CN100564757C - Steel wire stretching terminal equipment - Google Patents
Steel wire stretching terminal equipment Download PDFInfo
- Publication number
- CN100564757C CN100564757C CNB2006100535191A CN200610053519A CN100564757C CN 100564757 C CN100564757 C CN 100564757C CN B2006100535191 A CNB2006100535191 A CN B2006100535191A CN 200610053519 A CN200610053519 A CN 200610053519A CN 100564757 C CN100564757 C CN 100564757C
- Authority
- CN
- China
- Prior art keywords
- steel wire
- base
- wedge bar
- folding wedge
- ripple
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
A kind of steel wire stretching terminal equipment, comprise base, folding wedge bar, weldering plate, regulate nut, adjusting washer (disk), ripple seat, bellows covers, the double skewed slots coupling of folding wedge bar and base, there is screw thread the upper end of this folding wedge bar, cooperate with the adjusting nut, by the lower end alignment pin is arranged, the through hole that runs through is arranged on to minute face center line, promptly become two semicylindrical openings that are used for clamping steel wire separately the time at the folding wedge bar; In base the first half double skewed slots is arranged, be used for wedging folding wedge bar, two screws are arranged, the ripple folder that ripple seat that can load and unload at any time and bellows covers are formed in this base the latter half; There is step lower end at the ripple seat, fastens the lower end of base.Its advantage: when fastening steel wire, first road clamps with two semicylindrical openings of linearity, and clamp force distribution is even, do not hinder steel wire, when the second road add-on security clamps, bear the part tensile force yet, clamp bending so exempt routine, twine with cutting pliers, pincers wound and stress are concentrated to some extent; Use turnbuckle, dynamometer easily, easy to use.
Description
Technical field
The invention belongs to a kind of steel wire stretching terminal equipment of solar energy utilization innovation building aspect.
Background technology
The solar energy of prior art utilizes glass architecture, curtain wall, the daylighting top of aspect, the beam that the usefulness that has is traditional, wiping, rafter, and the stainless steel structure part that the consumption that has is a large amount of involves great expense, and the sunlight that more obviously lacks is blocked more by structural member itself.
Summary of the invention
The invention provides a kind of solar energy flat glass house novel structure, the innovation curtain wall needs to use steel wire stretching terminal equipment, and is inhomogeneous with the clamp force distribution that the solution prior art exists, and is difficult for using turnbuckle, ergographic problem.
Technical scheme of the present invention is: comprise base, folding wedge bar, weldering plate, regulate nut, adjusting washer (disk), ripple seat, bellows covers, the double skewed slots coupling of folding wedge bar and base, there is screw thread the upper end of this folding wedge bar, cooperate with the adjusting nut, by the lower end alignment pin is arranged, the through hole that runs through being arranged at the folding wedge bar on to minute face center line, promptly become two semicylindrical openings separately the time, is to be used for clamping the fastening purpose of steel wire; In base the first half double skewed slots is arranged, be used for wedging folding wedge bar, two screws are arranged, the ripple folder that ripple seat that can load and unload at any time and bellows covers are formed in this base the latter half; There is step lower end at the ripple seat, fastens the lower end of base.
Advantage of the present invention: when 1, fastening steel wire, first road clamps with two semicylindrical openings of linearity, and clamp force distribution is even, do not hinder steel wire, when the second road add-on security clamps, bear the part tensile force yet, clamp bending so exempt routine, twine with cutting pliers, pincers wound and stress are concentrated to some extent; 2, use turnbuckle, dynamometer easily, easy to use.
Description of drawings
Fig. 1 is a steel wire stretching terminal equipment stereogram full figure.
Fig. 2 is the base stereogram of steel wire stretching terminal equipment.
Fig. 3 is folding wedge bar (separated position) stereogram of steel wire stretching terminal equipment.
Fig. 4 is ripple folder (separated position) stereogram of steel wire stretching terminal equipment.
Fig. 5 is the adjusting nut 3 of steel wire stretching terminal equipment and the combined two-dimension figure of sleeve pipe 3b, skirt P.
The specific embodiment
Steel wire stretching terminal equipment of the present invention, Fig. 1 comprise base 1, and folding wedge bar 2 is regulated nut 3, adjusting washer (disk) 4, ripple seat 21, bellows covers 22.Fig. 2 is the first half of base 1, and double skewed slots 1a is arranged, and there are 2 screw 1b the lower end.Fig. 3 is a folding wedge bar 2, and upward (little) end is shaped on and splits screw thread 2b, and in order to the adjusting nut 3 and the adjusting washer (disk) 4 of match map 1, (Fig. 3) coaxial with splitting the axis of thread splits cylindrical hole 2a, runs through the folding wedge bar 2 of total length, and there are 2 pieces of alignment pin 2c the lower end.Fig. 4 ripple seat 21, coupling part bellows covers 22, run through bellows covers 22, ripple seat 21 with 2 pieces of soket head cap screws 23 after, can be fastened with 2 screw 1b of Fig. 2.Fig. 5 regulates nut 3, and its axis upper end has aperture 3a to connect, its internal thread be figure 3 split screw thread 2b, the sleeve pipe 3b of Fig. 5 and the upper end of regulating nut 3 and skirt P are movingly.
The function of steel wire stretching terminal equipment: the connecting firmly of terminal organ and building structure, available welding, bolt, step are buckled ways such as retaining, and the T with T section lives with standpipe A weldering this illustration 1 at the back side of terminal organ, and its front is with weldering plate 5 and inclined tube B weldering firmly.Splitting on the screw thread 2b of Fig. 1.Put adjusting washer (disk) 4, screw in nut 3, when nut does not screw, folding wedge bar 2 split both sides also not by double skewed slots 1a wedging, the cylindrical hole 2a that splits of Fig. 3 has a releasing orientation, can allow the stretching wire that will tighten up pass through easily.This moment Fig. 5 skirt P (outer parcel received), and sleeve pipe 3b penetrates steel wire, one direct puncture (can upwards move sleeve pipe 3b in skirt P outside to hole 3a, on contracting, conveniently wear steel wire), be easy to enter the aperture (Fig. 3) of the upper end 2a of folding wedge bar 2 through the steel wire of via hole 3a, the center hole of this original thread cutting in aperture, 60 ° of cone ports are arranged, so steel wire can pass the lower end of folding wedge bar quickly, with turnbuckle, dynamometer connects (ripple seat 21, bellows covers 22 is not all loaded onto), when steel wire reaches the tensile force design load, just screw nut 3, make folding wedge bar 2 rising (Fig. 1, Fig. 5, Fig. 3), and in the 1a of Fig. 2 double skewed slots, be subjected to wedge action and clamp the steel wire that penetrates, reach fastening.Then the ripple seat 21 of Fig. 4 is moved up between the bottom vertical plane of the base 1 of Fig. 2 and steel wire, till step 21b (Fig. 4, Fig. 1) hooks, cover bellows covers 22 again outside steel wire, penetrate 2 pieces of screws 23, by counterbore 22a, through hole 21a, 2 screw 1b of screw-in Fig. 2; When screw 23 screws in, also roll steel wire curved gradually and be subjected to tensile force, the turnbuckle below this moment is loosening up to head of screw sink to fully counterbore fastening after, separate turnbuckle, dynamometer, and cut unnecessary steel wire below the ripple folder.
At last sleeve pipe 3b toward moving down, be enclosed within the upper end of regulating nut 3, seal the upper and lower opening of sleeve pipe 3b with structural silicone adhesive or weather-resistant glue.
Fig. 2, Fig. 4 (except that screw) available 304,306 (island and other places should use 306L) stainless steel precision casting or line cutting processing.Fig. 3 can once finish inclined-plane, the left and right sides with the line cutting again with the quadratic prism body earlier with Double Tops point thread cutting, and the front and back parallel surface severs that centre bore also is slit into simultaneously when cracking.
Can be welded with plate 5 for bigger double skewed slots 1a notch is outer.The screw thread of folding wedge bar 2 upper ends, less screw thread available standards coarse thread triangle tooth form, bigger screw thread is then used trapezoidal thread.
Claims (1)
1, a kind of steel wire stretching terminal equipment, comprise base, folding wedge bar, weldering plate, regulate nut, adjusting washer (disk), ripple seat, bellows covers, the double skewed slots coupling of folding wedge bar and base, there is screw thread the upper end of this folding wedge bar, with regulate nut and cooperate, by the lower end alignment pin is arranged, the through hole that runs through is arranged at the folding wedge bar on to minute face center line, becoming two semicylindrical openings when promptly separating, is to be used for clamping the fastening purpose of steel wire; In base the first half double skewed slots is arranged, be used for wedging folding wedge bar, two screws are arranged, the ripple folder that ripple seat that can load and unload at any time and bellows covers are formed in this base the latter half; There is step lower end at the ripple seat, fastens the lower end of base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100535191A CN100564757C (en) | 2006-09-21 | 2006-09-21 | Steel wire stretching terminal equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100535191A CN100564757C (en) | 2006-09-21 | 2006-09-21 | Steel wire stretching terminal equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101148929A CN101148929A (en) | 2008-03-26 |
CN100564757C true CN100564757C (en) | 2009-12-02 |
Family
ID=39249613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100535191A Expired - Fee Related CN100564757C (en) | 2006-09-21 | 2006-09-21 | Steel wire stretching terminal equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100564757C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102626909A (en) * | 2012-04-10 | 2012-08-08 | 青岛理工大学 | Rapid clamping device for tubular objects, use method and application thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115762964B (en) * | 2022-11-28 | 2023-05-09 | 杭州银湖电气设备有限公司 | Integrated cabinet body with high protection level for dry type magnetic control reactor |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0771593B1 (en) * | 1995-10-30 | 2001-12-12 | DYCKERHOFF & WIDMANN AG | Method and device for uncovering and cleaning steel wire strands |
CN1664265A (en) * | 2004-03-04 | 2005-09-07 | 万国强 | Secondary tensile prestressed anchorage |
-
2006
- 2006-09-21 CN CNB2006100535191A patent/CN100564757C/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0771593B1 (en) * | 1995-10-30 | 2001-12-12 | DYCKERHOFF & WIDMANN AG | Method and device for uncovering and cleaning steel wire strands |
CN1664265A (en) * | 2004-03-04 | 2005-09-07 | 万国强 | Secondary tensile prestressed anchorage |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102626909A (en) * | 2012-04-10 | 2012-08-08 | 青岛理工大学 | Rapid clamping device for tubular objects, use method and application thereof |
CN102626909B (en) * | 2012-04-10 | 2014-07-09 | 青岛理工大学 | Rapid clamping device for tubular objects, use method and application thereof |
Also Published As
Publication number | Publication date |
---|---|
CN101148929A (en) | 2008-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20080098669A1 (en) | Variable girder tie | |
CN100564757C (en) | Steel wire stretching terminal equipment | |
CN2749989Y (en) | Line pole correcting device | |
CN209760863U (en) | External prestress steel strand connector and matched tensioning device | |
CN210513907U (en) | Anchor rod drawing experiment device and system | |
CN112814172B (en) | Tension self-adjusting combined node for full-tension cross cable truss structure | |
CN101368430A (en) | Reinforced bar jointing sleeve | |
CN205567298U (en) | Device of towed fixed sapling of environment -friendly and other supports | |
CN2446200Y (en) | Ground tackle clamping sheet | |
CN210562619U (en) | Steel structure free of welding installation | |
CN204290826U (en) | Photovoltaic system flexible installing device | |
CN203691328U (en) | Fixing structure of solar cell panel | |
CN104400901A (en) | Fixing device in pre-stressed reinforcement tension machine | |
CN110965702A (en) | Finish rolling screw-thread steel ground tackle | |
CN208589452U (en) | Solar battery array without frame three-dimensional structure | |
CN221676287U (en) | Clamp for welding tubular pile end plate | |
CN206561940U (en) | A kind of agricultural unmanned plane of many rotors of multipurpose pulls button folded piece | |
CN107957371B (en) | Clamp for bamboo chip tensile test | |
CN212656472U (en) | Anchor clamps are prevent wind to standing-seam crimping roofing | |
CN219710283U (en) | Quick succinct connector | |
CN205407683U (en) | A photovoltaic module mounting structure for various steel tile roofing | |
CN216516989U (en) | Efficient building structure's location connecting device | |
CN221646380U (en) | Woodworking beam column template easy to install | |
CN215670541U (en) | 2400 MPa-level re-tensioning anchor assembly | |
CN212317554U (en) | Prestressed carbon fiber plate anchorage device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 315327, Zhejiang, Cixi Province East Town Industrial Zone Wei two road Ningbo man and Mechanical Bearing Co., Ltd. Patentee after: Huang Jinlun Address before: 315327, No. 457-459, Zhen Zhen Dong Road, Cixi, Zhejiang Patentee before: Huang Jinlun |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091202 Termination date: 20110921 |