CN100458742C - Content reproduction control method - Google Patents

Content reproduction control method Download PDF

Info

Publication number
CN100458742C
CN100458742C CNB2005800153311A CN200580015331A CN100458742C CN 100458742 C CN100458742 C CN 100458742C CN B2005800153311 A CNB2005800153311 A CN B2005800153311A CN 200580015331 A CN200580015331 A CN 200580015331A CN 100458742 C CN100458742 C CN 100458742C
Authority
CN
China
Prior art keywords
content
regeneration
interrupt process
content regeneration
service condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005800153311A
Other languages
Chinese (zh)
Other versions
CN1954301A (en
Inventor
仁野裕一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Publication of CN1954301A publication Critical patent/CN1954301A/en
Application granted granted Critical
Publication of CN100458742C publication Critical patent/CN100458742C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

When a process (interrupt process) causing no problem in the content copyright management but to be executed with a higher priority than a content reproduction such as a telephone call or alarm display is started or ended during a content reproduction/execution, process judgment means (308) reports it to control means (305). The control means (305) outputs a reproduction interrupt instruction for temporarily stopping the use time measurement and interrupting the content reproduction to reproduction/execution means (304) and outputs a reproduction resume instruction for resuming the use time measurement and resuming the content reproduction to the reproduction/execution means (304) in accordance with the end report of process judgment means (308).

