CN101038051A - Pipeline of composing metal with polypropene - Google Patents

Pipeline of composing metal with polypropene Download PDF

Info

Publication number
CN101038051A
CN101038051A CN 200610020475 CN200610020475A CN101038051A CN 101038051 A CN101038051 A CN 101038051A CN 200610020475 CN200610020475 CN 200610020475 CN 200610020475 A CN200610020475 A CN 200610020475A CN 101038051 A CN101038051 A CN 101038051A
Authority
CN
China
Prior art keywords
polypropylene
metal
continuum
polar group
compound
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610020475
Other languages
Chinese (zh)
Other versions
CN100455868C (en
Inventor
甘国工
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100204752A priority Critical patent/CN100455868C/en
Publication of CN101038051A publication Critical patent/CN101038051A/en
Application granted granted Critical
Publication of CN100455868C publication Critical patent/CN100455868C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)
  • Laminated Bodies (AREA)

Abstract

The invention provides a metallic polypropylene combined canal, characterized in that the canal wall of which is provided with tubular metal frame having apertures as reinforcement bodies, the grafting modified polypropylene continuum with polar group is firmly glued and coated on the frame surfaces through apertures of the tubular metallic frame on surfaces of the frame, grafting ratio of the grafting modified polypropylene is 0.12 percent to 1.5 percent. The invention solves technical problem of hard firm integral gluing of metallic and polypropylene combination.

