CN101041954A - 大面积软弱地基土袋与基槽复合加固法 - Google Patents

大面积软弱地基土袋与基槽复合加固法 Download PDF

Info

Publication number
CN101041954A
CN101041954A CN 200710021226 CN200710021226A CN101041954A CN 101041954 A CN101041954 A CN 101041954A CN 200710021226 CN200710021226 CN 200710021226 CN 200710021226 A CN200710021226 A CN 200710021226A CN 101041954 A CN101041954 A CN 101041954A
Authority
CN
China
Prior art keywords
bag
soil
foundation
foundation trench
earth bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710021226
Other languages
English (en)
Inventor
张志铁
刘斯宏
叶吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200710021226 priority Critical patent/CN101041954A/zh
Publication of CN101041954A publication Critical patent/CN101041954A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种大面积软弱地基土袋与基槽复合加固法,适用于大面积软弱地基的加固处理。它是在整个需加固处理区域通过土袋的交叉分层堆叠满铺,所述土袋的制法为:根据土质及所需承载力的要求,设置袋子的规格、大小,直接用现场需处理的软土灌装入袋,袋口扎紧;然后,将二个土袋成一对,袋口与袋口对扎成连体形状,该法包括如下工艺步骤:根据设计所需的深度和长度以及所需填入的土袋体积开挖基槽;基槽挖出的土方装袋并将扎实的连体土袋交叉分层堆叠满辅在软弱基槽中,每辅一层,用小型平板夯夯实,使之每层厚15~30cm。本发明能方便大型施工设备的进入,施工周期短、性价比高。