Description

Content reproduction control method
Technical field
The present invention relates to towards mobile telephone terminal content reproduction control method, system, terminal, program, utilize conditional information delivery server, program, particularly relate to can carry out content utilize number of times or utilize utilization restriction such as time content reproduction control method, system, terminal, program, utilize conditional information delivery server, program.
Background technology
The technology that is accompanied by mobile telephone terminal rapidly improves, and the application target of mobile telephone terminal does not rest on conversation, also expands to the audiovisual of content., mobile telephone terminal has following 2 features: the function as phone becomes override; In addition, comparing with PC (PC), is little picture, and input interface is few, so the user is difficult to carry out 2 operations simultaneously with mobile telephone terminal.Therefore, when wishing user's audio-visual content, when the interruption that causes when incoming call arrives, interrupt the content audiovisual automatically.
As the method that realizes such function, propose after End of Interrupt, to continue the method (for example, with reference to patent documentation 1) of the audiovisual of beginning content because the audiovisual of content is interrupted in the interruptions such as arrival of phone or Email.
Figure 20 is the key diagram that an example of content regeneration interruption continuation start method in the past is described.According to example shown in Figure 20, realize that in the past content regeneration interrupts continuing the mobile telephone terminal of start method and comprise: detect promptly the regenerate regeneration interrupting information detection part 31 of interrupting information (for example, degradation under the electric power of the battery that produces in call-in reporting that sends in the content regeneration and Email reception notification or the content regeneration) and output of the information of interrupting content regeneration; According to the regeneration interrupting information of regeneration interrupting information detection part 31 outputs, interrupt the content regeneration interruption member 32 of content regeneration; Detect the interruption position detection part 33 of the interruption position of content; Detect the regeneration continuation start information detection part 34 that the regeneration that continues the beginning content regeneration continues start information.Regeneration continues start information detection part 34 when detecting regeneration and continue start information, to remanufactured component (not shown) indication, with near the reproducing contents interruption position of content.
Patent documentation 1: the spy opens 2002-77458 communique (paragraph 0012-0033, Fig. 1).
Summary of the invention
, the method for record is not considered to the use restriction of additional service time of grade on probation of content and access times and the application of the content of dispensing in the patent documentation 1.In addition, if mobile telephone terminal open systemization and multifunction, then the user can carry out various processes simultaneously in content regeneration, but the method for record does not consider to prevent the illegal process (content problematic process on the literary propertys such as storer output of outside) of starting when content is used in the patent documentation 1.
Therefore, one object of the present invention is, when being provided at the interruption of content regeneration, preserve the content use amount before interrupting, when beginning, the continuation of content regeneration detects the content use amount, according to using control content, suitably continue the use of beginning content, thereby about the use restriction of additional service time and access times and the content of dispensing, also can suitably carry out the interruption of content regeneration and continue beginning content reproduction control method, system, terminal, program, utilize conditional information delivery server, program.
Second purpose of the present invention is, when being provided at content regeneration, in order to suppress content reproduction control method, system, terminal, program that the user carries out problematic program on the literary property, to utilize conditional information to join telecommunications services device and program.
Content reproduction control method of the present invention is characterised in that: the instrumentation content regeneration time, the process that storage is also preferentially carried out than content regeneration is the tabulation of interrupt process, judge whether the process that will start in the content regeneration is interrupt process, if being judged to be the process that will start is interrupt process, just store the use amount of content before this, interrupt content regeneration, execution up to interrupt process finishes, if the execution of interrupt process finishes, use amount with regard to the content of detection of stored, according to the use amount of the content that detects, continue the beginning content regeneration.
Instrumentation as the use amount of content, can the instrumentation content regeneration time, be interrupt process if be judged to be the process that will start, can interrupt the instrumentation of content regeneration time, if the execution of interrupt process finishes, can continue to begin the instrumentation of content regeneration time.According to such method, the use amount of the correct instrumentation content of energy.
Content reproduction control method of the present invention is characterised in that: it is that the information of the tabulation of interrupt process is promptly used conditional information that the side of providing and delivering dispensing comprises the process of also preferentially carrying out than content regeneration, receive a side with reference to the service condition information of receiving, judge whether the process that will start in the content regeneration is interrupt process, if being judged to be the process that will start is interrupt process, just interrupt content regeneration, up to the execution end of interrupt process.
The to provide and deliver service condition information of recovery time of comprising limiting content of the side of providing and delivering, can the instrumentation content regeneration time, if receiving a side, to be judged to be the process that will start be interrupt process, can interrupt the instrumentation of content regeneration time, if the execution of interrupt process finishes, just continue the instrumentation of beginning content regeneration time.According to such method, the use amount of the correct instrumentation content of energy.
Content reproduction control method of the present invention is characterised in that: the tabulation of illegal process that stores the process of altering of the bootlegging that may carry out content or content, the process of also preferentially carrying out than content regeneration is the tabulation of interrupt process, the process that judgement will be started in content regeneration is illegal process, or interrupt process, or the process beyond illegal process and the interrupt process, if being judged to be the process that will start is interrupt process, just interrupt content regeneration, execution up to interrupt process finishes, if be judged to be the process that will start is illegal process, just suppresses the starting of this process.
Content reproduction control method of the present invention is characterised in that: the tabulation of illegal process that stores the process of altering of the bootlegging that may carry out content or content, the process of also preferentially carrying out than content regeneration is the tabulation of interrupt process, the data of the content of regeneration usefulness, the process that judgement will be started in content regeneration is illegal process, or interrupt process, or the process beyond illegal process and the interrupt process, if being judged to be the process that will start is interrupt process, just interrupt content regeneration, execution up to interrupt process finishes, if be judged to be the process that will start is illegal process, just the data of the content of deletion regeneration usefulness.
The recovery time of a side limiting content if provide and deliver, distributed contents with regard to the instrumentation content regeneration time, if interrupt process starts, just interrupts the instrumentation of content regeneration time, if the execution of interrupt process finishes, continues the instrumentation of beginning content regeneration time.According to such structure, the use amount of the correct instrumentation content of energy.
Content reproduction control method of the present invention is characterised in that: dispensing includes the tabulation of illegal process of the process of altering of the bootlegging that may carry out content or content, the process of also preferentially carrying out than content regeneration is that the information of the tabulation of interrupt process is promptly used conditional information, receive the service condition information that side storage is received, service condition information with reference to storage, the process that judgement will be started in content regeneration is illegal process, or interrupt process, or the process beyond illegal process and the interrupt process, if being judged to be the process that will start is interrupt process, just interrupt content regeneration, execution up to interrupt process finishes, if be judged to be the process that will start is illegal process, just suppresses the starting of this process.
Content reproduction control method of the present invention is characterised in that: dispensing includes the tabulation of illegal process of the process of altering of the bootlegging that may carry out content or content, the process of also preferentially carrying out than content regeneration is that the information of the tabulation of interrupt process is promptly used conditional information, receive the service condition information that side storage is received, according to service condition information, the contents decryption of encrypting, service condition information with reference to storage, the process that judgement will be started in content regeneration is illegal process, or interrupt process, or the process beyond illegal process and the interrupt process, if being judged to be the process that will start is interrupt process, just interrupt content regeneration, execution up to interrupt process finishes, if be judged to be the process that will start is illegal process, just forces to finish content regeneration, the data of the content of deletion deciphering.
The recovery time of a side limiting content if provide and deliver, the content that dispensing is encrypted can the instrumentation content regeneration time, if interrupt process starting, just interrupt the instrumentation of content regeneration time,, just continue the instrumentation of beginning content regeneration time if the execution of interrupt process finishes.According to such method, the use amount of the correct instrumentation content of energy.
Content reproduction terminal of the present invention is characterised in that, comprising: the process that storage is also preferentially carried out than content regeneration is the storage part of the use amount of the tabulation of interrupt process, content before this; Judge whether the process that will start in the content regeneration is the process judging part of interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If the execution of interrupt process finishes, the use amount with regard to the content of detection of stored portion storage according to the use amount of the content that detects, makes regeneration/execution unit continue to begin the control assembly of content regeneration.
The communication component that can comprise received content, the recovery time of a side limiting content if provide and deliver, distributed contents, control assembly instrumentation content regeneration time then, if interrupt process starting, just interrupt the instrumentation of content regeneration time,, just continue the instrumentation of beginning content regeneration time if the execution of interrupt process finishes.According to such method, the use amount of the correct instrumentation content of energy.
Content generation control system of the present invention have reproducing contents the content reproduction terminal, promptly use conditional information by the service condition information delivery server of communication line to the dispensing of content reproduction terminal the information of the condition of expression content reproduction terminal reproducing contents, it is characterized in that: service condition information delivery server comprises that comprising the process of also preferentially carrying out than content regeneration be that the service condition information of tabulation of interrupt process is to the service condition information delivery parts of content reproduction terminal dispensing; The content reproduction terminal comprises: with reference to the service condition information of receiving, whether the process that will start in the content regeneration is the process judging part of interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process.
Can the provide and deliver service condition information of information of recovery time of comprising limiting content of service condition information delivery server, the content reproduction terminal can comprise: the instrumentation content regeneration time, if interrupt process starting, just interrupt the instrumentation of content regeneration time, if the execution of interrupt process finishes, just continue the control assembly of the instrumentation of beginning content regeneration time.According to such method, the use amount of the correct instrumentation content of energy.
Content reproduction terminal of the present invention is characterised in that, comprising: receiving the process of also preferentially carrying out than content regeneration from the side joint of providing and delivering is the communication component of the tabulation of interrupt process; The service condition memory unit of the tabulation of the interrupt process that the storing communication parts are received; Consult and use the tabulation of the interrupt process of condition storage component stores, judge whether the process that will start in the content regeneration is the process judging part of interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process.
The control assembly that can also comprise the instrumentation content regeneration time, the recovery time of a side limiting content if provide and deliver, distributed contents, if then control assembly interrupt process starting, just interrupt the instrumentation of content regeneration time, if the execution of interrupt process finishes, just continue the instrumentation of beginning content regeneration time.According to such method, the use amount of the correct instrumentation content of energy.
Service condition information delivery server of the present invention is characterised in that, comprises: comprising the process of also preferentially carrying out than content regeneration is that the information of the tabulation of interrupt process promptly uses conditional information by the service condition information delivery parts of communication line to the terminal distribution of reproducing contents.
Can also comprise the program of installing according in the content reproduction terminal, the tabulation of the process of the tabulation of generation interrupt process generates parts, and service condition information delivery parts send by telephone line the service condition information of the tabulation of the interrupt process of the tabulation generation parts generation that comprises process to the content reproduction terminal.According to such structure,, can provide and deliver the tabulation of interrupt process to the content reproduction terminal according to the program of installing in the content reproduction terminal.
Content reproduction terminal of the present invention is characterised in that, comprises: the tabulation, the process of also preferentially carrying out than content regeneration of illegal process that stores the process of altering of the bootlegging that may carry out content or content is the storage part of the tabulation of interrupt process; The process that judgement will be started in content regeneration is illegal process, or interrupt process, or the process judging part of the process beyond illegal process and the interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If the process judging part judges that the process that will start is illegal process, the illegal process starting that just suppresses the starting of this process suppresses parts.
Content reproduction terminal of the present invention is characterised in that, comprises: the tabulation of the illegal process of the process of altering of the data of the content of store decrypted, the bootlegging that might carry out content or content, the process of also preferentially carrying out than content regeneration are the storage part of the tabulation of interrupt process; The process that judgement will be started in content regeneration is illegal process, or interrupt process, or the process judging part of the process beyond illegal process and the interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If the process judging part judges that the process that will start is illegal process, just make regeneration/execution unit force to finish content regeneration, delete the control assembly of the data of the content of deciphering from storage part.
The communication component that can comprise received content, the recovery time of a side limiting content if provide and deliver, the content that dispensing is encrypted, the control assembly instrumentation content regeneration time, if interrupt process starting, just interrupt the instrumentation of content regeneration time,, just continue the instrumentation of beginning content regeneration time if the execution of interrupt process finishes.According to such method, the use amount of the correct instrumentation content of energy.
Content generation control system of the present invention is characterised in that, comprises: the terminal of reproducing contents is the content reproduction terminal; The information that has the process of also preferentially carrying out the tabulation of the illegal process of the process of altering that includes the bootlegging that may carry out content or content, than content regeneration and be the tabulation of interrupt process promptly uses conditional information by the service condition information delivery server of communication line to the service condition information delivery parts of content reproduction terminal dispensing; The content reproduction terminal comprises: with reference to the service condition information of receiving, judge that the process that will start is illegal process in content regeneration, or interrupt process, or the process judging part of the process beyond illegal process and the interrupt process; If it is interrupt process that the process judging part is judged to be the process that will start, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If it is illegal process that the process judging part is judged to be the process that will start, the illegal process starting that just suppresses the starting of this process suppresses parts.
Content generation control system of the present invention is characterised in that, comprises: the terminal of reproducing contents is the content reproduction terminal; The information that has the process of also preferentially carrying out the tabulation of the illegal process of the process of altering that includes the bootlegging that may carry out content or content, than content regeneration and be the tabulation of interrupt process promptly uses conditional information by the service condition information delivery server of communication line to the service condition information delivery parts of content reproduction terminal dispensing; The content reproduction terminal comprises: with reference to the service condition information of receiving, judge that the process that will start is illegal process in content regeneration, or interrupt process, or the process judging part of the process beyond illegal process and the interrupt process; If it is interrupt process that the process judging part is judged to be the process that will start, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If it is illegal process that the process judging part is judged to be the process that will start, just make regeneration/execution unit force to finish content regeneration, the control assembly of the data of the content of deletion regeneration usefulness.
The content reproduction terminal can also comprise the communication component of received content, the recovery time of a side limiting content if provide and deliver, distributed contents, control assembly instrumentation content regeneration time then, if interrupt process starting, just interrupt the instrumentation of content regeneration time,, just continue the instrumentation of beginning content regeneration time if the execution of interrupt process finishes.According to such method, the use amount of the correct instrumentation content of energy.
Content reproduction terminal of the present invention is characterised in that, comprises: the tabulation, the process of also preferentially carrying out than content regeneration of illegal process that stores the process of altering of the bootlegging that may carry out content or content is the storage part of the tabulation of interrupt process; With reference to the tabulation of storage portion stores, judge that the process that will start is illegal process in content regeneration, or interrupt process, or the process judging part of the process beyond illegal process and the interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If the process judging part judges that the process that will start is illegal process, the illegal process starting that just suppresses the starting of this process suppresses parts.
Content reproduction terminal of the present invention is characterised in that, comprises: the tabulation, the process of also preferentially carrying out than content regeneration of illegal process of receiving the process of altering of the bootlegging might carry out content or content from the side joint of providing and delivering is the communication component of the tabulation of interrupt process; The service condition memory unit of the tabulation of the illegal process that the storing communication parts are received, the tabulation of interrupt process; The storage part of the content that storing, regenerating is used; Consult and use the tabulation of the illegal process of condition storage component stores, the tabulation of interrupt process, judge that the process that will start is illegal process in content regeneration, or interrupt process, or the process judging part of the process beyond illegal process and the interrupt process; If the process judging part judges that the process that will start is an interrupt process, just interrupt content regeneration, the regeneration/execution unit that finishes up to the execution of interrupt process; If the process judging part judges that the process that will start is illegal process, just make regeneration/execution unit force to finish content regeneration, from the regenerate control assembly of data of content of usefulness of storage part deletion.
The communication component that can comprise received content, the recovery time of a side limiting content if provide and deliver, distributed contents, the control assembly instrumentation content regeneration time, if interrupt process starting, just interrupt the instrumentation of content regeneration time,, just continue the instrumentation of beginning content regeneration time if the execution of interrupt process finishes.According to such method, the use amount of the correct instrumentation content of energy.
Service condition information delivery server of the present invention is characterised in that, comprises: the process of also preferentially carrying out the tabulation of the illegal process of the process of altering that includes the bootlegging that may carry out content or content, than content regeneration is that promptly to use conditional information be the service condition information delivery parts of content reproduction terminal dispensing by communication line to the terminal of reproducing contents to the information of the tabulation of interrupt process.
Also comprise the kind according to the content of the program of installing in the content reproduction terminal, content reproduction terminal regeneration, the tabulation of process of tabulation that generates tabulation, the interrupt process of illegal process generates parts; Service condition information delivery parts are provided and delivered by communication line the service condition information of the tabulation of the tabulation of the illegal process of the tabulation generation parts generation that comprises process, interrupt process to the content reproduction terminal.According to such structure, according to the kind of the content of the program of installing in the content reproduction terminal, content reproduction terminal regeneration, can be to content reproduction terminal the provide and deliver tabulation of illegal process, the tabulation of interrupt process.
Content regeneration control program of the present invention is characterised in that the process that storage is also preferentially carried out than content regeneration is that the computing machine of the tabulation of interrupt process is carried out following the processing: judge whether the process that will start in content regeneration is the process determination processing of interrupt process; The use amount of instrumentation content if the process determination processing judges that the process that will start is an interrupt process, is just interrupted content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process; In control and treatment,,,, make regeneration/execution handle the processing that continues the beginning content regeneration according to the content use amount that detects with regard to the content use amount of detection of stored portion storage if the execution of interrupt process finishes.
In control and treatment, carry out: as the instrumentation of the use amount of content, the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.According to such structure, the use amount of the correct instrumentation content of energy.
Content regeneration control program of the present invention is characterised in that, making storage comprise the process of also preferentially carrying out than content regeneration is that the information of the tabulation of interrupt process promptly uses the computing machine of conditional information to carry out following the processing: consult and use conditional information, judge whether the process that will start is the process determination processing of interrupt process in content regeneration; If it is interrupt process that the process determination processing is judged to be the process that will start, just interrupt content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process.
Carry out: if the recovery time of the side limiting content of providing and delivering, distributed contents, then in control and treatment, the processing of instrumentation content regeneration time; If interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.According to such structure, the use amount of the correct instrumentation content of energy.
Service condition information delivery program of the present invention is characterised in that: the process that storage is also preferentially carried out than content regeneration is that to carry out terminal to reproducing contents be that the information that the dispensing of content reproduction terminal comprises the tabulation of interrupt process promptly uses the service condition information delivery of conditional information to handle to the computing machine of the tabulation of interrupt process.
According to the program of installing in the content reproduction terminal, the tabulation of carrying out the process of the tabulation that generates interrupt process generates to be handled, in the service condition information delivery is handled, carry out the service condition information processing that dispensing comprises the tabulation of the interrupt process that generates in the tabulation generation processing of process.According to such structure, according to the program of installing in the content reproduction terminal, can be to the tabulation of content reproduction terminal dispensing interrupt process.