Description

The pipeline that metal and polypropylene are compound
Technical field:
The present invention relates to the graft modification of polypropylene material, it is modified as polar polymer by non-polar polymer, relate to the compound pipe production technology of metal and polypropylene, particularly pertusate as metal cylindrical skeleton that strengthens body and compound pipeline and the pipe fitting of polypropylene material that polarity is arranged.
Technical background:
The compound pipeline of metal and polymer comprises tubing and existing many technology and the patent reports of pipe fitting, also has a large amount of products and engineering to use in practical engineering application, and this multiple tube has become important industry at continuous development and progress.
Metallic conduit has higher intensity and the lower hot line coefficient that expands, but it is not corrosion-resistant, not only can not carry corrosive fluid, even carry not corrupt liquid, etc. at least also will do the preservative treatment of surperficial anti-electrocorrosion during application with burying.
Polymer pipe has Corrosion Protection preferably, also convenient the connection, carry at potable water and corrosive fluid, the chemical engineering application facet, extraordinary usability is arranged, but have relatively high expectations, the bearing capacity reduction greatly of simple polymerisation pipe when the conveyance fluid temperature is higher than 50 ℃~80 ℃ at discharge pressure, particularly the bloated coefficient of hot line is more than ten times of metal tube, and the application of simple polymerisation pipe is restricted.
Because above-mentioned two kinds of pipes respectively have excellent performance, but each has unsurmountable problem to exist again, so the compound pipeline of metal and polymer is as a kind of advantages, and the pipeline that shortcoming overcomes has had significant progress.This composite pipe many with metal tube or skeleton as strengthening body, according to requirement of engineering wall and/or outer wall composite polymeric materials within it.Because inside and outside wall composition polymer at pipe, this polymer is mainly born anti-corrosion function, so the connection between tube and tube, the tube and tube spare also mainly relies on being welded to connect or being threaded between metal tube and the skeleton, can't stand the system pressure requirement with docking also to hold by the melting welding between the polymer.Particularly diameter is at the pipeline of φ more than 630, being welded to connect between the basic dependence metal tube, even the pipe of φ below 630 welded, but inwall is because soldered can't enter personnel, composition polymer butt joint place is anticorrosion once more, and metal tube and polymer pipe are encountered difficulties in the engineering application less than the composite pipe of φ below 630.If because to metal tube and skeleton butt welding or be threaded, the local inwall of the ruinate polymer composite layer in joint can't be repaired.Therefore under this background, as strengthening body multiple tube of composition polymer on skeleton sufficient development has been arranged with pertusate metal frame.This pipe intensity mainly strengthens skeleton by metal and bears, the polymer continuum is mainly born anticorrosion and tube and tube, fusion between the tube and tube spare connects, but polymer and metal tube, compound many important techniques difficulties and the problem of also existing between the metal cylindrical skeleton.General antiseptic property is good, chemical resistance is good, carry the standard compliant polymer of potable water all to belong to non-polar polymer such as polyethylene (PE) and polypropylene (PP), but interface compound with it or surface are the metal surfaces, as the aluminium sheet band, the steel plate band, these surfaces are typical polar surfaces, can not bond and affinity between the two at all, though the polymer continuum coats its surface and is compound, separate but the interface is actual, people are when producing and using this multiple tube for this reason, the bonding at the two interface, affinity is realized having adopted a lot of ways on truly compound.Because do not solve the affinity at the two interface, can not make the two interface really bonding, firmly compound is one, in fact the common composite material of bringing into play of our inreal the two excellent properties of acquisition.
The steel metal surface of known and disclosed non-polar polymer (as PE or PP) and polarity and the secure bond on aluminum metal surface, be combined with each other, up to the present also mainly be to rely between the two interface, increase one deck adhesive layer or apply the transition layer that one deck can make the two affinity and firmly be combined with each other.Concrete technological scheme has many kinds.A kind of be between the interface, use polar group arranged but the Bond that can merge and be bonded as one with non-polar polymer, ethene-ethyl acrylate copolymer, ethene-acrylic copolymer such as commercially available binary copolymerization, with ethene-vinyl acetate-ethenol copolymer of ternary polymerization or the like, another kind is to apply one deck transition layer in advance in the metal surface such as epoxy resin, compound again one deck ethene-acetate ethylene copolymer on it, compound with nonpolar polymer again.
The transition layer of these adhesive layers or coating can both be better with polarity metal surface and firm being combined with each other of nonpolar polymer.But owing to need the special coating equipment of extruding to apply this layer binder layer, on the production line of composite pipe, need at least two of many increases to extrude the equipment of coating at metal tube or skeleton inner and outer surface respectively, investment is increased, cost of production increases, technology is wayward, special in the less production line of diameter such as φ 200 pipes, be difficult.In order to make Bond can effectively be coated in the metal frame surface, and abundant moistening metal polar surfaces, the processing fusing point of general these Bonds is all lower, melt index is higher, though on the interface, can be easy to the two interface bonding compound, but when composite pipe during in higher serviceability temperature, this layer binder layer can produce on the interface again because of the low not enough slippage of temperature resistant capability of fusing point, destroyed to combine and born pressure-bearing and excellent function