The specific embodiment
The present invention does with detailed description below in conjunction with drawings and Examples:
Embodiment 1,
The present invention includes following steps:
A, in the die cavity that mould (4) and (5) are formed, with emery wheel working layer materials (8), transition layered material (17), separation layer (7) and centrifugal medium (6) ecto-entad hierarchal arrangement radially, mould is fixed on the mainshaft mechanism (11); Emery wheel working layer materials (8) comprises abrasive material, metallic bond;
B, starter motor (12), the molding mass high speed rotary that drives mould, centrifugal medium and form by emery wheel working layer materials, transition layered material, centrifugal medium pressurizes to molding mass by separation layer;
C, start heater, to molding mass heat up, pressurization, finish centrifuge hot press sintering after, close heating power supply;
D, be cooled to below 300 ℃, stop the rotation, take apart a die.
Centrifugal medium (4) is high desnity metal particle or alloying pellet among the present invention, particle size range: between 0.1~1mm.Described centrifugal medium (4) is casting tungsten carbide powder or coarse granule tungsten powder.Abrasive material is diamond or cubic boron nitride.Bond comprises metal dust, non-metal powder etc.As preferred version, between described steps A and B, also can add following processing step: mould environment of living in is sealed, vacuumize, charge into protection gas.Heater is induction heating apparatus or resistive heating device.As preferred version, should pass through pelletization treatment respectively at the emery wheel working layer materials described in the described steps A, transition layered material.
Employed centrifuge hot press sintering device in the metal bonding agent extra hard material grinding wheel centrifuge hot press sintering method of the present invention, it is characterized in that: it comprises heater and centrifuge apparatus; Described heater adopts induction heating apparatus or resistive heating device; Centrifuge apparatus comprises support (1) and support (15), described support (15) is provided with protective cover (10) and rotary main shaft mechanism (11), in rotary main shaft mechanism (11), be mounted with mould, described mould comprises mould baffle plate (5), mould external mold (4) and core rod (9), by mould baffle plate (5), in the die cavity that mould external mold (4) and core rod (9) constitute centrifugal medium (6) is housed, separation layer (7), emery wheel working layer materials (8) and transition layered material (17), mould is in the heating element heater in the heater (2), and rotary main shaft mechanism (11) is provided with coolant guiding channel.Be provided with coolant guiding channel in the main shaft in the rotary main shaft mechanism (11); Described cooling medium is cold gas or cooling fluid.Label (3) is the cooling medium outlet port, and label (16) is the cooling medium inlet seat, and label (13) is the driving belt on the motor, and label (14) is a belt wheel.
Embodiment 2,
Method of the present invention comprises the steps:
Manufacture and design Φ 100mm * 150mm (height dimension) * 3mm (emery wheel abrasive material thickness)/7mm (the non-abrasive material thickness of emery wheel also claims transition zone)
The percentage by weight of bond is: Cu 50~80%, Co 10~15%, Fe 10~15%, Ni 5~10%, Sn 10~20%, Zn 0~5%.
Diamond concentration: 100%, granularity 70/80.
Concrete preparation method is as follows:
A, batch mixing
Earlier the various bond powder that above-mentioned prescription is needed are put into the general two dimension of super hard abrasive tool industry after by the weighing of prescription share or the three-dimensional blender machine fully mixes (do and mix) evenly, the time is 40 minutes.Add diamond again and fully mix (do mix) evenly, the time is 30 minutes.
B, granulation
Above-mentioned compound is added metal binding agent diamond tool make general granulation agent (the interim forming agent of WS120); stir in the agitator on the general granulator of industry and reach required do wet degree after; carry out pelletization treatment; compound becomes the evenly particle of (30 sieve mesh made in U.S.A) of size through granulating, have good flowability and stable apparent density.
C, moulding:
Mold pressing preformed: get the above-mentioned particulate material of some (calculating), in the steel mold of packing into, on hydraulic press, load certain axial compressive force compression moulding at normal temperatures, become the parison relative density to reach 60% through granulating according to above-mentioned emery wheel size.
