CN100487312C - Boiler run control method and boiler run control system - Google Patents

Boiler run control method and boiler run control system Download PDF

Info

Publication number
CN100487312C
CN100487312C CNB200610088693XA CN200610088693A CN100487312C CN 100487312 C CN100487312 C CN 100487312C CN B200610088693X A CNB200610088693X A CN B200610088693XA CN 200610088693 A CN200610088693 A CN 200610088693A CN 100487312 C CN100487312 C CN 100487312C
Authority
CN
China
Prior art keywords
coal
boiler
tag
character
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB200610088693XA
Other languages
Chinese (zh)
Other versions
CN1873328A (en
Inventor
柏崎良之
清水悟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN1873328A publication Critical patent/CN1873328A/en
Application granted granted Critical
Publication of CN100487312C publication Critical patent/CN100487312C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Regulation And Control Of Combustion (AREA)
  • Feeding And Controlling Fuel (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The invention relates to a method for controlling boiler operation, which comprises following steps: putting IC tag stored with information about coal properties into coal with the same ration for each coal species; reading said information; determining supply amount in relative to unit time, mixing ration and coal property for every species according to read information; defining the operational parameter according to said determined information and proceeding control for boiler according to fixed operational parameter. The invention controls boiler for various coal species to realize optimum burning in relative to real coal mixing ratio. ss

Description

Boiler run control method and boiler run control system
Technical field
The coal that the present invention relates to more than one coals is the progress control method and the boiler run control system of the boiler of fuel.
Background technology
Because the coal burning boiler (with the boiler of coal) that usually in the power plant, the uses coal from import all over the world commonly used, so it is also various to be used in the character (coal character) of the coal in the boiler as raw material.Because combustion characteristics changes because of the difference of coal character, be the operation that is adapted to different coals so improve the important indicator of boiler efficiency again.
Therefore, all the time, the operation of manual many coals of the reply boiler by operator control or tackle the operation control of many coals boiler by computer.The former is following method: the operator utilizes empirical index to judge the kind of coal, set coal (caloric value of this coal, fuel ratio, moisture, ash content, comminuted etc.) in the operational parameter control calculation procedure of bonded boiler operating control device, control CALCULATION OF PARAMETERS as required, and control the adjustment of parameter as required.
The latter is following method: the ash behind the analysis coal combustion etc., infer the coal character of multiple coal, based on this coal character, control CALCULATION OF PARAMETERS with the operational parameter control calculation procedure, and this result of calculation outputed in the boiler operatiopn control device, or following method: measure and be fed into broken coal supply amount and the coal of using in the grater (flintiness of coal) of coal dust, carry out the operation control (spy opens the 2003-170079 communique) of grater based on these information.
But all there is following problem in described arbitrary technology: thus coal burning boiler is set very labor intensive in the coal character that grasp is supplied to.
That is, under the situation of passing through the operation control that the operator controls many coals boiler in the past, need manually carry out data setting, thereby this problem of labor intensive on data setting etc. is arranged.Under the situation of the operation control of the many coals boiler that the ash behind the coal combustion etc. has been carried out analyze,,, expend this problem of expense thereby have on system imports so that system becomes is very complicated because analysis result need be fed back in data setting again.Again, patent documentation 1 disclosed technology is the technology in the operation of the grater control, and the gas of not considering boiler distributes the control of the aperture of damper or vapor (steam) temperature setting value etc.
Again, during coal in switching is fed into boiler, the blending ratio of putting into the coal in the boiler changes.For example, from coal A when coal B switches coal, the ratio of the coal of initial coal A is more, but the ratio of coal B increases gradually after a while.But any of conventional art can not know that all the coal of which coal of a few percent is put in the boiler at this moment, thereby following problem is arranged: boiler control during this period might become unstable.
Summary of the invention
The present invention addresses these problems, and purpose is to provide a kind of coal burning boiler for many coals to control, and makes its boiler run control method that becomes the boiler combustion corresponding with the mixing ratio of actual coal etc.
The present invention provides a kind of boiler run control method in order to solve described problem, comprising: the IC tag spreading gear is mixed in step in the coal with the IC tag that has stored the information relevant with the coal character of described coal; Described coal supplied with described coal to the stoker of boiler is supplied to step in the boiler; Read the step of the information that is mixed in the IC tag in the coal that is fed in the described boiler as the IC tag reader of the reading device of described IC tag; Carry out following step (1), (2) that the boiler operatiopn control device of the operation control of described boiler carries out, (1), determines the step of the coal character of the blending ratio of the quantity delivered of the unit interval correspondence of described each coal, described each coal and described each coal based on the information of the IC tag that reads by described IC tag reader; And (2) are based on quantity delivered, the blending ratio of described each coal and the coal character of described each coal of the unit interval correspondence of described definite described each coal, calculate the operational parameter control of described boiler, and, carry out the step of the operation control of described boiler based on the operational parameter control of described calculating.With regard to other method, will in embodiment described later, narrate.
According to the present invention, just can control for the coal burning boiler of many coals, make it become the corresponding boiler combustion of mixing ratio with actual coal.
Description of drawings
Fig. 1 is the figure that is illustrated in the power plant of comparative example the relation between the operation control of many coals boiler that coal is carried out from unload coal the place equipment this process and operator in being transported to boiler;
Fig. 2 is the figure of order of operation control of many coals boiler of the boiler run control method of expression first embodiment of the present invention;
Fig. 3 is the calcspar of structure of the boiler operatiopn control device of presentation graphs 2;
Fig. 4 is the figure of function of the boiler operatiopn control device of key diagram 3;
Fig. 5 is the calcspar of structure of the boiler operatiopn control device of expression second embodiment;
Fig. 6 is the figure of step of operation control of many coals boiler of the boiler run control method of expression second embodiment.
Symbol description
1 coal carry vessel
2 machine for unloading coals
3 coal yard ground
4 conveyer belts
5 feed bins
6 stokers
7 graters
8 boiler bodies
11 boiler operatiopn control device
12 IC labels
13 IC label readers
15 equalization coal character calculation procedures
16 operational parameter control calculation procedures
17 boiler operatiopn control programs
20 boilers
30 IC label writing stations
31 input units
32 IC label spreading gears
110 CPU (equalization coal character calculating part, operational parameter control calculating part)
111 memories
The specific embodiment
Below, with reference to description of drawings the specific embodiment of the present invention (below, be called embodiment).
The flow process of operation control of many coals boiler of comparative example at first, is described.As example, description operation person carries out the situation of the operation control of many coals boiler at this.Fig. 1 is the figure that is illustrated in the power plant of comparative example the relation between the operation control of many coals boiler that coal is carried out from unload coal the place equipment this process and operator in being transported to boiler.
At first, transport the coal of coming from colliery all over the world, unload coal from coal carry vessel 1 by machine for unloading coal 2, and be transported to storage in the coal yard ground 3 in the place of unloading coal by coal carry vessel 1.Then, preserve in coal yard the coal in 3 be transported to boiler 20 by conveyer belt 4.This boiler 20 includes the feed bin 5 that is used for temporarily storing coal, coal is supplied to the stoker 6 of grater 7, coal is processed as the grater 7 of micropowder and makes the boiler body 8 of the coal combustion that is processed as micropowder and constitutes.If coal is transported in the feed bin 5 by conveyer belt 4, then in stoker 6, carry out the adjusting of coal quantity delivered, coal is processed as micropowder and is transported in the boiler body 8 with grater 7, thereby be utilized as the fuel of the usefulness of burning.
At this moment, because the coal of supplying with from stoker 6 is many coals,, and be input in the boiler operatiopn control device 11 so the operator selects to represent the coal code (coal ID) of the kind of the coal of mixing with the input unit of PC (personal computer) 9.Consequently, undertaken by boiler operatiopn control device 11 corresponding to the control of the selected coal code of operator.
But because only switch the coal code, boiler can not carry out the suitable burning corresponding to coal character, so the operator need adjust control setting value etc.And then, because in the handoff procedure of coal, can not know which coal with which kind of ratio is mixed, instability so control during this period might become.
(first embodiment)
The flow process of operation control of many coals boiler that boiler run control method carried out of first embodiment of the present invention then, is described.Fig. 2 is the figure of step of operation control of many coals boiler that boiler run control method carried out of expression first embodiment of the present invention.
At first, unload coal from coal carry vessel 1 by machine for unloading coal 2, and be transported to storage in the coal yard institute 3 by the coal that 1 transportation of coal carry vessel comes.
Then, the manager is by the coal of the coal that unloads, and will be input in the input unit 31 with output state, caloric value, fuel ratio, ash content, moisture and the comminuted relevant information (information of relevant coal character) of the coal of this coal.If IC tag writing station 30 receives the relevant information of coal character with input from input unit 31, then IC tag writing station 30 is written into the information of relevant this coal character in the IC tag 12.
And, unloading and be transported to from coal carry vessel 1 coal yard ground 3 these processes at this coal, IC tag spreading gear 32 mixes IC tag 12 in coal, and described IC tag 12 writes the information relevant with coal character.That is, under the situation of the unloaded information of the coal of IC tag spreading gear 32 acquisition coal A, then in this coal, mix the IC tag 12 that (broadcasting sowing) writes the information relevant with the coal character of coal A.When the unloaded information of coal that obtains coal B, then in this coal, mix the IC tag 12 that (broadcasting sowing) writes the information relevant with the coal character of coal B again.
This moment is preferred, IC tag 12, and unloaded and machine for unloading coal 2 placed coal yard institute at 3 o'clock with coal at coal, was blended in as far as possible in heterogeneity in the coal integral body, again, all was mixed in the coal with identical ratio by each coal.That is, preferably in each coal, including on the ratio of IC tag 12 and do not having deviation.This is more correctly to grasp the quantity delivered of each coal of time per unit and the blending ratio of this coal for, boiler operatiopn control device 11.
In addition, the blending ratio of Ci Shi IC tag 12 for example is about 10/t.
Then, be mixed with the coal of IC tag 12, be transported to the feed bin 5 by conveyer belt 4 from coal yard institute 3, thereby be transported to the boiler body 8 via grater 7 from stoker 6.
In this IC tag 12, have IC chip (IC integrated circuit) and be connected in antenna on this IC chip.In this IC chip, store and the output state of coal, caloric value (kJ/kg), fuel ratio (value that obtains divided by fixed carbon with volatile ingredient), moisture, ash content and relevant information such as comminuted.
Thereby, because this IC tag 12 is very small-sized (for example, 0.4mm is square etc.), so, also the operation of boiler 20 is not exerted an influence even in boiler 20, burn with coal.
If this IC tag 12 then utilizes antenna to be transformed to electric power from the electromagnetic wave that this IC tag reader 13 sends near IC tag reader 13.Then, the IC chip uses this electric power to produce the electromagnetic wave of the identifying information (ID) that writes of expression, and sends to the IC tag reader 13 from antenna.Thereby the identifying information that IC tag reader 13 can will be written in the IC chip in the mode with IC tag 12 noncontacts (wireless) reads in IC tag reader 13.
Like this, the IC tag reader 13 that is arranged on the stoker 6 reads the information of coal character by be mixed in IC tag 12 from the coal that stoker 6 is supplied with in grater 7.
Then, the information of the IC tag 12 that is read by IC tag reader 13 is sent to boiler operatiopn control device 11.Then, the number of the IC tag 12 of each coal that boiler operatiopn control device 11 is read by the IC tag reader according to time per unit is calculated the blending ratio of each coal.Again, according to this blending ratio, with the coal character that reads by IC tag reader 13, calculate the coal character of the equalization that supplies to the coal in the boiler body 8.Then, according to the coal character of this equalization, with the coal quantity delivered of time per unit, calculate the operational parameter control that boiler body 8 becomes optimal boiler combustion, thereby carry out operation control based on the boiler body of this operational parameter control.The operation control of this moment will be narrated in the back.
Fig. 3 is the calcspar of structure of the boiler operatiopn control device of presentation graphs 2.As shown in Figure 3, boiler operatiopn control device 11 have the CPU (central processing unit) 110 that carries out various calculation process, as memory 111, the realization and the network of the communicating by letter usefulness controller 112 of the IC tag reader 13 of Fig. 2 and I/O (I/O) interface 113 of boiler 20 being exported control signals used by CPU110 to the storage part in computing zone.
In memory 111, store: equalization coal character calculation procedure 15, make the information of CPU110 according to the IC tag of exporting from IC tag reader 13 12, come computational rules to supply to the coal character of the equalization of the coal in the boiler body 8 in the time; Operational parameter control calculation procedure 16, calculate the operational parameter control (dynamic guide's control signal and grater rotary speed etc. when gas distributes damper aperture, SH (SuperHeater, superheater) spraying aperture, vapor (steam) temperature setting value, water combustion ratio, load variations) of boiler 20 according to definite coal character; Boiler operatiopn control program 17 is based on the operational parameter control that is calculated, to boiler 20 output operation control signals.
In addition, the equalization coal character calculating part in the technical scheme realizes that by making CPU110 carry out equalization coal character calculation procedure the operational parameter control calculating part is realized by making CPU110 carry out operational parameter control calculation procedure 16.Again, network is equivalent to acceptance division in the technical scheme with controller 112.
Then,, use Fig. 4, the function of boiler operatiopn control device 11 is described suitably with reference to Fig. 2~Fig. 3.Fig. 4 is the figure of function of the boiler operatiopn control device of key diagram 3.At this,, illustrate that it is coal A, coal B and this situation of 3 kinds of coal C that boiler 20 uses the coal as fuel as example.
At first, read the IC tag 12 that is mixed in the coal of supplying with by stoker 6 with IC tag reader 13.Then, the information with the IC tag 12 that reads outputs in the boiler operatiopn control device 11 one by one.
The CPU110 of boiler operatiopn control device 11 is based on equalization coal character calculation procedure 15, and the information storage of the IC tag 12 that will receive via network usefulness controller 112 is in memory 111.In this information that is stored in the memory 111 is the coal character I of coal A AThe coal character I of (symbol 40), coal B BThe coal character I of (symbol 42) and coal C C(symbol 44), with the number N of the IC tag 12 that is contained in the coal A in the coal of from stoker 6, supplying with in the stipulated time AThe number N of the IC tag 12 of (symbol 41), coal B BThe number N of the IC tag 12 of (symbol 43) and coal C C(symbol 45).Contain caloric value, fuel ratio, moisture, ash content, information such as comminuted in this packets of information of coal character again.In addition, the information of this coal character also can further include and the output state of coal, the relevant information of ature of coal classification (anthracite, pitch coal, inferior pitch coal, brown coal etc.), caking property (non-bonding, strong bonding, weak bonding etc.).
Then, CPU110 to be stored in the data in the memory 111, calculates the coal character of the equalization that supplies to the coal in the boiler body 8 at the appointed time based on equalization coal character calculation procedure 15.
That is,, obtain the caloric value, fuel ratio, moisture, ash content of the coal of supplying with in the stipulated time, comminuted etc. mean value based on following formula (1).
[formula 1]
N A N A + N B + N C I A + N B N A + N B + N C I B + N C N A + N B + N C I C · · · ( 1 )
Then, CPU110 is based on operational parameter control calculation procedure 16, and the coal character by equalization (coal supply amount of caloric value, fuel ratio, moisture, ash content, comminuted, time per unit etc.) is calculated the operational parameter control that is used for moving efficiently boiler 20.Operational parameter control at this for example is gas distribution damper aperture, SH spraying aperture, vapor (steam) temperature setting value, dynamic guide's control signal, grater 7 rotary speeies etc. when water fires than standard, load variations of boiler body 8.This operational parameter control calculation procedure 16 for example can be realized by using the spy to open the technique known that flat 06-102905 communique put down in writing.
CPU110 carries out operational parameter control calculation procedure 16 based on the fuel ratio of the coal character of equalization.For example, CPU110 is with reference to the function (with reference to the zone 18 of Fig. 4) of the expression best SH spraying aperture corresponding with fuel ratio, come calculating optimum SH spraying aperture, perhaps by each fuel ratio, function (with reference to the zone 18 of Fig. 4) with reference to the expression best grater rotary speed corresponding with the coal supply amount, come calculating optimum grater rotary speed, thereby obtain operational parameter control.
Then,, carry out boiler operatiopn control program 17 because CPU110 is based on this operational parameter control,, even boiler operatiopn control device 11 also can carry out optimum operation to boiler 20 and control under the situation that blending ratio and the passing of time one of each coal changes.
Like this, by after coal is unloaded, coal being transported in the process on coal yard ground 3, irrespectively mix with coal with the coal class with the IC tag 12 that the ratio of a certain regulation will include about the various information of coal, and read its information by the IC tag reader 13 that is arranged on the stoker, just can correctly know from stoker 6 to supply to the information (information such as caloric value, fuel ratio, moisture, ash content, comminuted, output state, medium classification and caking property) of the many coals the grater 7 or the quantity delivered of each coal.With this, compare with the operation control of many coals boiler that the operator carried out of comparative example, can alleviate the burden of control.Again, the operation of the many coals boiler that is carried out with computer control is compared, and can reduce equipment cost.
(second embodiment)
Then,, use Fig. 5 and Fig. 6, second embodiment of the present invention is described with reference to Fig. 2~Fig. 4.Fig. 5 is the calcspar of structure of the boiler operatiopn control device of expression second embodiment.Fig. 6 is the figure of step of operation control of many coals boiler of the boiler run control method of expression second embodiment of the present invention.
Second embodiment is characterised in that IC tag 12 stores coal ID (identifying information of coal, coal code), and the information storage of the coal character of relevant this coal is in boiler operatiopn control device 11 sides.That is, as shown in Figure 5, memory 111 stores the coal property list 120 of the expression information relevant with the coal character of each coal ID.The structural element mark identical Reference numeral identical with described first embodiment omits explanation.
As shown in Figure 6, the coal that comes by coal carry vessel 1 carrying, with first embodiment in the same manner, unload coal from coal carry vessel 1 by machine for unloading coal 2, and be transported in the coal yard ground 3.Then, the manager is by the coal of the coal that unloads, and utilizes input unit 31 to import output state, caloric value, fuel ratio, ash content, moisture and comminuted relevant information (information of relevant coal character) with the coal of this coal.At this moment, to IC tag writing station 30 output coal ID, the information relevant with the coal character of each coal ID outputs in the boiler operatiopn control device 11.
IC tag writing station 32 will be written to the IC tag 12 from the coal ID of input unit 31 outputs, and this IC tag 12 is transported in the IC tag spreading gear 32.Then, the IC tag spreading gear 32 and first embodiment mix (broadcasting sowing) in coal with IC tag 12 in the same manner.
On the other hand, boiler operatiopn control device 11 then is stored in it in memory 111 as coal property list 120 if receive the information relevant with the coal character of each coal ID from input unit 31.
This coal property list 120 is as shown in table 1.
[table 1]
The coal property list
Coal ID Fuel ratio Caloric value Ash content Moisture Comminuted Caking property Output state The ature of coal classification
A a b c d e f g h
B ... ... ... ... ... ... ... ...
... ... ... ... ... ... ... ... ...
For example, in table 1, the fuel ratio of the coal of expression coal ID " A " is " a ", and caloric value is " b ", and ash content is " c ", and moisture is " d ", and comminuted is " e ", and caking property is " f ", and output state is " g ", and the ature of coal classification is " h ".
Then, boiler operatiopn control device 11 is then determined the coal character of this coal if receive the coal ID that is stored in the IC tag 12 via IC tag reader 13 with reference to coal property list 120.Then, carry out the calculating of operational parameter control based on this coal character of determining.
Like this, even under the situation that the blending ratio of the coal of boiler operatiopn control device 11 in supplying to boiler body 8 and the passing of time one change, also can carry out optimum operation control to boiler 20.Promptly, because can correctly know from stoker 6 to supply to the information (information of caloric value, fuel ratio, moisture, ash content, comminuted, output state, ature of coal classification, caking property etc.) of the many coals in the grater 7 or the quantity delivered of each coal, control so carry out many coals operations easily.
Again, in the present embodiment, because the information storage of relevant coal character is in the memory 111 of boiler operatiopn control device 11, so can reduce to be stored in information content in the IC tag 12.That is, even the little IC tag 12 of memory capacity also can be implemented native system.
In addition, in said embodiment, illustrated that the blending ratio of 12 pairs of coals of IC tag is done to become identical ratio by each coal, but be not limited thereto.For example, the blending ratio of IC tag 12 on each coal not simultaneously, the ratio of this mixing is set in the memory 111 of boiler operatiopn control device 11 via input unit 31.And, calculating during the coal character of equalization, with reference to these blending ratios, to the number (N of Fig. 4 of IC tag 12 by equalization coal character calculation procedure 15 A, N B, N C) be weighted calculating.Like this, though at the blending ratio of IC tag 12 under situations different on each coal, boiler operatiopn control device 11 also can carry out the optimized operation control of boiler 20.
The boiler operatiopn control device 11 of present embodiment can be realized by the program of carrying out aforesaid processing.Can be stored in the medium that can read (CD-ROM etc.) of computer these programs are provided again.Also can provide this program by network again.

