CN100532755C - Water-proof structure and water-proof construction method and used under layer coil - Google Patents
Water-proof structure and water-proof construction method and used under layer coil Download PDFInfo
- Publication number
- CN100532755C CN100532755C CNB2006100733811A CN200610073381A CN100532755C CN 100532755 C CN100532755 C CN 100532755C CN B2006100733811 A CNB2006100733811 A CN B2006100733811A CN 200610073381 A CN200610073381 A CN 200610073381A CN 100532755 C CN100532755 C CN 100532755C
- Authority
- CN
- China
- Prior art keywords
- layer
- coiled material
- waterproof roll
- waterproof
- basal surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
The waterproof structure or waterproof construction method has the back of waterproof roll heated to smelt and adhered onto the base surface. Thus obtained waterproof structure includes one waterproof roll layer, one base layer and one lower roll layer between the waterproof roll layer and the base layer, with the waterproof roll layer being fixed onto the lower roll layer through hot smelting the hot smelted layer in the lower roll layer. The present invention has high construction efficiency, high construction accuracy, and capacity of preventing heat damage and heat deformation of the waterproof roll.
Description
Technical field
The present invention relates to waterproof construction and its job practices and used new portion material, be specifically related to as the following layer coiled material and relative waterproof construction and the waterproof construction method that are located in the new portion material between asphalt tanking and the substrate.
Background technology
Bituminous waterproofing heat construction method, promptly at the construction field (site) by melting pot with the pitch heating and melting, use the job practices of the pitch spreading lamination asphalt roofing and so on of this fusion, waterproof reliability height is now in occupation of the main flow of waterproof construction method.
Promptly, in the construction of the bituminous waterproofing heat construction method at position, plane in the past, the asphalt blocks of regulation shape are pulverized, input is with in the pots as thermal source such as kerosene blastburne, be heated to 260 ° of left and right sides fusions Celsius, be transported to the job location, carry out in the place ahead of roofing materials the pitch of fusion being scattered and to engage the operation of laying roofing materials equably thereon with spoon by 18 liters of containers etc., repeat 2~3 times by this way, form asphalt tanking.In each operation, molten asphalt replenishes fusion by pulverizing asphalt blocks.
Correlation technique has announcement in following document.
[patent documentation 1] Japan Patent spy opens 2003-313996
[patent documentation 2] Japan Patent spy opens 2000-234421
[patent documentation 3] Japanese patent laid-open 08-302927
[patent documentation 4] Japanese patent laid-open 08-239961
Summary of the invention
Yet, have following problem in the above-mentioned prior art.
(a) owing to move into melting pot at the construction field (site), the heating stipulated time is carried out operation with its spreading after fusing, and therefore has problems such as operating efficiency, cost; Also owing to will handle fusion and be in the pitch of high hot state, so these operations itself also will inevitably have danger inevitably.
(b) can throw into question to the environment around the job site.That is, follow the heating fusion operation of pitch to produce cigarette and foul smell, they can bring harmful effect to the dwelling environment of surrounding resident.This problem is especially remarkable in renovation project of inhabited building etc.
The present invention provides following waterproof construction in order to solve above-mentioned problem in the past: possess waterproof roll; Be located between this waterproof roll and the basal surface, described waterproof roll and basal surface are engaged fixing following layer coiled material, on the one side of this time layer coiled material, has hot melt layer, simultaneously the another side relative with basal surface is engaged by fixing means and anchors on the basal surface, and the hot melt layer by layer coiled material under the heating and melting engages described waterproof roll and is fixed on down on the layer coiled material.
In addition, the present invention has realized following following layer coiled material for the problem that solves above-mentioned bituminous waterproofing heat construction method in the past: it is the following layer coiled material that is located between basal surface and the waterproof roll, it is characterized in that, on one side, has hot melt layer, this hot melt layer surface is covered with barrier material, is formed with the buffer part that adopts the foam ink material between barrier material and the hot melt layer surface.
In addition, the present invention has realized the waterproof construction method that is made of following operation in order to solve above-mentioned problem in the past:
(1) on basal surface, is coated with the operation of primer as required;
(2) above-mentioned following layer coiled material is engaged the operation that is fixed on the basal surface;
(3) by blowtorch, hot air to the hot melt layer that adhesion is fixed on the following layer coiled material on the basal surface heat, the operation of fusion;
(4) on the fusion face of following layer coiled material bonding waterproof roll, will descend layer coiled material to engage the operation of fixing with waterproof roll.
Waterproof construction of the present invention has the surface that is located in the following layer coiled material between substrate and the waterproof roll to anchoring on substrate or other basal surface and heats and make its fusion, engage the structure that adheres to waterproof roll on this fusion face, so do not need the operation of fusing and so on as the waterproof construction that adopts bituminous waterproofing heat construction method in the past large-scale pitch heating at the construction field (site), can realize free from environmental pollution, and efficiently, safely, waterproof construction with high reliability.
In addition, owing to the structure of layer coiled material down of the present invention that is located between basal surface and the waterproof roll is, one side has hot melt layer, this hot melt layer surface is covered with barrier material, be formed with the buffer part that adopts the foam ink material simultaneously between barrier material and the hot melt layer surface, so when constructing waterproof construction, do not need the operation of fusing and so on as the waterproof construction that adopts bituminous waterproofing heat construction method in the past large-scale pitch heating at the construction field (site), can realize free from environmental pollution, and efficiently, safely, waterproof construction with high reliability.
In addition, waterproof construction method of the present invention is owing to have following formation, therefore the operation that does not need picture to adopt the waterproof construction large-scale pitch at the construction field (site) of bituminous waterproofing heat construction method in the past to heat to fuse and so on, can realize free from environmental pollution, and efficiently, safely, waterproof construction with high reliability:
(1) on basal surface, is coated with the operation of primer as required;
(2) then, above-mentioned following layer coiled material is engaged the operation that is fixed on the basal surface;
(3) by blowtorch, hot air or other heater to the hot melt layer that adhesion is fixed on the following layer coiled material on the basal surface heat, the operation of fusion;
(4) at the bonding waterproof roll of fusion face of following layer coiled material, following layer coiled material is engaged fixing operation with waterproof roll.
Description of drawings
Fig. 1 is the sectional view of the described waterproof construction of one embodiment of the present of invention.
Fig. 2 is the sectional view of an embodiment of following layer coiled material 13 shown in Figure 1.
Fig. 3 is that the part of following layer coiled material 13 shown in Figure 2 is omitted stereogram.
Fig. 4 is the basad key diagram of going up the job practices of laying water-proof coiled material of the described employing blowtorch of one embodiment of the present of invention job practices.
Fig. 5 is the sectional view as the waterproof roll of waterproof roll.
Fig. 6 is the key diagram that adopt to use the job practices in the past in the substrate waterproof construction of blowtorch job practices of waterproof roll.
The specific embodiment
Waterproof roll is made of waterproof roll, and following layer coiled material is made of the flaky material of dip coated pitch gained on base material.Hot melt layer in the following layer coiled material is made of the bitumen layer of following layer coiled material, at the one side formation adhesive layer of following layer coiled material.Therefore, adopt the described waterproof construction of embodiment of such structural element as follows.
Promptly, described waterproof construction is: possess at the waterproof roll that forms in the substrate, be located between this waterproof roll and the substrate and engage the following layer coiled material of fixing described waterproof roll and substrate, described down layer coiled material and opposite face substrate that constitutes at flaky material by dip coated pitch gained on base material, adhesive layer with bonding substrate, substrate and following layer coiled material engage fixing by described adhesive layer, described waterproof roll is fixed on down on the layer coiled material its joint by the face heating and melting relative with waterproof roll that will descend layer coiled material.
As previously mentioned, the structure of following layer coiled material makes: it is located between substrate and the waterproof roll, by to the face heating and melting relative and the welding waterproof roll is fixed in the substrate by the adhesive layer that is formed at another side, thereby in substrate, engage fixedly waterproof roll with waterproof roll.Then, following layer coiled material is formed by the adhesive layer that adheres to the 2nd barrier material from the teeth outwards that constitutes main part by the flaky material at dip coated pitch gained on the base material, adheres to the 1st barrier material on the face relative with described waterproof roll of this main part and be formed at another side, is formed with the buffer part that adopts the foam ink material between described the 1st barrier material that forms with resin film and the main part.And buffer part better is the trellis body formation that is coated on the resin film surface with printing.Following layer coiled material also can adopt partial fixing method based on the mechanical fixation of using screw, steady pin etc. at the fixing means of basal surface, perhaps uses the part adhering method of pitch class bonding agent, replaces adopting the fixed engagement of described adhesive layer.
Embodiment
Below, by embodiment the present invention is further described.
Fig. 1 is the sectional view of the described waterproof construction of one embodiment of the present of invention.Among the figure, the 11st, as the waterproof roll of waterproof roll, this waterproof roll 11 as known in the art, the dip coated modified bitumen forms on base material, is formed with the mineral matter layer of sand 12 as polished surface from the teeth outwards.The 13rd, be located in the following layer coiled material between the surface of described waterproof roll 11 and base concrete S.Following layer coiled material 13 engages fixing with basal surface by the adhesive layer that is formed at soffit, on the other hand, the top layer part of following layer coiled material 13 and the waterproof roll 11 following layer coiled material 13 by being heated fusion is bonding.
Among Fig. 1, whole ground of following layer coiled material 13 and basal surface is bonding, but also can form known insulation division between the two described, forms the so-called exhaust channel that swells of being used to prevent.
Fig. 2 is the sectional view of an embodiment of following layer coiled material 13 shown in Figure 1.The main part of this time layer coiled material 13 is obtained by dip coated modified bitumen on base material 14, forms bitumen layer 15 and bitumen layer 16.The modified bitumen of bitumen layer 15 use with bitumen layer 16 compare the better material of meltbility.In addition in the drawings, the 17th, by the hot melt layer that heating is melted, hot melt layer 17 is made of the top layer part of bitumen layer 15 in the present embodiment.In addition, 17a pastes the 1st barrier material that is arranged on hot melt layer 17 (bitumen layer 15) surface.In addition, the 18th, be formed at the lip-deep adhesive layer of described bitumen layer 16, the surface is covered with the 2nd barrier material.
For the described layer coiled material down of present embodiment, further describe by Fig. 3.Fig. 3 is that the part of following layer coiled material 13 shown in Figure 2 is omitted stereogram.The 1st barrier material 17a that stickup is arranged on hot melt layer 17 (bitumen layer 15) surface is made of resin film 17b and the trellis body 17c as cushion coat that forms by the printing coating of using foam ink at its back side.
As resin film, can use polyethylene, polypropylene, nylon, polyester etc. any, but the high material of heat resisting temperature is unfavorable.From this angle, better be polyethylene, polypropylene, nylon, low-melting point polyester.In addition, about thickness, because make the relation of its thermal contraction, and the film that shrinks remains in the hot melt layer surface, so better be below the 50 μ m.In addition, as foam ink, use in solvent dissolution heat plastic synthetic resin, add the material known of blowing agent again.
Among this embodiment, the 1st barrier material 17a has above-mentioned structure, but also can 17 moments of hot melt layer directly be exposed, thereby this fusion rapidly, carry out easily by adopting the structure of as foamed styrene powder bed, polystyrene film easy fusion or contraction, making.
, the step of constructing of the waterproof construction that uses down layer coiled material 13 is described to Fig. 4 around Fig. 1.
Among Fig. 4,11 relate to the waterproof roll that Fig. 1 has stated, have mineral matter layer of sand 12 on the surface, are web-like to roll.In addition, the 13rd, stick to the following layer coiled material on cast concrete base S surface.Following the carrying out of following layer coiled material 13 based joints: the 2nd barrier material 18a of following layer coiled material 13 shown in Figure 2 is made of release film or release liners, it is peelled off push on the surface that anchors at substrate S after exposing adhesive layer 18.
Then, as shown in Figure 4, will be as after being waterproof roll 11 that web-like takes in and being placed on down assigned address on the layer coiled material 13 of waterproof roll, the flames F exiting of radiation blowtorch B, baking is the surface of layer coiled material 13 down, make hot melt layer 17 (constituting by bitumen layer 15 in the present embodiment) fusion of following layer coiled material 13 shown in Figure 3, on this fusion face, launch coiled material, waterproof roll 11 sets are engaged.The radiation of flames F exiting since the surface of the following layer coiled material of confirming with easy naked eyes 13 as object, the operator can easily confirm to adjust molten condition on one side, operate on one side, can be implemented in the bonding of waterproof roll 11 under the suitable condition and following layer coiled material 13, compared with prior art, can realize much better construction precision.
In Fig. 2 and Fig. 3, the flame radiation in the baking operation is carried out from the top of the 1st barrier material 17a.By heating, at first the foaming ingredient from the trellis body 17c that uses foam ink produces gas, forms the space between hot melt layer 17 and the film 17b.Because the gap is compared with foaming part not, thermal capacitance is very little, so the heat film 17b of this part by flame easily fuses certainly.Then, caused that by it the film 17b integral body of lining hot melt layer 17 disperses to shrink finely, hot melt layer 17 is by less heat exposure fusion.In the present embodiment, constitute heater means, but also can adopt the injection of hot blast with the radiation of the flame of blowtorch.
As mentioned above, if adopt the present invention, then can fuse the barrier material of the coating adhesive layer of liquid by for example citrene and so on or pastel rapidly, adhesive layer is exposed, be fixed on the basal surface with being about to lower floor's coiled material joint, in the process of constructing, the fusion of the barrier material in the following layer coiled material and the fusion of hot melt layer also can be seen clearly molten condition in operator's the suitable visual field, be construction precision so can obtain good efficiency of construction simultaneously.In addition,,, after construction just, also can keep the rigidity of regulation, avoid the problem of easy deformation and so on so the fire damage to waterproof roll can not take place because heating is carried out following layer coiled material.
Advantage when allowing the following layer coiled material that adopts the application is clearer and more definite, below in the past the following layer coiled material and the thermal bonding job practices of waterproof roll is described.
Fig. 5 is the sectional view of described waterproof roll, and this waterproof roll 2 has the structure of dip coated modified bitumen on base materials such as nonwoven 3.Among the figure, 2a is the high bitumen layer of melt temperature, is formed with the mineral matter layer of sand as the fine finishining layer on the surface.In addition, 2b is the modified asphalt layer of base side, corresponding to the heat construction method, uses the lower material of melt temperature, on the surface, promptly the face relative with substrate adhered to as the resin film 4 that is used to prevent bonding barrier layer etc.
In the construction of the bituminous waterproofing heat construction method at position, plane in the past, the asphalt blocks of regulation shape are pulverized, input is with in the pots as thermal source such as Wick lifter of kerosine burner, be heated to 260 ° of left and right sides fusions Celsius, be transported to the job location by 18 liters of containers etc., carry out scattering equably with spoonful pitch in the place ahead of roofing materials and engaging the operation of laying roofing materials thereon, repeat 2~3 times the formation asphalt tanking by this way fusion.
Yet, have following problem in the above-mentioned prior art.
