CN101026867A - 多载波td-scdma系统中的hsdpa资源管理方法 - Google Patents
多载波td-scdma系统中的hsdpa资源管理方法 Download PDFInfo
- Publication number
- CN101026867A CN101026867A CNA200610055132XA CN200610055132A CN101026867A CN 101026867 A CN101026867 A CN 101026867A CN A200610055132X A CNA200610055132X A CN A200610055132XA CN 200610055132 A CN200610055132 A CN 200610055132A CN 101026867 A CN101026867 A CN 101026867A
- Authority
- CN
- China
- Prior art keywords
- hsdpa
- resource
- node
- message
- carrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
本发明涉及一种多载波TD-SCDMA系统中的HSDPA资源的管理方法,包括在小区HSDPA资源配置或重配置的过程中,在Node B与RNC间的配置请求、配置响应和配置失败消息中指示载波信息,使Node B可首先为其所支持的配置分配HSDPA资源,而拒绝其他不支持的配置,同时Node B向RNC报告HSDPA不支持配置的失败原因,从而支持小区HSDPA资源配置或重配置的部分成功,使资源配置过程的效率得以改进。在小区的能力或资源操作状态发生改变时,使NodeB按载波向RNC报告HS-DSCH的资源操作状态;在进行与HSDPA相关的公共测量时,将公共测量类型IE和频点信息UARFCN IE配合,使得HSDPA相关的测量可以基于小区内的各个载波。因此可对多载波系统中的HSDPA资源进行有效管理,以提高系统运行效率。
Description
技术领域
本发明涉及宽带无线数据通信技术领域,具体涉及高速下行分组接入(HSDPA)资源的管理方法。
背景技术
高速下行分组接入(HSDPA)是一种提高时分-同步码分多址接入(TD-SCDMA)系统下行数据传输速率的技术,是3GPP标准化组织为了满足上下行数据业务不对称的需求通过R5(Release 5)版本的系统标准中提出的,可以在已有的TD-SCDMA系统网络结构下,将用户下行业务数据速率提高到2.8Mbps以上。
图1为WCDMA或TD-SCDMA系统的小区部分架构示意图。如图1所示,TD-SCDMA系统包括无线网络控制器(RNC)、节点B(Node B)以及用户设备(UE)。在TD-SCDMA系统的小区中与HSDPA相关的资源包括高速物理下行共享信道(HS-PDSCH,High Speed-Physicai Downlink SharedChannel),用于传送业务数据;高速共享控制信道(HS-SCCH,HighSpeed-Shared Control Channel),用于传送信令信息以及高速共享信息信道(HS-SICH,High Speed-Shared Information Channel),用于传输用户设备反馈的控制信息。
一个小区内相关的HSDPA资源由RNC通过物理共享信道重配置(Physical shared channel reconfiguration)过程来为该小区配置/重配置。RNC根据小区业务模型等来判断是否需要在小区内预留HSDPA资源。若需要预留HSDPA资源,则RNC发送物理共享信道重配请求(PHYSICALSHARED CHANNEL RECONFIGURATION REQUEST)消息给Node B来建立小区内的HSDPA资源,还可以通过该消息重配/删除小区内的HSDPA资源。
一个UE相关的HSDPA资源由RNC根据该UE的数据吞吐量、QoS等因素来决定是否需要为其进行分配。如果需要,RNC向Node B发出无线链路建立请求(Radio Link Setup Request)和/或无线链路重配置请求(Radio Link Reconfiguration Prepare 或Radio Link ReconfigurationRequest)消息,要求Node B分配HSDPA资源。Node B响应该请求,进行HSDPA资源分配,然后通过响应消息告知RNC。该响应消息包含高速下行共享信道时分双工模式响应信元(HS-DSCH TDD Information ResponseIE)。HS-DSCH TDD Information Response IE包括HS-SCCH、HS-SICH和混合自动重复请求(HARQ)存储分区等信息。RNC进而将该信息告知UE,从而实现HSDPA资源的分配。
当一个小区的能力(Capability)和/或其资源操作状态(Resourceoperational state)发生改变时,Node B将使用资源状态指示(Resourcestatus indication)消息向RNC报告,另外,Node B还可以使用审核响应(AUDIT RESPONSE)消息向RNC报告资源操作状态。
有关上述消息的具体描述请参见3GPP标准化组织的标准文档“3GPPTS 25.433 v5.13.0”。
为了进一步提高TD-SCDMA系统中的下行业务数据传输速率,当前TD-SCDMA系统的技术发展趋势是将多载波概念引入无线接口(AirInterface)技术中,使一个TD-SCDMA系统的小区可以支持多个载波上的无线传输。这种多载波TD-SCDMA系统中的HSDPA小区可以提供大约N倍于单载波HSDPA终端用户的峰值数据速率,其中N为小区可支持的载波的数目,从而可显著提高小区吞吐量和频谱效率。
在这种多载波HSDPA TD-SCDAM系统中,为小区配置/重配置相关的HSDPA资源和为UE分配相关的HSDPA资源等相关的HSDPA资源管理操作都将需要针对多载波进行。
在当前建议的多载波TD-SCDMA系统方案中,Node B应用部分(NBAP,Node B Application Part)协议不具有报告物理共享信道重配置请求的部分成功的能力,即,根据物理共享信道重配置请求中与HSDPA相关的资源配置信息,Node B只可完成其中一些载波上的资源配置/重配值操作,但并不能支持所请求的全部载波上的资源配置/重配置操作时,Node B不能向RNC报告这种状况,在这种情况下Node B只能拒绝该物理共享信道重配置请求。RNC将重新发送物理共享信道重配置请求以再次配置HSDPA资源。
在当前建议的多载波TD-SCDMA系统方案中,在资源状况指示和审核响应消息中也没有针对每个载波的HSDPA资源操作状态进行报告的能力。而且在无线链路增加请求(Radio link addition request)消息中,没有相关的HSDPA信息。这意味着在Node B内小区间切换过程中,当UE使用源小区中的HSDPA时,不能在目标小区中同时建立DCH和HSDPA相关资源。
此外,由于现有TD-SCDMA系统方案中的与HSDPA相关的公共测量(Common Measurement)是基于一个小区的,在一个支持多载波的小区中,RNC将难以判断哪个载波具有良好的HSDPA性能,这将降低无线资源管理的性能。
所述关于多载波HSDPA TD-SCDAMA系统的有关修改建议请具体参见“中国通信标准化协会TC5-WG9-2005-065Q-多载波HSDPA Iub接口修订”。
综上所述,在当前建议的多载波TD-SCDMA系统方案中,仍不能针对多载波对HSDPA资源进行有效管理。
发明内容
有鉴于此,本发明的目的在于合理的对多载波上的HSDPA资源进行管理,从而提高多载波上的HSDPA资源的管理效率,为进行多载波HSDPA传输提供基础,进而为多载波HSDPA用户终端提供较高峰值数据速率、提高小区数据吞吐量和频谱效率。
上述的发明目的通过以下的技术方案加以实现:多载波TD-SCDMA系统中的HSDPA资源管理方法,RNC为小区配置或重配置HSDPA相关资源的过程包括步骤:
A.RNC向Node B发送一条HSDPA资源的配置请求消息,所述请求消息中指示了需要进行配置的载波信息;
B.Node B根据其收到的所述请求消息进行HSDPA相关资源的配置;
C.Node B向RNC发送一条HSDPA资源的配置响应消息,所述响应消息中指示了配置失败的载波信息。
在步骤B中,若HSDPA相关资源的配置全部成功,Node B建立/重配/删除所有指示载波上的HSDPA相关资源。
在步骤B中,若HSDPA相关资源的配置部分成功,Node B建立/重配/删除其所支持载波上的HSDPA相关资源。
在步骤C中,所述响应消息中还指示了配置失败的原因。所指示的失败原因为一个通用的原因值或一个特定的原因值。
在上述的请求消息和响应消息中,使用明示或暗示的方式指示载波信息。
所述的请求消息为物理共享信道重配置请求消息。
所述的响应消息为物理共享信道重配置响应消息或物理共享信道重配置失败消息。
多载波TD-SCDMA系统中的HSDPA资源管理方法,当RNC决定需要为UE分配相关的HSDPA资源时,包括步骤:
RNC向Node B发出一条请求消息,要求Node B分配HSDPA资源;
Node B根据该请求进行HSDPA资源分配,并通过相应的响应消息告知RNC,在该响应消息中通过一个载波信元来指示相应载波上HS-PDSCH资源分配情况。
多载波TD-SCDMA系统中的HSDPA资源管理方法,当Node B向RNC报告一个小区的能力和/或资源操作状态的改变时,包括步骤:
Node B向RNC发送Resource status indication消息或AUDITRESPONSE消息,所述消息中的HS-DSCH Resources Information IE中具有载波信息。
多载波TD-SCDMA系统中的HSDPA资源管理方法,在进行Node B内的小区间切换时,包括步骤:
RNC向Node B发送RADIO LINK ADDITION REQUEST消息,该消息中存在HS-DSCH TDD Information IE;
Node B接收所述消息,向RNC发送RADIO LINK ADDITION RESPONSE消息,该消息中存在HS-DSCH TDD Information Response IE。
RADIO LINK ADDITION REQUEST消息中还存在HS-DSCH-RNTI IE、HS-PDSCH RL ID IE。
多载波TD-SCDMA系统中的HSDPA资源管理方法,当进行HSDPA相关的公共测量时,在RNC向Node B发送的Common measurement initiationrequest消息中,将Common Measurement Type IE和频点信息UARFCN IE相关联。
所述HSDPA相关的公共测量包括:所有未被HS-PDSCH或HS-SCCH使用的码字的传输载波功率,HS-DSCH所需功率,HS-DSCH提供的比特率。
根据本发明的方法,对物理共享信道重配置请求的部分成功的支持可实现对HSDPA资源的有效管理,以提高系统运行效率。