D, centrifuge hot press sintering:
A. above-mentioned cold moudling pressed compact, centrifugal dielectric material and separation layer are assembled in graphite jig; on the special-purpose centrifuge hot press sintering equipment of this patent design, carry out centrifuge hot press sintering; this centrifuge hot press sintering equipment thermal source is a Frequency Induction Heating, and sintering atmosphere is restitutive protection's atmosphere.Heat up during sintering and revolution employing programming automation control.
B. starter motor (12), the molding mass high speed rotary that drives mould, centrifugal medium and form by emery wheel working layer materials, transition layered material, centrifugal medium pressurizes to molding mass by separation layer; Sintering temperature rise period centrifuge speed is 1200RPM, and the holding stage centrifuge speed is 4000RPM, and natural temperature-fall period centrifuge speed is 2000RPM.
C. start heater, molding mass is heated up, pressurizes 760 ℃ ± 3 ℃ of sintering temperatures; After finishing centrifuge hot press sintering, close heating power supply, sintering time amounts to 24 minutes: the temperature rise period branch carries out for four sections, amounts to nine minutes, holding stage five minutes, and cooling is ten minutes naturally;
D. be cooled to below 260 ℃, stop the rotation, take apart a die.
Above-mentioned centrifugal medium (4) is a casting tungsten carbide powder, particle size range: between 0.5~1mm.
Centrifugal burning emery wheel base Performance Detection: the averag density of emery wheel sintered blank is 90% (relative density), and the emery wheel hardness number is HRB85 ± 2; The emery wheel external diameter detects size: Φ 100mm ± 0.02 * 150mm ± 0.05.Compare with traditional handicraft, the density of the emery wheel of employing centrifugal burning technology manufacturing is more even, and the outside dimension precision has improved an order of magnitude.
This kind specification emery wheel is used for the bar centreless grinding processing of materials such as magnetic material, crystal, carbide alloy.Compare with the emery wheel of traditional handicraft manufacturing, the emery wheel of centrifuge hot press sintering technology manufacturing has better profile hold facility, higher grinding efficiency and lower manufacturing cost.
Embodiment 3,
Method of the present invention comprises the steps:
Manufacture and design Φ 100mm * 150mm (height dimension) * 5mm (emery wheel abrasive material thickness)/5mm (the non-abrasive material thickness of emery wheel also claims transition zone)
The percentage by weight of bond is: Cu 50~80%, Co 10~15%, Fe 10~15%, Ni 5~10%, Sn 15~20%, Zn 0~5%.
Diamond concentration: 75%, granularity 140/170.
Concrete preparation method is as follows:
A, batch mixing
Earlier the various bond powder that above-mentioned prescription is needed are put into the general two dimension of super hard abrasive tool industry after by the weighing of prescription share or the three-dimensional blender machine fully mixes (do and mix) evenly, the time is 40 minutes.Add diamond again and fully mix (do mix) evenly, the time is 40 minutes.
B, granulation
Above-mentioned compound is added metal binding agent diamond tool make general granulation agent (the interim forming agent of WS120); stir in the agitator on the general granulator of industry and reach required do wet degree after; carry out pelletization treatment; compound becomes the evenly particle of (40 sieve mesh made in U.S.A) of size through granulating, have good flowability and stable apparent density.
C, moulding:
Mold pressing preformed: get the above-mentioned particulate material of some (calculating), in the steel mold of packing into, on hydraulic press, load certain axial compressive force compression moulding at normal temperatures, become the parison relative density to reach 55% through granulating according to above-mentioned emery wheel size.
D, centrifuge hot press sintering:
A. above-mentioned cold moudling pressed compact, centrifugal dielectric material and separation layer are assembled in graphite jig; on the special-purpose centrifuge hot press sintering equipment of this patent design, carry out centrifuge hot press sintering; this centrifuge hot press sintering equipment thermal source is a Frequency Induction Heating, and sintering atmosphere is restitutive protection's atmosphere.Heat up during sintering and revolution employing programming automation control.
B. starter motor (12), the molding mass high speed rotary that drives mould, centrifugal medium and form by emery wheel working layer materials, transition layered material, centrifugal medium pressurizes to molding mass by separation layer; Sintering temperature rise period centrifuge speed is 1200RPM, and the holding stage centrifuge speed is 4500RPM, and natural temperature-fall period centrifuge speed is 2000RPM.
C. start heater, molding mass is heated up, pressurizes 780 ℃ ± 3 ℃ of sintering temperatures; After finishing centrifuge hot press sintering, close heating power supply, sintering time amounts to 24 minutes: the temperature rise period branch carries out for four sections, amounts to nine minutes, holding stage five minutes, and cooling is ten minutes naturally;
D. be cooled to below 200 ℃, stop the rotation, take apart a die.
Above-mentioned centrifugal medium (4) is a casting tungsten carbide powder, particle size range: between 0.5~1mm.
Centrifugal burning emery wheel base Performance Detection: the averag density of emery wheel sintered blank is 92% (relative density), and the emery wheel hardness number is HRB88 ± 2; The emery wheel external diameter detects size: Φ 100mm ± 0.02 * 150mm ± 0.05.Compare with traditional handicraft, the density of the emery wheel of employing centrifugal burning technology manufacturing is more even, and the outside dimension precision has improved an order of magnitude.
This kind specification emery wheel is used for the bar centreless grinding processing of materials such as magnetic material, crystal, carbide alloy.Compare with the emery wheel of traditional handicraft manufacturing, the emery wheel of centrifuge hot press sintering technology manufacturing has better profile hold facility, higher grinding efficiency and lower manufacturing cost.
Embodiment 4,
Method of the present invention comprises the steps:
Manufacture and design Φ 150mm * 150mm (height dimension) * 3mm (emery wheel abrasive material thickness)/5mm (the non-abrasive material thickness of emery wheel also claims transition zone)
The percentage by weight of bond is: Cu 60~80%, Co 5~10%, Fe 0~10%, Ni 5~10%, Sn 10~20%, Zn 0~5%.
Diamond concentration: 100%, granularity 80/100.
Concrete preparation method is as follows:
A, batch mixing
Earlier the various bond powder that above-mentioned prescription is needed are put into the general two dimension of super hard abrasive tool industry after by the weighing of prescription share or the three-dimensional blender machine fully mixes (do and mix) evenly, the time is 40 minutes.Add diamond again and fully mix (do mix) evenly, the time is 30 minutes.
B, granulation
Above-mentioned compound is added metal binding agent diamond tool make general granulation agent (the interim forming agent of PEG); stir in the agitator on the general granulator of industry and reach required do wet degree after; carry out pelletization treatment; compound becomes the evenly particle of (30 sieve mesh made in U.S.A) of size through granulating, have good flowability and stable apparent density.
C, moulding:
Mold pressing preformed: get the above-mentioned particulate material of some (calculating), in the steel mold of packing into, on hydraulic press, load certain axial compressive force compression moulding at normal temperatures, become the parison relative density to reach 65% through granulating according to above-mentioned emery wheel size.
D, centrifuge hot press sintering:
A. above-mentioned cold moudling pressed compact, centrifugal dielectric material and separation layer are assembled in graphite jig; on the special-purpose centrifuge hot press sintering equipment of this patent design, carry out centrifuge hot press sintering; this centrifuge hot press sintering equipment thermal source is a Frequency Induction Heating, and sintering atmosphere is restitutive protection's atmosphere.Heat up during sintering and revolution employing programming automation control.
B. starter motor (12), the molding mass high speed rotary that drives mould, centrifugal medium and form by emery wheel working layer materials, transition layered material, centrifugal medium pressurizes to molding mass by separation layer; Sintering temperature rise period centrifuge speed is 1500RPM, and the holding stage centrifuge speed is 4000RPM, and natural temperature-fall period centrifuge speed is 2000RPM.
C. start heater, molding mass is heated up, pressurizes 800 ℃ ± 5 ℃ of sintering temperatures; After finishing centrifuge hot press sintering, close heating power supply, sintering time amounts to 30 minutes: the temperature rise period branch carries out for four sections, amounts to ten minutes, holding stage five minutes, and cooling is 15 minutes naturally;
D. be cooled to below 250 ℃, stop the rotation, take apart a die.
Above-mentioned centrifugal medium (4) is the coarse granule tungsten powder, particle size range: between 0.2~0.8mm.