Description

大面积软弱地基土袋与基槽复合加固法
技术领域
本发明涉及一种大面积软弱地基土袋与基槽复合加固法,适用于大面积软弱地基的加固处理。特别适合在流塑状淤泥质土及复杂地质条件下的加固处理。
背景技术
目前,在大面积软弱地基加固施工方法中常采用基槽法等。在软弱地基特别是流塑淤泥质土的施工中,由于软弱地基的承载力低,使得大型、重型机械无法进入施工,只能通过置换法或辅垫相当数量的石料后进入施工,造成了造价高,工期长等缺陷:
采用基槽施工方法对软弱地基处理,由于采用这些方法均需大型设备、重型机械或土方机械进入施工,因此对地基的承载力要求较高,而低于40Kpa/m2的软弱地基大型、重型设备根本无法进入施工,同样需要铺垫大量的垫层,满足机械设备进入施工,因此造价高,工期长。
发明内容
本发明的目的在于克服上述不足,提供一种能方便大型施工设备进入、施工安全系数大、造价低,工期短的大面积软弱地基土袋与基槽复合加固法。
本发明的目的是这样实现的:一种大面积软弱地基土袋与基槽复合加固法,其特点是:在整个需加固处理区域通过土袋的交叉分层堆叠满铺,为加固软弱土地基创造有利条件,然后再结合基槽复合加固施工技术,可对6~8m范围地基进行浅层加固,使大面积软弱地基达到设计要求所需的承载力,所述土袋的制法为:根据土质及所需承载力的要求,设置袋子的规格、大小及堆叠土袋的层数,直接用现场需处理的软土灌装入袋,袋口扎紧;然后,将二个土袋成一对,袋口与袋口对扎成连体形状,该法的具体工艺步骤如下:根据设计所需的深度和长度和所需填入的土袋体积开挖基槽;基槽挖出的土方装袋并将扎实的连体土袋交叉分层堆叠满辅在软弱基槽中,每辅一层,用小型平板夯夯实,使之每层厚15~30cm。一般建筑设施的基槽通过本法,可不打桩直接在基槽内施工,并有防震抗震作用。
使用该工艺,既能确保软弱地基各种设备展开施工的要求,又能通过控制分层铺垫土袋来达到适合不同类型施工机械对处理软弱地基自身的需求。即在整个需加固处理区域通过土袋的交叉分层堆叠满铺,为加固软弱土地基创造有利条件,再结合其他深层处理技术,使软弱地基达到设计要求所需的承载力。该法施工安全系数大、造价低,工期短。特别适用于软弱地基特别是承载力低于40Kpa/m2场地加固施工。
本工法的有如下优点:
1、施工周期短、性价比高:本施工工艺由于利用土袋对需处理的软弱地基表层进行直接加固的作用,而且取材方便,成本低,施工周期短;同时,由于施工成本下降,质量提高,经土袋复合加固后的软土地基可根据不同要求分层堆叠,形成了实际意义的“硬壳层”,使软弱地基快速适合不同机械施工的需要;其性价比大大提高。
2、不受软弱地基承载力低的限制,可根据需要随意调整软弱地基表层的承载力:通过调整土袋的层数,使之适合不同施工机械对地基承载力的需求,从而为软弱地基的加固处理提供了有效的保障。并结合其他对软弱地基方法的处理,达到最终所需的加固效力。
附图说明
图1为本发明采用的单个土袋简图。
图2为本发明采用的二个土袋成一对构成连体土袋简图。
图3为本发明采用的连体土袋分层堆叠示意图。
图4为本发明采用的土袋层数的计算示意图。
具体实施方式
本发明涉及一种大面积软弱地基土袋与基槽复合加固法,它是在整个需加固处理区域通过土袋的交叉分层堆叠满铺,如图3,为加固软弱土地基创造有利条件,然后再结合基槽施工技术,使大面积软弱地基达到设计要求所需的承载力。其土袋的制法如下:根据设计所需的深度和长度和所需填入的土袋体积开挖基槽;基槽挖出的土方装袋并将扎实的连体土袋交叉分层堆叠满辅在软弱基槽中,每辅一层,用小型平板夯夯实,使之每层厚约15~30cm。所需层厚根据计算(附后)。
附:土袋层数的计算,如图4:
计算公式P=Po×b/b+2H·tgθ
式中:P——软土地基承载力      Po——基础底部承载力
b——基础底部宽度              H——土袋堆置高度
tgθ——土袋堆置后的压力扩散扩散角
例:现有软基场地10万平方需静压管桩进行加固处理,已知场地软土地基的承载力P=35Kpa/m2,而进入施工的500T静压桩机的接地比为6T,即软基底承载力需Po=60Kpa/m2,软基底接触宽度b=1m。
求:土袋需铺设厚度H。
解:土袋的压力扩散角θ=45°,Po=60Kpa/m2,b=1m,场地承载力fS=35kpa,则经压力扩散后作用在场地软土上的荷载力P可由下式计算(使P≤fS=35kpa)
P=Po×b/(b+2H·tgθ)=30=60×1/(1+2×H×1)
H≥0.4m
要使500T静压桩机进入施工,用本法土袋辅设高度为0.4m,土袋经分层夯实或压密后的厚度为0.15m,因此用三层土袋经分层夯实或压实后就能使静压桩机正常施工。

Claims (1)

1、一种大面积软弱地基土袋与基槽复合加固法,其特征在于:在整个需加固处理区域通过土袋的交叉分层堆叠满铺,所述土袋的制法为:根据土质及所需承载力的要求,设置袋子的规格、大小,直接用现场需处理的软土灌装入袋,袋口扎紧;然后,将二个土袋成一对,袋口与袋口对扎成连体形状,该法包括如下工艺步骤:根据设计所需的深度和长度以及所需填入的土袋体积开挖基槽;基槽挖出的土方装袋并将扎实的连体土袋交叉分层堆叠满辅在软弱基槽中,每辅一层,用小型平板夯夯实,使之每层厚15~30cm。
CN 200710021226 2007-04-17 2007-04-17 大面积软弱地基土袋与基槽复合加固法 Pending CN101041954A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710021226 CN101041954A (zh) 2007-04-17 2007-04-17 大面积软弱地基土袋与基槽复合加固法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710021226 CN101041954A (zh) 2007-04-17 2007-04-17 大面积软弱地基土袋与基槽复合加固法