Claims (8)

1. a boiler run control method is used to carry out and the corresponding boiler operatiopn control of the blending ratio of coal, it is characterized in that,
Comprise:
The IC tag spreading gear is mixed in step in the coal with the IC tag that has stored the information relevant with the coal character of described coal;
Described coal supplied with described coal to the stoker of boiler is supplied to step in the boiler;
Read the step of the information that is mixed in the IC tag in the coal that is fed in the described boiler as the IC tag reader of the reading device of described IC tag;
Carry out following step (1), (2) that the boiler operatiopn control device of the operation control of described boiler carries out,
(1), determines the step of the coal character of the blending ratio of the quantity delivered of the unit interval correspondence of described each coal, described each coal and described each coal based on the information of the IC tag that reads by described IC tag reader;
(2) based on quantity delivered, the blending ratio of described each coal and the coal character of described each coal of the unit interval correspondence of described definite described each coal, calculate the operational parameter control of described boiler, and, carry out the step of the operation control of described boiler based on the operational parameter control of described calculating.
2. boiler run control method as claimed in claim 1 is characterized in that,
The information relevant with described coal character is caloric value, fuel ratio, ash content, moisture and the comminuted relevant information with described coal.
3. a boiler run control method is used to carry out and the corresponding boiler operatiopn control of the blending ratio of coal, it is characterized in that,
Comprise:
The IC tag spreading gear will store IC tag as the coal ID of the identifying information of described coal and be mixed in step in the coal;
Described coal supplied with described coal to the stoker of boiler is supplied to step in the boiler;
Read the step of the information that is mixed in the IC tag in the coal that is fed in the described boiler by IC tag reader as the reading device of described IC tag;
Carry out following step (1), (2), (3) that the boiler operatiopn control device of the operation control of described boiler carries out,
(1) based on the information of the described IC tag that reads, measure the quantity delivered of the described unit interval correspondence of described each coal, determine the step of the blending ratio of described each coal;
(2) by described coal ID, the coal property list of the coal character of the described coal of contrast expression, with the information of the described IC tag that reads, determine the step of the coal character of described each coal; And
(3) based on quantity delivered, the blending ratio of described each coal and the coal character of described each coal of the described unit interval correspondence of described each coal of described mensuration, calculate the operational parameter control of described boiler, and, carry out the step of the operation control of described boiler based on the operational parameter control of described calculating.
4. boiler run control method as claimed in claim 3 is characterized in that,
Described IC tag spreading gear is being mixed in described IC tag in the step of coal, and the ratio of the quantity of the IC tag of mixing adopts identical ratio by each coal.
5. a boiler run control system is used to carry out and the corresponding boiler operatiopn control of the blending ratio of coal, it is characterized in that,
Have:
The IC tag reader reads the information of IC tag, and described IC tag is mixed in the coal in the boiler that the coal that is fed into the coal more than a kind is a fuel, and stores the information relevant with the coal character of described coal;
The boiler operatiopn control device has: acceptance division receives the information of the IC tag that is read by described IC tag reader; Equalization coal character calculating part, based on the blending ratio of each coal of determining by each number of each coal of the IC tag of described reception with the relevant information of coal character of each coal of described reception, calculate the coal character of the equalization that supplies to the coal in the described boiler; The operational parameter control of described boiler based on the coal character of described equalization, calculates in s operation control calculation of parameter portion, and, carry out the operation control of described boiler based on the operational parameter control of described calculating.
6. a boiler run control system is used to carry out and the corresponding boiler operatiopn control of the blending ratio of coal, it is characterized in that,
Have:
The IC tag reader reads the information of IC tag, and described IC tag is mixed in the coal in the boiler that the coal that is fed into the coal more than a kind is a fuel, and stores and the relevant information of described coal character;
The boiler operatiopn control device has: acceptance division receives the information of the IC tag that is read by described IC tag reader; Storage part is pressed the coal ID as the identifying information of described coal, the coal property list of the coal character of the described coal of storage representation; Equalization coal character calculating part, coal ID with described reception is that described coal property list retrieved in keyword, determine to be fed into the coal character in the described boiler, and determine the blending ratio of described each coal according to each number of each coal of the IC tag of described reception, calculate the coal character of the equalization that is fed into the coal in the described boiler based on the blending ratio of the coal character of described definite each coal and described definite each coal; The operational parameter control calculating part based on the coal character of described equalization, calculates the operational parameter control of described boiler, and, carry out the operation control of described boiler based on the operational parameter control of described calculating.
7. as each described boiler run control system in the claim 5,6, it is characterized in that,
The information relevant with described coal character is caloric value, fuel ratio, ash content, moisture and the comminuted relevant information with described coal.
8. boiler run control system as claimed in claim 7 is characterized in that,
The ratio that is mixed in the quantity of the IC tag in the coal that is fed in the described boiler is by the identical ratio of described coal.
CNB200610088693XA 2005-06-02 2006-06-01 Boiler run control method and boiler run control system Expired - Fee Related CN100487312C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2005162870A JP4153927B2 (en) 2005-06-02 2005-06-02 Boiler operation control method and boiler operation control system
JP2005162870 2005-06-02

Publications (2)

Publication Number Publication Date
CN1873328A CN1873328A (en) 2006-12-06
CN100487312C true CN100487312C (en) 2009-05-13

Family

ID=37483876

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200610088693XA Expired - Fee Related CN100487312C (en) 2005-06-02 2006-06-01 Boiler run control method and boiler run control system

Country Status (2)

Country Link
JP (1) JP4153927B2 (en)
CN (1) CN100487312C (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101487594B (en) * 2009-02-23 2010-06-02 东南大学 Control method for restraining influence of coal mill start/stop to main vapour pressure of boiler
CN101832544B (en) * 2010-05-14 2012-05-30 上海发电设备成套设计研究院 Method for online monitoring thermal deviations of final superheater and final reheater of boiler of power station
CN101871655B (en) * 2010-06-24 2012-01-04 西安交通大学 On-line monitoring system for coal-combustion overall process of power station boiler
JP5609695B2 (en) * 2011-02-14 2014-10-22 東京電力株式会社 Flowable powder monitoring method
JP5856899B2 (en) * 2012-04-23 2016-02-10 株式会社日立製作所 Coal-fired power plant control equipment
JP6180218B2 (en) * 2013-07-24 2017-08-16 三菱日立パワーシステムズ株式会社 Solid fuel combustion equipment
CN104930542A (en) * 2015-06-18 2015-09-23 广东电网有限责任公司电力科学研究院 Ultra-supercritical coal-fired boiler unit start adjusting method and system
CN105203290B (en) * 2015-09-22 2017-12-26 广东电网有限责任公司电力科学研究院 Ultra supercritical anise circle of contact coal-fired power station boiler cool power field test method
CN107631321B (en) * 2017-08-15 2019-02-15 华中科技大学 A kind of coal dust firing online detection and control system and method
CN107559878A (en) * 2017-09-25 2018-01-09 华能国际电力股份有限公司日照电厂 The method and device of fire coal management
JP6818105B1 (en) * 2019-09-30 2021-01-20 三菱パワー株式会社 Fuel identification system, control system and solid fuel crusher, and fuel identification method
CN113719856A (en) * 2021-08-24 2021-11-30 河北邯峰发电有限责任公司 Automatic coal blending and blending combustion control method for coal-fired generator set
CN113739195B (en) * 2021-08-26 2024-06-07 上海发电设备成套设计研究院有限责任公司 Method, device, equipment and medium for controlling separated coal feeding amount