(a) owing to move into melting pot at the construction field (site), the heating stipulated time is carried out operation with its spreading after fusing, and therefore has problems such as operating efficiency, cost; Also owing to will handle fusion and be in the pitch of high hot state, so these operations itself also will inevitably have danger inevitably.
(b) can throw into question to the environment around the job site.That is, follow the heating fusion operation of pitch to produce cigarette and foul smell, they can bring harmful effect to the dwelling environment of surrounding resident.This problem is especially remarkable in renovation project of inhabited building etc.
Fig. 6 is the key diagram that adopt to use the job practices in the past in the substrate waterproof construction of adhesion job practices of aforementioned waterproof roll.In this job practices, at first on basal surface S, be coated with primer as required, then the modification waterproof roll 2 that will be rolled into web-like on one side launches in the direction of arrows, on one side by toasting to the flames F exiting of the back side of modification waterproof roll 2 radiation blowtorch B, make modified bitumen 2 described modified asphalt layer 2a surface, comprise resin film 4 fusions.After the modified bitumen fusion, rotate modification waterproof roll 2 like this, fusion place by being pressed on the basal surface S, is repeated this operation then, modification waterproof roll 2 joints are fixed in the substrate.But there is following problem in such job practices.
(c) because use the heating of blowtorch be the operator hand-held it carry out, so can can't keep the radiation of flame in the right direction, therefore the heat emission meeting of the bitumen layer of target be produced unevenly, can't obtain correct molten condition sometimes.
(d) because the radiation direction of flame is the narrow that is surrounded by substrate and coiled material, therefore the operator is difficult for naked eyes affirmation fusion situation, residual sometimes not puddle for the precision that the bond degree of waterproof roll and substrate can't obtain stipulating, may damage the waterproof reliability.
(e) because the back side of heating waterproof roll itself makes its fusion, so can the fine finishining layer (mineral matter layer of sand) of face side be exerted an adverse impact, after perhaps just having adhered to construction, still be in the waterproof roll easy deformation of soft state, need at the construction field (site) to note carefully, also can influence efficiency of construction.
Relative therewith, because as long as the application's following layer coiled material and the set that engages waterproof roll thereon be layer coiled material surface under the heating and melting, so above-mentioned in the past the such problem of job practices is solved.
Claims (3)
1. a waterproof construction is characterized in that possessing: waterproof roll; Be located between this waterproof roll and the basal surface, described waterproof roll and basal surface are engaged fixing following layer coiled material, on the one side of this time layer coiled material, has hot melt layer, simultaneously the another side relative with basal surface is engaged by fixing means and anchors on the basal surface, and the hot melt layer by layer coiled material under the heating and melting engages described waterproof roll and is fixed on down on the layer coiled material.
2. following layer coiled material, be the following layer coiled material that is located between basal surface and the waterproof roll, it is characterized in that on one side, to have hot melt layer, this hot melt layer surface is covered with barrier material, is formed with the buffer part that adopts the foam ink material between barrier material and hot melt layer surface.