在将HS-DSCH TDD Information IE添加到无线链路增加请求消息之后,当UE在源小区中具有HSDPA资源时,在其进行Node B内小区间切换时可以在lub接口之上使用无线链路增加请求在目标小区中建立相应的HSDPA资源,使Node B内的小区间切换更有效率。
当Node B向RNC报告一个小区的能力和/或资源操作状态的改变时,Node B通过所述修改后的NBAP协议消息,即Resource status indication消息或AUDIT RESPONSE消息,能够针对每个载波上的HSDPA相关资源操作状态向RNC进行报告,从而提高了Node B上报的效率。
附图说明
图1为WCDMA或TD-SCDMA系统的小区部分架构示意图;
图2为根据本发明的HSDPA资源的管理方法的流程示意图。
具体实施方式
下文中提及的有关消息和表格的相关描述请参见3GPP标准化组织的标准文档“3GPP TS 25.433 v5.13.0”以及中国通信标准化协会的标准文档TC5-WG9-2005-065Q-多载波HSDPA Iub接口修订。
本发明通过支持物理共享信道重配置请求的部分成功,实现对HSDPA资源的有效管理。
根据本发明提供的HSDPA资源的管理方法,如图2所示,RNC向NodeB发送的物理共享信道重配置请求,Node B响应该请求,并根据Node B所支持的配置情况配置HSDPA资源。
若Node B支持所述信道重配置请求中的部分配置,则为所支持的部分配置建立/重配置/删除HSDPA资源,而Node B拒绝其不支持的其他部分配置,并向RNC报告失败原因。
如果Node B支持所述信道重配置请求中的部分配置,如HS-PDSCH和/或HS-SCCH的配置,Node B通过NBAP向RNC报告这种部分配置成功的情况。成功的配置可以先在Node B运行起来,不能配置HSDPA资源的原因可以通过PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE和/或PHYSICAL SHARED CHANNEL RECONFIGURATION RESPONSE消息来向RNC报告。这样可以避免因为部分配置的失败而导致整个小区的HSDPA不可用。
下面通过对具体实施过程的描述进一步说明根据本发明的HSDPA资源的管理是如何配置HSDPA资源以及报告不支持HSDPA相关配置的失败原因。
在物理共享信道重配置过程的具体实施例1中,根据本发明提供的HSDPA资源的管理方法,对物理共享信道重配过程的规定如下:
如果Node B能支持PHYSICAL SHARED CHANNEL RECONFIGURATIONREQUEST消息中的所有关于HS-PDSCH和HS-SCCH的配置,Node B应存储Configuration Generation ID IE,使这些资源对现在和将来的HS-DSCH传输信道可用,并发送PHYSICAL SHARED CHANNEL RECONFIGURATIONRESPONSE。
例如,针对HS-PDSCH信道进行配置时,PHYSICAL SHARED CHANNELRECONFIGURATION REQUEST消息包含HS-PDSCH TDD Information IE,则Node B将判断:
如果HS-PDSCH TDD Information IE不包含任何DL Timeslot and CodeInformation LCR per UARFCN IE,则删除小区内所有现存的HS-PDSCH资源。
如果DL Timeslot and Code Information LCR per UARFCN IE存在,但其中不包含任何DL Timeslot and Code Information LCR IE,但包含UARFCN IE,则删除该UARFCN IE所指示的载波上的所有现存的HS-PDSCH资源。其他载波上的HSDPA资源配置不受影响。
如果DL Timeslot and Code Information LCR per UARFCN IE既包含DL Timeslot and Code Information LCR IE也包含UARFCN IE,而且该UARFCN IE所指示的载波上均没有配置HS-PDSCH资源,则按照各载波上的DL Timeslot and Code Information LCR IE来配置相应载波上的HS-PDSCH资源。
如果DL Timeslot and Code Information LCR per UARFCN IE既包含DL Timeslot and Code Information LCR IE也包含UARFCN IE,但该UARFCN IE所指示的载波上已配置有HS-PDSCH资源,则用各载波上的DLTimeslot and Code Information LCR IE配置来取代相应载波的原有HS-PDSCH资源配置。
如果Node B可支持某个载波上的所有配置,则根据请求,建立/重配/删除该载波上的HSDPA资源成功。具体地说,如果Node B能支持PHYSICALSHARED CHANNEL RECONFIGURATION REQUEST消息中该载波的所有关于HS-PDSCH和HS-SCCH的配置,Node B使这些资源对现在和将来的HS-DSCH传输信道可用,
如果Node B不能支持某个载波上的所有配置,该载波上的HSDPA资源不能成功地被建立/重配/删除。Node B通过PHYSICAL SHARED CHANNELRECONFIGURATION FAILURE消息向RNC报告该载波的HSDPA资源不成功的原因。
并在该FAILURE消息中包含Cause IE。
如果所有载波上的HSDPA资源配置都不能支持,Cause IE可以是单个通用的原因值,或者是与引起失败的载波有关的值。
如果只有部分载波上的HSDPA资源配置不能支持,Cause IE是与引起失败的载波有关的值。Node B中将拒绝失败载波上的HSDPA相关配置,使成功载波上配置的资源对现在和将来的HS-DSCH传输信道可用。
物理共享信道重配置请求消息请参见“中国通信标准化协会TC5-WG9-2005-065Q-多载波HSDPA Iub接口修订”,只是将其中DLTimeslot and Code Information LCR IE的范围(Range)从1..<maxnoofDLtsLCR>改为0..<maxnoofDLtsLCR>。
表1为PHYSICAL SHARED CHANNEL RECONFIGURATION REQUEST消息的具体内容。
表1 PHYSICAL SHARED CHANNEL RECONFIGURATION REQUEST
IE/Group Name | Pre-sence | Range | IE Type &Reference | SemanticsDescription | Criticality | AssignedCriticality |
Message Disc riminator | M | 9.2.1.45 | ||||
省略...... | ||||||
PUSCH Sets ToDelete | 0..<maxnoofPUSCHSets> | GLOBAL | reject | |||
>PUSCH Set ID | M | 9.2.3.13 | - | |||
HS-PDSCH TDDInformation | 0..1 | GLOBAL | reject | |||
省略...... | ||||||
DL Timeslot andCode InformationLCR per UARFCN | 0..<maxFrequencyinCell> | 1.28Mcps TDD系统必需,不适用于3.84McpsTDD系统 | - | |||
>>DL Timeslot andCode InformationLCR | 0..<maxnoofDLtsLCR> | - | ||||
>>>Time Slot LCR | M | 9.2.3.24a | - | |||
省略..... |
对物理共享信道重配置失败(PHYSICAL SHARED CHANNELRECONFIGURATION FAILURE)消息内容的修改如表2所示,表中灰色的区域中为经过修改的内容:
表2 PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE
IE/Group Name | Pre-sence | Range | IE Type andReference | SemanticsDescription | Criticality | AssignedCriticality |
Message Discriminator | M | 9.2.1.45 | - | |||
Message Type | M | 9.2.1.46 | YES | reject | ||
Transaction ID | M | 9.2.1.62 | - | |||
CHOICE Cause Level | M | YES | ignore | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>Set Specific | TDD Only | - | ||||
>>Unsuccessful DLShared Channel Set | 0..<maxnoofPDSCHSets> | EACH | ignore | |||
>>>PDSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
>>Unsuccessful ULShared Channel Set | 0..<maxnoofPUSCHSets> | EACH | ignore | |||
>>>PUSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
CHOICE Cause Level | O | 仅适用于使用多载频的1.28McpsTDD系统 | YES | ignore | ||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>UARFCN Specific | - | |||||
>>UnsuccessfulHSDPA UARFCN | 0..<maxFrequencyinCell> | EACH | ignore | |||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - | |||
Criticality Diagnostics | O | 9.2.1.17 | YES | ignore |
Range Bound | Expianation |
maxnoofPDSCHSets | Maximum number of PDSCH Sets in a cell |
maxnoofPUSCHSets | Maximum number of PUSCH Sets in a cell |