anticorrosion and that be connected firmly as the two, make the nonpolar compound polymeric layer and the compound also corresponding generation slippage of metal surface, destroyed to combine and born pressure-bearing and excellent function anticorrosion and that be connected firmly as the two, reduced the heatproof engineering application of temperature of composite pipe, reality has reduced the engineering property of pipe.This in addition adhesive layer complex technique is in the application on pertusate metal frame surface, can make by hole and coat of not heatproof fusion and the slippage of the polymer continuum of skeleton because of adhesive layer, reduce the heatproof engineering property of composite pipe greatly, when serious even can make of hole the internal and external layer of skeleton between the slippage of non-polar polymer continuum by skeleton, destroy the two and combined and bear pressure and anticorrosion and link firm excellent properties, and reduced the bearing capacity of this composite pipe delivering hot water's medium and aggressive medium greatly.Therefore promptly to strengthen the body skeleton and produce the pipeline compound with polymer by pertusate metal, so that solve the composite pipe of the aforesaid φ of convenience 630 following calibers, utilize the polymer continuum to realize tube and tube, fusion between the tube and tube spare connects, utilize simultaneously the hole of skeleton that the bloated expansion of hot line that the continuum that coats is higher than ten times of metallic material is pinned again, make continuum and composite pipe have class formula metal and and the line of metal frame expand rate and give full play to the excellent properties of the compound composite pipe of pertusate metal frame and polymer, make polymer continuum and metal polar surfaces secure bond and compound again, prevent that the two interface and section from having infirm compound the infiltrate through combination interface of flowing medium because of the interface, pipeline corrosion protection and leakproof linkage function were lost efficacy, better for using at the two interface, cost is lower, compound more reliable, produce more convenient, the interface secure bond that can give full play to again for the composite pipe function and compound new technological scheme, the emphasis that has become industry to pursue.The author had once applied for many patents and had made many conceptual designs for this reason, but all fail to jump out aforesaid those several basic schemes, more there is not scheme, the market industry does not have scheme to relate to utilize the polymer continuum can adopt the modify and graft polar group to make non-polar polymer directly have polarity yet and can directly coat metal frame with the secure bond combined polarity, the technological scheme of pertusate metal frame particularly, so, even the two interface secure bond and compound be one, pertusate metal frame and polymer continuum are connected as a single entity by hole, prevent that promptly the polymer continuum from producing the bloated or thermal expansion of the line that is higher than ten times of metal frames of polymer, can be one because of it is firmly compound again, can couple together by pipe or the hot melt of pipe fitting outer wall or the ripe molten internal and external layer polymer melting of electricity and be pipe network its skeleton hole, realize that reliable pipe network fusion connects, solve the compound pipeline of metal and polymer and can not give full play to its excellent properties, can not conveniently connect, the two interface be difficult for secure bond compound for one or compound for one must relate to adhesive layer or the coating transition layer investment big, the technical barrier that cost is high.
The application number 200510020523 of the applicant's application, in in September, 2005 disclosed steel-plastic composite pipe production method and device the polymer continuum that adopts maleic anhydride or acrylic ester grafted polymer to make the clad metal skeleton was once disclosed in specification, and the weight ratio and the polyethylene or the polypropylene blending modified technological scheme that is used as continuum that do not have grafting that adopt the above-mentioned graft polymer 15~30% of more economical usefulness, but in the industry the professional person only all know with the blend ratio realize firm bonding and compound be disclose inadequate, because of different polymer materials and the percent grafting of the unsaturated carboxylic acid of different polar functionalities are big differences very, can produce percent grafting in 0.3~6% scope, to realize real secure bond and compound with the polar surfaces of metal such as steel and aluminium, have under certain treatment conditions on the surface, the percent grafting of above-mentioned polymer and unsaturated carboxylic acid will reach the percent grafting more than 0.12% at least, if simply with 15~30% weight blend recently, technological scheme does not realize purpose.All to be the applicant sum up out by a large amount of prescriptions and production and adhesion test for this, could set up feasible because of having only by a large amount of tests, but with original openly scheme than the new trickle technological scheme that the explicit costs ability to bear is arranged, the applicant has done clearer and more definite on disclosed scheme and improvement project more accurately for this reason.
Summary of the invention:
The objective of the invention is in order to overcome above deficiency, provide a kind of and can solve the difficult firmly compound technical barrier of one that is of metal and compound the two interface of polypropylene, energy is reliable, the metal composite plastic pipe of convenient connection.
The object of the present invention is achieved like this:
The pipeline that metal of the present invention and polypropylene are compound, there is conduct to strengthen the tubular metal frame of body in the tube wall of multiple tube with hole, through the polypropylene continuum with polar group of graft modification by the hole on the tubular metal frame in skeleton, the firm compound and coating in outer and skeleton surface, the polyacrylic percent grafting 0.12%~3% of graft modification (also promptly measuring its gel fraction 0.12%~3%), the polypropylene continuum that polar group is arranged is the polypropylene with carboxyl or hydroxyl or carbonyl or anhydride group polar group, and its infrared spectrogram has the characteristic absorption peak of typical above-mentioned polar group.There are not binder material layer or coating layer at tubular metal frame and polypropylene continuum compound interface, only depend on this polypropylene continuum can be with skeleton surface secure bond compound and bear 20 ℃ of water temperatures, 0.6Mpa with the pressurized tests at the compound interface (section) of the impermeable continuum of the hydraulic pressure of upward pressure and skeleton, the polypropylene of graft modification is measured its percent grafting 〉=0.12%.
The pipeline that above-mentioned metal and polypropylene are compound, polypropylene continuum are that process extruder extruding graft reaction modifying under the peroxide grafted action of evocating is to have polypropylene polar group or that polarity is arranged by maleic anhydride (MAH) and polypropylene.
The pipeline that above-mentioned metal and polypropylene are compound, the polypropylene continuum be by a kind of and polypropylene in methyl methacrylate (MMA), acrylic acid (AA), hydroxyethyl methacrylate (HEMA), GMA (GMA), the maleimide (BMI) under the peroxide grafted action of evocating, be polypropylene through extruder extruding graft reaction modifying with polar group.With maleic anhydride (MAH) and polypropylene grafted, can obtain the good polypropylene that polarity is arranged of heat resistance and thermal endurance, the compound interface of pipe (section) under the 0.8Mpa service condition, can stand to reach the test that the above operation of 1000h is impermeable, do not split 80 ℃ of temperature.This scheme and the non-polar polypropylene of not graft modification and the multiple tube ratio of Steel Skeleton have improved 5% hot water bearing capacity test at least.Since its can with strengthen body secure bond and compound, the ring stress under the actual situation of being heated is born and is being shared by compound good enhancing body, therefore, pipe moves under the long term thermal load condition good load performance.
The pipeline that above-mentioned metal and polypropylene are compound, the polypropylene continuum be by a kind of and polypropylene in vinyl benzene (St) and maleic anhydride (MAH) or methyl methacrylate (MMA), hydroxyethyl methacrylate (HEMA), the GMA (GMA) under the peroxide grafted action of evocating, be polypropylene through extruder extruding graft reaction modifying with polar group.There is being vinyl benzene (St) to participate in grafting and modification with maleic anhydride (MAH) or other above-mentioned unsaturated carboxylic acid, make polypropylene become the continuum that polar group arranged of percent grafting up to 2-3%, existing ripe disclosed prescription and technology, grafted material also has the commercial goods to supply.
The pipeline that above-mentioned metal and polypropylene are compound, the polypropylene continuum be by a kind of and atactic copolymerized polypropene (PP-R) in vinyl benzene (St) and maleic anhydride (MAH), methyl methacrylate (MMA), hydroxyethyl methacrylate (HEMA), the GMA (GMA) under the peroxide grafted action of evocating, be atactic copolymerized polypropene (PP-R) through the extruding graft reaction modifying with polar group.There being vinyl benzene (St) to participate in grafting and modification, make atactic copolymerized polypropene (PP-R) become the continuum that polar group arranged of percent grafting with maleic anhydride (MAH) or other above-mentioned unsaturated carboxylic acid up to 2-3%.
The pipeline that above-mentioned metal and polypropylene are compound, the polypropylene continuum is by maleic anhydride (MAH) and polypropylene material, adopting solid state mechanochemistry grafting method to utilize the graft modification of millstones shape chemical reactor is the polypropylene with polar group, adopt the method not only available maleic anhydride of grafting (MAH), other unsaturated carboxylic acid also can, the existing open source literature report of the method can be saved initator, technology maturation can improve the sanitation performance index.
The pipeline that above-mentioned metal and polypropylene are compound, the polypropylene continuum is the polypropylene with polar group and nonpolar polypropene blended the making that does not have modification by graft modification, its blend continuum percent grafting is greater than 0.2%, graft modification has the polypropylene of polar group, its percent grafting is generally 0.5%~0.8% even up to 2-3% (having benzene second monomer to participate in reaction), if hole steel band metal frame surface is arranged handles through cleaning and texturing, the percent grafting of general carboxyl or hydroxyl or carbonyl or anhydride group polar group reaches 0.12% above continuum just can the firm and compound good skeleton surface of effective adhesive, therefore the polypropylene and the nonpolar polyacrylic mixed proportion of polarity are arranged, can in certain proportion, adjust according to the adhesive property on metal frame surface fully.If there is the polar polypropylene percent grafting to reach 0.72%, the mixed proportion non-polar polypropylene can be 70~80%, it is greater than 20% that polar polypropylene is arranged, just can bond through the tubular metal frame of cleaning and coat firmly, and can bear 20 ℃ of water temperatures of compound interface (section), the pressure-bearing impermeable, that tear, tear compound interface of 0.6Mpa hydraulic pressure is tested.Compare with a scheme of disclosed additional proportion 15~30% weight ratios in the application number 200510020523, former scheme discloses insufficient, the ratio that adds because of polar polymer and the percent grafting of its polar group have the most direct relation, if percent grafting is lower than 0.4%, even the blend ratio reaches .30%, the grafting of the polar group of the material after the blend is reached more than 0.12%, actual be can not with metal polar surfaces secure bond and compound and bear of the test of the water of certain pressure to the pressure permeation at interface.This scheme can be saved costs than whole use grafted materials, makes this kind coat pipeline that skeleton forms tube wall by polar polypropylene and has the market competition ability and widely applied.
The pipeline that above-mentioned metal and polypropylene are compound, atactic copolymerized polypropene (PPR) continuum be by the polypropylene with polar group of graft modification, have in the binder polymer of polar group a kind of with do not have nonpolar atactic copolymerized polypropene (PPR) blend of modification to make, its blend continuum percent grafting is at least greater than 0.12%.
The tubular metal frame that the pipeline that above-mentioned metal and polypropylene are compound, the conduct with hole in the tube wall of multiple tube strengthen body is that the broadwise steel wire twines warp-wise steel wire point of intersection through being welded.
The tubular metal frame that the pipeline that above-mentioned metal and polypropylene are compound, the conduct with hole in the tube wall of multiple tube strengthen body is that pertusate steel band or steel plate or aluminium strip form through longitudinal curl or screw winding.
The tubular metal frame that the pipeline that above-mentioned metal and polypropylene are compound, the conduct with hole in the tube wall of multiple tube strengthen body is pertusate steel band or aluminium strip or steel plate through longitudinal curl or screw winding through being welded.
The pipeline that above-mentioned metal and polypropylene are compound, the tubular metal frame that has the conduct enhancing body of hole in the tube wall of multiple tube are that the steel wire of at least one left hand screw and the steel wire intersection of at least one right-hand screw are entwined.
The pipeline that above-mentioned metal and polypropylene are compound, the tubular metal frame that the conduct with hole in the tube wall of multiple tube strengthens body is to be entwined through spiral by the steel wire of at least one left hand screw or the steel wire of at least one right-hand screw.
There are the electrodeposited coating of burning of preventing and erosion or the anti-corrosion of metal layer that plates with physical vacuum film plating process (PVD) in the surface that the pipeline that above-mentioned metal and polypropylene are compound, the conduct with hole in the tube wall of multiple tube strengthen the tubular Steel Skeleton of body.For the antiseptic power that makes pipeline improves, the life-span is longer, to the copper coating or the zinc-plated or chromium plating of metal frame, keeps for a long time so that skeleton strengthens function.
The pipeline that above-mentioned metal and polypropylene are compound, tube wall skin that forms at the compound tubular Steel Skeleton of the polypropylene continuum secure bond that polar group is arranged in the tube wall of multiple tube and/or internal layer are the also compound nonpolar polypropylene layer of one deck.Extrude the nonpolar polypropylene layer of compound one deck again on the polyacrylic continuum skin that polarity is arranged and/or the internal layer surface of playing secure bond and complex metal frame, can reduce the polyacrylic consumption that polarity is arranged and save cost, particularly the thicker product of tube wall has the effect that very significantly reduces cost and improve performance.The residue of its graft reaction can be carried out better intercepting and shielding, further improve its sanitation performance and increase switching performance.
The pipeline that above-mentioned metal and polypropylene are compound, pipe fitting are the pipe fittings that two logical or threeways or four-way or 90 ° of elbows or 45 ° of elbows and reducing have CONCENTRIC REDUCER.
The pipeline that metal of the present invention and polypropylene are compound, can make tubing, can make pipe fitting again, adopt of surperficial secure bond and the coating of the polypropylene continuum with carboxyl or hydroxyl or carbonyl polar group of process graft modification with skeleton, solve the compound pipeline of metal and polypropylene and can not give full play to its excellent properties, can not conveniently connect, the two interface be difficult for secure bond compound for one or compound for one must relate to adhesive layer or the coating transition layer the technical barrier that investment is big, cost is high, the pipe network more reliable performance.
Description of drawings:
Fig. 1 is the pipeline connection diagram of the present invention that the three-way pipeline link is arranged.
Fig. 2 has the pipeline of the present invention of three-way pipeline link to connect another schematic representation.
Embodiment:
Embodiment 1:
Fig. 1 has provided the embodiment of the invention 1 figure.Referring to Fig. 1, there is pertusate steel plate to roll the cylindrical skeleton 2 of welding in the tee pipe fitting 1, have the polypropylene continuum 3 of polar group to pass the inside and outside surperficial strong bond of hole on the tubular pipe support 2 and cylindrical skeleton and it coated to form tube wall.Pertusate steel sheet metal cylindrical skeleton 5 is arranged in the tubing 4, have the polypropylene continuum 6 of polar group pass cylindrical skeleton 5 with it inside and outside surperficial strong bond and it is coated form tube wall.Have in the tubing 7 by broadwise steel wire 8 around steel radial 9 and the metal cylindrical skeleton 10 that forms through welding, have the polypropylene continuum 11 of polar group pass hole on the metal cylindrical skeleton 10 with it inside and outside surperficial strong bond and it is coated form tube wall.Tubing 4,7 lays respectively at pipe fitting 1 two ends and an end and stretches into respectively in the joint socket of pipe fitting to connect as one with it and form pipe network φ 160mm, material is polypropylene (PPR), to this pipe network with 80 ℃, 1.6Mpa pressure pressure testing, the termination of tubing 4 and pipe fitting 1 all cuts off bare metal skeleton and the compound interface (section) of continuum, impermeable through 165h continuous pressure testing, do not reduce pressure, not only anti-corrosion capacity is strong for this composite pipe, the bearing capacity height, also whole indexs reach the drinking-water pipe sanitary standard.
The polypropylene that polar group is arranged is by following prescription, adopt the extruder extruding pelletization, polypropylene grafted rate is that 0.5%~0.8% prescription is known open source literature, below all heavily by mass parts, 100 parts of polypropylene (PPB), 2~5 parts of maleic anhydrides (MAH), 0.1~0.2 part of peroxide grafted initator (DCP).
The polypropylene (PPR) that polar group is arranged, also can adopt the extruder extruding pelletization to obtain percent grafting by following prescription be 2%~3% polypropylene, this atactic copolymerized polypropene (PP-R) can be produced the hot water pipe net composite pipe, at 80 ℃, and long-time running under the 0.8Mpa condition.Atactic copolymerized polypropene (PP-R) Beijing Yanshan Petrochemical is produced 100 parts.Maleic anhydride (MAH) 2-4 part, grafting initator (DCP) 0.2-0.3 part, 1~3 part of vinyl benzene (St).