3. a waterproof construction method is characterized in that, is made of following operation:
(1) on basal surface, is coated with the operation of primer as required;
(2) the described layer coiled material down of claim 2 is engaged the operation that is fixed on the basal surface;
(3) by blowtorch, hot air to the hot melt layer that adhesion is fixed on the following layer coiled material on the basal surface heat, the operation of fusion;
(4) on the fusion face of following layer coiled material bonding waterproof roll, will descend layer coiled material to engage the operation of fixing with waterproof roll.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100733811A CN100532755C (en) | 2006-03-31 | 2006-03-31 | Water-proof structure and water-proof construction method and used under layer coil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100733811A CN100532755C (en) | 2006-03-31 | 2006-03-31 | Water-proof structure and water-proof construction method and used under layer coil |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101046120A CN101046120A (en) | 2007-10-03 |
CN100532755C true CN100532755C (en) | 2009-08-26 |
Family
ID=38771007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100733811A Expired - Fee Related CN100532755C (en) | 2006-03-31 | 2006-03-31 | Water-proof structure and water-proof construction method and used under layer coil |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100532755C (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020015199A (en) * | 2018-07-24 | 2020-01-30 | カシオ計算機株式会社 | Thermal expansion sheet, method for producing thermal expansion sheet and shaped article |
WO2020102495A1 (en) | 2018-11-14 | 2020-05-22 | Biospan Technologies, Inc. | Agricultural oil seal and preservation agent |
CN110777951A (en) * | 2019-11-13 | 2020-02-11 | 北京首钢建设集团有限公司 | Waterproof construction method for waterproof interfaces made of different materials |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5979133A (en) * | 1997-07-18 | 1999-11-09 | Funkhouser; Philip L. | Reinforced waterproofing system for porous decks |
CN1477279A (en) * | 2003-07-11 | 2004-02-25 | 杨明鹭 | Roof water-proofing construction method |
CN1632259A (en) * | 2004-12-30 | 2005-06-29 | 夏良强 | Construction method for water-proof thermal insulation roofing with integrated protecting layer |
-
2006
- 2006-03-31 CN CNB2006100733811A patent/CN100532755C/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5979133A (en) * | 1997-07-18 | 1999-11-09 | Funkhouser; Philip L. | Reinforced waterproofing system for porous decks |
CN1477279A (en) * | 2003-07-11 | 2004-02-25 | 杨明鹭 | Roof water-proofing construction method |
CN1632259A (en) * | 2004-12-30 | 2005-06-29 | 夏良强 | Construction method for water-proof thermal insulation roofing with integrated protecting layer |
Also Published As
Publication number | Publication date |
---|---|
CN101046120A (en) | 2007-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100532755C (en) | Water-proof structure and water-proof construction method and used under layer coil | |
NL8003008A (en) | BITUMINOUS, THERMALLY INSULATING AND WATERPROOFING PLATE, AND APPLICATION METHOD THEREFOR. | |
JP2003253608A (en) | Pavement method and pavement structure | |
KR20050115879A (en) | Coating material, use thereof and method for applying said coating material | |
JP5926563B2 (en) | Block pavement construction method | |
JP2008303541A (en) | Waterproofing construction method for asphalt to be laid at normal temperature and waterproofing layered structure | |
JP2000170111A (en) | Waterproof adhesion method of pavement and its structure | |
EP2419474B1 (en) | Joint filler material | |
CN109537638A (en) | Suitable for the waterproof slab coiled material of pedestal foot and the friendship circle method of side wall waterproof roll | |
CN105464295A (en) | Roof no-open-fire waterproof system capable of being exposed and waterproof method | |
JP4684642B2 (en) | Asphalt waterproofing method and base material used for this | |
JPH10287812A (en) | Modified asphalt composition for sealing waterproof sheet, and waterproofing using the same | |
JP5958776B2 (en) | Resin lining construction method | |
JP2001207414A (en) | Method and device for sticking waterproof sheet | |
JP3126856B2 (en) | Asphalt roofing and construction method using it | |
JP2004036227A (en) | Paving method and asphalt pavement structure | |
US712308A (en) | Method of laying roofs. | |
JP2694584B2 (en) | Elevated roads using steel floor slabs and asphalt paving materials | |
JP2004115642A (en) | Method for applying asphalt roofing | |
JP2002013253A (en) | Waterproofing construction method for asphalt and reinforcing material for asphalt waterproofing material used therefor | |
JP4092154B2 (en) | How to lay tiles | |
JPH06134931A (en) | Heat insulating sheet for lining and lining method | |
JPH10292570A (en) | Sealant for waterproof sheet and waterproofing method therewith | |
JP2007261904A (en) | Welding type acid-resistant sticking body and its application method | |
JPH05117979A (en) | Heat-insulating water-proofing fibrous sheet for lining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |