CN100494637C - Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well - Google Patents

Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well Download PDF

Info

Publication number
CN100494637C
CN100494637C CNB2006100698822A CN200610069882A CN100494637C CN 100494637 C CN100494637 C CN 100494637C CN B2006100698822 A CNB2006100698822 A CN B2006100698822A CN 200610069882 A CN200610069882 A CN 200610069882A CN 100494637 C CN100494637 C CN 100494637C
Authority
CN
China
Prior art keywords
hole
monitoring
sensor
hydraulic
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100698822A
Other languages
Chinese (zh)
Other versions
CN1912348A (en
Inventor
成云海
司荣军
张淑同
张淑林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CNB2006100698822A priority Critical patent/CN100494637C/en
Publication of CN1912348A publication Critical patent/CN1912348A/en
Application granted granted Critical
Publication of CN100494637C publication Critical patent/CN100494637C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

A method for erecting transducer to monitor micro shock of deep well shallow hole in coal mine includes preparing hydraulic pillow, setting transducer in one side of hard plastic block with arc cross section and filling gel to fix it, binding another hard plastic block with arc cross section and hydraulic bag to be an integral unit, fixing an oil tube on hydraulic bag to form a monitoring unit, series-connecting said monitoring unit to be unit string by signal cable and drawing rope, placing unit in drilled hole at preset position to let hard plastic block be opened and pressed in drilled hole for monitoring micro shock.

Description

The mounting method of shallow hole microseismic monitoring sensor of coal mine deep well
Technical field
The present invention relates to the coal mine downhole safety monitoring, especially monitor the microseism position monitor that rock mass breaks.
Background technology
The microseism position monitor technology that rock mass breaks is a mine safety monitoring technology advanced in the world today, can be widely used in prediction and forecast roof falling over great extent, prominent watered-out well, coal and mine disasters such as gas is outstanding, bump.At present the colliery of the mine degree of depth more shallow (in 450m) is when carrying out this work, and generally adopting faces down on ground drills, and with grouting three-component geophone is installed then, monitors main frame and is also placed in ground, and it is simple relatively to operate.At the mine of the degree of depth above 450m, adopt said method obviously uneconomical, nor easy to operate.Therefore, need a kind of method that is suitable for the installation three-component geophone of coal mine deep well down-hole in boring (degree of depth is less than 50m) of invention.
Summary of the invention
The objective of the invention is to invent a kind of mounting method that is suitable for the microseismic monitoring sensor of shallow bore hole under the coal mine deep well.
Method of the present invention is:
1, makes flat jack, the duroplasts piece that a section is an arc is processed the hole that can put into sensor from a side, placement upper sensor and encapsulating are fixed in the hole, be another section that duroplasts piece and a hydraulic pressure capsule of arc is bonded to an integral body again, fix an oil pipe on the hydraulic pressure capsule, become a monitoring device;
During use, monitoring device is serially connected by sensor signal cable and pull rope interval 10-25cm, forms the device string;
2, hole from bottom to top at the underworkings of needs monitoring;
3, will fix the fixed pulley anchor fluke and put on pull rope and head into the hole with drill steel at the bottom of;
4, then by artificial pulling traction rope, will install string and hang in the hole, be drawn to the precalculated position;
5, by hydraulic oil pipe to hydraulic pressure capsule pressurization oil transportation to the 2MPa, make it that two duroplasts pieces are strutted jam-packed in boring;
6, by signal cable the microseismic signals that receives is transferred to the main frame of data receiving center, carry out the microseism monitoring;
7, finish microseism monitoring after, open the pressure-relief valve of hydraulic tube, reclaim flat jack and reuse.
During being applicable to,, deepens micro seismic monitoring device mounting method of the present invention if hole firmly to use (drilling depth is in 50m) under the coal mine of mantlerock, the boring easy deformation, and flat jack is difficult to install and reclaim.Hydraulic pressure capsule in the flat jack with surrounding two hard plastic cover spreadings of the flat jack that bonds together of three-component geophone, squeezes on drill hole wall it when the pressure that is subjected to about 2MPa.
Points for attention during installation:
1, to install as early as possible after boring is up to, prevent the boring distortion;
When 2, holing incompetent bed, the location, hole of collapsing will add sleeve pipe, and the anchor fluke rear portion adds guide peg, otherwise anchor fluke enters easily and collapses the hole, hole and can't install;
3, pull rope and stable rope can not relax in lifting process, prevent that two ropes tangle knot, cause and can't promote.
Good effect of the present invention is:
Mounting method of the present invention is convenient and swift, and sensor fully is coupled with the rock of drill hole wall and contacts, and prevents the decay of microseismic signals in the hole, helps the reception of signal, the reliability height.Solved in surface drilling complicated operation, problem that expense is high.Can apply in fields such as water conservancy, ground, tunnels.
Description of drawings
Fig. 1 is the vertical view of monitoring device of the present invention, and Fig. 2 is the front view of Fig. 1, and Fig. 3 is the mounting structure schematic diagram of the present invention in boring.
Among the figure: 1-duroplasts piece A, 2-hydraulic pressure capsule, 3-duroplasts piece B, 4-sensor, 5-glue, 6-hydraulic oil pipe, 7-cable rope, 8-anchor fluke, 9-fixed pulley, 10-monitoring device, 11-pull rope, 12-boring.
The specific embodiment
Narrate mounting method of the present invention below with reference to the accompanying drawings.
1, makes flat jack, the duroplasts piece 1 that a section is an arc is processed the hole that can put into sensor from a side, upward glue 5 is fixing to place upper sensor 4 and filling in the hole, be another section that duroplasts piece 3 and a hydraulic pressure capsule 2 of arc is bonded to an integral body again, fix an oil pipe on the hydraulic pressure capsule 2, become a monitoring device 10;
Monitoring device is serially connected by sensor signal cable rope 7 and pull rope 11 intervals 10-25cm, forms device string (as shown in Figure 3);
2, hole 12 from bottom to top at the underworkings of needs monitoring;
3, the anchor fluke 8 that will fix fixed pulley 9 is put on pull rope 11 usefulness drill steels and is headed at the bottom of the hole;
4, then by artificial pulling traction rope 11, will install string and hang in the hole, be drawn to the precalculated position;
5, by hydraulic oil pipe 6 to hydraulic pressure capsule 2 pressurization oil transportations to the 2MPa, make it that two duroplasts pieces 1 and 3 are strutted jam-packed in boring 12;
6, by signal cable rope 7 microseismic signals that receives is transferred to the main frame of data receiving center, carry out the microseism monitoring;
9, finish microseism monitoring after, open the pressure-relief valve of hydraulic tube, reclaim flat jack and reuse.

Claims (1)

1, a kind of mounting method of shallow hole microseismic monitoring sensor of coal mine deep well, it may further comprise the steps:
The first step: make flat jack, the duroplasts piece that a section is an arc is processed the hole that can put into sensor from a side, placement upper sensor and encapsulating are fixed in the hole, be another section that duroplasts piece and a hydraulic pressure capsule of arc is bonded to an integral body again, fix an oil pipe on the hydraulic pressure capsule, become a monitoring device; During use, monitoring device is serially connected by sensor signal cable and pull rope interval 10-25cm, forms the device string;
Second step: the underworkings in the needs monitoring is holed from bottom to top;
The 3rd step: at the bottom of will having fixed the fixed pulley anchor fluke and putting on pull rope and head into the hole with drill steel;
The 4th step: then by artificial pulling traction rope, will install string and hang in the hole, and be drawn to the precalculated position;
The 5th step: by hydraulic oil pipe to hydraulic pressure capsule pressurization oil transportation to the 2MPa, make it that two duroplasts pieces are strutted jam-packed in boring;
The 6th step: by signal cable the microseismic signals that receives is transferred to the main frame of data receiving center, carry out the microseism monitoring;
The 7th step: after finishing the microseism monitoring, open the pressure-relief valve of hydraulic tube, reclaim flat jack and reuse.
CNB2006100698822A 2006-08-11 2006-08-11 Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well Expired - Fee Related CN100494637C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100698822A CN100494637C (en) 2006-08-11 2006-08-11 Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100698822A CN100494637C (en) 2006-08-11 2006-08-11 Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well

Publications (2)

Publication Number Publication Date
CN1912348A CN1912348A (en) 2007-02-14
CN100494637C true CN100494637C (en) 2009-06-03

Family

ID=37721384

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100698822A Expired - Fee Related CN100494637C (en) 2006-08-11 2006-08-11 Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well

Country Status (1)

Country Link
CN (1) CN100494637C (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101373219B (en) * 2008-08-23 2012-09-19 刘庭驹 Method for collecting safe monitoring data of earthquake and buildings
CN101446206B (en) * 2009-01-09 2011-01-12 中国安全生产科学研究院 Mine fiber optic sensor mounting method and special jaw
CN101949918B (en) * 2010-08-24 2013-04-17 甘肃农业大学 Device for installing soil humidity sensor
CN102465698A (en) * 2010-11-03 2012-05-23 北京科若思技术开发有限公司 Device and method for detecting effects and advantage directions of fracturing and water flooding
CN102242630B (en) * 2011-01-30 2017-05-31 山东科技大学 Flexible mine compression monitoring device and its monitoring method
CN102155263B (en) * 2011-03-11 2013-01-09 北京科技大学 Under-mine deep hole microseism monitoring sensor mounting device
CN103777235B (en) * 2014-01-13 2016-08-17 中国科学院武汉岩土力学研究所 A kind of stage excavation buried hard rock tunnel microseismic monitoring sensor method for arranging
CN104654947A (en) * 2014-12-19 2015-05-27 山东黄金矿业(莱州)有限公司三山岛金矿 Calibration gun mounting structure and method
CN107247287B (en) * 2017-06-14 2024-06-07 核工业北京地质研究院 Hydraulic support type microseismic sensor device
CN107478216B (en) * 2017-08-11 2020-05-01 山东省科学院激光研究所 Space attitude measuring device, microseismic monitoring system and method
CN108845347A (en) * 2018-05-02 2018-11-20 重庆华地工程勘察设计院 Near-surface combined microseism data monitoring system and method
CN109297462B (en) * 2018-11-09 2019-10-08 山东科技大学 The observation device and method of base object model rock stratum dynamic settling amount are covered on goaf
CN113266366B (en) * 2021-05-31 2022-05-17 太原理工大学 Automatic control method for hydraulic rod of rock burst roadway
CN114061815A (en) * 2021-11-29 2022-02-18 山东大学 Tunnel ground stress direction testing device and method based on rock mass acoustic signals
CN117905443A (en) * 2024-01-17 2024-04-19 浙江大学 Recoverable installation device and installation method for in-hole vibration sensor

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88101902A (en) * 1987-04-02 1988-10-19 法国石油研究所 In the drilling well earthquake data acquisition and data be sent to control and the record center system device
CN1043185A (en) * 1988-11-29 1990-06-20 气体研究院 Method of determing depth of hydraulic fracture zone in earth
CN2298527Y (en) * 1997-02-27 1998-11-25 张少甲 Improved vertical seismic profile logging instrument

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88101902A (en) * 1987-04-02 1988-10-19 法国石油研究所 In the drilling well earthquake data acquisition and data be sent to control and the record center system device
CN1043185A (en) * 1988-11-29 1990-06-20 气体研究院 Method of determing depth of hydraulic fracture zone in earth
CN2298527Y (en) * 1997-02-27 1998-11-25 张少甲 Improved vertical seismic profile logging instrument

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
深井地压灾害微震监测技术研究. 李庶林,杨念哥,尹贤刚,郑文达,C.Trifu,I.Leslie.第八次全国岩石力学与工程学术大会论文集. 2004
深井地压灾害微震监测技术研究. 李庶林,杨念哥,尹贤刚,郑文达,C.Trifu,I.Leslie.第八次全国岩石力学与工程学术大会论文集. 2004 *

Also Published As

Publication number Publication date
CN1912348A (en) 2007-02-14

Similar Documents

Publication Publication Date Title
CN100494637C (en) Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well
US6692194B2 (en) Method for installing a conductor casing through a suction substructure
CN102155263B (en) Under-mine deep hole microseism monitoring sensor mounting device
US5704732A (en) Deep water piling and method of installing or removing
CN100494638C (en) Mounting method for deep hole microseismic monitoring sensor of coal mine
CN103899316A (en) Novel drilling method for shaft drilling machine
CN107328385B (en) Goaf top and bottom plate deformation and filling body stress monitoring integrated device and method
CN207541062U (en) A kind of water quality detecting device used for geological prospecting
CN203822310U (en) Novel drilling-method shaft-well drill
CN202531151U (en) Hydraulic fracturing device for coal mine laneway pressure relief
CN211824858U (en) Shield constructs around originating/arrival section tunnel stratum water and soil pressure monitoring devices
CN113309487A (en) Recoverable fixed-point grouting device and method for directional long drilling hole in underground coal mine
CN200940498Y (en) Down hole shallow hole micro quake monitor device
CN109611146A (en) A kind of unrestrained grouting method of absciss layer water
US9115582B2 (en) Stope fill barrier
CN204804820U (en) Horizontal well rod pipe conveying dynamic logging process rod pipe column
US4718791A (en) High capacity tieback installation method
CN105626109B (en) It is a kind of that there is the method for repeating to apply prestressed cable bolting
CN111880270B (en) Vertical seismic profile optical cable well descending device, oil and gas exploration system and well descending method
CN104863550B (en) Hydraulic jet perforation and APR testing combination operation technique
AU720498B2 (en) Hydraulic fracturing of ore bodies
CN207331690U (en) Pile pile sunk stake machine
US20010030045A1 (en) Assembly and floatation method for drilling drivepipe
CN108843355A (en) A kind of mechanical anchoring device
CN216246427U (en) Portable pore-forming and deep hole sensor installation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20090213

Address after: 168, Shun Middle Road, Huainan City, Anhui Province, China: 232001

Applicant after: Anhui University Of Science And Technology

Address before: Shandong province Tai'an city Taishan District Daizong Street No. 223 Shandong University of Science and Technology post encoding: 271019

Applicant before: Cheng Yunhai

ASS Succession or assignment of patent right

Owner name: ANHUI TECHNOLOGY UNIVERSITY

Free format text: FORMER OWNER: CHENG YUNHAI

Effective date: 20090213

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Sanzheng Group Co., Ltd.

Assignor: Anhui University Of Science And Technology

Contract record no.: 2010340000146

Denomination of invention: Mounting method for shallow hole microseismic monitoring sensor of coal mine deep well

Granted publication date: 20090603

License type: Exclusive License

Open date: 20070214

Record date: 20100806

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090603

Termination date: 20100811