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2947900B2 (en) * 1990-08-30 1999-09-13 バブコツク日立株式会社 Minimum load control unit for coal combustion equipment
JP2004176956A (en) * 2002-11-26 2004-06-24 Hitachi Ltd Method of operating ash melting furnace
JP2004239533A (en) * 2003-02-06 2004-08-26 Hitachi Ltd Combustion device and thermal power generation device

Also Published As

Publication number Publication date
JP4153927B2 (en) 2008-09-24
JP2006336951A (en) 2006-12-14
CN1873328A (en) 2006-12-06

Similar Documents

Publication Publication Date Title
CN100487312C (en) Boiler run control method and boiler run control system
Strid Eriksson et al. Environmental systems analysis of pig production-the impact of feed choice (12 pp)
Lehuger et al. Environmental impact of the substitution of imported soybean meal with locally-produced rapeseed meal in dairy cow feed
Nazarenko et al. Influence of relief conditions on plant growth and development
Stark Feed processing to maximize feed efficiency
CN103964145A (en) Accurate coal blending process
Li et al. Availability of potassium in biomass combustion ashes and gasification biochars after application to soils with variable pH and clay content
Einarsson et al. The nitrogen footprint of Swedish food consumption
Maguire et al. Effect of phytase and vitamin D metabolite (25OH-D3) in turkey diets on phosphorus solubility in manure-amended soils
Thaler Use of distillers dried grains with solubles (DDGS) in swine diets
CN106699281A (en) Method and device for controlling fertilizer distribution
Krieg et al. In situ and in vitro evaluation of crude protein degradation and utilisable crude protein content of barley, rye and triticale grains for ruminants
Lory et al. A classification system for factors affecting crop response to nitrogen fertilization
Binggeli et al. Economic and environmental effects of revised metabolizable protein and amino acid recommendations on Canadian dairy farms
Weiss et al. Impact and management of variability in feed and diet composition
EP3984660A1 (en) Method and system for storing biomass raw material
Moerschner et al. Energy investigations of different intensive rape seed rotations–a German case study
JP2003034588A (en) Method and system for circulation-chain-type recycling of food refuse
Swanson et al. A sequential approach to the feed-mix problem
Du Plessis Feed prices in the spotlight
Davulis et al. Potential for energy conservation in feeding livestock and poultry in the United States, Station Bulletin, no. 506
CN111553540B (en) Intelligent batching system and method for agriculture and forestry biomass power plant
Wiśniewska-Kadżajan et al. Changes in the Nutritional Value of Timothy (Phleum pratense L.) Biomass as a Response to Varied Organomineral Treatment
Miller et al. Effects Of Coal Blending On The Utilization Of High-Sulfur Iowa Coal And Low-Sulfur Western Coal
US20240131485A1 (en) Conversion of solid waste into a blend having a target composition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: MITSUBISHI HITACHI POWER SYSTEM LTD.

Free format text: FORMER OWNER: HITACHI,LTD.

Effective date: 20140513

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140513

Address after: Kanagawa County, Japan

Patentee after: MITSUBISHI HEAVY INDUSTRIES, Ltd.

Address before: Tokyo, Japan

Patentee before: Hitachi, Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Kanagawa Prefecture, Japan

Patentee after: Mitsubishi Power Co.,Ltd.

Address before: Kanagawa Prefecture, Japan

Patentee before: MITSUBISHI HEAVY INDUSTRIES, Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090513