maxFrequencyinCell | Maximum number of Frequency that can be defined in a Cell |
在物理共享信道重配置过程的具体实施例2中,与实施例1不同之处在于:某个载波上的HS-SCCH和HS-PDSCH的配置成功与否相互独立。
对物理共享信道重配过程的具体规定如下:
如果Node B能支持PHYSICAL SHARED CHANNEL RECONFIGURATIONREQUEST消息中的所有关于HS-PDSCH和HS-SCCH的配置,Node B应存储Confi guration Generation ID IE,使这些资源对现在和将来的HS-DSCH传输信道可用,并发送PHYSICAL SHARED CHANNEL RECONFIGURATIONRESPONSE。
如果Node B能支持某个载波上的所有HS-SCCH相关配置,该载波上的HS-SCCH资源应该被视为建立/重配/删除成功,Node B使这些资源对现在和将来的HS-DSCH传输信道可用。Node B通过PHYSICAL SHAREDCHANNEL RECONFIGURATION FAILURE来报告HS-SCCH配置不成功载波的失败原因。
如果Node B能支持某个载波上的所有HS-PDSCH相关配置,该载波上的HS-PDSCH资源被视为建立/重配/删除成功,Node B使这些资源对现在和将来的HS-DSCH传输信道可用。Node B通过PHYSICAL SHARED CHANNELRECONFIGURATION FAILURE来报告HS-PDSCH配置不成功载波的失败原因。
PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息中包含Cause IE。Cause IE可以是单个通用的原因值,或者是与每个引起失败的特定载波有关的值。
PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息的修改采用如下表3或者表4的方式,表中灰色的区域中为经过修改的内容。
表3 PHYS ICAL SHARED CHANNEL RECONFIGURATION FAILURE
IE/Group Name | Pre-sence | Range | IEType andReference | SemanticsDescription | Criticality | AssignedCriticality |
MessageDisc riminator | M | 9.2.1.45 | - | |||
Message Type | M | 9.2.1.46 | YES | reject | ||
Transaction ID | M | 9.2.1.62 | - | |||
CHOICE Cause Leyel | M | YES | ignore | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>Set Specific | TDDOnly | - | ||||
>>Unsuccessful DLShared Channel Set | 0..<maxnoofPDSCHSets> | EACH | ignore | |||
>>>PDSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
>>Unsuccessful ULShared Channel Set | 0..<maxnoofPUSCHSets> | EACH | ignore | |||
>>>PUSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
CHOICE Cause Level | O | 仅适用于使用多载频的1.28M印sTDD系统 | YES | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>UARFCNSpecific | - | |||||
>>UnsuccessfuIHS-PDSCH UARFCN | 0..<maxFrequencyinCell> | EACH | ||||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - | |||
CHOICE Cause Level | O | 仅适用于使用多载频的1.28Mcps | YES |
TDD系统 | ||||||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>UARFCN Specific | - | |||||
>>UnsuccessfulHS-SCCH UARFCN | 0..<maxFrequencyinCell> | EACH | ||||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - | |||
Criticality Diagnostics | O | 9.2.1.17 | YES | ignore |
Range Bound | Explanation |
maxnoofPDSCHSets | Maximum number of PDSCH Sets in a cell |
maxnoofPUSCHSets | Maximum number of PUSCH Sets in a cell |
maxFrequencyinCell | Maximumnumber of Frequency that can be defined in a Cell |
表4 PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE
IE/Group Name | Pre-sence | Range | IEType andReference | SemanticsDescription | Criticality | AssignedCriticality |
MessageDiscriminator | M | 9.2.1.45 | - | |||
Message Type | M | 9.2.1.46 | YES | reject | ||
Transaction ID | M | 9.2.1.62 | - | |||
CHOICE Cause Level | M | YES | ignore | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>Set Specific | TDDOnly | - | ||||
>>Unsuccessful DLShared Channel Set | 0..<maxnoofPDSCHSets> | EACH | ignore | |||
>>>PDSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
>>Unsuccessful ULShared Channel Set | 0..<maxnoofPUSCHSets> | EACH | ignore | |||
>>>PUSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
CHOICE Cause Level | O | 仅适用于使用多载频的1.28McpsTDD系统 | YES | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | ForHS-PDSCH | - | ||
>>Cause | O | 9.2.1.6 | ForHS-SCCH | - | ||
>UARFCN Specific | - | |||||
>>UnsuccessfulHS-PDSCH UARFCN | 0..<maxFrequencyinCell> | EACH | ||||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - |
>>UnsuccessfulHS-SCCH UARFCN | 0..<maxFrequencyinCell> | EACH | ||||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - | |||
CriticalityDiagnostics | O | 9.2.1.17 | YES | ignore |
Range Bound | Explanation |
maxnoofPDSCHSets | Maximum number of PDSCH Sets in a cell |
maxnoofPUSCHSets | Maximum number of PUSCH Sets in a cell |
maxFrequencyinCell | Maximum number of Frequency that can be defined in a Cell |
在物理共享信道重配置过程的具体实施例3中,为了支持物理共享信道重配请求的部分成功,对PHYSICAL SHARED CHANNEL RECONFIGURATIONRESPONSE消息和PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息进行修改,以使Node B能报告不成功载波的失败原因。
在此,对物理共享信道重配过程的规定如下:
如果Node B能支持PHYSICAL SHARED CHANNEL RECONFIGURATIONREQUEST消息中的所有关于HS-SCCH的配置,Node B即发送PHYSICALSHARED CHANNEL RECONFIGURATION RESPONSE消息。
如果Node B不能支持PHYSICAL SHARED CHANNEL RECONFIGURATIONREQUEST消息中的所有关于HS-SCCH的配置,Node B应发送PHYSICALSHARED CHANNEL RECONFIGURATION FAILURE消息。
如果Node B能支持PHYSICAL SHARED CHANNEL RECONFIGURATIONREQUEST消息中的所有关于HS-PDSCH的配置,且Node B不需要进行HS-SCCH的配置,Node B应发送PHYSICAL SHARED CHANNELRFCONFTGURATION RESPONSE消息。
如果Node B不能支持PHYSICAL SHARED CHANNEL RECONFIGURATIONREQUEST消息中的所有关于HS-PDSCH的配置,则应该发送PHYSICALSHARED CHANNEL RECONFIGURATION RESPONSE消息或者PHYSICAL SHAREDCHANNEL RECONFIGURATION FAILURE消息。
PHYSICAL SHARED CHANNEL RECONFIGURATION RESPONSE消息或者PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息中可包含CauseIE。