Publications (1)

Publication Number Publication Date
CN101041954A true CN101041954A (zh) 2007-09-26

Family

ID=38807727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710021226 Pending CN101041954A (zh) 2007-04-17 2007-04-17 大面积软弱地基土袋与基槽复合加固法

Country Status (1)

Country Link
CN (1) CN101041954A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102127907A (zh) * 2010-01-18 2011-07-20 刘斯宏 土工袋筏及应用方法
CN104652403A (zh) * 2015-01-28 2015-05-27 浙江科技学院 一种水下土工布搭接铺设方法
CN107059837A (zh) * 2016-12-29 2017-08-18 上海建工二建集团有限公司 一种混凝土配重块堆载结构及其施工方法
CN108867615A (zh) * 2018-07-23 2018-11-23 重庆建工市政交通工程有限责任公司 一种液压强夯机与平板夯路机协作回填的施工方法
CN115506421A (zh) * 2022-09-26 2022-12-23 河海大学 一种含限位装置的土工袋减隔震系统

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102127907A (zh) * 2010-01-18 2011-07-20 刘斯宏 土工袋筏及应用方法
CN104652403A (zh) * 2015-01-28 2015-05-27 浙江科技学院 一种水下土工布搭接铺设方法
CN107059837A (zh) * 2016-12-29 2017-08-18 上海建工二建集团有限公司 一种混凝土配重块堆载结构及其施工方法
CN108867615A (zh) * 2018-07-23 2018-11-23 重庆建工市政交通工程有限责任公司 一种液压强夯机与平板夯路机协作回填的施工方法
CN115506421A (zh) * 2022-09-26 2022-12-23 河海大学 一种含限位装置的土工袋减隔震系统
CN115506421B (zh) * 2022-09-26 2023-11-14 河海大学 一种含限位装置的土工袋减隔震系统

Similar Documents

Publication Publication Date Title
CN102127908B (zh) 一种利用袋装砂垫层快速加固超软弱土地基的方法
CN210104706U (zh) 一种真空联合堆载预压处理深厚软基的施工结构
WO2009070984A1 (fr) Procédé de précontrainte sous vide sans couche de coussin de sable de drainage
CN101949153B (zh) 地基排水控制法
CN102561361A (zh) 用于上软下硬土层的超深t形槽壁桩及其成槽施工方法
CN101130952A (zh) 一种无密封快速真空预压强夯法
CN106840086A (zh) 超低位真空预压法快速固结软土试验装置
CN203755293U (zh) 一种真空预压联合堆载系统
CN102704488A (zh) 一种新型的软弱土地基基坑开挖方法
CN203684242U (zh) 滩涂区土工袋泥浆复合围堰式水中施工平台
CN101041954A (zh) 大面积软弱地基土袋与基槽复合加固法
CN1807773A (zh) 一种深厚湿陷性黄土地基的处理方法
CN101597898B (zh) 刚性排水桩及施工方法
CN111733792A (zh) 一种软土地基真空预压结合动力固结排水的地基处理方法及其处理系统
CN205636721U (zh) 滤井真空预压加固深厚软土地基的设备
CN201214787Y (zh) 刚性排水桩
CN106948757A (zh) 一种利用基坑区域进行的地埋管打井施工工艺
CN101041955A (zh) 大面积软弱地基土袋与换填复合加固法
CN101591906A (zh) 一次插管、多遍真空井点降水动力固结的地基处理方法
CN103215945A (zh) 非均质场地软土地基立体式组合动力排水固结系统和方法
CN101886384A (zh) 真空强夯同步法
CN205062795U (zh) 一种路基边坡夯实装置
CN101041956A (zh) 大面积软弱地基土袋与塑料排水板、静压桩或桩基复合加固法
CN208803456U (zh) 一种采用砂桩以及排水板加固泥炭土的结构
CN111441336A (zh) 复合膜高真空处理深厚软土地基技术

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication