CN100560249C - Integral running castings mold device of large-sized steel ingot clamp - Google Patents

Integral running castings mold device of large-sized steel ingot clamp Download PDF

Info

Publication number
CN100560249C
CN100560249C CNB2007101448763A CN200710144876A CN100560249C CN 100560249 C CN100560249 C CN 100560249C CN B2007101448763 A CNB2007101448763 A CN B2007101448763A CN 200710144876 A CN200710144876 A CN 200710144876A CN 100560249 C CN100560249 C CN 100560249C
Authority
CN
China
Prior art keywords
ring
tamper
ingot
steel
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2007101448763A
Other languages
Chinese (zh)
Other versions
CN101254524A (en
Inventor
王欢
李金良
姜萍
刘海澜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Heavy Equipment Engineering Research Co., Ltd.
China First Heavy Industries Co Ltd
Original Assignee
Tianjin Heavy Equipment Engineering Research Co Ltd
China First Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Heavy Equipment Engineering Research Co Ltd, China First Heavy Industries Co Ltd filed Critical Tianjin Heavy Equipment Engineering Research Co Ltd
Priority to CNB2007101448763A priority Critical patent/CN100560249C/en
Publication of CN101254524A publication Critical patent/CN101254524A/en
Application granted granted Critical
Publication of CN100560249C publication Critical patent/CN100560249C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)
  • Continuous Casting (AREA)

Abstract

The invention discloses a kind of integral running castings mold device of large-sized steel ingot clamp, belong to steel-making steel ingot technical field of mold, the low bottom-disc seat is tiled in ground level, the top bottom-disc guard ring aligns and is placed on the low bottom-disc seat, in the top bottom-disc guard ring, build several layers of refractory brick bed course by laying bricks or stones, tamper is covered on refractory brick bed course upper berth, on tamper, build the annular refractory brickwork by laying bricks or stones, facade resin tamper is covered in the ring shop in the annular refractory brickwork, facade resin tamper and steel ring bonding, circular metal mat is placed in the steel ring, and paste mutually with tamper the bottom, place the chassis cover at annular refractory brickwork top, mounting circular ring metal mat in the cover of chassis is installed ingot mould on the top bottom-disc guard ring, ring extension is installed on the ingot mould, hot top is installed on the ring extension, has been overcome the shortcoming that has a strong impact on ingot quality that shipper pole comes on the steel ingot sedimentary pile; Because the pincers handle is integrated poured forming with steel ingot, avoided clamping in the postorder forging the phenomenon generation that from steel ingot, comes off or pine puts.

Description

Integral running castings mold device of large-sized steel ingot clamp
Technical field
The present invention relates to a kind of integral running castings mold device of large-sized steel ingot clamp, belong to steel-making steel ingot technical field of mold.
Background technology
At present, along with power station, steel rolling equipment to large scale development, the single-piece weight of forged shaft such as rotor, backing roll is also increasing, and required steel ingot single-piece weight is also increasing, and the forging of large-scale steel ingot becomes a difficult problem, the conventional method that forges large-scale steel ingot is, afterbody with steel ingot is swaged into the pincers handle that is easy to clamping earlier, and clamping has the steel ingot upset forging type of pincers handle, and its deficiency is that the steel ingot firing time is long, steel ingot weight is big, the cost height; The external way that solves the overweight difficult problem of forging forged shaft equipment of using is only found Japan one tame enterprise, but what they adopted is that pincers are pre-buried casting, promptly forge with steel ingot in advance and be processed into the pincers handle that a size conforms is forged requirement, before cast, it is imbedded in the chassis, the upper end exceeds plane on the chassis, steel ingot is when cast, molten steel will clamp the upper end will be wrapped, make it to strike up partnership with steel ingot, for forging, postorder creates favorable conditions, help pincers from the chassis, deviating from smoothly, clamp little scale error; Its deficiency is: move to the ingot body on the steel ingot sedimentary pile, have a strong impact on ingot quality; Pincers can not fuse into one with steel ingot can only being wrapped by steel ingot, in postorder forges, easily come off from ingot or loosening, can not continue to finish the back and forge; To forge and be processed into steel ingot in advance and meet the pincers handle that forges dimensional requirement, not only waste a large amount of production costs, and bring difficulty to organization of production; The large-scale steel ingot pincers find no the report that closes this respect so far to the integrated poured blank that also is at home.
Summary of the invention
In order to overcome above-mentioned technical deficiency, the invention provides a kind of integral running castings mold device of large-sized steel ingot clamp, this integral running castings mold device of large-sized steel ingot clamp can not only solve the cast of various tonnage steel ingot pincers handles, and steel ingot pincers handle is that the one forging effect is good with steel ingot.
The technical solution adopted for the present invention to solve the technical problems is: it is by hot top, ring extension, ingot mould, the top bottom-disc guard ring, the low bottom-disc seat, facade resin tamper, steel cylinder, circular metal mat, the refractory brick bed course, tamper, refractory brickwork, the ring steel plate pad, the chassis cover is formed, the low bottom-disc seat is tiled in ground level, the top bottom-disc guard ring aligns and is placed on the low bottom-disc seat, in the top bottom-disc guard ring, build several layers of refractory brick bed course by laying bricks or stones, tamper is covered on refractory brick bed course upper berth, on tamper, build the annular refractory brickwork by laying bricks or stones, facade resin tamper is covered in the ring shop in the annular refractory brickwork, facade resin tamper and steel ring bonding, circular metal mat is placed in the steel ring, paste mutually with plane resin tamper the bottom, place the chassis cover at annular refractory brickwork top, mounting circular ring metal mat in the cover of chassis, on the top bottom-disc guard ring, ingot mould is installed, ring extension is installed on the ingot mould, hot top is installed on the ring extension; Upper and lower two parts are made on the chassis, i.e. top bottom-disc guard ring, low bottom-disc seat, the more common chassis of top bottom-disc guard ring manufacturing doubles and middle the perforation; The low bottom-disc seat is then thinner, works the effect that attaches of holding in the top bottom-disc guard ring; In concrete operations, with top bottom-disc guard ring, low bottom-disc seat fitly together to central seats that directly face the stage, the two-layer refractory brick bed course of flat block on the low bottom-disc seat, and sand or chromite sand are pacified in the farming of spreading the thick drying of 10mm-20mm, in case molten steel passes, be built into a circle refractory brickwork with refractory brick at farming peace sand or above the chromite sand; The appearance and size that roll of steel plate welds is overlapped the centre that is sitting in the space to the measure-alike mouth of a river with pincers, is filled to 2/3rds eminences with dry good farming peace sand or chromite sand on every side, fills and leads up with the resin chromite sand then; Prevent that farming peace sand or chromite sand from entering molten steel, spread circular metal mat, at refractory brickwork installed inside mouth of a river cover steel cylinder in the bottom of mouth of a river cover; Leave the space on the cover steel cylinder of the mouth of a river, make steel ingot form the mouth of a river when cast, like this, sedimentary pile further moves down when making ingot solidification, guarantees ingot quality, avoids pincers that root is cracked simultaneously; The chassis that assembles is sitting in the vacuum chamber, sits mould, ring extension and hot top more in the above.Like this, when ingot mould was poured into a mould, molten steel formed one and meets the pincers handle that forges dimensional requirement in the cover of the mouth of a river on chassis.
The invention has the beneficial effects as follows: overcome the shortcoming that has a strong impact on ingot quality that shipper pole comes on the steel ingot sedimentary pile; Because the pincers handle is integrated poured forming with steel ingot, avoided clamping in the postorder forging the phenomenon generation that from steel ingot, comes off or pine puts; It is simple to attach assembling, need not forge in advance the processing pincers, save substantial contribution and man-hour, only 296t steel ingot pincers are just economizing on the use of funds surplus in the of 100,000 yuan.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is the integrated poured die device structure chart of large-scale steel ingot jaw of the present invention.
Among the figure 1, hot top, 2, ring extension, 3, ingot mould, 4, the top bottom-disc guard ring, 5, the low bottom-disc seat, 6, facade resin tamper, 7, mouth of a river cover steel cylinder, 8, circular metal mat, 9, the refractory brick bed course, 10, tamper, 11, refractory brickwork, 12, the ring steel plate pad, 13, the chassis cover.
The specific embodiment
In Fig. 1, low bottom-disc seat 5 is tiled in ground level, top bottom-disc guard ring 4 aligns and is placed on the low bottom-disc seat 5, in top bottom-disc guard ring 4, build several layers of refractory brick bed course 9 by laying bricks or stones, tamper 10 is covered on refractory brick bed course 9 upper berths, on tamper 10, build annular refractory brickwork 11 by laying bricks or stones, facade resin tamper 6 is covered in the ring shop in annular refractory brickwork 11, facade resin tamper 6 and mouth of a river cover steel cylinder 7 bondings, circular metal mat 8 is placed in the mouth of a river cover steel letter 7, paste mutually with tamper 10 bottom, places chassis cover 13 at annular refractory brickwork 11 tops, mounting circular ring metal mat 12 in the cover 13 of chassis; Ingot mould 3 is installed on top bottom-disc guard ring 4, ring extension 2 is installed on the ingot mould 3, hot top 1 is installed on the ring extension 2.

