CN101008329B - 高炉煤气余压透平发电装置入口压力的控制方法 - Google Patents

高炉煤气余压透平发电装置入口压力的控制方法 Download PDF

Info

Publication number
CN101008329B
CN101008329B CN200610135174A CN200610135174A CN101008329B CN 101008329 B CN101008329 B CN 101008329B CN 200610135174 A CN200610135174 A CN 200610135174A CN 200610135174 A CN200610135174 A CN 200610135174A CN 101008329 B CN101008329 B CN 101008329B
Authority
CN
China
Prior art keywords
pressure
gas pressure
value
turbine generator
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200610135174A
Other languages
English (en)
Other versions
CN101008329A (zh
Inventor
高守龙
黎光
刘俊
李广忠
崔晓峰
吴林辉
马广强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Benxi Iron & Steel (group) Co Ltd
Original Assignee
Benxi Iron & Steel (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Benxi Iron & Steel (group) Co Ltd filed Critical Benxi Iron & Steel (group) Co Ltd
Priority to CN200610135174A priority Critical patent/CN101008329B/zh
Publication of CN101008329A publication Critical patent/CN101008329A/zh
Application granted granted Critical
Publication of CN101008329B publication Critical patent/CN101008329B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

本发明涉及一种高炉煤气余压透平发电装置入口压力的控制方法,该控制方法包括检测出高炉炉顶煤气压力值和洗涤器输出的煤气压力值,以及透平发电装置入口煤气压力的步骤,并将检测的煤气压力值输入输入到可编程序控制器内的步骤,再通过转速调节器随机调整静叶角度,以使透平发电装置入口煤气压力的检测值等于或近似于所述煤气压力的设定值。该种控制方式可以快速地消除高炉炉顶煤气压力的波动,而可保证TRT满负荷发电,能提高发电量50%,直接效益可增加100多万元/台。

