CN101041972A (en) 2007-09-26
CN101041972B CN101041972B (en) 2010-05-12

Family

ID=38807744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610031381A Expired - Fee Related CN101041972B (en) 2006-03-22 2006-03-22 Method technology for contamination collection and treatment

Country Status (1)

Country Link
CN (1) CN101041972B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352615A (en) * 2011-08-01 2012-02-15 中国科学院成都生物研究所 Method for performing emergency treatment on water pollution accident
CN111976052A (en) * 2020-08-19 2020-11-24 兰国忠 Rubber continuous mixing mill

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121239A (en) * 2010-05-24 2011-07-13 曾民先 Method for collecting and treating pollutants in large area

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1054054A (en) * 1990-11-17 1991-08-28 张定煊 Administer the method and the facility that pollute and utilize sewage
CN1406883A (en) * 2001-09-05 2003-04-02 武汉墨金经济发展有限公司 Sewage treatment
CN1399045A (en) * 2002-08-08 2003-02-26 黄斌夫 River purifying system and river waterworks
CN2592659Y (en) * 2002-12-31 2003-12-17 中国石化上海石油化工股份有限公司 Complex spinning assembly for manufacturing complex fiber

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352615A (en) * 2011-08-01 2012-02-15 中国科学院成都生物研究所 Method for performing emergency treatment on water pollution accident
CN102352615B (en) * 2011-08-01 2014-03-05 中国科学院成都生物研究所 Method for performing emergency treatment on water pollution accident
CN111976052A (en) * 2020-08-19 2020-11-24 兰国忠 Rubber continuous mixing mill

Also Published As

Publication number Publication date
CN101041972B (en) 2010-05-12

Similar Documents

Publication Publication Date Title
Rawn et al. Diffusions for Disposal of Sewage in Sea Water
CN203021357U (en) Assembly type river water purifying device for enhancing sand sedimentation by means of physical and ecological synergy
CN102874907B (en) In-situ purification system for high-turbidity river water and river water treatment method
CN101041972B (en) Method technology for contamination collection and treatment
RU2665072C1 (en) Method of reservoir water area localization of pollutants entering reservoir from tributaries and drains
CN1580415A (en) Composite wet land artesian polluted river water purifying method
KR20140016407A (en) Naturally friendly eco-friendly method to purify polluted river water while restoring river ecosystem by using dual-operation multifunctional movable gate equipped with a sewage sludge discharge passage
CN102121239A (en) Method for collecting and treating pollutants in large area
KR101635966B1 (en) River with clean water for ecological function
CN102515422B (en) Comprehensive treatment device for highway runoff pollution of water resource protection area
CN102557236B (en) Weak stream river side ditch repair system with pollutant reduction and landscape utilization functions
CN206014554U (en) A kind of device for cutting dirty segment processing sewage in situ
Sawagashira et al. Sedimentation control effect and environmental impact of sediment bypass in Miwa Dam Redevelopment Project
KR20150007271A (en) Friendly eco-friendly water purification system that recovers river ecosystem while producing electricity using eco-friendly multifunctional movable water gate composed of eco-friendly eco-friendly method
KR20140025566A (en) Nature-friendly eco-friendly method that restores natural ecosystem while purifying polluted river water by using multi-stage automatic fishery and river ecosystem restoration system
KR20200035535A (en) Reduction of pollution load and Blocking system using Waterfront space
CN202558740U (en) Water area quality protection and surface runoff recycling device
CN202415323U (en) Highway runoff pollution comprehensive treatment device for water resource protection area
CN113356325B (en) Comprehensive treatment method for water ecological environment of landscape water area
Fuertes Water Filtration Works
Youngchul et al. Experiences with constructed wetland systems in Korea
Brink et al. Sediment control at river abstraction works in South Africa
Zyder WASTEWATER REUSE AND RECYCLING STRATEGIC MANAGEMENT
KR20140027445A (en) Eco-friendly eco-friendly method to naturally clean polluted river water by using eco-friendly system combined with automatic fishing and power generation system to restore ecosystem
CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT Technical Report, Onondaga Lake, New York, Main Report

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20130322