Centrifugal burning emery wheel base Performance Detection: the averag density of emery wheel sintered blank is 93% (relative density), and the emery wheel hardness number is HRB90 ± 2; The emery wheel external diameter detects size: Φ 150mm ± 0.02 * 150mm ± 0.05.Compare with traditional handicraft, the density of the emery wheel of employing centrifugal burning technology manufacturing is more even, and the outside dimension precision has improved an order of magnitude.
This kind specification emery wheel is used for the bar centreless grinding processing of materials such as magnetic material, crystal, carbide alloy.Compare with the emery wheel of traditional handicraft manufacturing, the emery wheel of centrifuge hot press sintering technology manufacturing has better profile hold facility, higher grinding efficiency and lower manufacturing cost.
Embodiment 5,
Method of the present invention comprises the steps:
Manufacture and design Φ 150mm * 150mm (height dimension) * 2.5mm (emery wheel abrasive material thickness)/5.5mm (the non-abrasive material thickness of emery wheel also claims transition zone)
The percentage by weight of bond is: Cu 50~80%, Co 5~15%, Fe 5~15%, Ni 5~10%, Sn 10~20%, Zn 0~5%.
Diamond concentration: 75%, granularity 140/170.
Concrete preparation method is as follows:
A, batch mixing
Earlier the various bond powder that above-mentioned prescription is needed are put into the general two dimension of super hard abrasive tool industry after by the weighing of prescription share or the three-dimensional blender machine fully mixes (do and mix) evenly, the time is 40 minutes.Add diamond again and fully mix (do mix) evenly, the time is 40 minutes.
B, granulation
Above-mentioned compound is added metal binding agent diamond tool make general granulation agent (the interim forming agent of PEG); stir in the agitator on the general granulator of industry and reach required do wet degree after; carry out pelletization treatment; compound becomes the evenly particle of (30 sieve mesh made in U.S.A) of size through granulating, have good flowability and stable apparent density.
C, moulding:
Mold pressing preformed: get the above-mentioned particulate material of some (calculating), in the steel mold of packing into, on hydraulic press, load certain axial compressive force compression moulding at normal temperatures, become the parison relative density to reach 60% through granulating according to above-mentioned emery wheel size.
D, centrifuge hot press sintering:
A. above-mentioned cold moudling pressed compact, centrifugal dielectric material and separation layer are assembled in graphite jig; on the special-purpose centrifuge hot press sintering equipment of this patent design, carry out centrifuge hot press sintering; this centrifuge hot press sintering equipment thermal source is a Frequency Induction Heating, and sintering atmosphere is restitutive protection's atmosphere.Heat up during sintering and revolution employing programming automation control.
B. starter motor (12), the molding mass high speed rotary that drives mould, centrifugal medium and form by emery wheel working layer materials, transition layered material, centrifugal medium pressurizes to molding mass by separation layer; Sintering temperature rise period centrifuge speed is 1200RPM, and the holding stage centrifuge speed is 5000RPM, and natural temperature-fall period centrifuge speed is 2000RPM.
C. start heater, molding mass is heated up, pressurizes 810 ℃ ± 3 ℃ of sintering temperatures; After finishing centrifuge hot press sintering, close heating power supply, sintering time amounts to 30 minutes: the temperature rise period branch carries out for four sections, amounts to ten minutes, holding stage five minutes, and cooling is 15 minutes naturally;
D. be cooled to below 250 ℃, stop the rotation, take apart a die.
Above-mentioned centrifugal medium (4) is a casting tungsten carbide powder, particle size range: between 0.3~1mm.
Centrifugal burning emery wheel base Performance Detection: the averag density of emery wheel sintered blank is 95% (relative density), and the emery wheel hardness number is HRB93 ± 2; The emery wheel external diameter detects size: Φ 150mm ± 0.02 * 150mm ± 0.05.Compare with traditional handicraft, the density of the emery wheel of employing centrifugal burning technology manufacturing is more even, and the outside dimension precision has improved an order of magnitude.