The polypropylene grafted rate that polar group is arranged is the composite pipe of 0.5%~0.7% manufacture of materials, suits be not higher than 60 ℃, and 1Mpa pressure is operation down.Beijing Yanshan Petrochemical product ethene and 100 parts of propylene block copolymerization polypropylenes (PPB), 20 parts of LDPE, 5 parts of methyl methacrylates, 0.2~0.5 part of grafting initator (DCP).
0 part of 100 parts of atactic copolymerized polypropene Yanshan Petrochemical product, maleic anhydride (MAH) 2-4 part, grafting initator (DCP).Adopt solid state mechanochemistry grafting method to utilize horizontal pan type physico chemical reactor, this core texture is inserted flour milling, the inner circulating water cooling temperature that adopts of flour milling is controlled at 12~25 ℃, pressure is controlled at 17-19KN by the screw press system, and speed of grinding plate is controlled at 20-40 to be changeed/10 fens, grinding times 16 times, can produce the polar polypropylene that has that percent grafting reaches 0.5-0.8%, this method is relatively poor with reaction extrusion molding specific efficiency, but formulation cost is lower, and the polypropylene continuum does not have the residual peculiar smell of DCP.
The material of the polar polypropylene (percent grafting is 2%~3%) of maleic anhydride (MAH) graft modification is got 8 parts, with nonpolar atactic copolymerized polypropene (PP-R) material that do not have a modification with 92 parts of blend through extruding compound production composite pipe, the actual percent grafting of this pipe continuum is 0.16%~0.24%, but the cylindrical skeleton that pertusate broadwise steel wire is twined warp-wise steel wire and welding firmly coats and bonding, continuum can not be separated with the metal surface and peel off, compound interface (section) can bear 165 hours pressure testing of the hydraulic pressure of 20 ℃ of water temperature 2Mpa, the normal operation that can bear the long-term pipe network of 1.6Mpa.
The metal cylindrical skeleton is that porosity ratio accounts for 12%~25%.Aperture φ 3mm~φ 6mm, the steel plate band of thickness 1~3mm is welded behind longitudinal curl or helix-coil, through cross cross-head ecto-entad, simultaneously the skeleton internal and external layer form the continuum that coats and metal frame secure bond and compound be one, through cooling off the formation composite pipe.
The metal cylindrical skeleton is that porosity ratio accounts for 8~15%, aperture φ 3~φ 5, thickness is the aluminium strip of 0.2~0.4mm, through vertically coiling or screw winding are extruded the core pipe of φ 63 diameters of cooling forming in advance with the polypropylene material that polar group is arranged, extruding the polypropylene material that is compounded with polar group again at the aluminium strip outer surface of reeling coats aluminium strip, the heat that utilizes this molten mass is with core pipe and aluminium strip bonding, and by the hole on the aluminium strip core pipe and outer fusion continuum being connected and coat the formation tube wall simultaneously becomes multiple tube.
Embodiment 2:
Fig. 2 has provided the embodiment of the invention 2 figure.Present embodiment 2 is basic same with embodiment 1.Do not exist together is that metal frame 13 in the tubing 12 is the cylindrical skeletons that twined steel radial by the broadwise steel wire.
Produce the core pipe of φ 200 diameters in advance with the polypropylene that polar group is arranged, left-handed and dextrorotation intersect and twine the polyacrylic wire-shaped that has been coated with polar group and become the intersection grid on the core pipe, to being wound with the core pipe heating of steel wire, the polypropylene that utilizes the cross extruder head to extrude polarity simultaneously coats steel wire, simultaneously hole has been crowded with polar polypropylenes, make its secure bond and coat the intersection steel wire, hole and the fusion of internal layer core pipe by grid simultaneously is connected to form multiple tube.
The steel wire that spiral twines is not left-handed yet and dextrorotation intersects, and just only left-handed or only be that right hand helix twines on the core pipe, the suitable diameter of this method is less than the production of the composite pipe of φ 160.
Outside the metal cylindrical skeleton, adopt the cross extruder head to extrude the polypropylene continuum of polar group, this continuum enters inboard wall of skeleton by hole, inside and outside skeleton, form bonding and the coating of continuum to skeleton, the present embodiment difference, be skeleton to be coated the tube wall that forms composite pipe as the polypropylene continuum of polar group, on this tube wall according to the needs of the composite pipe compound more nonpolar polypropylene of one deck of extruding on layer and/or the skin within it, even can extrude if can and the polymer material of polar polypropylene bond vitrified and compound other, enlarged compound description of materials, also promptly enlarged being connected and networking of pipeline of this kind pipeline and different performance, can realize and being connected of the material of different performance, enlarge the adaptability of pipe network function and performance.
The compound one deck of extruding can bond vitrified with the polypropylene that polar group is arranged and the polymer material of compound other on internal layer on the tube wall and/or skin, comprise nonpolar polypropylene, engineers and technicians for the present technique field, as long as can finish design with reference to head and extruder layout inside and outside tube wall, how to extrude composite bed, method has many, no longer sets forth at this.In the compound injection moulding of its wall internal and external layer or extrude other polymer material, can finish design for pipe fitting, also no longer set forth at this with reference to quadric injection mould method or inside and outside wall double-shot moulding and relevant technologies and the mould extruded.
There is the infrared spectrogram of the polypropylene continuum of polar group that the characteristic absorption peak of typical above-mentioned polar group is all arranged among each above-mentioned embodiment.
The various embodiments described above are that foregoing of the present invention is further described, but this should be interpreted as that the scope of the above-mentioned theme of the present invention only limits to the foregoing description.All technology that realizes based on foregoing all belong to scope of the present invention.