Description

高炉煤气余压透平发电装置入口压力的控制方法
技术领域:
本发明涉及一种高炉煤气余压透平发电装置入口压力的控制方法。
背景技术:
高炉煤气余压透平发电装置简称为“TRT”,它是将原来减压阀组中损失的高炉煤气的能量经过透平膨胀做功带动发电机组发电的一种装置。从高炉输出的煤气通常需要经过旋风除尘器和洗涤器,以及旋流脱水器等部件后,再经过两条并联的管路输入给TRT。所述洗涤器通常是由环缝式洗涤器构成,当高炉煤气进入该洗涤器后,通过液压装置调整环缝大小的方式来调整洗涤器的输出压力,即在洗涤器中环缝的输入端和输出端之间存在着一个压力差,在通常情况下,该压力差值是一个恒定值。在TRT内设置有由轴限定的并用旋转角度来调整进入TRT内煤气量的静叶,而静叶旋转动作由可编程序控制器作为程序判定单元,并对转速调节器发出指令信号。
在现有技术中,TRT在正常工作时,用压力传感器直接检测高炉炉顶煤气压力并将其压力值作为设定值输入到可编程序控制器内,而通过压力传感器检测出的TRT入口压力作为检测值并反馈到可编程序控制器内,且通过可编程序控制器计算出设定值与检测值之间的压力差输送给转速调节器,使转速调节器能够随机地调整静叶角度,让TRT入口压力的检测值等于高炉炉顶的压力值。由此可见,高炉炉顶煤气压力是由TRT在工作时控制的,即静叶转动的角度是由高炉炉的压力来决定。但,由于高炉炉顶压力在设定值的范围内波动频率相当大,特别是高炉每8分钟就需要布料一次,且在布料时,炉顶压力的波动幅度和频率均会增加,而高炉与TRT之间的距离至少是洗涤器与TRT之间距离的两倍,TRT在接受到高炉炉顶压力波动的信号时,至少要比接收到洗涤器输出端压力信号滞后一段时间,所以,利用TRT直接调整高炉炉顶压力是滞后的,而不能及时调整高炉炉顶压力会影响高炉的正常生产。就TRT的发电量与高炉生产相比较而言,TRT是处于从属地位,当高炉炉顶压力波动而影响其正常生产时,TRT会被迫停机,此时,高炉输出的带压煤气会经过旁通管路直接进入储气部件中,这不仅浪费了高炉煤气资源,而且还降低发电量,同时因TRT频繁关闭而影响其使用寿命。
发明内容:
本发明的任务是提供一种利用控制洗涤器输出压力的方式来控制高炉炉顶压力的高炉煤气余压透平发电装置入口压力的控制方法。
本发明所提出的高炉煤气余压透平发电装置入口压力的控制方法包括以下步骤:通过压力传感器分别检测出高炉炉顶煤气压力值和洗涤器输出的煤气压力值,并将洗涤器输出的煤气压力值作为煤气压力的设定值输入到可编程序控制器内;然后通过压力传感器检测出透平发电装置入口煤气压力作为检测值并反馈到可编程序控制器内;再通过可编程序控制器计算出设定值与检测值之间的压力差值并输送给转速调节器,转速调节器根据接收的压力差值随机调整静叶角度,以使透平发电装置入口煤气压力的检测值等于或近似于所述煤气压力的设定值.
所述高炉炉顶输出的煤气压力值是在设定一个固定值的范围内随机波动的,而洗涤器的输入和输出的煤气压力通常设置为一个稳定的压力差,故所述煤气压力设定值是动态的设定值。TRT的煤气入口压力虽然是随着设定值的波动而波动,但,其在波动的同时会消除高炉炉顶煤气压力的波动,促使炉顶煤气压力趋于稳定。
本发明所提出的高炉煤气余压透平发电装置入口压力的控制方法采用洗涤器输出端煤气压力的设定值作为控制TRT输入端的压力,而洗涤器相距离TRT较近,TRT的响应速度相对较快,所以,该种控制方式可以快速地消除高炉炉顶煤气压力的波动,即便在高炉布料时,高炉炉顶的煤气压力波动也可控制在5Kpa之内;同时因为高炉炉顶煤气压力波动范围可以控制,所以,不会出现高炉煤气经旁通阀组直接流失的现象,进而可保证TRT满负荷发电,经过多次检测表明,采用该控制方法可提高发电量50%,每一台TRT年多发电2000万KW.h/台,直接效益可增加100多万元/台。
附图说明:
附图1是本发明所提出的高炉煤气余压透平发电装置入口压力的控制方法中一个实施例的逻辑框图。
具体实施方式:
参见图1,该图给出TRT入口压力的控制方法中一个实施例的逻辑框图。该控制方法涉及到高炉炉顶煤气压力P1、洗涤器输入和输出的煤气压力差值ΔP、可编程序控制器PLC、转速调节器PID及静叶这几个部分。
本实施例中所述的洗涤器是采用环缝式洗涤器,该种结构的洗涤器具有一个类似于文丘里管的口部,在该口部的下方安装有由液压装置控制的杆,在该杆部的顶端安装有可堵住文丘里管口部的头部。当杆向下方向拉动头部时,即可调整头部与文丘里管口部的间距,从而可调整洗涤器的输入与输出之间的煤气压力,所以,两者之间的煤气压力差基本上恒定值,并将该恒定值设置为ΔP。
首先采用压力传感器分别检测出高炉炉顶煤气压力值P1和洗涤器输出煤气压力值,洗涤器输入端和输出端所产生的煤气压力差设为ΔP,并将洗涤器输出的煤气压力值设置为P2,故P2=P1-ΔP,将P2作为煤气压力的设定值输入到可编程序控制器PLC内,然后采用压力传感器检测出TRT入口煤气压力作为检测值P,并将检测值P反馈到可编程序控制器PLC内,由可编程序控制器PLC比较设定值P2与检测值P的大小:当P与P2的数值相同时,由转速调节器PID直接将检测值P直接输入到TRT的入口;当P与P1之间存在着差值,将该差值并输送给转速调节器PID,由转速调节器PID根据接收的压力差值的大小随机调整静叶角度,以使TRT入口的煤气压力的检测值P等于或近似于设定值P2,从而达到利用TRT调整P1的目的。

Claims (1)

1.高炉煤气余透平发电装置入口压力的控制方法,其特征在于包括以下步骤:
通过压力传感器分别检测出高炉炉顶煤气压力值和洗涤器输出的煤气压力值,并将洗涤器输出的煤气压力值作为煤气压力的设定值输入到可编程序控制器内;
然后通过压力传感器检测出透平发电装置入口煤气压力作为检测值并反馈到可编程序控制器内;
再通过可编程序控制器计算出设定值与检测值之间的压力差值并输送给转速调节器,转速调节器根据接收的压力差值随机调整静叶角度,以使透平发电装置入口煤气压力的检测值等于或近似于所述煤气压力的设定值。
CN200610135174A 2006-12-29 2006-12-29 高炉煤气余压透平发电装置入口压力的控制方法 Expired - Fee Related CN101008329B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610135174A CN101008329B (zh) 2006-12-29 2006-12-29 高炉煤气余压透平发电装置入口压力的控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610135174A CN101008329B (zh) 2006-12-29 2006-12-29 高炉煤气余压透平发电装置入口压力的控制方法