Claims (1)

1, a kind of integral running castings mold device of large-sized steel ingot clamp, it is by hot top (1), ring extension (2), ingot mould (3), top bottom-disc guard ring (4), low bottom-disc seat (5), facade resin tamper (6), mouth of a river cover steel cylinder (7), circular metal mat (8), refractory brick bed course (9), tamper (10), annular refractory brickwork (11), ring steel plate pad (12), chassis cover (13) is formed, it is characterized in that: low bottom-disc seat (5) is tiled in ground level, top bottom-disc guard ring (4) aligns and is placed on the low bottom-disc seat (5), in top bottom-disc guard ring (4), build several layers of refractory brick bed course (9) by laying bricks or stones, tamper (10) is covered on refractory brick bed course (9) upper berth, on tamper (10), build annular refractory brickwork (11) by laying bricks or stones, facade resin tamper (6) is covered in the ring shop in annular refractory brickwork (11), facade resin tamper (6) and mouth of a river cover steel cylinder (7) bonding, circular metal mat (8) is placed in the mouth of a river cover steel cylinder (7), paste mutually with tamper (10) bottom, place chassis cover (13) at annular refractory brickwork (11) top, chassis cover (13) interior mounting circular ring metal mats (12); Go up installation ingot mould (3) at top bottom-disc guard ring (4), ingot mould (3) is gone up ring extension (2) is installed, and ring extension (2) is gone up hot top (1) is installed.
CNB2007101448763A 2007-12-16 2007-12-16 Integral running castings mold device of large-sized steel ingot clamp Active CN100560249C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007101448763A CN100560249C (en) 2007-12-16 2007-12-16 Integral running castings mold device of large-sized steel ingot clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007101448763A CN100560249C (en) 2007-12-16 2007-12-16 Integral running castings mold device of large-sized steel ingot clamp

Publications (2)

Publication Number Publication Date
CN101254524A CN101254524A (en) 2008-09-03
CN100560249C true CN100560249C (en) 2009-11-18

Family

ID=39889821

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007101448763A Active CN100560249C (en) 2007-12-16 2007-12-16 Integral running castings mold device of large-sized steel ingot clamp

Country Status (1)