Content regeneration control program of the present invention is characterised in that, the process that makes the tabulation of the illegal process of the process of altering that stores the bootlegging that may carry out content or content, also preferentially carries out than content regeneration is that the computing machine of the tabulation of interrupt process is carried out following the processing: judge that the process that will start in content regeneration is illegal process, still interrupt process, or the process determination processing of the process beyond illegal process and the interrupt process; If it is interrupt process that the process determination processing is judged to be the process that will start, just interrupt content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process; If it is illegal process that the process determination processing is judged to be the process that will start, the illegal process starting that just suppresses the starting of this process suppresses to handle.
Content regeneration control program of the present invention is characterised in that, the process that makes the tabulation of the illegal process of the process of altering that stores the bootlegging that may carry out content or content, also preferentially carries out than content regeneration is that the computing machine of the tabulation of interrupt process is carried out following the processing: judge that the process that will start in content regeneration is illegal process, still interrupt process, or the process determination processing of the process beyond illegal process and the interrupt process; If it is interrupt process that the process determination processing is judged to be the process that will start, just interrupt content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process; Contents decryption encrypting stores the processing of storage part into; If it is illegal process that the process determination processing is judged to be the process that will start, just force to finish the processing of content regeneration; Delete the processing of the data of the content of deciphering from storage part.
The recovery time of a side limiting content if provide and deliver, distributed contents is just carried out in control and treatment: the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, continue the processing of the instrumentation of beginning content regeneration time.According to such structure, the use amount of the correct instrumentation content of energy.
Content regeneration control program of the present invention is characterised in that, the tabulation of the illegal process of the bootlegging that storage package is contained might carry out content or the process of altering of content, the process of also preferentially carrying out than content regeneration are that the information of the tabulation of interrupt process promptly uses the computing machine of conditional information to carry out following the processing: consult and use conditional information, the process that judgement will be started in content regeneration is illegal process, still interrupt process, or the process determination processing of the process beyond illegal process and the interrupt process; If it is interrupt process that the process determination processing is judged to be the process that will start, just interrupt content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process; If it is illegal process that the process determination processing is judged to be the process that will start, the illegal process starting that just suppresses the starting of this process suppresses to handle.
Content regeneration control program of the present invention is characterised in that, the tabulation of the illegal process of the bootlegging that storage package is contained might carry out content or the process of altering of content, the process of also preferentially carrying out than content regeneration are that the information of the tabulation of interrupt process promptly uses the computing machine of conditional information to carry out following the processing: consult and use conditional information, the process that judgement will be started in content regeneration is illegal process, still interrupt process, or the process determination processing of the process beyond illegal process and the interrupt process; If it is interrupt process that the process determination processing is judged to be the process that will start, just interrupt content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process; Contents decryption encrypting stores storage part into, in the process determination processing, is illegal process if be judged to be the process that will start, just forces to finish content regeneration, and execution is from the control and treatment of the processing of the data of the content of storage part deletion deciphering.
The recovery time of a side limiting content if provide and deliver, distributed contents is just carried out in control and treatment: the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, continue the processing of the instrumentation of beginning content regeneration time.According to such structure, the use amount of the correct instrumentation content of energy.
Service condition information delivery program of the present invention is characterised in that, the process of make the tabulation of the illegal process of the process of altering that stores the bootlegging that may carry out content or content, also preferentially carrying out than content regeneration is that the computing machine of the tabulation of interrupt process is carried out and promptly used the information of the tabulation of tabulation that comprises illegal process and interrupt process conditional information that the service condition information delivery of the terminal distribution of reproducing contents is handled.
According to the program of installing in the content reproduction terminal, the tabulation of the process of the tabulation of the illegal process of execution generation and the tabulation of interrupt process generates to be handled, in the service condition information delivery is handled, carry out of the processing of the service condition information of the tabulation of tabulation that comprises illegal process that generates in the tabulation generation processing that comprises process and interrupt process to the dispensing of content reproduction terminal.According to such structure,, can provide and deliver the service condition information of the tabulation of tabulation that comprises illegal process and interrupt process to the content reproduction terminal according to the program of installing in the content reproduction terminal.
Content reproduction control method of the present invention is characterised in that: according to the tabulation of the interrupt process more preferential than content regeneration, judge in the content regeneration and will start whether the process that maybe will finish is described preferential interrupt process, when being the starting of described preferential interrupt process, preserve the use amount of content before this, interrupt content regeneration, finish up to interrupt process, when described interrupt process finishes, detect the use amount of the content of preserving, continue the content regeneration of the content-based use control method of beginning.
It should be noted that, described content use control method the control of recovery time or when regeneration begins through certain hour instrumentation when having regenerated 1 time number of times control, when starting, described interrupt process interrupts the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content reproduction control method of the present invention is characterised in that, in the service condition information of content regeneration, comprise the tabulation of the interrupt process of also preferentially carrying out than content regeneration, before content regeneration to content reproduction terminal this service condition information of providing and delivering, the content reproduction terminal is with reference to described service condition information, judge in the content regeneration and will start whether the process that maybe will finish is described preferential interrupt process, when being the starting of described preferential interrupt process, interrupt content regeneration, finish up to described interrupt process.
It should be noted that, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content reproduction control method of the present invention is characterised in that, the tabulation of the interrupt process that has the tabulation of the illegal process of altering of the bootlegging that might carry out content or content, also preferentially carries out than content regeneration, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when described process is the starting of described interrupt process, interrupt content regeneration, finish up to interrupt process, when described process is described illegal process, suppress the starting of this process.
Content reproduction control method of the present invention has the tabulation of the illegal process of altering of the bootlegging that might carry out content or content, the process of also preferentially carrying out than content regeneration is the tabulation of interrupt process, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when described process is the starting of described interrupt process, interrupt content regeneration, finish the data of the content of deletion regeneration usefulness up to interrupt process.
It should be noted that, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content reproduction control method of the present invention is characterised in that, in the service condition of content regeneration, include the tabulation of the illegal process of altering of the bootlegging that may carry out content or content, than the also preferentially tabulation of the interrupt process of execution of content regeneration, before content regeneration to content reproduction terminal this service condition of providing and delivering, the content reproduction terminal is with reference to described service condition, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when described process is the starting of described interrupt process, interrupt content regeneration, finish up to interrupt process, when described process is described illegal process, can suppress the starting of described process.
Content reproduction control method of the present invention is characterised in that, in the service condition of content regeneration, include the tabulation of the illegal process of altering of the bootlegging that may carry out content or content, than the also preferentially tabulation of the interrupt process of execution of content regeneration, before content regeneration to content reproduction terminal this service condition of providing and delivering, the content reproduction terminal is with reference to described service condition, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when described process is the starting of described interrupt process, interrupt content regeneration, finish up to interrupt process, when described process is described illegal process, force to finish content regeneration, the data of the content of deletion deciphering.
It should be noted that, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that, comprising: than the also preferentially tabulation of the interrupt process of execution of content regeneration; Judgement will start in content regeneration whether the process that maybe will finish is the parts of described interrupt process; Preserve the parts of the use amount of content before this; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When the end of described interrupt process, detect the content use amount of preserving, according to the use control method of content, continue the parts of beginning content regeneration.
It should be noted that, described content uses control method to have: the control of recovery time or when regeneration begins through certain hour instrumentation when having regenerated 1 time number of times control, when starting, described interrupt process interrupts the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that it is characterized in that: server has: the service condition of the content regeneration of the tabulation of the described interrupt process of storage parts to the dispensing of content reproduction terminal before content regeneration; The content reproduction terminal has: with reference to described service condition, judge and will start in content regeneration whether the process that maybe will finish is the parts of described interrupt process; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end.
It should be noted that, described content reproduction terminal can also have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Terminal of the present invention is characterised in that, comprising: with reference to the service condition that the content of the tabulation of storing the interrupt process of also preferentially carrying out than content regeneration is regenerated, judge in the content regeneration and will start whether the process that maybe will finish is the parts of described interrupt process; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end.
It should be noted that, can also have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Server of the present invention is characterised in that to have: before content regeneration to the parts of the service condition of the content regeneration of the tabulation of the described interrupt process of content reproduction terminal distribution and storage.
It should be noted that to have: the program of installing in the terminal according to the service condition of distributed contents regeneration generates the parts of the tabulation of the interrupt process more preferential than content regeneration.
Content generation control system of the present invention is characterised in that, comprising: might carry out the tabulation of the illegal process of altering of the bootlegging of content or content; Than the also preferentially tabulation of the interrupt process of execution of content regeneration; Judge and to start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When described process is the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When described process is described illegal process, suppress the parts of the starting of this process.
Content generation control system of the present invention is characterised in that, comprising: might carry out the tabulation of the illegal process of altering of the bootlegging of content or content; Than the also preferentially tabulation of the interrupt process of execution of content regeneration; Judge and to start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When described process is the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When described process is described illegal process, force to finish content regeneration, the parts of the data of the content of deletion deciphering.
It should be noted that, can also have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that: server has: before content regeneration to the distribution and storage of content reproduction terminal might carry out the tabulation of the illegal process of altering of the bootlegging of content or content, the parts of the service condition of the content regeneration of the tabulation of the interrupt process also preferentially carried out than content regeneration; The content reproduction terminal has: with reference to described service condition, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When being described illegal process, suppress the parts of the starting of this process.
Content generation control system of the present invention is characterised in that: server has: before content regeneration to the distribution and storage of content reproduction terminal might carry out the tabulation of the illegal process of altering of the bootlegging of content or content, the parts of the service condition of the content regeneration of the tabulation of the interrupt process also preferentially carried out than content regeneration; The content reproduction terminal has: with reference to described service condition, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When being described illegal process, force to finish content regeneration, the parts of the data of the content of deletion regeneration usefulness.
It should be noted that, described content reproduction terminal can also have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Terminal of the present invention is characterised in that, comprise: the service condition of the content regeneration of the tabulation of the interrupt process of also preferentially carrying out with reference to the illegal process of altering that might carry out the bootlegging of content or content, than content regeneration, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When being described illegal process, suppress the parts of the starting of this process.
Terminal of the present invention is characterised in that, comprise: the service condition of the content regeneration of the tabulation of the interrupt process of also preferentially carrying out with reference to the illegal process of altering that might carry out the bootlegging of content or content, than content regeneration, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the parts of interrupt process end; When being described illegal process, force to finish content regeneration, the parts of the content-data of deletion regeneration usefulness.
It should be noted that, can also have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Server of the present invention is characterised in that to have: before content regeneration to content reproduction terminal dispensing include the illegal process of altering of the bootlegging that may carry out content or content, the parts of the service condition of the content regeneration of the tabulation of the interrupt process also preferentially carried out than content regeneration.
Server of the present invention is characterised in that to have: the kind of the program of installing in the terminal according to the service condition of distributed contents regeneration and the content of regeneration generates the parts of the tabulation of the tabulation of described interrupt process and described illegal process.
Program of the present invention has the tabulation of the interrupt process of also preferentially carrying out than content regeneration, and be used for making the content reproduction terminal to carry out following processing: the judgement content regeneration will start whether the process that maybe will finish is the processing of described interrupt process; When being the starting of described interrupt process, interrupt content regeneration, up to the processing of interrupt process end; When described interrupt process finishes, detect the content use amount of preserving, according to the use control method of content, continue the processing of beginning content regeneration.
It should be noted that, in described program, when described content is used control method, the control of recovery time or begin when certain hour instrumentation when having regenerated 1 time number of times control from regeneration, make the content reproduction terminal carry out the instrumentation that when described interrupt process starts, interrupts the recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention makes the content reproduction terminal carry out following the processing: the service condition of the content regeneration of the tabulation of the process of also preferentially carrying out than content regeneration with reference to storage, and judge in the content regeneration and will start whether the process that maybe will finish is the processing of described interrupt process; When being the starting of described interrupt process, interrupt content regeneration, up to the processing of described interrupt process end.
It should be noted that, in described program, the content reproduction terminal is carried out: instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention is used to make server to carry out before content regeneration the processing of service condition of content regeneration of the tabulation of the interrupt process that the distribution and storage of content reproduction terminal are also preferentially carried out than content regeneration.
It should be noted that, in described program, make server carry out the program of installing in the terminal of the service condition of regenerating, generate the processing of the tabulation of described interrupt process according to distributed contents.
The tabulation of the interrupt process that program of the present invention has the tabulation of the illegal process of altering of the bootlegging that might carry out content or content, also preferentially carry out than content regeneration is carried out the content reproduction terminal to judge and will be started the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the processing of interrupt process end; When being described illegal process, suppress the processing of the starting of this process.
Program of the present invention has the tabulation, the tabulation of the interrupt process also preferentially carried out than content regeneration of illegal process of the process of altering of the bootlegging that might carry out content or content, and the content reproduction terminal is carried out: judge and will start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the processing of interrupt process end; When being described illegal process, force to finish content regeneration, the processing of the data of the content of deletion deciphering.
It should be noted that, in described program, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, make the content reproduction terminal carry out the instrumentation that when the starting of described interrupt process, interrupts the recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention makes the content reproduction terminal carry out following the processing: with reference to the service condition of the content regeneration of the tabulation of the tabulation of the illegal process of altering that stores the bootlegging that may carry out content or content, the interrupt process also more preferential than content regeneration, judge and will start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the processing of interrupt process end; When being described illegal process, suppress the processing of the starting of this process.
Program of the present invention makes the content reproduction terminal carry out following the processing: with reference to the service condition of the content regeneration of the tabulation of the tabulation of the illegal process of altering that stores the bootlegging that may carry out content or content, the interrupt process also more preferential than content regeneration, judge and will start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, interrupt content regeneration, up to the processing of interrupt process end; When being described illegal process, force to finish content regeneration, the processing of the data of the content of deletion deciphering.
In described program, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, make the content reproduction terminal carry out the instrumentation that when the starting of described interrupt process, interrupts the recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention be used to make server carried out before content regeneration to the distribution and storage of content reproduction terminal might carry out the tabulation of the illegal process of altering of the bootlegging of content or content, the processing of the service condition of the content regeneration of the tabulation of the interrupt process also preferentially carried out than content regeneration.
It should be noted that in described program, the program that server is carried out install in the terminal according to the service condition of distributed contents regeneration and the kind of content generate the processing of the tabulation of the tabulation of described interrupt process and described illegal process.
Content reproduction control method of the present invention is characterised in that: the tabulation with interrupt process of also preferentially carrying out than content regeneration, judge in the content regeneration and will start whether the process that maybe will finish is described interrupt process, preserve the use amount of content before this, when being the starting of described interrupt process, notify interrupt process to start to the user, if user's input is compared with content regeneration, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, finish up to interrupt process, when described interrupt process finishes, detect the use amount of the content of preserving,, continue the regeneration of beginning content according to the use control method of content.
It should be noted that, during described content reproduction control method, the control of recovery time or when regeneration begins through certain hour instrumentation when having regenerated 1 time number of times control, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content reproduction control method of the present invention is characterised in that: the tabulation of the described interrupt process of storage in the service condition of content regeneration, before content regeneration, described service condition is sent the content reproduction terminal, the content reproduction terminal is with reference to described service condition, judge in the content regeneration and will start whether the process that maybe will finish is described interrupt process, when being the starting of described interrupt process, notify interrupt process to start to the user, if user's input is compared with content regeneration, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, finish up to interrupt process.
It should be noted that, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content reproduction control method of the present invention is characterised in that: the tabulation with illegal process of altering of the bootlegging that might carry out content or content, the tabulation of the interrupt process also more preferential than content regeneration, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when being the starting of described interrupt process, notify interrupt process to start to the user, if user's input is compared with content regeneration, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, finish up to interrupt process, when being described illegal process, suppress the starting of this process.
Content reproduction control method of the present invention is characterised in that: the tabulation with illegal process of altering of the bootlegging that might carry out content or content, the tabulation of the interrupt process also more preferential than content regeneration, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when being the starting of described interrupt process, notify interrupt process to start to the user, if user's input is compared with content regeneration, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, finish the data of the content of deletion regeneration usefulness up to interrupt process.
It should be noted that, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content reproduction control method of the present invention is characterised in that: the tabulation that stores the illegal process of possibility bootlegging or content in the service condition of content regeneration, than the also preferentially tabulation of the interrupt process of execution of content regeneration, before content regeneration, described service condition is provided and delivered to the content reproduction terminal, the content reproduction terminal is with reference to described service condition, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when being the starting of described interrupt process, notify interrupt process to start to the user, if user's input is compared with content regeneration, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, finish up to interrupt process, when being described illegal process, suppress the starting of this process.
Content reproduction control method of the present invention is characterised in that: storing in the service condition of content regeneration may bootlegging/alter the tabulation of the illegal process of content, than the also preferentially tabulation of the interrupt process of execution of content regeneration, before content regeneration, described service condition is provided and delivered to the content reproduction terminal, the content reproduction terminal is with reference to described service condition, judge in the content regeneration and will start whether the process that maybe will finish is any one described 2 process, when being the starting of described interrupt process, notify interrupt process to start to the user, if user's input is compared with content regeneration, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, finish up to interrupt process, when being described illegal process, force to finish content regeneration, the data of the content of deletion deciphering.