Publications (2)

Publication Number Publication Date
CN101008329A CN101008329A (zh) 2007-08-01
CN101008329B true CN101008329B (zh) 2010-05-12

Family

ID=38696947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610135174A Expired - Fee Related CN101008329B (zh) 2006-12-29 2006-12-29 高炉煤气余压透平发电装置入口压力的控制方法

Country Status (1)

Country Link
CN (1) CN101008329B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107491107A (zh) * 2017-09-29 2017-12-19 四川德胜集团钒钛有限公司 一种压力自动控制系统及其在钢厂中的应用
CN116144408A (zh) * 2023-03-17 2023-05-23 北京铝能清新环境技术有限公司 一种高炉煤气干法除尘后分级净化精脱硫系统及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067557A (en) * 1976-07-02 1978-01-10 Kawasaki Jukogyo Kabushiki Kaisha System for changing over of blast furnace top pressure control
US4461142A (en) * 1981-04-15 1984-07-24 Kawasaki Jukogyo Kabushiki Kaisha Method of recovery of excess gas energy of blast furnace gas
CN1528917A (zh) * 2003-10-10 2004-09-15 陕西鼓风机(集团)有限公司 高炉煤气余压发电装置的高炉顶压稳定性自动控制方法
CN1676615A (zh) * 2005-04-13 2005-10-05 浙江大学 一种基于阻力系数等效的炉顶压力控制方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067557A (en) * 1976-07-02 1978-01-10 Kawasaki Jukogyo Kabushiki Kaisha System for changing over of blast furnace top pressure control
US4461142A (en) * 1981-04-15 1984-07-24 Kawasaki Jukogyo Kabushiki Kaisha Method of recovery of excess gas energy of blast furnace gas
CN1528917A (zh) * 2003-10-10 2004-09-15 陕西鼓风机(集团)有限公司 高炉煤气余压发电装置的高炉顶压稳定性自动控制方法
CN1676615A (zh) * 2005-04-13 2005-10-05 浙江大学 一种基于阻力系数等效的炉顶压力控制方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
JP昭54-144508A 1979.11.10
JP昭55-134114A 1980.10.18
JP昭60-62605A 1985.04.10
JP昭64-11918A 1989.01.17

Also Published As

Publication number Publication date
CN101008329A (zh) 2007-08-01

Similar Documents

Publication Publication Date Title
CN101126352B (zh) 用于燃气轮机控制的系统及其方法
US7818973B2 (en) Air-conditioning system and method of installing energy recovery apparatus
CN106089326B (zh) 干熄焦余热回收蒸汽发电汽轮机进、排汽控制方法
US6301895B1 (en) Method for closed-loop output control of a steam power plant, and steam power plant
EP0320718B1 (en) Variable speed pumping-up system
GB2467011A (en) Wave energy power take off control system
CN101623667A (zh) 磨机负荷自动控制方法及系统
CN101008329B (zh) 高炉煤气余压透平发电装置入口压力的控制方法
CN1879275A (zh) 运行或者调整风力发电设备的方法以及用风力发电设备提供初始调整功率的方法
CN104932566A (zh) 一种提高单元发电机组锅炉快速调整能力的控制系统及方法
CN114609902A (zh) 一种基于agc指令状态变化判断的燃煤机组变速率负荷控制方法及装置
CN113107828B (zh) 一种适用于火电厂凝结水泵的节能控制策略
US11231006B2 (en) Method for stabilizing the rotation speed of a hydraulic machine with S-characteristics and installation for converting hydraulic energy into electrical energy
JP4528693B2 (ja) 蒸気タービン発電プラントとその制御方法
CN107606257B (zh) 一种多功能全自动减压阀及其控制方法
JP3439112B2 (ja) 粉砕機の制御装置
CN114649818B (zh) 提升供热机组一次调频品质的方法、系统、终端及介质
CN110848727B (zh) 一种提高锅炉负荷响应速率的调节方法
CN108438911B (zh) 一种补风压力窜级调节系统
KR20130093511A (ko) 터빈을 위한 사전 경고 시스템 및 방법
JPH08338602A (ja) ボイラ制御装置
CN101105238A (zh) 大流量煤气压力调节阀
JP6004533B2 (ja) 蒸気タービンプラント
CN101008330B (zh) 高炉煤气余压透平发电装置的启动方法
CN113050411A (zh) 一种深度调峰时汽轮机主控辅助调压控制系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20101229