Country Link
CN (1) CN100560249C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102909323B (en) * 2012-11-05 2015-03-18 四川丰元机械制造有限公司 Lower suspended vacuum casting ingot mold and using method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB780701A (en) * 1956-03-29 1957-08-07 Christiana Spigervwerk Improvements relating to methods of casting metal in ingots and moulds for use therein
GB1346674A (en) * 1972-08-07 1974-02-13 Hilti Ag Ingot mould bottom plate construction
US4301991A (en) * 1979-09-06 1981-11-24 Crucible Inc. Ingot mold assembly

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB780701A (en) * 1956-03-29 1957-08-07 Christiana Spigervwerk Improvements relating to methods of casting metal in ingots and moulds for use therein
GB1346674A (en) * 1972-08-07 1974-02-13 Hilti Ag Ingot mould bottom plate construction
US4301991A (en) * 1979-09-06 1981-11-24 Crucible Inc. Ingot mold assembly

Also Published As

Publication number Publication date
CN101254524A (en) 2008-09-03

Similar Documents

Publication Publication Date Title
CN101905185B (en) In-situ ceramic partially-reinforced composite material hammerhead for crusher and preparation method
CN202894216U (en) Casting tooling for large-size and complicated framework type titanium alloy thin wall castings
CN101530904B (en) Composite material hammerhead of crusher and negative pressure casting method thereof
CN108971431B (en) Manufacturing method of ductile iron cutter block type casting of automobile stamping die
CN201807729U (en) Continuous casting tundish for reducing steel remaining quantity
CN101099983A (en) Metal thin plate calendaring resin die
CN103769562A (en) Preparation method for active element sintered ZTA (Zirconia Toughened Alumina) particulate reinforced steel based compound hammer
CN100560249C (en) Integral running castings mold device of large-sized steel ingot clamp
CN101530905B (en) Composite material hammer head of crusher and method for casting same
CN2771167Y (en) Combined counterpoise
CN104128572B (en) A kind of composite zinc ingot metal mould and preparation method thereof
CN202343917U (en) Casting mold device of two-liquid bimetal vertical-parted hammer head
CN203197199U (en) Anode steel claw casting mold and foam plastic gasified pattern thereof
CN202506811U (en) Mould for casting locking ring
CN101967837A (en) Bucket lip of excavator and manufacturing method thereof
CN101476539A (en) Manufacturing process of wind-power principal shaft product and its special integral forming device
CN201127989Y (en) Casting mold capable of using new casting method
CN201246439Y (en) Counterweight iron with welding casing
CN215434184U (en) Mould for building refractory lining of ladle
CN205464270U (en) Aluminium door check is made with half solid -state forming device
CN202131616U (en) Novel nodular cast iron hidden well cover
CN201405045Y (en) Split type steel ingot casting mold
CN204826545U (en) There is concrete floor of metal sheet in shop
CN201208645Y (en) Launder base structure on billet caster tundish car
CN204075157U (en) A kind of bimetallic alloy hammer metal mold for casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA FIRST HEAVY INDUSTRIES CO., LTD.

Free format text: FORMER OWNER: CHINA NO.1 HEAVY-DUTY MACHINERY GROUP CO.

Effective date: 20110406

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 161042 ROAD 9, CHANGQIAN ROAD, TIEXI, FULARJI DISTRICT, QIQIHAR CITY, HEILONGJIANG PROVINCE TO: 161042 NO. 9, CHANGQIAN ROAD, TIEXI, FULARJI DISTRICT, QIQIHAR CITY, HEILONGJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110406

Address after: 161042 Tiexi Road, Fulaerji District, Heilongjiang, China, No. 9, No.

Co-patentee after: Tianjin Heavy Equipment Engineering Research Co., Ltd.

Patentee after: China First Heavy Industries Co., Ltd.

Address before: 161042, 9 Road, Tiexi factory, Fulaerji District, Heilongjiang, Qigihar

Co-patentee before: Tianjin Heavy Equipment Engineering Research Co., Ltd.

Patentee before: China No.1 Heavy-Duty Machinery Group Co.