It should be noted that, instrumentation is to 1 time the basis of number of times restriction of having regenerated during distributed contents when beginning through certain hour in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that to have the tabulation of the interrupt process also more preferential than content regeneration; Comprise: judge in the content regeneration and will start whether the process that maybe will finish is the parts of described interrupt process; The parts that keep use amount before this; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When described interrupt process finishes, detect the use amount of the content of preserving, according to the use control method of content, continue the parts of beginning content regeneration.
It should be noted that, have: content use control method be the control of recovery time or when regeneration begins through certain hour instrumentation when having regenerated 1 time number of times control, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that: server has: the parts of before content regeneration the service condition of the content regeneration of the tabulation of the storage interrupt process also more preferential than content regeneration being provided and delivered to the content reproduction terminal; The content reproduction terminal has: with reference to described service condition, judge in the content regeneration and will start whether the process that maybe will finish is the parts of described interrupt process; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user.
It should be noted that, described content reproduction terminal has: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Terminal of the present invention is characterised in that, comprising: with reference to the service condition that the content of the tabulation of storing the interrupt process also more preferential than content regeneration is regenerated, judge in the content regeneration and will start whether the process that maybe will finish is the parts of described interrupt process; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user.
It should be noted that, have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that, comprising: might bootlegging/alter the tabulation of the illegal process of content; The tabulation of the interrupt process also more preferential than content regeneration; Judge and to start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, suppress the parts of the starting of this process.
Content generation control system of the present invention is characterised in that, comprising: might bootlegging/alter the tabulation of the illegal process of content; The tabulation of the interrupt process also more preferential than content regeneration; Judge and to start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, force to finish content regeneration, the parts of the data of the content of deletion deciphering.
It should be noted that, have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Content generation control system of the present invention is characterised in that: server has: may bootlegging storing before content regeneration/alter the service condition of content regeneration of tabulation of the tabulation of the illegal process of content, the interrupt process also more preferential to the parts of content reproduction terminal dispensing than content regeneration; The content reproduction terminal has: with reference to described service condition, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, suppress the parts of the starting of this process.
Content generation control system of the present invention is characterised in that: server has: may bootlegging storing before content regeneration/alter the service condition of content regeneration of tabulation of the tabulation of the illegal process of content, the interrupt process also more preferential to the parts of content reproduction terminal dispensing than content regeneration; The content reproduction terminal has: with reference to described service condition, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, force to finish content regeneration, the parts of the data of the content of deletion regeneration usefulness.
It should be noted that, described content reproduction terminal has: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Terminal of the present invention is characterised in that, comprise: may bootlegging with reference to storing/alter the service condition of content regeneration of the tabulation of the tabulation of the illegal process of content, the interrupt process also more preferential than content regeneration, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, suppress the parts of the starting of this process.
Terminal of the present invention is characterised in that, comprise: may bootlegging with reference to storing/alter the service condition of content regeneration of the tabulation of the tabulation of the illegal process of content, the interrupt process also more preferential than content regeneration, judge and will start the parts whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the parts of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, force to finish content regeneration, the parts of the data of the content of deletion regeneration usefulness.
It should be noted that, have: begin when certain hour instrumentation in the restriction of carrying out the recovery time or from regeneration to 1 time the basis of number of times restriction of having regenerated during distributed contents, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the parts of the instrumentation of beginning recovery time.
Program of the present invention has the tabulation of the interrupt process also more preferential than content regeneration; Make the content reproduction terminal carry out following the processing: to judge in the content regeneration and will start whether the process that maybe will finish is the processing of described interrupt process; Preserve the processing of content use amount before this; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the processing of interrupt process end if user's input is compared with content regeneration to the user; When described interrupt process finishes, detect the use amount of the content of preserving, according to the use control method of content, continue the processing of beginning content regeneration.
It should be noted that, when described content is used control method, the control of recovery time or begin when certain hour instrumentation when having regenerated 1 time inferior numerical control from regeneration, make the content reproduction terminal carry out the instrumentation that when the starting of described interrupt process, interrupts the recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention makes the content reproduction terminal carry out following the processing: the service condition of the content regeneration of the tabulation of the interrupt process that the reference storage is also more preferential than content regeneration, and judge in the content regeneration and will start whether the process that maybe will finish is the processing of described interrupt process; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the processing of interrupt process end if user's input is compared with content regeneration to the user.
It should be noted that, make the content reproduction terminal carry out instrumentation when beginning through certain hour to 1 time the basis of number of times restriction of having regenerated during distributed contents in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention has the tabulation of possible bootlegging/the alter illegal process of content, the tabulation of the interrupt process also more preferential than content regeneration; Make the content reproduction terminal carry out following the processing: to judge and to start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When described process is the starting of described interrupt process, notify interrupt process to start, if user's input is compared with content regeneration to the user, the preferential order of implementing interrupt process, just start interrupt process, interrupt content regeneration, up to the processing of interrupt process end; When described process is described illegal process, suppress the processing of the starting of this process.
Program of the present invention has the tabulation of possible bootlegging/the alter illegal process of content, the tabulation of the interrupt process also more preferential than content regeneration; Make the content reproduction terminal carry out following the processing: to judge and to start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the processing of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, force to finish content regeneration, the processing of the data of the content of deletion deciphering.
It should be noted that, make the content reproduction terminal carry out instrumentation when beginning through certain hour to 1 time the basis of number of times restriction of having regenerated during distributed contents in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
Program of the present invention makes the content reproduction terminal carry out following the processing: may bootlegging with reference to storing/alter the service condition of content regeneration of the tabulation of the tabulation of the illegal process of content, the interrupt process also more preferential than content regeneration, and judge and will start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the processing of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, suppress the processing of the starting of this process.
Program of the present invention makes the content reproduction terminal carry out following the processing: may bootlegging with reference to storing/alter the service condition of content regeneration of the tabulation of the tabulation of the illegal process of content, the interrupt process also more preferential than content regeneration, and judge and will start the processing whether process that maybe will finish is described 2 any one process in the content regeneration; When being the starting of described interrupt process, notify interrupt process to start,, preferentially implement the order of interrupt process, just start interrupt process, interrupt content regeneration, up to the processing of interrupt process end if user's input is compared with content regeneration to the user; When being described illegal process, force to finish content regeneration, the processing of the data of the content of deletion deciphering.
It should be noted that, make the content reproduction terminal carry out instrumentation when beginning through certain hour to 1 time the basis of number of times restriction of having regenerated during distributed contents in the restriction of carrying out the recovery time or from regeneration, when the starting of described interrupt process, interrupt the instrumentation of recovery time, when described interrupt process finishes, continue the processing of the instrumentation of beginning recovery time.
First effect of the present invention is about the use restriction of the additional service time of grade on probation of content and access times and the content of dispensing, and by the interruptions such as arrival of phone or Email, the audiovisual of interruption content even continue beginning, also can be used control.Reason is to use the instrumentation interruption member to preserve the use amount of content before this when content regeneration is interrupted, the use amount detection part detects remaining live part when content regeneration continues beginning, use and control the content of continuation beginning parts, continue to begin to the regeneration of a live part that permission is remaining content regeneration according to content use restriction.
In addition, second effect of the present invention is mobile telephone terminal open systemization and multifunction, even the user will start illegal process (process that has problem on the literary property) in content regeneration, also can suppress it.Reason is whether the process that the judgement of process judging part will be started is illegal process, and illegal process suppresses the starting that parts suppress this illegal process, or forces to finish content regeneration, deletes the data of the content of decoding from storer.
Description of drawings
Following brief description accompanying drawing.
Fig. 1 is the block diagram of a structure example of expression embodiments of the invention 1.
Fig. 2 is the expression user to the order of order input block input, the regeneration/execution unit key diagram to the corresponding relation of the information of control assembly output.
Fig. 3 is the information according to the input of regeneration/execution unit, the response of expression control assembly output, the key diagram of condition.
Fig. 4 is the response of expression regeneration/execution portion for input, the key diagram of the action of carrying out.
Fig. 5 is the key diagram of the expression control assembly given action that output is carried out before responding to regeneration/execution unit.
Fig. 6 is the key diagram of expression control assembly to the condition of each order of regeneration/execution unit input.
Fig. 7 is that expression regeneration/execution unit is ordered the key diagram of the action of carrying out when importing at each.
Fig. 8 is the block diagram of a structure example of the inner structure of expression control assembly.
Fig. 9 is the key diagram of the pairing action of order of expression control assembly output.
Figure 10 is the program flow diagram of the action of explanation embodiment 1.
Figure 11 is the program flow diagram of the action when not having the input of order in the regeneration of description.
Figure 12 is the block diagram of a structure example of the expression embodiment of the invention 2.
The key diagram of the corresponding relation of Figure 13 order that to be the expression user export regeneration/execution unit the order of order input block input, control assembly.
Figure 14 is the key diagram of the action that is predetermined carried out before or after the control assembly output command.
Figure 15 is that expression is corresponding with the order of control assembly input, the key diagram of the action that regeneration/execution unit carries out.
Figure 16 is the program flow diagram of the action of explanation embodiment 2.
Figure 17 is the program flow diagram of the action when not having the input of order in the regeneration of description.
Figure 18 is the block diagram of a structure example of the expression embodiment of the invention 3.
Figure 19 is the block diagram of a structure example of the expression embodiment of the invention 4.
Figure 20 is the key diagram that an example of content regeneration interruption continuation start method in the past is described.
Figure 21 is the block diagram of a structure example of the expression embodiment of the invention 5.
Figure 22 is the block diagram of a structure example of the expression embodiment of the invention 5.
Figure 23 is the program flow diagram of the action of the explanation embodiment of the invention 5.
Figure 24 is the figure that is used to illustrate the embodiment of the invention 5.
The 3-regenerating unit; 12-content regeneration interruption member; 13-interruption position detection part; 14-regeneration continues the start information detection part; 21-uses the instrumentation interruption member; 22-use amount detection part; 23-uses control to continue the beginning parts; The 24-service condition is exercised parts; 150-content converting server; 151-packaged content delivering part; 160-service condition information delivery server; 161-service condition information delivery parts; The 301-communication component; The 302-content storage element; 303-service condition memory unit; 304-regeneration/execution unit; The 305-control assembly; 306-orders input block; The 307-process monitors parts; 308-process judging part; The illegal process starting of 309-suppresses parts; 351-process processor controls; The 352-UI control part; The 353-input part; The 354-efferent; The 361-Department of Communication Force; The 362-content memorizer; 363-service condition storer; The 370-program storage; 371a, 371b-general procedure; 374-content regeneration/executive routine; 375-content regeneration/executive control program; 377-process supervisory programme; 378-process decision procedure; The illegal process starting of 379-control program.
Embodiment
Embodiment 1
With reference to Fig. 1 the embodiment of the invention 1 is described.Fig. 1 is the block diagram of a structure example of expression embodiments of the invention 1.
Embodiments of the invention 1 comprise: the information of the service condition of the content converting server 150 of distributed contents, dispensing expression content is promptly used the service condition information delivery server 160 of conditional information, the regenerating unit (content reproduction terminal) 3 of reproducing contents.
Content converting server 150 comprises the content converting parts 151 of distributed contents, and service condition information delivery server 160 comprises the service condition information delivery parts 161 of dispensing service condition information.It should be noted that content converting server 150 sends the information of the content of expression dispensing in advance to service condition information delivery server 160, service condition information delivery server 160 generates service condition information according to the information of receiving.
Regenerating unit 3 is downloaded from content converting server 150, or from the terminal of preserving content via communication component 301 received contents, comprise: the communication component 301 that receives the service condition information from service condition information delivery server 160; The content storage element 302 of memory contents; The service condition memory unit 303 of storage service condition information; Regeneration/the execution unit 304 of reproducing contents; All control assemblies 305 of control regenerating unit 3; The order input block 306 of input user's indication; The process that monitors the process that regenerating unit 3 will start monitors parts 307; What judge to monitor process that regenerating unit 3 will start is the process judging part 308 of what kind of process; The illegal process starting that suppresses the starting of illegal process suppresses parts 309.
Regenerating unit 3 is for example realized by mobile telephone terminal.In addition, regenerating unit 3 is for example realized by the such terminal that programmed control works of passing through of PDA (portable data assistance) such portable terminal, PC, information household appliances, auto-navigation system, music player.
Carry out content with the information that comprises the URL communication informations such as (UniformResource Locators) that regenerating unit 3 is used to obtain service condition information promptly between position information, according to specific form, be aggregated into a processing (below be called packing) in the file, store content converting server 150 into.In addition, a position information comprises and is used for other content aware ID (content ID).Following content packing is called packaged content.It should be noted that, content packaging the time, can be the part of the data of content or all encryption.
Service condition information is the information that expression regenerating unit 3 is used for the condition of reproducing contents.Service condition information comprises: expression for and content ID that position information comprise related, between the operating period with package information, access times and service time etc. are used to use the information of the condition of content.Service condition information delivery server 160 is before regenerating unit 3 regeneration packaged content, and by 3 dispensings of 301 pairs of regenerating units of communication component, the service condition information stores of 301 dispensings of communication component is to service condition memory unit 303 service condition information.
Communication component 301 is to be used for parts that packaged content and service condition information are downloaded regenerating unit 3, and any that is taken into parts by the data to regenerating unit 3 of physical storage media such as the communication component that uses Internet connection via mobile phone carrier communication net, infrared ray connections, WLAN (Local Area Network), Bluetooth (registered trademark), use storage card realizes.
The packaged content that content storage element 302 storages are downloaded.The service condition information that 303 storages of service condition memory unit are downloaded.Service condition memory unit 303 is the form storage service condition information can't illegally alter from the outside usually.As service condition management of information method, for example can use encryption, digital electronic signature, to the storer with anti-distorting property (for example, SD card (registered trademark), MAGICGATE (registered trademark), MMC (MultiMediaCard (registered trademark etc.)), anti-storage of distorting device (for example satisfying the device of the important document of the FIPS140-1 of NIST (National Institute of Standards and Technology) regulation or FIPS140-2, the encryption accelerator that Sesure SH is such) or to the access control of storage service condition database of information.
Order input block 306 is according to the input of user's keyboard, selects to want the packaged content of regenerating, and the content regeneration beginning of accepted user input, finishes, interrupts, continues each order of beginning.
Regeneration/execution unit 304 is according to the packaged content of user to order and user's selection of 306 inputs of order input block, according to the corresponding relation that is predetermined, the packaged content of expression beginning, end, the information of interrupting, continue the requirement of beginning, content storage element 302 storages is exported control assembly 305.Fig. 2 is the expression user to the key diagram of the corresponding relation of the information of the order of order input block 306 input and 305 outputs of 304 pairs of control assemblies of regeneration/execution unit.
Control assembly 305 is according to the information of regeneration/execution unit 304 inputs, according to the condition that is predetermined, to the 304 output responses of regeneration/execution unit.Fig. 3 is the information of expression according to 304 inputs of regeneration/execution unit, the response of control assembly 305 outputs and the key diagram of condition.
If the response input, regeneration/execution unit 304 just according to the corresponding relation that is predetermined, moves.Fig. 4 is the response of expression regeneration/execution unit 304 for input, the key diagram of the action of carrying out.It should be noted that control assembly 305 carried out given action before 304 outputs respond to regeneration/execution unit.Fig. 5 is that expression control assembly 305 is being exported the key diagram of the given action of carrying out before the response to regeneration/execution unit 304.If according to example shown in Figure 5, control assembly 305 the non-packingization of packaged content of regeneration/execution unit 304 inputs, was extracted content out before output begins the permission response, the content of extracting out is exported regeneration/execution unit 304.Here, non-packingization be meant packaged content return to original between the processing of position information and content, but control assembly 305 when non-packing, its decoding, restores content and is original data when part or all of the data of content encrypted.
The user operates the operating portion (not shown) of regenerating unit 3, if determine packaged content, to order input block 306 input regeneration initiation commands, the packaged content that regeneration/execution unit 304 is just determined from content storage element 302 extractions is exported the information of the packaged content of extracting out, expression regeneration initiation command to control assembly 305.It should be noted that, if the user imports the regeneration initiation command of packaged content, order input block 306 just shows the content ID that position information between the packaged content of content storage element 302 storage comprises at the display part (not shown) of regenerating unit 3, make user's select to require to regenerate packaged content of beginning.
Control assembly 305 is also imported content simultaneously when input begins to allow response, therefore regeneration/execution unit 304 begins the content regeneration imported.In addition, regeneration/execution unit 304 is in content regeneration, service condition becomes expiration, or interrupt process (process that also should preferentially carry out than content regeneration) starting, or interrupt process is when finishing, control assembly 305 output regeneration ending orders, regeneration interruptive command or regeneration continue initiation command, but regeneration/execution unit 304 is carried out and the corresponding action of each order that is predetermined.Fig. 6 is the key diagram of the condition of 305 pairs of regeneration/execution units of expression control assembly, 304 each order of input.Fig. 7 is that expression regeneration/execution unit 304 is ordered the key diagram of the action of carrying out when importing at each.
Inner structure with reference to description of drawings control assembly 305.Fig. 8 is the block diagram of a structure example of the inner structure of expression control assembly 305.
Control assembly 305 comprises: if from the 304 input expression content regeneration of regeneration/execution unit, finish, interrupt and continue the information of the requirement of beginning, packaged content, with regard to the packaged content of consulting and using condition memory unit 303 storage comprise between the pairing service condition information of content ID of packaged content of position information representation, according to condition shown in Figure 3, judgement is to 304 which response of output of regeneration/execution unit, after carrying out the action corresponding with the response of judging, this response is exported regeneration/execution unit 304, when become expiration the service time of content, regeneration/execution unit 304 is sent the regeneration ending order, carry out the service condition of the action corresponding that is predetermined and exercise parts 24 with the regeneration ending order; If interrupt starting from process judging part 308 notices, just interrupt the instrumentation (for example, the instrumentation of the service time of content) of the use amount of content, use amount is before this stored into the use instrumentation interruption member 21 of the storage part (not shown) of regenerating unit 3; In the interruption of the instrumentation of use amount simultaneously, to the content of the regeneration/execution unit 304 output regeneration interruptive commands interruption member 12 of regenerating; According to the information of regeneration/execution unit 304 inputs, detect the interruption position detection part 13 of the interruption position of content regeneration; The regeneration that detects the image (for example representing the information that interrupt process finishes) that continues the beginning content regeneration from process judging part 308 continues start information detection part 14; Exercise the maximum use amount that parts 24 are extracted content out from service condition, extract the use amount of using before this out from using instrumentation interruption member 21, get the difference of these use amounts, calculate the use amount detection part 22 of spendable remaining content use amount (residue live part); Continue the calculating of beginning content use amount, regeneration is continued the use control continuation beginning parts 23 of the information of initiation command and expression content regeneration interruption position to 304 outputs of regeneration/execution unit.
Fig. 9 is the key diagram of the pairing action of order of expression control assembly 305 outputs.In example shown in Figure 9, if the beginning and the end of 308 pairs of control assemblies of process judging part, 305 notice interrupt process, control assembly 305 is as per advice the situation of interrupt process just, and regeneration/execution unit 304 is sent regeneration orders, interruptive command or regeneration continuation initiation command.Control assembly 305 carries out the action of representing in the example of Fig. 9 according to these orders.
Process judging part 308 is (in other words, 305 pairs of regeneration/execution units of control assembly 304 are exported and are begun to allow the response back) in content regeneration, monitor among the OS (Operating System) and reside the whole processes that will start or finish.
Regenerating unit 3 in storage part, store in advance may carry out content duplicate, alter or to the process of the output of other memory devices (below be called illegal process.For example record or show that the process of the storer temporarily guarantee for content regeneration, power supply disconnect, battery takes off, the pressures end processes such as a spot of alarm of residue of battery), on the copyright administration of content, the be out of question tabulation of the process (interrupt process) that still should preferentially carry out such as the arrival of phone and Email, instant messages etc. or alarm.Table 1 is expression and the table of content type corresponding file form with the example of illegal process.And process judging part 308 is with the tabulation of illegal process of the format management that can not alter from the outside and interrupt process.As concrete management method, can use encryption, digital electronic signature, control to the storage of storer or to the access of database of store list with anti-distorting property.And, if notify the powerful or end of process arbitrarily, just, judge which of illegal process, interrupt process or process in addition be this process be with reference to 2 tabulations of illegal process and interrupt process from process judging part 308.Then, in the time will starting illegal process, 308 pairs of illegal process startings of process judging part suppress parts 309 and notify this meaning.When interrupt process will start or finish, 308 pairs of control assemblies 305 of process judging part were notified this meaning.
[table 1]
The kind of content File layout (example) Illegal process
Music Mp3, wav, wma etc. The process of the storage part of visit sound card
Still frame Jpeg, gif, bmp etc. The process of the storage part of picture catching accessing video card
Animation Mpeg2, Mpeg4, QuickTime etc. The process of the storage part of the process visit sound card of the storage part of picture catching accessing video card
Text txt The process of the storage part of picture catching accessing video card
Regenerating unit 3 carries content regeneration control program, process judging part 308 is carried out judged whether the process that will start in the content regeneration is the process determination processing of interrupt process, the use amount of instrumentation content, if the process determination processing judges that the process that will start in the content regeneration is an interrupt process, just make control assembly 305 carry out the control and treatment that content use amount is before this stored in storage part, if the process determination processing judges that the process that will start in the content regeneration is an interrupt process, regeneration/execution unit 304 is carried out interrupted content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process, in control and treatment, if the execution of interrupt process finishes, content use amount with regard to the storage of detection of stored portion, control assembly 305 is carried out according to the content use amount that detects, continued the processing of beginning content regeneration.In addition, content regeneration control program carries out control assembly 305 in control and treatment: as the instrumentation of the use amount of content, the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.
Regenerating unit 3 carries content regeneration control program, process judging part 308 is carried out judged that the process that will start in the content regeneration is illegal process, the process determination processing of the process beyond interrupt process or illegal process and the interrupt process, if the process determination processing judges that the process that will start is an interrupt process, regeneration/execution unit 304 is carried out interrupted content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process, if the process determination processing judges that the process that will start is illegal process, the illegal process starting that just makes illegal process starting suppress the starting of parts 309 these processes of execution inhibition suppresses to handle.It should be noted that,, control assembly 305 is carried out: the processing of instrumentation content regeneration time if provide and deliver a lateral confinement system content regeneration time distributed contents; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.
Regenerating unit 3 carries content regeneration control program, process judging part 308 is carried out judged that the process that will start in the content regeneration is illegal process, the process determination processing of the process beyond interrupt process or illegal process and the interrupt process, if the process determination processing judges that the process that will start is an interrupt process, regeneration/execution unit 304 is carried out interrupted content regeneration, handle up to regeneration/executions that the execution of interrupt process finishes, control assembly 305 is carried out comprise the contents decryption of encryption and stored into the processing of storage part, if it is that illegal process just makes regeneration/execution handle the processing of forcing to finish content regeneration that the process determination processing is judged the process that will start, the control and treatment of the processing of the data of the content of encrypting from storage part deletion.The lateral confinement system content regeneration time distributed contents if provide and deliver just makes control assembly 305 carry out in control and treatment: the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.
Service condition information delivery server 160 carries service condition information delivery program, and allowing service condition information delivery parts 161 carry out the information that comprises the tabulation of interrupt process is promptly used conditional information is the service condition information delivery processing of regenerating unit (content reproduction terminal) dispensing to the terminal of reproducing contents.
In addition, conditional information delivery server 160 carries service condition information delivery program, and allowing service condition information delivery parts 161 carry out the information of the tabulation of tabulation that comprises illegal process and interrupt process is promptly used conditional information is the service condition information delivery processing of regenerating unit 3 (content reproduction terminal) dispensing to the terminal of reproducing contents.
Illegal process starting suppresses parts 309 when illegal process will be started, and suppresses the starting of this process.Particularly, when for example regenerating unit 3 carries UNIX (registered trademark) or Linux (registered trademark), carry out the kill order, when carrying Windows (registered trademark), carry out the Ctrl-C order.In addition, illegal process starting suppresses parts 309 when illegal process will be started, from the storage part deletion content of regenerating unit 3.
The following describes the action of present embodiment.Figure 10 is the program flow diagram of the action of explanation embodiment 1.
The user operates the operating portion of regenerating unit 3, and specific packaged content in the packaged content of chosen content memory unit 302 storages is to order input block 306 input regeneration initiation commands (step S101).Order 306 regeneration initiation commands of importing of input block, determine that the information of packaged content is to 304 outputs of regeneration/execution unit.
Regeneration/execution unit 304 is extracted the packaged content that users determine out from content storage element 302, the regeneration of the packaged content of extracting out, input is begun to order pairing requirement promptly regenerate and begin requirement control assembly 305 is exported (step S102).
Control assembly 305 is with reference to position information between the packaged content of importing, the pairing service condition information of content ID that position information comprises between determining.Then, extract the service condition information of determining out from service condition memory unit 303, consult and use conditional information, effectively whether the service condition of the content of judgement service condition information representation (step S103).When not being effective, control assembly 305 shows the information of urging the user to buy new service condition information at the display part of regenerating unit 3 in the service condition of the content of service condition information representation.
When the user buys service condition information (step S104), after buying service condition information, control assembly 305 execution in step S103., when the user does not buy service condition information (step S104), the 304 output beginnings of 305 pairs of regeneration/execution units of control assembly do not allow response (step S105), finish.At this moment, control assembly 305 shows error message at the display part of regenerating unit 3.
When the service condition of the content of service condition information representation was effective in step S103, control assembly 305 was extracted the non-packingization of packaged content out content, allowed the content of extracting out response to 304 outputs (step S106) of regeneration/execution unit with beginning.Then, control assembly 305 carries out access times when control of content, carries out the addition of access times, and bring into use the instrumentation (step S107) of time when controlling the service time of carrying out content.
If content and regeneration begin to allow the response input, regeneration/execution unit 304 just begins content regeneration or execution (step S108).
In content regeneration, if the user operates the operating portion of regenerating unit 3, the order that 306 inputs are interrupted, continued beginning or finish to the order input block, regeneration/execution unit 304 carries out following action (step S109) according to this order.
In step S109, when order input block 306 has the input of interruptive command, 304 pairs of control assemblies of regeneration/execution unit, 305 output regeneration interrupt requests (step S110).If input regeneration interrupt request when control assembly 305 was controlled in the service time of carrying out content, is interrupted the instrumentation (step S111) of service time, 304 outputs interrupt allowing response (step S112) to regeneration/execution unit.If interrupt allowing the response input, regeneration/execution unit 304 just interrupts content regeneration or execution (step S113).
In step S109, when order input block 306 had the input that continues initiation command, the 305 output regeneration of 304 pairs of control assemblies of regeneration/execution unit continued to begin requirement (step S114).If regeneration continues to begin requirement input, effectively whether control assembly 305 with regard to the service condition of the service condition information representation of reference among the determination step S103 (step S115).When not being effective, control assembly 305 makes the display part of regenerating unit 3 urge the user to buy the information of new service condition information in the service condition of the content of service condition information representation.When the user buys service condition information (step S116), after buying service condition information, control assembly 305 execution in step S115., when the user does not buy service condition information (step S116), regeneration/execution unit 304 output resumes are begun not allow response (step S117), carry out action identical when importing the order of describing later.At this moment, control assembly 305 shows error message at the display part of regenerating unit 3.When the service condition of service condition information representation is effective in step S115, when carrying out the control of service time of content, continue to bring into use the instrumentation (step S118) of time, regeneration/execution unit 304 output resumes are begun to allow response (step S119).If continue to begin to allow the response input, regeneration/execution unit 304 just continues beginning content regeneration or execution (step S120).
In step S109, when order input block 306 had the input of the finish command, regeneration/execution unit 304 finished content regeneration or execution (step S121), and control assembly 305 output regeneration endings are required (step S122).If regeneration ending requires input, when control assembly 305 was controlled in the service time of carrying out content, the instrumentation (step S123) that finishes service time, the data (step S124) of the content of the storage portion stores of deletion regenerating unit 3 are finishing to allow response to 304 outputs (step S125) of regeneration/execution unit.If finish to allow the response input, regeneration/execution unit 304 is just got back to the state before the step S101.
Explanation in step S109, the action when the input that order input block 306 not have to order.Figure 11 is the program flow diagram of the action when not having the input of order in the regeneration of description.
At this moment, process judging part 308 carries out following action according to the having or not of the beginning of the process of control assembly 305 notice.At first, when not having the starting of interrupt process (step S201), when the service condition of the service condition information representation of reference among the step S103 comprised the condition of service time, control assembly 305 was judged whether expire service time (step S202).Service time is when expiring, to the 304 output regeneration ending orders (step S203) of regeneration/execution unit, execution in step S121.Get back to step S109 when not expiring service time.
In addition, when the starting of interrupt process is arranged (process judging part 308 be judged to be interrupt process will start time), when controlling the service time of carrying out content (it comprises restriction during total service time, count during through certain above service time be the whole controls of the service time after 1 time uses such as control begin to regenerate), control assembly 305 interrupts the instrumentation (step S204) of service time, to regeneration/execution unit 304 output regeneration interruptive commands (step S205).If the input of regeneration interruptive command, regeneration/execution unit 304 just interrupts content regeneration or execution, and the interruption position detection part 13 of control assembly 305 detects content regeneration interruption position (step S206).Then, if effectively whether process judging part 308 to the end (step S207) of control assembly 305 notice interrupt process, with regard to the service condition of the service condition information representation of reference among the determination step S103 (step S208).When not being effective, control assembly 305 makes the display part of regenerating unit 3 urge the user to buy the information of new service condition information in the service condition of the content of service condition information representation.When the user buys service condition information (step S209), after buying service condition information, control assembly 305 execution in step S208., when the user does not buy service condition information, after the 304 transmission regeneration ending orders of 305 pairs of regeneration/execution units of control assembly (step S210), get back to step S121.When the service condition of service condition information representation is effective among the step S208, when carrying out the control of service time of content, do not remain the calculating (step S211) of service time, continue to bring into use the instrumentation (step S212) of time, according to remaining service time, determine the interruption position of content regeneration, the interruption position of the content regeneration of determining and regeneration are continued initiation command to 304 outputs (step S213) of regeneration/execution unit.If the interruption position of content regeneration and regeneration continue the initiation command input, regeneration/execution unit 304 just continues beginning content regeneration or execution (step S214) from the interruption position of content regeneration.
It should be noted that when content regeneration continued beginning or incoming call end, the continuation with unconditional permission content regeneration or execution sometimes began.Promptly be when service condition is effective copyright administration policy before the regeneration ending of the service condition of content regeneration service condition information representation when beginning when effective, setting content.In an embodiment of the present invention, do not suppose such policy of setting, so the action of record step S115, step S116, step S117, step S208, step S209, step S210, but when setting described copyright administration policy, can omit these actions.
Below, for concrete example explanation embodiment 1.The concrete structure of embodiment 1, same with the structure of the embodiment 1 shown in the example of Fig. 1, so pay identical symbol, omit explanation.
In this embodiment,, enumerate service condition (1): term of life as the service condition of the pairing service condition information representation of specific packaged content: 23: 59: 59 on the 31st Dec in 2003, and access times limit 5 times; Service condition (2): term of life: 23: 59: 59 on the 31st Dec in 2003, and accumulative total 2 kinds of service conditions such as limited 5 minutes service time, with reference to the program flow diagram of Figure 10 and Figure 11, described.
At first, consider that the pairing service condition of packaged content is to use condition (1), condition memory unit 303 is the situation of the service condition information of storage representation service condition (1).At this moment, in the step S103 of Figure 10, control assembly 305 checks whether present times are more Zao than term of life, and whether the number of times of regenerating before this is in 5 times.Then, when satisfying both sides' service condition, control assembly 305 execution in step S106., when not satisfying any one or both sides' service condition, control assembly 305 shows the information of urging the user to buy new service condition information at the display part of regenerating unit 3.
If the user newly buys service condition information, control assembly 305 just checks in step S103 once again whether it is effective, if but guarantee that the service condition information that the user buys effectively (for example is, when the user buys new service condition information, the user can only select effective service condition information, or when downloading effective service condition information automatically), control assembly 305 is not got back to the action of step S103, execution in step S106.
At step S107, in service condition (1), comprise the access times restriction, so control assembly 305 adds access times 1 time, this number of times is stored in the storage part of regenerating unit 3 with the form that the user who has malice can't alter.As the example of the mode of storing, consider encryption, anti-use of altering device, signature.When storing in the storage part of regenerating unit 3, the value arbitrarily of the number of times of storage use before this or remaining access times.In addition, in service condition (1), do not comprise restriction service time, so control assembly 305 does not carry out the instrumentation of service time.In addition, after the content regeneration beginning, in service condition (1), do not comprise restriction service time, so control assembly 305 omits each action of step S111, step S118, step S123, step S211, step S212.
It should be noted that when setting the such condition of service condition (1), control assembly 305 is when checking that regeneration continues beginning or during the validity of the service condition of incoming call when finishing (step S115, step S208), sometimes based on the right expiration of service condition.When this is equivalent to the regeneration beginning, do not welcome term of life, but regenerate when continuing beginning the situation that term of life has been crossed.At this moment, the display part at regenerating unit 3 shows the information of urging the user to buy new service condition information.In the present embodiment, when service condition is condition (1),, content regeneration or carry out and to count from start to end 1 time, can carry out 5 content regeneration or execution as long as in the way, term of life is not expired.
Then, consider that the pairing service condition of packaged content is to use condition (2), condition memory unit 303 is the situation of the service condition information of storage representation service condition (2).At this moment, in the step S103 of Figure 10, control assembly 305 checks whether present times more Zao than term of life, and before this time of reproducing contents accumulation and whether within 5 minutes.Then, when satisfying both sides' service condition, control assembly 305 execution in step S106., when not satisfying any one or both sides' service condition, control assembly 305 shows the information of urging the user to buy new service condition information at the display part of regenerating unit 3.
If the user newly buys service condition information, control assembly 305 just checks in step S103 once again whether it is effective, if but guarantee that the service condition information that the user buys effectively (for example is, when the user buys new service condition information, the user can only select effective service condition information, or when downloading effective service condition information automatically), control assembly 305 is not got back to the action of step S103, execution in step S106.
At step S107, in service condition (2), comprise restriction service time, so control assembly 305 is brought into use the instrumentation of time.More specifically, control assembly 305 makes the timer (not shown) of regenerating unit 3 bring into use the instrumentation of time.It should be noted that control assembly 305 can comprise timer.In addition, after the content regeneration beginning, in service condition (2), comprise restriction service time, so each action of execution in step S111, step S118, step S123, step S204, step S211, step S212, step S202, step S203.
At this moment, control assembly 305 is in step S111, step S123 and step S204, when making the timer of regenerating unit 3 stop using the instrumentation of time, content regeneration beginning back and content regeneration are continued service time after the beginning and accumulative total and the addition of service time before this.In addition, control assembly 305 is at step S118 and step S212, makes the timer of regenerating unit 3 bring into use the instrumentation of time.Control assembly 305 is in step S202, if the accumulative total of service time before this becomes 5 minutes, with regard to the action of execution in step S203.
It should be noted that when setting the such condition of service condition (2), control assembly 305 is when checking that regeneration continues beginning or during the validity of the service condition of incoming call when finishing (step S115, step S208), sometimes based on the right expiration of service condition.When this is equivalent to the regeneration beginning, do not welcome term of life, but regenerate when continuing beginning the situation that term of life has been crossed.At this moment, the display part at regenerating unit 3 shows the information of urging the user to buy new service condition information.In the present embodiment, when service condition is condition (2), as long as in the way, term of life is not expired, and can carry out content regeneration or execution, up to the accumulative total of content regeneration or execution time with become 5 minutes.
As mentioned above, according to present embodiment, use instrumentation interruption member 21, use amount detection part 22 and use control to continue beginning parts 23 temporary transient instrumentation that interrupts the use amount of content in the starting of interrupt process, so can correctly carry out the use control of content.In addition, in the present embodiment, the beginning and the end of the illegal process of process judging part 308 judgements, illegal process starting suppresses the starting that parts 309 suppress illegal process, or deletes content from the storage part of regenerating unit 3.Therefore, even mobile telephone terminal open systemization and multifunction, the user will start illegal process in content regeneration, just can suppress that it causes illegally.
Embodiment 2
With reference to accompanying drawing, embodiment 2 is described.Figure 12 is the block diagram of a structure example of the expression embodiment of the invention 2.
The embodiment of the invention 2 is with the difference of the embodiment of the invention 1 shown in Figure 1: order input block 306 the information of order and definite packaged content to control assembly 305 inputs; Control assembly 305 is extracted the packaged content of content storage element 302 storages out.Therefore, the action and the embodiment of the invention 1 of each parts beyond the service condition of regeneration/execution unit 304 and the control assembly 305 enforcement parts 24 are same, so omit explanation.
The service condition of control assembly 305 exercise parts 24 according to the user to the order of order input block 306 inputs and the information (content ID) of definite packaged content, consult and use the corresponding service condition information of information 303 storages of condition memory unit and definite packaged content 306 inputs of order input block, judgement is to which order of regeneration/execution unit 304 outputs, the order that 304 outputs are judged to regeneration/execution unit.Figure 13 is the key diagram of expression user to the corresponding relation of the order of 305 pairs of regeneration/execution units of order, control assembly, 304 outputs of order input block 306 inputs.Control assembly 305 before or after output command, the action that is predetermined.Figure 14 is the key diagram of the action that is predetermined carried out before or after explanation control assembly 305 output commands.
Figure 15 is that expression is corresponding with the order of control assembly 305 inputs, the key diagram of the action that regeneration/execution unit 304 carries out.If the action corresponding with it just carried out in the order shown in the left hurdle of regeneration/execution unit 304 control assemblies 305 input Figure 15.For example, during 305 pairs of regeneration/execution units of control assembly, 304 input regeneration initiation commands, control assembly 305 is the non-packingization of packaged content, and the content of extraction is simultaneously to 304 inputs of regeneration/execution unit, so regeneration/execution unit 304 beginning content regeneration.
The following describes the action of embodiment.Figure 16 is the program flow diagram of the action of explanation embodiment 2.
The user operates the operating portion of regenerating unit 3, and specific packaged content in the packaged content of chosen content memory unit 302 storages is to order input block 306 input regeneration initiation commands (step S301).Order 306 regeneration initiation commands of importing of input block, determine that the information of packaged content is to control assembly 305 outputs.
Control assembly 305 is extracted packaged content according to the information of definite packaged content of input out from content storage element 302, with reference to position information between the packaged content of extracting out, determines the service condition information corresponding with a content ID that position information comprises.Then, extract the service condition information of determining out, consult and use conditional information, judge the service condition whether effective (step S302) of the content of service condition information representation from service condition memory unit 303.When the service condition of the content of service condition information representation was not effective, control assembly 305 showed the information of urging the user to buy new service condition information at the display part of regenerating unit 3.
When the user buys service condition information (step S303), after buying service condition information, control assembly 305 execution in step S302., when the user does not buy service condition information (step S303), just finish.
Among the step S302, when the service condition of the content of service condition information representation was effective, control assembly 305 was extracted the non-packingization of packaged content out content, allowed the content of extracting out response to 304 outputs (step S304) of regeneration/execution unit with beginning.Then, control assembly 305 carries out access times when control of content, carries out the addition of access times, and bring into use the instrumentation (step S305) of time when controlling the service time of carrying out content.
If content and regeneration begin to allow the response input, regeneration/execution unit 304 just begins content regeneration or execution (step S306).
In content regeneration, if the user operates the operating portion of regenerating unit 3, the order that 306 inputs are interrupted, continued beginning or finish to the order input block, regeneration/execution unit 304 carries out following action (step S307) according to this order.
In step S307, when order input block 306 has the input of interruptive command, when control assembly 305 was controlled in the service time of carrying out content, interrupt the instrumentation (step S308) of service time, to regeneration/execution unit 304 output regeneration interruptive commands (step S309).If the input of regeneration interruptive command, regeneration/execution unit 304 just interrupts content regeneration or execution (step S310).
In step S307, when order input block 306 has the input that continues initiation command, the service condition of the service condition information representation of reference whether effectively (step S311) among the control assembly 305 determination step S302.When not being effective, control assembly 305 makes the display part of regenerating unit 3 urge the user to buy the information of new service condition information in the service condition of the content of service condition information representation.When the user buys service condition information (step S312), after buying service condition information, control assembly 305 execution in step S311., when the user does not buy service condition information (step S312), carry out action identical when importing the finish command of describing later.When the service condition of service condition information representation is effective in step S311, when carrying out the control of service time of content, continue to bring into use the instrumentation (step S313) of time, 304 output regeneration continue initiation commands (step S314) to regeneration/execution unit.If regeneration continues the initiation command input, regeneration/execution unit 304 just continues beginning content regeneration or execution (step S315).
In step S307, when order input block 306 has the input of the finish command, when control assembly 305 was controlled in the service time of carrying out content, the instrumentation (step S316) that finishes service time was to the 304 output regeneration ending orders (step S317) of regeneration/execution unit.If regeneration ending order input, regeneration/execution unit 304 just finishes content regeneration or execution (step S318).Then, the data (step S319) of the content of the storage portion stores of control assembly 305 deletion regenerating units 3 are got back to step S301 state before.
Explanation in step S307, do not have the order input the time action.Figure 17 is the program flow diagram of the action when not having the input of order in the regeneration of description.
At this moment, process judging part 308 carries out following action according to the having or not of the beginning of the process of control assembly 305 notice.At first, when not having the starting of interrupt process (step S401), when the service condition of the service condition information representation of reference among the step S302 comprised the condition of service time, control assembly 305 was judged whether expire service time (step S402).Service time is when expiring, to the 304 output regeneration ending orders (step S403) of regeneration/execution unit, execution in step S316.Get back to step S307 when not expiring service time.
In addition, when the starting of interrupt process is arranged (process judging part 308 be judged to be interrupt process will start time), when controlling the service time of carrying out content, control assembly 305 interrupts the instrumentation (step S404) of service time, to regeneration/execution unit 304 output regeneration interruptive commands (step S405).If the input of regeneration interruptive command, regeneration/execution unit 304 just interrupts content regeneration or execution, and the interruption position detection part 13 of control assembly 305 detects content regeneration interruption position (step S406).Then, if effectively whether process judging part 308 to the end (step S407) of control assembly 305 notice interrupt process, with regard to the service condition of the service condition information representation of reference among the determination step S302 (step S408).When not being effective, control assembly 305 makes the display part of regenerating unit 3 urge the user to buy the information of new service condition information in the service condition of the content of service condition information representation.When the user buys service condition information (step S409), after buying service condition information, control assembly 305 execution in step S408., when the user does not buy service condition information, after the 304 transmission regeneration ending orders of 305 pairs of regeneration/execution units of control assembly (step S410), get back to step S316.When the service condition of service condition information representation is effective among the step S408, when carrying out the control of service time of content, do not remain the calculating (step S411) of service time, continue to bring into use the instrumentation (step S412) of time, according to remaining service time, determine the interruption position of content regeneration, the interruption position of the content regeneration of determining and regeneration are continued initiation command to 304 outputs (step S413) of regeneration/execution unit.If the interruption position of content regeneration and regeneration continue the initiation command input, regeneration/execution unit 304 just continues beginning content regeneration or execution (step S414) from the interruption position of content regeneration.
It should be noted that when content regeneration continued beginning or incoming call end, the continuation with unconditional permission content regeneration or execution sometimes began.Promptly be when service condition is effective copyright administration policy before the regeneration ending of the service condition of content regeneration service condition information representation when beginning when effective, setting content.In an embodiment of the present invention, do not suppose such policy of setting, thus the action of record step S311, step S312, step S408, step S409, step S410, but when setting described copyright administration policy, can omit these actions.
As mentioned above, according to present embodiment, can obtain effect similarly to Example 1.
Embodiment 3
With reference to accompanying drawing, embodiment 3 is described.Figure 18 is the block diagram of a structure example of the expression embodiment of the invention 3.
The embodiment of the invention 3 is with the difference of embodiment 1: service condition information delivery server 160 comprises the tabulation generation parts 162 of process of the tabulation of the tabulation that generates illegal process and interrupt process, the tabulation that service condition information comprises process generates part or all of tabulation of the tabulation of the illegal process that parts 162 generate and interrupt process, and process judging part 308 is with reference to this tabulation.Other structures similarly to Example 1, so omit explanation.
The tabulation of process generates the kind of parts 162 according to the content of installed software, 150 dispensings of content converting server in the regenerating unit 3, generate the tabulation of illegal process and the tabulation of interrupt process, the tabulation that generates is exported service condition information delivery parts 161.Service condition information delivery parts 161 generate the tabulation that comprises process the service condition information of the tabulation of parts 162 generations regenerating unit 3 are provided and delivered.
Process judging part 308 monitors among the OS resident, whole processes of starting or finishing, when the process that any one of the tabulation of the tabulation of the interrupt process that service condition information comprises, the interrupt process of storage portion stores or both sides comprise will start or finish, notify this meaning to control assembly 305.In addition, when any one of the tabulation of the tabulation of the illegal process that process judging part 308 comprises in service condition information, the illegal process of storage portion stores or the process that both sides comprise will start or finish, illegal process starting is suppressed parts 309 notify this meaning.
Regenerating unit 3 carries content regeneration control program, make process judging part 308 carry out the service condition information of consulting and using 303 storages of condition memory unit, judge whether the process that will start in the content regeneration is the process determination processing of interrupt process, if the process determination processing judges that the process that will start is an interrupt process, regeneration/execution unit 304 is carried out interrupt content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process.In addition, if provide and deliver a lateral confinement system content regeneration time distributed contents, content regeneration control program just makes control assembly 305 carry out in control and treatment: the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.
Regenerating unit 3 carries content regeneration control program, make process judging part 308 carry out the service condition information of consulting and using 303 storages of condition memory unit, judge that the process that will start in the content regeneration is illegal process, the process determination processing of the process beyond interrupt process or illegal process and the interrupt process, if the process determination processing judges that the process that will start is an interrupt process, regeneration/execution unit 304 is carried out interrupted content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process, if the process determination processing judges that the process that will start is illegal process, the illegal process starting that just makes illegal process starting suppress the starting of parts 309 these processes of execution inhibition suppresses to handle.
In addition, regenerating unit 3 carries content regeneration control program, make process judging part 308 carry out the service condition information of consulting and using 303 storages of condition memory unit, judge that the process that will start in the content regeneration is illegal process, the process determination processing of the process beyond interrupt process or illegal process and the interrupt process, if the process determination processing judges that the process that will start is an interrupt process, regeneration/execution unit 304 is carried out interrupted content regeneration, regeneration/the executions processing that finishes up to the execution of interrupt process, the contents decryption of encrypting, store in the storage part, in the process determination processing, if judge that the process that will start is illegal process, just making control assembly 305 execution that regeneration/execution is handled forces to finish content regeneration, deletes the processing of the data of the content of deciphering from storage part.The lateral confinement system content regeneration time distributed contents if provide and deliver, content regeneration control program just makes control assembly 305 carry out in control and treatment: the processing of instrumentation content regeneration time; If the processing of the instrumentation of content regeneration time is just interrupted in the interrupt process starting; If the execution of interrupt process finishes, just continue the processing of the instrumentation of beginning content regeneration time.
Service condition information delivery server 160 carries service condition information delivery program, and allowing service condition information delivery parts 161 carry out the information that comprises the tabulation of interrupt process is promptly used conditional information is the service condition information delivery processing of regenerating unit (content reproduction terminal) 3 dispensings to the terminal of reproducing contents.In addition, service condition information delivery program makes the tabulation of process generate parts 162 and carries out the program of installing according in the regenerating unit (content reproduction terminal) 3, the tabulation of the process of the tabulation of generation interrupt process generates to be handled, in the service condition information delivery is handled, allow service condition information delivery parts 161 carry out the service condition information processing that dispensing comprises the tabulation of the interrupt process that generates in the tabulation generation processing of process.
In addition, in addition, conditional information delivery server 160 carries service condition information delivery program, and allowing service condition information delivery parts 161 carry out the information of the tabulation of tabulation that comprises illegal process and interrupt process is promptly used conditional information is the service condition information delivery processing of regenerating unit 3 (content reproduction terminal) dispensing to the terminal of reproducing contents.Service condition information delivery program makes the tabulation of process generate parts 162 and carries out the program of installing according in the regenerating unit (content reproduction terminal) 3, the tabulation of process that generates the tabulation of the tabulation of illegal process and interrupt process generates to be handled, in the service condition information delivery is handled, the service condition information processing of the tabulation of the illegal process that the tabulation that allows the 161 execution dispensings of service condition information delivery parts comprise process generates in generating and handling and the tabulation of interrupt process.
The following describes the action of embodiment 3.In embodiment 3, before communication component 301 is downloaded service condition information, the content of the process that installed software is carried out in 301 pairs of service condition information deliveries of communication component server, the 160 notice regenerating units 3.The tabulation of the process of service condition information delivery server 160 generates the kind of parts 162 according to the content of the content converting server corresponding with service condition information 150 dispensings, generates the tabulation of illegal process and the tabulation of interrupt process automatically.For example, when content is the content of music when MP3 forms such as (MPEG (Motion Picture Experts Group)-1Audio Layer-3) (for example), even the process work of picture catching does not become piracy yet, so, do not add the tabulation of illegal process about such process., the such process of storage part of visit sound card might be encroached on literary property, so add the tabulation of illegal process.Particularly, in the tabulation of illegal process, append the kind of the content shown in the example of table 1, the process corresponding with file layout.In addition, content converting server 150 sends the information that allows to allow conversion format of content, output in specific DRM (DigitalRights Management) system to service condition information delivery server 160.Then, the tabulation of process generates parts 162 according to the information of receiving from content converting server 150, and the process of the system's output content beyond specific DRM system is appended in the tabulation of illegal process.
In addition, the tabulation of the process of service condition information delivery server 160 generates the content of parts 162 according to the software of communication component 301 notices of regenerating unit 3, generates the tabulation of interrupt process automatically.For example, when the software of alarm is installed, think that the advance ratio content regeneration of alarm is also preferential, in regenerating unit 3 so in the tabulation of interrupt process, append.Such process also has the incoming call of phone, the arrival of Email, the arrival of instant messages.The tabulation of the process of service condition information delivery server 160 generates parts 162 and generates the tabulation of illegal process and the tabulation of interrupt process, and service condition information delivery parts 161 send the service condition information of the tabulation of tabulation that comprises illegal process and interrupt process to regenerating unit 3.
In the regenerating unit 3, communication component 301 receives the service condition information of the tabulation of the tabulation that comprises illegal process and interrupt process, 303 storages of service condition memory unit.When control assembly 305 makes regeneration/execution unit 304 reproducing contents, to reading of the tabulation of the tabulation of the illegal process of process judging part 308 indication service condition memory units 303 storages and interrupt process, process judging part 308 carries out the judgement of illegal process and interrupt process with reference to the tabulation of the illegal process of the storage portion stores of regenerating unit 3 and the tabulation of interrupt process.The action and the embodiment of the invention 1 beyond the illegal process that process judging part 308 carries out and the judgement of interrupt process are same, so omit explanation.
As mentioned above, according to present embodiment, in the present embodiment,, can also set illegal process, interrupt process neatly according to the kind of installed software in the regenerating unit 3 except the effect of embodiment 1.
It should be noted that embodiments of the invention 2 and embodiment 3 are recited as the variation of embodiment 1, but also can make up embodiment 1~embodiment 3 respectively.The embodiment of Shi Xianing also can realize the effect same with embodiment 1~embodiment 3 thus.
Embodiment 4
With reference to description of drawings embodiment 4.Figure 19 is the block diagram of a structure example of the expression embodiment of the invention 4.
The embodiment of the invention 4 is installed as the program that makes processor carry out content reproduction control method of the present invention, makes regenerating unit 3 carry out the program of installing.Regenerating unit 3 comprises: the process processor controls 351 of executive routine; The user imports the input part 353 of indication; Efferent 354 to user's output information; UI (User Interface) control part 352 of control input part 353 and efferent 354; From content converting server 150 received contents, receive the Department of Communication Force 361 of service condition information from service condition information delivery server 160; The content memorizer 362 of the content that storing communication portion 361 receives from content converting server 150; The service condition storer 363 of the service condition information that storing communication portion 361 receives from service condition information delivery server 160; Stored program program storage 370.
Program storage 370 is stored: make process processor controls 351 carry out the content regeneration/executive routine 374 of content regeneration/execution except general procedure, make process processor controls 351 carry out the content regeneration/executive control program 375 of the control of content regeneration/execution, make process processor controls 351 carry out the process supervisory programme 377 of the supervision of process, the process that makes process processor controls 351 determinating processes processor controls 351 start or to finish is the process decision procedure 378 of what kind of process, make process processor controls 351 suppress the illegal process starting control program 379 of the starting of illegal process.
UI control part 352 and input part 353 have the function of order input block 306.In addition, Department of Communication Force 361 carries out the action same with communication component 301.Content memorizer 362 storage packaged content, service condition storer 363 storage service condition information.In addition, content regeneration/executive routine 374 makes process processor controls 351 carry out the action same with regeneration/execution unit 304, content regeneration/executive control program 375 makes process processor controls 351 carry out the action same with control assembly 305, process supervisory programme 377 makes process processor controls 351 carry out monitoring the action that parts 307 are same with process, process decision procedure 378 makes process processor controls 351 carry out the action same with process judging part 308, and illegal process starting control program 379 makes process processor controls 351 carry out suppressing the same action of parts 309 with illegal process starting.
Embodiment 4 adopts the structure of program that each parts of embodiment 1, embodiment 2, embodiment 3 are replaced into, so the action of the action of embodiment 4 and embodiment 1, embodiment 2, embodiment 3 is same.Therefore, omit the explanation of the action of embodiment 4.
As mentioned above, according to present embodiment, realize each parts of regenerating unit 3, so, can realize effect of the present invention by the terminal by programmed control work such as PC or PDA by program.
Embodiment 5
Below, present invention will be described in detail with reference to the accompanying embodiment 5.
Figure 21, the 22nd, the block diagram of embodiment 5.If with reference to Figure 21, Figure 22, almost structure is identical with the embodiment of the invention 1 for the embodiment of the invention 5, but difference is: the input of control assembly 305 processing command input blocks 306, control assembly 305 have regeneration interruption user and confirm parts 41.
If from the 308 notice interrupt process startings of process judging part, regeneration is interrupted the user and is confirmed that parts 41 just notify interrupt process to start to the user, allow the user select (a) to interrupt regeneration, implement interrupt process, or (b) do not carry out interrupt process, proceed regeneration,, carry out described (a) or (b) according to input based on the user from order input block 306.At this moment, according to input, when carrying out (a), use instrumentation interruption member 21 to carry out from the user.
Below with reference to the program flow diagram of Figure 22 and Figure 23,, illustrate and the action of embodiment 1 difference about present embodiment.
The program flow diagram of Figure 23 is the program flow diagram about the processing of appending between the step S109 of the program flow diagram of Figure 10 and step S122.At this moment, according to from the having or not of the beginning of the interrupt process of 308 pairs of control assemblies of process judging part 305 notice, carry out following processing (step S109).
At first, when step S109 does not have the starting of interrupt process, execution in step S514.In step S514, when the service condition of reference comprises the condition of service time among the step S103, control assembly 305 in use between less than the time, execution in step S109, when not being, after the 304 output regeneration ending orders of regeneration/execution unit, execution in step S515 (S121).
Then, when the starting of interrupt process was arranged in step S501, example as shown in figure 24 was such, and notice is carried out the meaning (step S502) of interrupt process.In Figure 24,, when carrying out interrupt process, urge button input from the user in the overlapping demonstration of player picture.When not importing, do not implement interrupt process, remain untouched and proceed regeneration from user's button.
It should be noted that, in the present example,,, but also can use the notice of the vibration that utilizes sound or terminal, based on the notice of the combination of sound, picture, vibration to the starting of user notification interrupt process by in the overlapping demonstration of picture.
Carry out the service time control (it comprises restriction during total service time, count during through certain above service time be the whole controls of the service time after 1 time uses such as control begin to regenerate) of content, demonstration residue live part (when adding up service time, reproducible excess time.In addition, service time is through certain when above, counts when using 1 time control, to excess time or the number of times counted for 1 time), provide the judgement of whether interrupting material to the user.
If by step S502, import the execution of interrupt process from the user, when carrying out the service time control of content (it comprises restriction during total service time, count during through certain above service time be the whole controls of the service time after 1 time uses such as control begin to regenerate), interrupt the instrumentation (step S503) of service time, to regeneration/execution unit 304 output regeneration interruptive commands (step S504).If regeneration/execution unit 304 is received the regeneration interruptive command, just interrupt content regeneration/execution, the interruption position detection part 13 of control assembly 305 detects content regeneration interruption position (step S504).
Then, if from the end (step S506) of process judging part 308 notice interrupt process, with regard to the service condition of reference among the determination step S103 whether effectively (step S507).
When service condition is invalid, urge the user to buy new service condition (step S508).When buying service condition, execution in step S507 once again after the purchase.And when not buying, after the 304 output regeneration ending orders of regeneration/execution unit, execution in step S509 (S121).
In step S507, when service condition is effective, the service time of carrying out content is when limiting, calculate the residue service time (step S510) of content, continue to bring into use the instrumentation (step S511) of time, 304 output regeneration restart order and content regeneration interruption position (step S512) to regeneration/execution unit.Then, when regeneration/execution unit 304 restarts content regeneration/execution (step S513), as shown in figure 24, and the across-the-line starting player, (accumulative total is during service time, reproducible excess time also can to show the residue live part when starting.In addition, service time is through certain when above, counts when using 1 time control, to the excess time or the number of times of 1 counting), the meaning that user's affirmation is restarted.Then, execution in step S514.
It should be noted that, restart or send a telegram here when finishing in regeneration, sometimes restarting with unconditional permission content regeneration or execution.For example be when service condition is effective copyright administration policy before the regeneration ending of the service condition of content regeneration service condition information representation when beginning when effective, setting content.In an embodiment of the present invention, do not suppose such policy of setting, so the processing of record step S115, step S116, step S117, step S507, step S508, step S509, but when setting described copyright administration policy, can omit these steps.
As mentioned above, in the present embodiment, except the effect of embodiment 1, when interrupt process started, the user can select to implement interrupt process, or ignored interrupt process, continued reproducing contents.
It should be noted that embodiments of the invention 5 also can appropriate combination the above embodiments 1~embodiment 3, embodiment 5.The embodiment of Shi Xianing also can realize and described same effect thus.
According to the present invention, can be used for content regeneration to mobile telephone terminal.In content reproduction terminal in addition, can be applied to have content regeneration purposes in addition, beyond content regeneration, carry out the device purposes such as (for example music players of the entertainment device in auto-navigation system, the aircraft, band radio function) of the high processing of priority.

Claims (14)

1. content reproduction control method,
The instrumentation content regeneration time;
The process that storage is also preferentially carried out than content regeneration is the tabulation of interrupt process;
Judge whether the process that will start in the content regeneration is described interrupt process;
If being judged to be the process that will start is described interrupt process, just interrupt the instrumentation of content regeneration time, the storage content regeneration time before this, interrupt content regeneration, up to the execution end of described interrupt process;
If the execution of described interrupt process finishes, just detect the described content regeneration time of being stored, restart the instrumentation of content regeneration time;
According to the described content regeneration time of being detected, restart content regeneration.
2. content reproduction control method according to claim 1 is characterized in that,
The side of providing and delivering dispensing comprises the information of the tabulation of described interrupt process and promptly uses conditional information;
Receive a side with reference to the described service condition information of being received, judge whether the process that will start in the content regeneration is described interrupt process;
If being judged to be the process that will start is described interrupt process, just interrupt content regeneration, up to the execution end of described interrupt process.
3. content reproduction control method according to claim 1 is characterized in that,
Above-mentioned interrupt process is a kind of in the arrival, alarm of incoming call, the instant message of phone.
4. content reproduction control method according to claim 1 is characterized in that,
If being judged to be the process that will start in the described content regeneration is described interrupt process, then whether notice carries out described interrupt process,
Under the situation of the execution of having selected described interrupt process, interrupt content regeneration till described interrupt process finishes,
Under the situation of the execution of non-selected described interrupt process, continue content regeneration.
5. content reproduction control method according to claim 1 is characterized in that,
Under the described content regeneration time of being detected is situation more than the stipulated time, it is 1 time with described content regeneration counting.
6. a content generation control system comprises
The instrumentation parts, the instrumentation content regeneration time;
Storage part, the process that storage is also preferentially carried out than content regeneration is the tabulation of interrupt process;
The process judging part judges whether the process that will start in the content regeneration is described interrupt process;
Regeneration/execution unit interrupts content regeneration when described process judging part judges that the process that will start is described interrupt process, up to the execution end of described interrupt process; And
Control assembly, when described process judging part judges that the process that will start is described interrupt process, just the content regeneration time before the above-mentioned instrumentation parts instrumentation is stored into described storage part, if the execution of described interrupt process finishes, just detect the content regeneration time of described storage portion stores, according to the content regeneration time of being detected, make described regeneration/execution unit restart content regeneration.
7. content generation control system according to claim 6 is characterized in that,
The information of the tabulation that having provides and delivers comprises described interrupt process is promptly used the parts of conditional information;
Described process judging part with reference to the described service condition information of being received, judges whether the process that will start in the content regeneration is described interrupt process.
8. content generation control system according to claim 6 is characterized in that,
Above-mentioned interrupt process is a kind of in the arrival, alarm of incoming call, the instant message of phone.
9. content generation control system according to claim 6 is characterized in that,
Have: if be judged to be the process that will start in the described content regeneration is described interrupt process, and then whether notice carries out the parts of described interrupt process,
Described control assembly under the situation of the execution of having selected described interrupt process, interrupts content regeneration till the execution of described interrupt process finishes,
Under the situation of the execution of non-selected described interrupt process, continue content regeneration.
10. content generation control system according to claim 6 is characterized in that,
Described control assembly under the content regeneration time of described detection is situation more than the stipulated time, is 1 time with described content regeneration counting.
11. a content regeneration control terminal comprises
The instrumentation parts, the instrumentation content regeneration time;
Storage part, the process that storage is also preferentially carried out than content regeneration is the tabulation of interrupt process;
The process judging part judges whether the process that will start in the content regeneration is described interrupt process;
Regeneration/execution unit if described process judging part judges that the process that will start is described interrupt process, just interrupts content regeneration, up to the execution end of described interrupt process; With
Control assembly, when described process judging part judges that the process that will start is described interrupt process, the use amount of the content before the above-mentioned instrumentation parts instrumentation is stored into described storage part, if the execution of described interrupt process finishes, just detect the content regeneration time of described storage portion stores, according to the content regeneration time of being detected, make described regeneration/execution unit restart content regeneration.
12. content regeneration control terminal according to claim 11 is characterized in that,
Above-mentioned interrupt process is a kind of in the arrival, alarm of incoming call, the instant message of phone.
13. content regeneration control terminal according to claim 11 is characterized in that,
Have: if judge the process that will start in the described content regeneration is described interrupt process, and then whether notice carries out the parts of described interrupt process,
Described control assembly under the situation of the execution of having selected described interrupt process, interrupts content regeneration till described interrupt process finishes, and under the situation of the execution of non-selected described interrupt process, continues content regeneration.
14. content regeneration control terminal according to claim 11 is characterized in that,
Described control assembly under the content regeneration time of described detection is situation more than the stipulated time, is 1 time with described content regeneration counting.
CNB2005800153311A 2004-05-13 2005-05-12 Content reproduction control method Expired - Fee Related CN100458742C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP143536/2004 2004-05-13
JP2004143536 2004-05-13
JP130918/2005 2005-04-28