如果所有载波上的HS-PDSCH配置都不能支持,Cause IE可以是单个通用的原因值,或者是与每个引起失败的特定载波有关的值。如果只有部分载波上的HS-PDSCH资源配置不能支持,Cause IE是与每个引起失败的特定载波有关的值。Node B中将拒绝失败载波上的配置,使成功载波上配置的资源对现在和将来的HS-DSCH传输信道可用。
相应地对PHYSICAL SHARED CHANNEL RECONFIGURATION RESPONSE和PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息的修改如表5、表6所示下,表中灰色的区域中为经过修改的内容:
表5 PHYSICAL SHARED CHANNEL RECONFIGURATION RESPONSE
IE/Group Name | Pre-sence | Range | IE Type andReference | SemanticsDescription | Criticality | AssignedCriticality |
Message Discriminator | M | 9.2.1.45 | - | |||
Message Type | M | 9.2.1.46 | YES | reject | ||
Transaction ID | M | 9.2.1.62 | - | |||
Criticality Diagnostics | O | 9.2.1.17 | YES | ignore | ||
CHOICE Gause Level | O | 仅适用于使用多载频的1.28Mcps TDD系统 | YES | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>UARFGN Specific | - | |||||
>>UnsuccessfulHS-PDSCH UARFCN | 0..<maxFrequencyinCell> | EACH | ||||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - |
表6 PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE
IE/Group Name | Pre-sence | Range | IE Type andReference | SemanticsDescription | Criticality | AssignedCriticality |
Message Dscriminator | M | 9.2.1.45 | - | |||
Message Type | M | 9.2.1.46 | YES | reject | ||
Transaction ID | M | 9.2.1.62 | - | |||
CHOICE Cause Level | M | YES | ignore | |||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>Set Specific | TDDOnly | - | ||||
>>Unsuccessful DLShared Channel Set | 0..<maxnoofPDSCHSets> | EACH | ignore | |||
>>>PDSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
>>Unsuccessful ULShared Channel Set | 0..<maxnoofPUSCHSets> | EACH | ignore | |||
>>>PUSCH Set ID | M | 9.2.3.13 | - | |||
>>>Cause | M | 9.2.1.6 | - | |||
CHOICE Cause Level | O | 仅适用于使用多载频的1.28McpsTDD系统 | YES | ignore | ||
>General | - | |||||
>>Cause | M | 9.2.1.6 | - | |||
>UARFCN Specific | - | |||||
>>UnsuccessfulHS-PDSCH UARFCN | 0..<maxFrequencyinCell> | EACH | ignore | |||
>>>UARFCN | M | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>>Cause | M | 9.2.1.6 | - | |||
Criticality Diagnostics | O | 9.2.1.17 | YES | ignore |
Range Bound | Explanation |
maxnoofPDSCHSets | Maximum number of PDSCH Sets in a cell |
maxnoofPUSCHSets | Maximum number of PUSCH Sets in a cell |
maxFrequencyinCell | Maximum number of Frequency that can be defined in a Cell |
在物理共享信道重配置过程的具体实施例4中,PHYSICAL SHAREDCHANNEL RECONFIGURATION REQUEST消息每次只能配置一个载频上的HSDPA相关资源,如果Node B能支持PHYSICAL SHARED CHANNELRECONFIGURATION REQUEST消息中的所有关于HS-PDSCH和HS-SCCH的配置,Node B应发送PHYSICAL SHARED CHANNEL RECONFIGURATION RESPONSE。
例如,针对HS-PDSCH信道进行配置时,PHYSICAL SHARED CHANNELRECONFIGURATION REQUEST消息中包含HS-PDSCH TDD Information IE,则Node B将判断:
如果HS-PDSCH TDD Information IE不包含任何DL Timeslot and CodeInformation LCR IE和UARFCN IE,则Node B删除小区内所有现存的HS-PDSCH资源。
如果HS-PDSCH TDD Information IE不包含任何DL Timeslot and CodeInformation LCR IE,但包含UARFCN IE,则Node B删除该UARFCN IE所指示的载波上的所有现存的HS-PDSCH资源。
如果HS-PDSCH TDD Information IE包含DL Timeslot and CodeInformation LCR IE和UARFCN IE,而且UARFCN IE所指示的载波上没有配置HS-PDSCH资源,则按照DL Timeslot and Code Information LCR IE来配置该载波上的HS-PDSCH资源。
如果HS-PDSCH TDD Information IE包含DL Timeslot and CodeInformation LCR IE和UARFCN IE,而且UARFCN IE所指示载波上已配置有HS-PDSCH资源,则用该DL Timeslot and Code Information LCR IE的配置来取代该载波的原有HS-PDSCH资源配置。
如果Node B不能支持所有的配置,则应拒绝PHYSICAL SHAREDCHANNEL RECONFIGURATION REQUEST消息中的所有配置,并且发送PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息,并在该消息中包含Cause IE。
PHYSICAL SHARED CHANNEL RECONFIGURATION FAILURE消息可以参照3GPP TS25.433v5.13.0,也可以采用表2的方式。
相应地对PHYSICAL SHARED CHANNEL RECONFIGURATION REQUEST消息的修改如表7,表7中的省略部分参见3GPP TS25.433v5.13.0,表中灰色的区域中为经过修改的内容:
表7 PHYSICAL SHARED CHANNEL RECONFIGURATION REQUEST
IE/Group Name | Presence | Range | IE Type andReference | SernanticsDescription | Criticality | AssignedCriticality |
MessageDiscriminator | M | 9.2.1.45 | - | |||
省略...... | ||||||
HS-PDSCH TDDInformation | 0..1 | GLOBAL | reject | |||
>DL Timeslot andCode Information | 0..<maxnoofDLts> | 3.84McpsTDD系统必需,不适用于1.28McpsTDD系统 | - | |||
省略...... | ||||||
>>HS-PDSCHand HS-SCCHTotal Power | O | MaximumTransmissionPower9.2.1.40 | 时隙内HS-PDSCH和HS-SCCH码字所允许的最大传输功率 | YES | reject | |
>DL Timeslot andCode InformationLCR | 0..<maxnoofDLtsLCR> | 1.28McpsTDD系统必需,不适用于3.84McpsTDD系统 | - | |||
>>Time Slot LCR | M | 9.2.3.24a | - | |||
>>Midamble ShiftLCR | M | 9.2.3.7A | - | |||
>>Codes LCR | 1..<maxnoofHSPDSCHs> | - |
>>>TDDChannelisationCode | M | 9.2.3.19 | - | |||
>>HS-PDSCHand HS-SCCHTotal Power | O | MaximumTransmissionPower9.2.1.40 | 时隙内HS-PDSCH和HS-SCCH码字所允许的最大传输功率 | YES | reject | |
>UARFCN | O | 9.2.1.65 | Nt,参见3GPP TS25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
Add to HS-SCCHResource Pool | 0..1 | GLOBAL | reject | |||
>HS-SCCHInformation | 0..<maxnoofHSSCCHs> | 仅适用于3.84McpsTDD系统 | - | |||
省略...... | - | |||||
>>>TDDChannelisationCode | M | 9.2.3.19 | - | |||
>HS-SCCHInformation LCR | 0..<maxnoofHSSCCHs> | 仅适用于1.28McpsTDD系统 | GLOBAL | reject | ||
>>HS-SCCH ID | M | 9.2.3.5Ga | - | |||
>>Time Slot LCR | M | 9.2.3.24a | - | |||
>>Midamble ShiftLCR | M | 9.2.3.7A | - | |||
>>First TDDChannelisationCode | M | TDDChannelisation Code9.2.3.19 | - | |||
>>Second TDDChannelisationCode | M | TDDChannelisation Code9.2.3.19 | - | |||
>>MaximumHS-SCCH Power | M | DL Power9.2.1.21 | - |
>>HS-SICHInformation LCR | 1 | - | ||||
>>>HS-SICHID | M | 9.2.3.5Gb | - | |||
>>>Time SlotLCR | M | 9.2.3.24a | - | |||
>>>MidambleShiftLCR | M | 9.2.3.7A | - | |||
>>>TDDChannelisationCode | M | 9.2.3.19 | - | |||
>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
Modify HS-SCCHResource Pool | 0..1 | GLOBAL | reject | |||
>HS-SCCHInformation | 0..<maxnoofHSSCCHs> | 仅适用于3.84McpsTDD系统 | - | |||
省略...... | - | |||||
>>>TDDChannelisationCode | O | 9.2.3.19 | - | |||
>HS-SCCHInformation LCR | 0..<maxnoofHSSCCHs> | 仅适用于1.28McpsTDD系统 | GLOBAL | reject | ||
>>HS-SCCH ID | M | 9.2.3.5Ga | - | |||
>>Time Slot LCR | O | 9.2.3.24a | - | |||
>>Midamble ShiftLCR | O | 9.2.3.7A | - | |||
>>First TDDChannelisationCode | O | TDDChannelisation Code9.2.3.19 | - | |||
>>Second TDDChannelisationCode | O | TDDChannelisation Code9.2.3.19 | - | |||
>>MaximumHS-SCCH Power | O | DL Power9.2.1.21 | - |
>>HS-SICHInformation LCR | 0..1 | - | ||||
>>>HS-SICHID | M | 9.2.3.5Gb | - | |||
>>>Time SlotLCR | O | 9.2.3.24a | - | |||
>>MidambleShiftLCR | O | 9.2.3.7A | - | |||
>>>TDDChannelisationCode | O | 9.2.3.19 | - | |||
>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
Delete fromHS-SCCH ResourcePool | 0..<naxnoofHSSCCHs> | GLOBAL | reject | |||
>HS-SCCH ID | M | 9.2.3.5Ga | - | |||
ConfigurationGeneration ID | O | 9.2.1.16 | YES | reject |
在本发明的具体实施例5中,根据本发明提供的HSDPA资源的管理方法,当RNC根据该UE的数据吞吐量、QoS等因素决定需要为其分配相关的HSDPA资源时,RNC向Node B发出Radio Link Setup Request/RadioLink Reconfiguration Request/Radio Link Reconfiguration Prepare消息,要求Node B分配HSDPA资源。Node B响应该请求,进行HSDPA资源分配,然后通过响应消息告知RNC。该响应消息中的HS-DSCH TDDInformation Response IE针对HS-PDSCH只具有一个载波信元。
“中国通信标准化协会TC5-WG9-2005-065Q-多载波HSDPAIub接口修订”一文中提出的HS-DSCH TDD Information Response IE中有两个载波信元,如下表8中所示的ControlledFrequency IE和UARFCN IE,这两个载波信元指的都是分配给UE的HS-PDSCH所处载波的频点信息。当RNC收到的HS-DSCH TDD Information Response IE内所指的两个载波频点信息不一致时,将会给RNC带来不必要的错误处理的代价,也有可能导致HS-DSCH TDD Information Response IE所在的响应消息的失败。
表8 HS-DSCH TDD Information Response IE
IE/Group Name | Pre-sence | Range | IE Type &Reference | SemnanticsDescription | Criticality | AssignedCriticality |
HS-DSCH MAC-dFlow SpecificInformationResponse | 0..<maxnoofMACdFlows> | - | ||||
>HS-DSCH MAC-dFlow ID | M | 9.2.1.31I | - | |||
>Binding ID | O | 9.2.1.4 | - | |||
>Transport LayerAddress | O | 9.2.1.63 | - | |||
>HS-DSCH InitialCapacity Allocation | O | 9.2.1.31Ha | - | |||
HS-SCCH SpecificInformationResponse | 0..<maxNoOfHSSCCHcodes> | 不适用于1.28McpsTDD系统 | GLOBAL | reject | ||
>Time Slot | M | 9.2.3.23 | - | |||
>Midamble ShiftAnd Burst Type | M | 9.2.3.7 | - | |||
>TDD ChannelisationCode | M | 9.2.3.19 | - | |||
>HS-SICH Information | 1 | - | ||||
>>HS SICH ID | M | 9.2.3.5Gb | - | |||
>>Time Slot | M | 9.2.3.23 | - | |||
>>Midamble Shift AndBurst Type | M | 9.2.3.7 | - | |||
>>TDD ChannelisationCode | M | 9.2.3.19 | - | |||
HS-SCCH SpecificInformationResponse LCR perUARFCN | 0..<maxHSDPAFrequency> | 不适用于3.84 McpsTDD系统 | ||||
>HS-SCCH SpecificInformationResponse LCR | 1..<maxNoOfHSSCCHcodes> | GLOBAL | reject | |||
>>Time Slot LCR | M | 9.2.3.24A | - | |||
>>Midamble Shift LCR | M | 9.2.3.7A | - | |||
>>First TDDChannelisation Code | M | TDDChannelisation Code9.2.3.19 | - | |||
>>Second TDDChannelisation Code | M | TDDChannelisation Code9.2.3.19 | - |
>>HS-SICHInformation LCR | 1 | - | ||||
>>>HS SICH ID | M | 9.2.3.5Gb | ||||
>>>Time Slot LCR | M | 9.2.3.24A | - | |||
>>Midamble Shift LCR | M | 9.2.3.7A | - | |||
>>>TDDChannelisationCode | M | 9.2.3.19 | - | |||
>>ControiledFrequency | O | UARFCN9.2.1.65 | 采用多频率时适用于1.28McpsTDD系统该IE表示由HS-SCCH控制的频率. | - | ||
>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
HARQ MemoryPartitioning perUARFCN | 0..<maxHSDPAFrequency> | |||||
>CHOICE HARQMemory Partitioning | O | - | ||||
>>Implicit | - | |||||
>>>Number ofProcesses | M | INTEGER(1..8,...) | 对于HARQ进程ID,编号从0到进程个数减1,信道比特总数按照[18]中定义的规则在所有HARQ进程间平均划分。 | - | ||
>>Explicit | - | |||||
>>>HARQ MemoryPartitioningInfomation | 1..<maxnoofHARQprocesses> | 第一个HARQ进程参数实例标识为0,第二个标识为1,依次类推。 | - |
>>>>ProcessMemory Size | M | 9.2.1.49D | See[18] | - | ||
>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - |
因而,根据本发明的HSDPA资源管理方法,将上述的两个载波信元合为一个,这样就避免了上述问题的发生。对HS-DSCH TDD InformationResponse IE的修改如表9所示,表中灰色的区域中为经过修改的内容:
表9 HS-DSCH TDD Information Response IE
IE/Group Name | Pre-sence | Range | IE TypeReference | SemanticsDescriptioR | Criticality | AssignedCriticality |