Claims (16)

1, the pipeline that metal and polypropylene are compound, it is characterized in that having in the tube wall of multiple tube conduct to strengthen the tubular metal frame of body with hole, the polypropylene continuum with polar group through graft modification passes through the hole of tubular metal frame in skeleton, outward with skeleton surface secure bond and coating, the polypropylene grafted rate of graft modification is 0.12%~3%, the polypropylene continuum that polar group is arranged is the polypropylene continuum with carboxyl or hydroxyl or carbonyl or anhydride group polar group, and its infrared spectrogram has the characteristic absorption peak of typical above-mentioned polar group.
2, the compound pipeline of metal as claimed in claim 1 and polypropylene is characterized in that the polypropylene continuum is that process extruder extruding graft reaction modifying under the peroxide grafted action of evocating is the polypropylene with polar group by maleic anhydride and polypropylene.
3, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that the polypropylene continuum be by a kind of and polypropylene in methyl methacrylate, acrylic acid, hydroxyethyl methacrylate, GMA, the maleimide under the peroxide grafted action of evocating, be polypropylene through extruder extruding graft reaction modifying with polar group.
4, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that the polypropylene continuum be by a kind of and polypropylene in vinyl benzene and maleic anhydride, methyl methacrylate, hydroxyethyl methacrylate, the GMA under the peroxide grafted action of evocating, be polypropylene through extruder extruding graft reaction modifying with polar group.
5, require 1 or 2 described metals and the compound pipeline of polypropylene as claim, it is characterized in that the polypropylene continuum be by a kind of and atactic copolymerized polypropene in vinyl benzene and maleic anhydride, methyl methacrylate, hydroxyethyl methacrylate, the GMA under the peroxide grafted action of evocating, be modified as polypropylene through the reaction extruding graft with polar group.
6, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that the polypropylene continuum is at least by maleic anhydride and polypropylene material, adopting solid state mechanochemistry grafting method to utilize the graft modification of millstones shape chemical reactor is the polypropylene with polar group.
7, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that the polypropylene continuum is by the polypropylene with polar group of graft modification or has the binder polymer and nonpolar polypropene blended the making that does not have modification of polar group, its blend continuum percent grafting is at least greater than 0.12%.
8, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that the atactic copolymerized polypropene continuum be by the polypropylene with polar group of graft modification or have in the binder polymer of polar group a kind of with do not have the nonpolar atactic copolymerized polypropene blend of modification to make, its blend continuum percent grafting is greater than 0.12%.
9, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene is characterized in that tubular metal frame that the conduct with hole in the tube wall of multiple tube strengthens body is that pertusate steel band or steel plate or aluminium strip form through longitudinal curl or screw winding.
10, the compound pipeline of metal as claimed in claim 9 and polypropylene is characterized in that tubular metal frame that the conduct with hole in the tube wall of multiple tube strengthens body is pertusate steel band or aluminium strip or steel plate through longitudinal curl or screw winding through being welded.
11, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that conduct in the tube wall of multiple tube with hole strengthen body the tubular metal frame be that the broadwise steel wire twines warp-wise steel wire point of intersection through being welded.
12, the tubular metal frame that the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, the conduct that it is characterized in that having in the tube wall of multiple tube hole strengthen body is that the steel wire of the steel wire of at least one left hand screw and at least one right-hand screw intersects and is entwined.
13, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene is characterized in that the tubular metal frame that the conduct with hole in the tube wall of multiple tube strengthens body is to be entwined through spiral by the steel wire of at least one left hand screw or the steel wire of at least one right-hand screw.
14, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene is characterized in that there are the electrodeposited coating of burning of preventing and erosion or the anti-corrosion of metal layer that plates with the physical vacuum film plating process in the surface that the conduct with hole in the tube wall of multiple tube strengthens the tubular Steel Skeleton of body.
15, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene, it is characterized in that the tube wall skin that forms at the compound tubular Steel Skeleton of the polypropylene continuum secure bond that polar group is arranged in the tube wall of multiple tube and/or internal layer also compound the nonpolar polypropylene layer of one deck.
16, the compound pipeline of metal as claimed in claim 1 or 2 and polypropylene is characterized in that pipe fitting is the pipe fitting that two logical or threeways or four-way or 90 ° of elbows or 45 ° of elbows and reducing have CONCENTRIC REDUCER.
CNB2006100204752A 2006-03-13 2006-03-13 Pipeline of composing metal with polypropene Expired - Fee Related CN100455868C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100204752A CN100455868C (en) 2006-03-13 2006-03-13 Pipeline of composing metal with polypropene

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100204752A CN100455868C (en) 2006-03-13 2006-03-13 Pipeline of composing metal with polypropene

Publications (2)

Publication Number Publication Date
CN101038051A true CN101038051A (en) 2007-09-19
CN100455868C CN100455868C (en) 2009-01-28

Family

ID=38889130

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100204752A Expired - Fee Related CN100455868C (en) 2006-03-13 2006-03-13 Pipeline of composing metal with polypropene

Country Status (1)

Country Link
CN (1) CN100455868C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979980A (en) * 2012-12-06 2013-03-20 上海皮尔萨管业有限公司 Composite temperature-resistant loose joint
CN113402832A (en) * 2021-07-16 2021-09-17 安庆市悦发管业有限公司 Laying pipe and preparation process thereof
CN114296197A (en) * 2021-12-31 2022-04-08 上海网讯新材料科技股份有限公司 Composite armor structure and optical fiber cable

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1234987C (en) * 2001-09-07 2006-01-04 金德铝塑复合管有限公司 Atactic copolymerized polypropylene aluminium composite pipe and its manufacture
CN2649903Y (en) * 2003-01-08 2004-10-20 成都海特管业有限公司 Aluminium foil reinforced polypropylene pipe
CN2612860Y (en) * 2003-03-31 2004-04-21 义乌市洁康管业有限公司 Random copolymerized polypropene compound tube

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979980A (en) * 2012-12-06 2013-03-20 上海皮尔萨管业有限公司 Composite temperature-resistant loose joint
CN113402832A (en) * 2021-07-16 2021-09-17 安庆市悦发管业有限公司 Laying pipe and preparation process thereof
CN113402832B (en) * 2021-07-16 2022-05-03 安庆市悦发管业有限公司 Laying pipe and preparation process thereof
CN114296197A (en) * 2021-12-31 2022-04-08 上海网讯新材料科技股份有限公司 Composite armor structure and optical fiber cable

Also Published As

Publication number Publication date
CN100455868C (en) 2009-01-28

Similar Documents

Publication Publication Date Title
CN100455866C (en) Pipeline of polar polymer and poleless polymer composing with metal reinforcement
CN109253320B (en) Multilayer composite pipe and preparation method thereof
CN102086357B (en) Adhesive resin used for steel band reinforced polyethylene spiral corrugated pipe and preparation method thereof
CN104610814A (en) Polyethylene powder for anti-corrosive pipeline and preparation method for polyethylene powder
FR2726345A1 (en) POLYAMIDE AND POLYETHYLENE TUBES FOR THE DISTRIBUTION OF DOMESTIC GAS
CN105567135A (en) Polypropylene adhesive powder for anticorrosion pipelines and preparation method thereof
CN103205228A (en) Preparation method of hot-melt adhesive for multilayer oxygen-resistance pipe
CN104388013A (en) Adhesive resin with high resistance to water soaking, and preparation method and application thereof
CN100455867C (en) Pipeline of composing metal with polythene
NO342138B1 (en) Protective polymer layer
CN106893525A (en) One kind is for steel pipe corrosion-proof adhering resin and preparation method thereof
CN102650354A (en) Aluminum-plastic composite pipe with high strength and high heat conductivity
CN100455868C (en) Pipeline of composing metal with polypropene
CN1237139C (en) Hot-melt adhesive for polypropylene and metal
CN102705591B (en) Heat-resistant and pressure-resistant polyethylene composite pipe
CN100404942C (en) Pipe network for connecting metal composite plastic pipe and plastic pipe
CN1407268A (en) Atactic copolymerized polypropylene aluminium composite pipe and its manufacture
CN101268139B (en) Coextrusion binder of co-grafted PE and PP diluted in a non-grafted PE
CN1207469A (en) Glass fibre reinforced plastic and high-density polyethylene compound pipe and mfg. method thereof
CN109575855A (en) A kind of anti-nozzle absciss layer polyethylene liner steel pipe hot melt adhesive and the preparation method and application thereof
CN102146270B (en) Special bonding resin with obstructing performance for polythene spiral corrugated pipe
CN1598388A (en) Pipeline connector with steel skelelton rainforced composite polymer and its mfg. method
CN1669771A (en) Steel wire reinforced composite plastic pipe production method and apparatus
CN101699120B (en) Microporous plastic-covered PPR copper liner reinforced composite pipe and preparation method thereof
CN200961768Y (en) Metal composite plastic pipe and plastic pipe fitting connected pipe net

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090128

Termination date: 20130313