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CNA2008101886090A Division CN101458753A (en) 2004-05-13 2005-05-12 Content consumption control method
CNA2008101886086A Division CN101458752A (en) 2004-05-13 2005-05-12 Content consumption control method

Publications (2)

Publication Number Publication Date
CN1954301A CN1954301A (en) 2007-04-25
CN100458742C true CN100458742C (en) 2009-02-04

Family

ID=38059751

Family Applications (3)

Application Number Title Priority Date Filing Date
CNA2008101886090A Pending CN101458753A (en) 2004-05-13 2005-05-12 Content consumption control method
CNB2005800153311A Expired - Fee Related CN100458742C (en) 2004-05-13 2005-05-12 Content reproduction control method
CNA2008101886086A Pending CN101458752A (en) 2004-05-13 2005-05-12 Content consumption control method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CNA2008101886090A Pending CN101458753A (en) 2004-05-13 2005-05-12 Content consumption control method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CNA2008101886086A Pending CN101458752A (en) 2004-05-13 2005-05-12 Content consumption control method

Country Status (1)

Country Link
CN (3) CN101458753A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112507324B (en) * 2021-02-05 2021-06-04 浙江地芯引力科技有限公司 RISC processor circuit and method for analyzing data and command safety

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1302399A (en) * 1999-02-22 2001-07-04 松下电器产业株式会社 Computer and program recorded medium
JP2002077458A (en) * 2000-08-29 2002-03-15 Hitachi Ltd Portable telephone terminal device, contents reproduction interrupting and restarting method of portable telephone terminal device, and contents distributing station
US6606707B1 (en) * 1999-04-27 2003-08-12 Matsushita Electric Industrial Co., Ltd. Semiconductor memory card
CN1441610A (en) * 2001-11-30 2003-09-10 株式会社东芝 Control method of mobile terminal and mobile terminal
JP2003316585A (en) * 2002-04-24 2003-11-07 Casio Comput Co Ltd Terminal equipment, process monitoring method and program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1302399A (en) * 1999-02-22 2001-07-04 松下电器产业株式会社 Computer and program recorded medium
US6606707B1 (en) * 1999-04-27 2003-08-12 Matsushita Electric Industrial Co., Ltd. Semiconductor memory card
JP2002077458A (en) * 2000-08-29 2002-03-15 Hitachi Ltd Portable telephone terminal device, contents reproduction interrupting and restarting method of portable telephone terminal device, and contents distributing station
CN1441610A (en) * 2001-11-30 2003-09-10 株式会社东芝 Control method of mobile terminal and mobile terminal
JP2003316585A (en) * 2002-04-24 2003-11-07 Casio Comput Co Ltd Terminal equipment, process monitoring method and program

Also Published As

Publication number Publication date
CN101458752A (en) 2009-06-17
CN101458753A (en) 2009-06-17
CN1954301A (en) 2007-04-25

Similar Documents

Publication Publication Date Title
KR100898326B1 (en) Management method for drm contents based in usual history and portable device using the same
CN1333314C (en) Software execution control system and software execution control program
JP4711696B2 (en) Data communication management system, mobile terminal, and mobile terminal control program
CN109657448B (en) Method and device for acquiring Root authority, electronic equipment and storage medium
KR101496632B1 (en) System for safe contents service for youths and method therefor
CN106022101B (en) application management method and terminal
CN103218564A (en) Mobile terminal protection method and mobile terminal protection device
WO2008149196A1 (en) Toolkit application launching mechanism after wrong rights detection on mobile tv smartcard
CN106569917B (en) Data backup method and mobile terminal
US20150047019A1 (en) Information processing method and electronic device
CN111371841B (en) Data monitoring method and device
CN100458742C (en) Content reproduction control method
EP1770531A1 (en) Content reproduction control method
KR20140055897A (en) User terminal, reliability management server, and method and program for preventing unauthorized remote operation
CN110334529B (en) Data processing method, device, equipment, system and audio equipment
CN113221195A (en) Method, device and storage medium for storing business data
CN111221586A (en) Privacy cleaning method for application program, readable storage medium and terminal equipment
US20080276299A1 (en) Wireless terminal apparatus and method of protecting system resources
JPH09319451A (en) Rental fee determining device and use right managing device for computer software
KR20110059363A (en) Method for protecting application and method for executing application thereof
CN110362983B (en) Method and device for ensuring consistency of dual-domain system and electronic equipment
CN113438540A (en) Advertisement pre-loading playing method and device based on advertisement exposure rate
CN103577724A (en) IPTV (internet protocol television) third-party application-based copyright protection method and device
JP4765419B2 (en) Billing management system, billing management apparatus and billing management method for stored data
CN113934988A (en) Software security protection method, computer device and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090204

Termination date: 20160512