HS-DSCH MAC-dFlow SpecificInformationResponse | 0..<maxnoofMACdFlows> | - | ||||
省略...... | ||||||
HS-SCCH SpecificInformationResponse | 0..<maxNoOfHSSCCHcodes> | 不适用于1.28McpsTDD系统 | GLOBAL | reject | ||
省略...... | ||||||
>>TDDChannelisation Code | M | 9.2.3.19 | - | |||
HS-SCCH SpecificInformationResponse LCR perUARFCN | 0..<maxHSDPAFrequency> | 不适用于3.84 McpsTDD系统 | ||||
>HS-SCCH SpecificInformationResponse LCR | 1..<maxNoOfHSSCCHcodes> | GLOBAL | reject | |||
>>Time Slot LCR | M | 9.2.3.24A | - | |||
>>Midamble ShiftLCR | M | 9.2.3.7A | - | |||
>>First TDDChannelisation Code | M | TDDChannelisation Code9.2.3.19 | - | |||
>>Second TDDChannelisation Code | M | TDDChannelisation Code9.2.3.19 | - | |||
>>HS-SICHInformation LCR | 1 | - | ||||
>>>HS SICH ID | M | 9.2.3.5Gb | ||||
>>>Time Slot LCR | M | 9.2.3.24A | - | |||
>>Midamble ShiftLCR | M | 9.2.3.7A | - | |||
>>>TDDChannelisation Code | M | 9.2.3.19 | - | |||
>>UARFCN | O | 9.2.1.65 | Nt,参见3GPP TS25.105仅适用于使用多载频的1.28McpsTDD系统 | - |
>ControlledFrequency | O | UARFCN9.2.1.65 | 采用多频率时适用于1.28McpsTDD系统该IE表示由HS-SCCH控制的频率. | - | ||
>CHOICE HARQMemory Partitioning | O | - | ||||
>>Implicit | - | |||||
>>>Number ofProcesses | M | INTEGER(1..8,...) | 对于HARQ进程ID,编号从0到进程个数减1,信道比特总数按照[18]中定义的规则在所有HARQ进程间平均划分。 | - | ||
>>Explicit | - | |||||
>>>HARQMemoryPartitioningInfomation | 1..<maxnoofHARQprocesses> | 第一个HARQ进程参数实例标识为0,第二个标识为1,依次类推。 | - | |||
>>>>ProcessMemory Size | M | 9.2.1.49D | See[18] | - |
在本发明的具体实施例6中,根据本发明提供的HSDPA资源的管理方法,当一个小区的能力和/或其资源操作状态发生改变时,Node B将使用Resource status indication消息或AUDIT RESPONSE消息向RNC报告,所述消息中的HS-DSCH Resources InformationIE中具有载波信息,从而使得Node B可以按载波向RNC报告HS-DSCH的资源操作状态。
对于AUDIT RESPONSE和RESOURCE STATUS INDICATION消息的修改,即增加载波信息,如表10、表11所示,表中灰色的区域中为经过修改的内容。
表10AUDIT RESPONSE
IE/Group Name | Pre-sence | Range | IE Type andReference | SemanticsDescription | Criticality | AssignedCriticality |
Message Discriminator | M | 9.2.1.45 | - | |||
省略...... | ||||||
Cell Information | 0..<maxCellinNodeB> | EACH | ignore | |||
>C-ID | M | 9.2.1.9 | - | |||
……Omitted…… | ||||||
>DwPCH Information | O | CommonPhysicalChannelStatusInformation9.2.1.13A | 仅适用于1.28McpsTDD系统 | YES | ignore | |
>HS-DSCHResourcesInformation | 0..<maxFrequencyinCell> | YES | ignore | |||
>>ResourceOperational State | M | 9.2.1.52 | - | |||
>>Availability Status | M | 9.2.1.2 | - | |||
>>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
CommunicationControl PortInformation | 0..<maxCCPinNodeB> | EACH | ignore | |||
省略...... |
Range Bound | Explanation |
省略...... | |
maxFPACHCell | Maximum number of FPACHs that can be defined in a Cell |
maxFrequencyinCell | Maximum number of Frequency that can be defined in a Cell |
表11RESOURCE STATUS INDICATION
IE/Group Name | Pre-sence | Range | IE TypeandReference | SemanticsDescription | Criticality | AssignedCriticality |
Message Discriminator | M | 9.2.1.45 | - | |||
Message Type | M | 9.2.1.46 | YES | ignore | ||
Transaction ID | M | 9.2.1.62 | - | |||
CHOICE IndicationType | M | YES | ignore | |||
>No Failure | - | |||||
>>Local CellInformation | 1..<max LocalCellinNodeB> | EACH | ignore | |||
省略...... | ||||||
>>>HSDPA Capability | O | 9.2.1.31Ga | YES | ignore | ||
>>Local Cell GroupInformation | 0..<maxLocalCellinNodeB> | EACH | ignore | |||
省略...... | ||||||
>Service Impacting | - | |||||
>>Local CellInformation | 0..<maxLocalCellinNodeB> | EACH | ignore | |||
>>>Local Cell ID | M | 9.2.1.38 | - | |||
省略...... | ||||||
>>>Reference ClockAvailability | O | 9.2.3.14A | TDD only | YES | ignore | |
>>>HSDPA Capability | O | 9.2.1.31Ga | YES | ignore | ||
>>Local Cell GroupInformation | 0..<maxLocalCellinNodeB> | EACH | ignore | |||
省略...... | ||||||
>>Cell Information | 0..<maxCellinNodeB> | EACH | ignore | |||
>>>C-ID | M | 9.2.1.9 | - | |||
>>>ResourceOperational State | O | 9.2.1.52 | - | |||
>>>Availability Status | O | 9.2.1.2 | - | |||
>>>DwPCH Information | O | CommonPhysicalChannelStatusInformation9.2.1.13A | 仅适用于1.28McpsTDD系统 | YES | ignore | |
>>>HS-DSCHResources | 0..<maxFrequency | YES | ignore |
Information | inCell> | |||||
>>>>ResourceOperational State | M | 9.2.1.52 | - | |||
>>>>Availability Status | M | 9.2.1.2 | - | |||
>>>>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>>Power Local CellGroup Information | 0..<maxLocalCellinNodeB> | EACH | ignore | |||
省略...... |
在本发明的具体实施例7中,根据本发明的HSDPA资源管理方法,在RADIO LINK ADDITION RESPONSE消息中增加HS-DSCH TDD InformationResponseIE,RADIO LINK ADDITION REQUEST消息中增加HS-DSCH TDDinformation IE,以在Node B内的小区间切换时同时建立专用信道和HSDPA相关资源。所述的HS-DSCH TDD Information Response IE可以根据现有技术而来,更好的作法是将所述的HS-DSCH TDD InformationResponse IE根据本发明的方法进行修改,使其修改后的内容中只具有一个载波信元。此外,还可在RADIO LINK ADDITION REQUEST消息中增加HS-DSCH-RNTIIE、HS-PDSCH RL ID IE,这样在Node B内的小区间切换时可以效率更高。