This kind specification emery wheel is used for the bar centreless grinding processing of materials such as magnetic material, carbide alloy.Compare with the emery wheel of traditional handicraft manufacturing, the emery wheel of centrifuge hot press sintering technology manufacturing has better profile hold facility, higher grinding efficiency and lower manufacturing cost.
Embodiment 6,
Method of the present invention comprises the steps:
Manufacture and design Φ 80mm * 50mm (height dimension) * 5mm (emery wheel abrasive material thickness)/5mm (the non-abrasive material thickness of emery wheel also claims transition zone) form grinding wheel, axial circular arc: R3 is arranged on the emery wheel excircle.
The percentage by weight of bond is: Cu 50~80%, Co 10~15%, Fe 0~10%, Ni 5~15%, Sn 5~15%, Zn 0~5%.
Diamond concentration: 100%, granularity 325/400.
Concrete preparation method is as follows:
A, batch mixing
Earlier the various bond powder that above-mentioned prescription is needed are put into the general two dimension of super hard abrasive tool industry after by the weighing of prescription share or the three-dimensional blender machine fully mixes (do and mix) evenly, the time is 40 minutes.Add diamond again and fully mix (do mix) evenly, the time is 60 minutes.
B, granulation
Above-mentioned compound is added metal binding agent diamond tool make general granulation agent (the interim forming agent of WS120); stir in the agitator on the general granulator of industry and reach required do wet degree after; carry out pelletization treatment; compound becomes the evenly particle of (80 sieve mesh made in U.S.A) of size through granulating, have good flowability and stable apparent density.
C, moulding:
Centrifugal preformed: the centrifugal force that utilizes centrifugal medium to be produced in the mould of at a high speed rotation is applied to the particulate material preformed after the pressure that is produced on the interface of particulate material of centrifugal medium and granulation makes granulation.Become the parison relative density to reach 50%.The centrifuge maximum speed reaches 12000RPM.
D, centrifuge hot press sintering:
A. above-mentioned cold moudling pressed compact, centrifugal dielectric material and separation layer are assembled in graphite jig; on the special-purpose centrifuge hot press sintering equipment of this patent design, carry out centrifuge hot press sintering; this centrifuge hot press sintering equipment thermal source is a Frequency Induction Heating, and sintering atmosphere is restitutive protection's atmosphere.Heat up during sintering and revolution employing programming automation control.
B. starter motor (12), the molding mass high speed rotary that drives mould, centrifugal medium and form by emery wheel working layer materials, transition layered material, centrifugal medium pressurizes to molding mass by separation layer; Sintering temperature rise period centrifuge speed is 1500RPM, and the holding stage centrifuge speed is 6000RPM, and natural temperature-fall period centrifuge speed is 2000RPM.
C. start heater, molding mass is heated up, pressurizes 810 ℃ ± 3 ℃ of sintering temperatures; After finishing centrifuge hot press sintering, close heating power supply, sintering time amounts to 32 minutes: the temperature rise period branch carries out for four sections, amounts to 12 minutes, holding stage five minutes, and cooling is 15 minutes naturally;
D. be cooled to below 150 ℃, stop the rotation, take apart a die.
Above-mentioned centrifugal medium (4) is a casting tungsten carbide powder, particle size range: between 0.2~8mm.
Centrifugal burning emery wheel base Performance Detection: the averag density of emery wheel sintered blank is 92% (relative density), and the emery wheel hardness number is HRB90 ± 2; The emery wheel external diameter detects size: Φ 80mm ± 0.02 * 50mm ± 0.05, circular arc R ± 0.01.Compare with traditional handicraft, the density of the emery wheel of employing centrifugal burning technology manufacturing is more even, and outside dimension has higher accuracy class.
This kind specification emery wheel is used for the edging processing and forming of materials such as crystal, glass.Compare with the emery wheel of traditional handicraft manufacturing, this centrifuge hot press sintering technology has solved the processing difficult problem of circular arc working face on the emery wheel outer circumference surface well, and the emery wheel of manufacturing has better profile hold facility, higher grinding efficiency and lower manufacturing cost.