RADIO LINK ADDITION REQUEST消息以及RADIO LINK ADDITIONRESPONSE消息的修改如表12、表13所示,表中灰色的区域中为经过修改的内容。
表12RADIO LINK ADDITION REQUEST
IE/Group Name | Presence | Range | IE TyPe andReference | SemanticsDescription | Criticality | AssignedCriticality |
MessageDiscriminator | M | 9.2.1.45 | - | |||
省略...... | ||||||
RL Information | 1 | YES | reject | |||
省略...... | ||||||
>>UplinkSynchronisationFrequency | M | 9.2.3.26G | - | |||
HS-DSCH Information | O | HS-DSCHTDDInformation9.2.3.5F | YES | reject | ||
HS-DSCH-RNTI | C-InfoHSDSCH | 9.2.1.31J | YES | reject | ||
HS-PDSCH RL ID | C-InfoHSDSCH | RL ID 9.2.1.53 | YES | reject |
Range Bound | Explanation |
maxnoCCTrCH | Number of CCTrCH for one UE |
Condition | Explanation |
InfoHSDSCH | The IE shall be present if HS-DSCH Informnation IE is present. |
表13RADIO LINK ADDITION RESPONSE MESSAGE
IE/Group Name | Pre-sence | Range | IE Type andReference | SemanticsDescription | Criticality | AssignedCriticality |
MessageDiscriminator | M | 9.2.1.45 | - | |||
省略...... | ||||||
RL InformationResponse LCR | 0..1 | 1.28Mcps TDD系统必需,不适用于3.84McpsTDD系统 | YES | ignore | ||
省略...... | ||||||
>USCH InformationResponse | O | 9.2.3.29 | YES | ignore | ||
HS-DSCH InformationResponse | O | HS-DSCHTDDInformationResponse9.2.3.5G | YES | ignore |
在本发明的具体实施例8中,根据本发明的HSDPA资源管理方法,为了使HSDPA相关的测量基于小区内的各个载波,将Common MeasurementType IE和频点信息UARFCN IE配合。
如表14所示,表14中的Common Measurement Type IE包括HSDPA相关的公共测量:所有没有被HS-PDSCH和HS-SCCH所使用的码字的传输载波功率(Transmitted carrier power of all codes not used forHS-PDSCH or HS-SCCH transmission),HS-DSCH所需功率(HS-DSCHRequired Power),HS-DSCH提供的比特率(HS-DSCH Provided Bit Rate)。Common Measurement Type IE和频点信息UARFCN IE配合起来,表示HSDPA相关的公共测量是对于UARFCN IE所指示的载波上进行的,这使得关于HSDPA的测量可以基于小区内的各个载波,RNC易于判断哪个载波具有良好的HSDPA性能,有利于无线资源管理。例如准入控制、载波之间的负载平衡等等可以从基于载波的与HSDPA相关的公共测量中获益。
表14 COMMON MEASUREMENT INITIATION REQUEST
IE/Group Name | Pre-sence | Range | IE Type andReference | SemanticsDescription | Criticality | AssignedCriticality |
Message Discriminator | M | 9.2.1.45 | - | |||
省略...... | ||||||
CHOICE CommonMeasurement ObjectType | M | YES | reject | |||
>Cell | - | |||||
>>C-ID | M | 9.2.1.9 | - | |||
省略...... | ||||||
>>>>>>NeighbouringTDD CellMeasurementInformation LCR | M | 9.2.1.47E | YES | reject | ||
>>UARFCN | O | 9.2.1.65 | Nt,参见3GPPTS 25.105仅适用于使用多载频的1.28McpsTDD系统 | - | ||
>RACH | FDD only | - | ||||
省略...... | ||||||
CommonMeasurementType | M | 9.2.1.11 | YES | reject | ||
省略...... |
上述实施例是用于说明和解释本发明的原理的。可以理解,本发明的具体实施方式不限于此。对于本领域技术人员而言,在不脱离本发明的实质和范围的前提下可进行各种变更和修改。
Claims (14)
1、多载波TD-SCDMA系统中的HSDPA资源管理方法,其特征在于,RNC为小区配置或重配置HSDPA相关资源的过程包括步骤:
A.RNC向Node B发送一条HSDPA资源的配置请求消息,所述请求消息中指示了需要进行配置的载波信息;
B.Node B根据其收到的所述请求消息进行HSDPA相关资源的配置;
C.Node B向RNC发送一条HSDPA资源的配置响应消息,所述响应消息中指示了配置失败的载波信息。
2、如权利要求1所述的HSDPA资源管理方法,其特征在于,
在步骤B中,若HSDPA相关资源的配置全部成功,Node B建立/重配/删除所有指示载波上的HSDPA相关资源。
3.如权利要求1所述的HSDPA资源管理方法,其特征在于,
在步骤B中,若HSDPA相关资源的配置部分成功,Node B建立/重配/删除其所支持载波上的HSDPA相关资源。
4.如权利要求1所述的HSDPA资源管理方法,其特征在于,
在步骤C中,所述响应消息中还指示了配置失败的原因。
5.如权利要求4所述的HSDPA资源管理方法,其特征在于,
所指示的失败原因为一个通用的原因值或一个特定的原因值。
6.如权利要求1所述的HSDPA资源管理方法,其特征在于,
使用明示或暗示的方式指示载波信息。
7.如权利要求1所述的HSDPA资源管理方法,其特征在于,
所述的请求消息为物理共享信道重配置请求消息。
8.如权利要求1所述的HSDPA资源管理方法,其特征在于,
所述的响应消息为物理共享信道重配置响应消息或物理共享信道重配置失败消息。
9.多载波TD-SCDMA系统中的HSDPA资源管理方法,其特征在于,当RNC决定需要为UE分配相关的HSDPA资源时,包括步骤:
RNC向Node B发出一条请求消息,要求Node B分配HSDPA资源;
Node B根据该请求进行HSDPA资源分配,并通过相应的响应消息告知RNC,在该响应消息中通过一个载波信元来指示相应载波上HS-PDSCH资源分配情况。
10.多载波TD-SCDMA系统中的HSDPA资源管理方法,其特征在于,当Node B向RNC报告一个小区的能力和/或资源操作状态的改变时,包括步骤:
Node B向RNC发送Resource status indication消息或AUDITRESPONSE消息,所述消息中的HS-DSCH Resources Information IE中具有载波信息。
11.多载波TD-SCDMA系统中的HSDPA资源管理方法,其特征在于,在进行Node B内的小区间切换时,包括步骤:
RNC向Node B发送RADIO LINK ADDITION REQUEST消息,该消息中存在HS-DSCH TDD Information IE;
Node B接收所述消息,向RNC发送RADIO LINK ADDITION RESPONSE消息,该消息中存在HS-DSCH TDD Information Response IE。
12.如权利要求11所述的HSDPA资源的管理方法,其特征在于,RADIOLINK ADDITION REQUEST消息中还存在HS-DSCH-RNTI IE、HS-PDSCH RL IDIE。
13.多载波TD-SCDMA系统中的HSDPA资源管理方法,其特征在于,当进行HSDPA相关的公共测量时,在RNC向Node B发送的Commonmeasurement initiation request消息中,将Common Measurement TypeIE和频点信息UARFCN IE相关联。
14.如权利要求13所述的HSDPA资源的管理方法,其特征在于,所述HSDPA相关的公共测量包括:所有未被HS-PDSCH或HS-SCCH使用的码字的传输载波功率,HS-DSCH所需功率,HS-DSCH提供的比特率。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610055132XA CN100488286C (zh) | 2006-02-23 | 2006-02-23 | 多载波td-scdma系统中的hsdpa资源管理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610055132XA CN100488286C (zh) | 2006-02-23 | 2006-02-23 | 多载波td-scdma系统中的hsdpa资源管理方法 |
Related Child Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110326157XA Division CN102404803A (zh) | 2006-02-23 | 2006-02-23 | 多载波td-scdma系统中的hsdpa资源管理方法 |
CN2011103254241A Division CN102612144A (zh) | 2006-02-23 | 2006-02-23 | 多载波td-scdma系统中的hsdpa资源管理方法 |
CN200910203717A Division CN101626600A (zh) | 2006-02-23 | 2006-02-23 | 多载波td-scdma系统中的hsdpa资源管理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101026867A true CN101026867A (zh) | 2007-08-29 |
CN100488286C CN100488286C (zh) | 2009-05-13 |
Family
ID=38744669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200610055132XA Expired - Fee Related CN100488286C (zh) | 2006-02-23 | 2006-02-23 | 多载波td-scdma系统中的hsdpa资源管理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100488286C (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009049543A1 (fr) * | 2007-10-10 | 2009-04-23 | Beijing Xinwei Telecom Technology Inc. | Procédé et système associé pour la reconfiguration du canal de service dans un système de communication sans fil |
WO2009105933A1 (zh) * | 2008-02-25 | 2009-09-03 | 中兴通讯股份有限公司 | 一种多载波系统中确认时延的配置装置及方法 |
WO2009117942A1 (zh) * | 2008-03-24 | 2009-10-01 | 华为技术有限公司 | 一种资源分配方法、装置 |
CN101547510B (zh) * | 2008-03-25 | 2010-08-25 | 鼎桥通信技术有限公司 | 一种资源分配方法及系统 |
CN101925075A (zh) * | 2010-08-27 | 2010-12-22 | 新邮通信设备有限公司 | 一种基站控制消息发送方法 |
CN101562855B (zh) * | 2008-04-14 | 2011-04-06 | 华为技术有限公司 | 一种处理无线链路增加流程的方法、设备及系统 |
CN102088430A (zh) * | 2009-12-03 | 2011-06-08 | 华为技术有限公司 | 一种多载波配置方法、基站和用户设备 |
CN101499962B (zh) * | 2008-01-29 | 2011-09-28 | 鼎桥通信技术有限公司 | 一种获取分组域信道状态的方法及系统 |
CN102480790A (zh) * | 2010-11-29 | 2012-05-30 | 鼎桥通信技术有限公司 | 载波资源配置方法、装置及基站 |
CN102821419A (zh) * | 2012-08-23 | 2012-12-12 | 西安科技大学 | 一种hsdpa系统中无线资源管理的接纳控制算法 |
CN103828462A (zh) * | 2012-09-26 | 2014-05-28 | 华为技术有限公司 | 资源泄漏的修复的请求及修复方法、资源请求及提供设备 |
CN101400127B (zh) * | 2007-09-26 | 2014-05-28 | 电信科学技术研究院 | 实现调度测量的方法及系统 |
CN101822013B (zh) * | 2007-10-10 | 2017-03-15 | 高通股份有限公司 | 用于通信系统的高效系统识别方案 |
-
2006
- 2006-02-23 CN CNB200610055132XA patent/CN100488286C/zh not_active Expired - Fee Related
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101400127B (zh) * | 2007-09-26 | 2014-05-28 | 电信科学技术研究院 | 实现调度测量的方法及系统 |
WO2009049543A1 (fr) * | 2007-10-10 | 2009-04-23 | Beijing Xinwei Telecom Technology Inc. | Procédé et système associé pour la reconfiguration du canal de service dans un système de communication sans fil |
CN101822013B (zh) * | 2007-10-10 | 2017-03-15 | 高通股份有限公司 | 用于通信系统的高效系统识别方案 |
US8306545B2 (en) | 2007-10-10 | 2012-11-06 | Beijing Xinwei Telecom Technology Inc. | Method and system for reassigning traffic channel configuration in wireless communication system |
CN101499962B (zh) * | 2008-01-29 | 2011-09-28 | 鼎桥通信技术有限公司 | 一种获取分组域信道状态的方法及系统 |
WO2009105933A1 (zh) * | 2008-02-25 | 2009-09-03 | 中兴通讯股份有限公司 | 一种多载波系统中确认时延的配置装置及方法 |
CN101953212B (zh) * | 2008-02-25 | 2012-11-14 | 中兴通讯股份有限公司 | 一种多载波系统中确认时延的配置装置及方法 |
WO2009117942A1 (zh) * | 2008-03-24 | 2009-10-01 | 华为技术有限公司 | 一种资源分配方法、装置 |
CN101547510B (zh) * | 2008-03-25 | 2010-08-25 | 鼎桥通信技术有限公司 | 一种资源分配方法及系统 |
CN101562855B (zh) * | 2008-04-14 | 2011-04-06 | 华为技术有限公司 | 一种处理无线链路增加流程的方法、设备及系统 |
CN102088430A (zh) * | 2009-12-03 | 2011-06-08 | 华为技术有限公司 | 一种多载波配置方法、基站和用户设备 |
CN101925075B (zh) * | 2010-08-27 | 2013-05-22 | 新邮通信设备有限公司 | 一种基站控制消息发送方法 |
CN101925075A (zh) * | 2010-08-27 | 2010-12-22 | 新邮通信设备有限公司 | 一种基站控制消息发送方法 |
CN102480790A (zh) * | 2010-11-29 | 2012-05-30 | 鼎桥通信技术有限公司 | 载波资源配置方法、装置及基站 |
CN102480790B (zh) * | 2010-11-29 | 2014-08-13 | 鼎桥通信技术有限公司 | 载波资源配置方法、装置及基站 |
CN102821419A (zh) * | 2012-08-23 | 2012-12-12 | 西安科技大学 | 一种hsdpa系统中无线资源管理的接纳控制算法 |
CN103828462A (zh) * | 2012-09-26 | 2014-05-28 | 华为技术有限公司 | 资源泄漏的修复的请求及修复方法、资源请求及提供设备 |
CN103828462B (zh) * | 2012-09-26 | 2018-01-16 | 华为技术有限公司 | 资源泄漏的修复的请求及修复方法、资源请求及提供设备 |
Also Published As
Publication number | Publication date |
---|---|
CN100488286C (zh) | 2009-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100488286C (zh) | 多载波td-scdma系统中的hsdpa资源管理方法 | |
KR101256155B1 (ko) | 시분할-동기식 코드 분할 다중 접속 시스템의 다중 캐리어고속 하향 패킷 접속 구현 방법 | |
KR101162456B1 (ko) | 통신 시스템에서 tdd 동작을 위한 방법, 기지국, 및 이동국 | |
CN101127556B (zh) | 一种载波资源的动态调度方法 | |
CN101345988A (zh) | 多载波系统的资源分配方法及装置 | |
CN102067697B (zh) | 用于在移动通信网络中减小干扰的方法和设备 | |
CN100393173C (zh) | Td-scdma系统中多载波小区配置高速下行共享信道的方法 | |
CN100518042C (zh) | 基于多载波高速下行分组接入系统的载波资源处理方法 | |
CN104270765A (zh) | 基站节点资源分配方法及系统、设备 | |
CN101547515A (zh) | 一种资源分配方法、装置及通信系统 | |
CN101167264B (zh) | 用于在通信网络中分配功率的方法和装置 | |
CN102143498A (zh) | 多制式联合通信的方法、系统及无线网络控制设备 | |
CN101374328B (zh) | 一种资源配置方法和装置 | |
CN101646198A (zh) | LTE-Advanced系统下行链路的实现方法、基站和用户设备 | |
KR20050046307A (ko) | 이동통신시스템에서 고속 패킷 데이터 서비스를 위한자원관리 방법 | |
CN100442925C (zh) | 多载频系统无线网络控制器间终端载频信息交互的方法 | |
CN100547951C (zh) | Td-scdma系统中的物理信道配置和信令传输方法 | |
CN101094166B (zh) | 一种为多载波高速下行分组接入分配无线资源的方法 | |
CN100407703C (zh) | 多频点td-scdma系统中高速下行分组业务的实现方法 | |
CN101442779A (zh) | 一种更新载频资源的方法、装置及系统 | |
CN100359982C (zh) | 多载频小区系统中共享信道的配置及使用方法 | |
CN100426697C (zh) | 多载频小区中下行链路功率控制方法 | |
CN102196541B (zh) | 实现多载波增强上行接入功率共享管理的方法及系统 | |
CN101626600A (zh) | 多载波td-scdma系统中的hsdpa资源管理方法 | |
CN101521940B (zh) | 一种用户设备上报能力等级及信道资源分配的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090513 Termination date: 20160223 |