Prior art keywords
ash
valve
pressure
storehouse
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100125587A
Other languages
Chinese (zh)
Other versions
CN1824593A (en
Inventor
李玉清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100125587A priority Critical patent/CN100457589C/en
Publication of CN1824593A publication Critical patent/CN1824593A/en
Application granted granted Critical
Publication of CN100457589C publication Critical patent/CN100457589C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Transport Of Granular Materials (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention relates to a method for making up-going lime bin pump implement automatic blockage elimination and its continuous operation. Said method is implemented by utilizing existent lime bin pump system, central processor in control circuit and process control software stored in EEPROM. It is characterized by that between main lime-conveying pipe and lime-stored tank a lime-discharging pipe and a controlled lime-discharging valve are set. Besides, it also includes the components of air inlet tube, etc. Said invention also provides the concrete steps for implement said method.

Description

Upstriker ash storehouse pump is realized the method for automatic block clearing and continuous handling thereof
Technical field
The present invention relates to upstriker ash storehouse pump and realize the method for automatic block clearing and continuous handling thereof.
Background technology
The a large amount of fly ash that produce in the thermoelectric power station production are collected the storage ash bucket through electric dust collector, are delivered to grey storehouse through grey storehouse pumping system again.Existing grey storehouse pumping system adopts upstriker ash storehouse pump mostly, comprises the cone pump body in the system architecture, and the fluidized-bed structure at the bottom of the storehouse is connected with the compressed gas house steward by air inlet valve, and Cang Ding is provided with the pressurized feed mouth and is connected with valve system by pressurizing valve.In the upstriker ash pipeline from the top straight cutting of storehouse pump to the storehouse at the bottom of, fluidisation bed surface top, in the existing technology in the pump of upstriker ash storehouse ash pipeline be communicated with main ash pipeline by a bleeder valve.Total system is set in out the below of ash bucket by a blanking valve and flapper, by means of the height of γ level-sensing device control blanking.Present structure inevitably can cause fly ash to produce obstruction in the process of transmission.Thereby cause the interruption of total system operation, remove to dredge pipeline.Because the static friction force of ash pipeline lower end deposition dying embers in the time of need overcoming each start, the ash output valve that is positioned on the outer main ash pipeline of storehouse pump must be closed, and goods fluid is finished and pressure is opened this bleeder valve when sufficient again in pump.Cause this bleeder valve frequently opening and closing under high-velocity stream is washed away like this, serious wear often needs to change bleeder valve, and the continuity of production can't be guaranteed, has improved operation cost widely.
Summary of the invention
The purpose of this invention is to provide one and on the pump of upstriker ash storehouse, realize the method for automatic block clearing, and on the basis of this method, provide the method that realizes the total system continuous handling.
What the present invention at first solved is how to handle in process of production because the blockage problem that the variation that press in the storehouse all may occur at any time.The reason of this obstruction is that material advances with wave in the process of transmission.When insufficient pressure, partial material deposits formation and piles up, and results in blockage.The superposition that can cause transmitting the logistics crest when excessive is pressed in the storehouse, directly forms and blocks the excessive easier obstruction of pressure often.Certainly, solving the method for stopping up is not produce obstruction, and the pressure maintenance of absolute stable storehouse is impossible.
Key of the present invention is by means of the central process unit in existing grey storehouse pumping system, the control circuit, and the process control software that is stored among the EEPROM realizes that concrete method comprises:
1. between main ash handing pipeline and storage ash bucket, be provided with and rush down grey pipeline, be provided with the controlled grey valve that rushes down in the pipeline,
2. be respectively equipped with pressure sensor at main ash handing pipeline and pump internal upper part space, storehouse,
The pressure data that sets in the standard pressure data interval in master's ash handing pipeline and pump internal upper part space, storehouse and the main ash handing pipeline under the blocked state and pump internal upper part space, storehouse deposits the specific region among the EEPROM in during 3. with normal operation,
4. realize automatic block clearing according to following steps:
A. the pressure data in the main ash handing pipeline that will gather according to the cycle of setting and pump internal upper part space, storehouse is delivered to central process unit and has been deposited the normal data processing of comparing, makes the block clearing judgement,
B. close all air inlet valves of storehouse pumping system,
C. open fast controlled rush down grey valve to the storage ash bucket rush down ash fast, close the controlled grey valve that rushes down after finishing,
D. open the storehouse pumping system and add air valve, pressurizing valve, and the pressure data in online acquisition master ash handing pipeline and pump housing internal upper part space, storehouse is delivered to central process unit and has been deposited the normal data processing of comparing, the life of main line pressure no longer raises to normal operating pressure, block clearing finishes, as continues to be increased to stop up to press and change the b step over to and enter and rush down ash manipulation once more and finish until block clearing.
Open the controlled grey valve that rushes down fast, can form main ash handing pipeline pressure and descend fast, it is slow to make that obstruction spot deposition thing drives, opening clearance, the mediation of pipeline after being beneficial to pressurize.Above method can online eliminating obstruction go on production process continuously.
The present invention makes upstriker ash storehouse pump realize that not shutting down continuous handling just may realize under the support of above method.The key of the following method that provides is the low pressure smooth starting problem that solves each transmission.
Upstriker ash provided by the present invention storehouse pump realizes that the continuous handling method needs the central process unit utmost point in existing grey storehouse pumping system, the control circuit and the process control software that is stored among the EEPROM to support that concrete content comprises:
1. the top near grey storehouse pump is provided with the balance openings tubule on interior ash pipeline, and interior ash pipeline directly is communicated with main ash pipeline,
2. insert one at interior ash pipeline lower port place and blow loose tubule, this pipe blows loose valve and is connected with pneumatic manifold by controlled,
3. each air inlet valve, inlet valve in the pumping system of grey storehouse all adopt controlled solenoid valve or pneumatic valve,
4. realize the continuous handling of upstriker ash storehouse pump according to following steps:
A. the cleaning air valve is opened in system start-up, checks the inflation pressure, confirms the state of bringing down stocks by central process unit,
B. close all air inlet valves, open inlet valve, by material deadweight and balance openings tubule in the ash bucket
Exhaust realizes Automatic feed, feed time to or level-sensing device close inlet valve after sending signal,
C. open air inlet valve, top, the storehouse pressurizing valve of fluid bed and pass in ash pipeline lower port place blow loose valve, the pressure in on-line measurement storehouse pump and the main ash pipeline is submitted to central process unit and is confirmed state,
D. the pressure in storehouse pump and the main ash pipeline is closed after the balance gradually and is blown loose valve, and the pressure of keeping in the main ash pipeline reaches normal working between the work nip of setting, and keep this state and finish until whole mass transport,
Less than retaining pressure down in limited time, open and blow loose valve if the pressure in the e. main ash pipeline exceeds maximum working pressure, the adjusting work differential pressure is closed and is blown loose valve to normal district, returns steps d,
If the pressure in the f. main ash pipeline adopts step e invalid when exceeding maximum working pressure, pressure continues to rise under the obstruction value that reaches setting in limited time, according to second page of step 4. in record method carry out automatic block clearing and handle, go to step c after the processing and carry out,
G. the online pressure that detects in storehouse pump and the main ash pipeline is dropped rapidly under the operation pressure interval, assert that this defeated ash finishes, and goes to a step and enters the next round operation.
Good effect of the present invention is the continuous running that can full automaticity realizes upstriker ash storehouse pump, is implemented in the adjusting of continuous operating material phase concentrations.When pipe is pressed with ascendant trend, can regulate by the keying of blowing loose valve or anti-blocking valve being carried out actv., avoid the generation of stopping up as much as possible.In case obstruction takes place then can disappear stifled automatically.Organic cooperation of blowing pine pipe and equalizing pipe can make every phase concentrations of carrying when starting of taking turns steadily rise, and whole process need not open and close bleeder valve, even omits bleeder valve, has fundamentally overcome the defective of prior art.
Description of drawings
Fig. 1 is the structural representation of the upstriker ash storehouse pumping system that the present invention relates to.
Wherein 1 is the grey storehouse pump pump housing, the 2nd, and storage ash bucket, the 3rd, blanking valve and flapper, the 4th, main ash pipeline, the 5th, rush down ash pipe, the 6th, controlledly rush down grey valve, the 7th, anti-blocking valve, the 8th, interior ash pipeline, the 9th, balance tubule, the 10th, blow the pine pipe, the 11st, blow loose valve, the 12nd, fluid bed, the 13rd, add air valve, the 14th, air chamber, the 15th, pressurizing valve, the 16th, compressed-air actuated gas main, the 17th, anti-blocking blowpipe.
Further specify below in conjunction with accompanying drawing and the objective of the invention is how to realize.
The specific embodiment
Can clearly recognize with reference to the accompanying drawings, content of the present invention is that original upstriker ash storehouse pump configuration has been done crucial improvement, designed the automatic block clearing method under the presence on the improved again basis, on this design-calculated basis, upstriker ash storehouse pump has been realized that automatic continuous operation redesigns.
The method of automatic block clearing realizes that by means of central process unit in the complete set in the pumping system of existing grey storehouse configuration, the control circuit and the process control software that is stored among the EEPROM thereof key is:
1. between main ash pipeline 4 and storage ash bucket 2, be provided with and rush down ash pipe 5, be provided with the controlled grey valve 6 that rushes down in the pipeline.2. be respectively equipped with pressure sensor at main ash pipeline 4 and the storehouse pump housing 1 internal upper part space, the pressure data that the standard pressure data in master's ash handing pipeline and pump housing internal upper part space, storehouse and the main ash handing pipeline under the blocked state and pump internal upper part space, storehouse set during 3. with normal operation deposits the specific region among the EEPROM in, 4. realizes automatic block clearing according to following steps:
A. the pressure data in the main ash handing pipeline that will gather according to the cycle of setting and pump housing internal upper part space, storehouse is delivered to central process unit and has been deposited the normal data processing of comparing, makes the block clearing judgement,
B. close grey storehouse all air inlet valves of pumping system,
C. open fast controlled rush down grey valve 6 to the storage ash bucket 2 rush down ash fast, close the controlled grey valve that rushes down after finishing,
That d. opens grey storehouse pumping system adds air valve (13), pressurizing valve (15), and the pressure data in online acquisition master ash handing pipeline and pump housing internal upper part space, storehouse is delivered to central process unit and has been deposited the normal data processing of comparing, main line pressure no longer raises after rising to normal operating pressure, block clearing finishes, as continues to be increased to stop up to press and change the b step over to and enter and rush down ash manipulation once more and finish until block clearing.
The groundwork of automatic block clearing method is very similar to carrying of mediation sewer pipe, often just can solve obstruction smoothly 2-3 time, and transportation work is continued.
In order further to simplify the operation, shorten the operating time, can take following measure:
1. controlled below of rushing down grey valve 6 has added anti-blocking blowpipe 17 between main ash pipeline 4 and the gas main 16, wherein disposed controlled anti-blocking valve 7.2. in steps d. storehouse pumping system inflation, the pressurizing valve opened only are meant controlled anti-blocking valve 7, after opening anti-blocking valve 7, main line pressure no longer raises after rising to normal operating pressure, block clearing finishes, the normal start-up routine that transfers system to, as continue to be increased to stop up to press and change the b step over to and enter and rush down ash manipulation once more and finish until block clearing, transfer the normal start-up routine of system to.
The method that upstriker ash storehouse pump is realized continuous handling realizes by means of central process unit in existing grey storehouse pumping system, the control circuit and the process control software that is stored among the EEPROM thereof, it is characterized in that:
1. be provided with the balance tubule 9 of opening on interior ash pipeline 8 near the top of the grey storehouse pump housing, interior ash pipeline 8 directly is communicated with main ash pipeline 4.2. insert one at interior ash pipeline 8 lower port places and blow loose tubule 10, this pipe blows loose valve 11 and is connected with compressed-air actuated gas main 16 by controlled.3. each air inlet valve, inlet valve in the pumping system of grey storehouse all adopt controlled solenoid valve or pneumatic valve.4. realize the continuous handling of upstriker ash storehouse pump according to following steps:
A. the cleaning air valve is opened in system start-up, checks the inflation pressure, confirms the state of bringing down stocks by central process unit,
B. close all air intake valves, start inlet valve and flapper 3, by material deadweight in the storage ash bucket 2 and balance tubule 9 exhausts realization Automatic feed, feed time to or level-sensing device close inlet valve after sending signal,
C. open fluid bed 12 add air valve 13, top, storehouse pressurizing valve 15 and pass in ash pipeline lower port place blow loose valve 11, the pressure in the on-line measurement storehouse pump housing 1 and the main ash pipeline 4 is submitted to central process unit and is confirmed state,
D. the pressure in storehouse pump and the main ash pipeline is closed after the balance gradually and is blown loose valve 11, and the pressure of keeping in the main ash pipeline reaches normal working between the work nip of setting, and keep this state and finish until whole mass transport,
If the pressure in the e. main ash pipeline 4 exceeds maximum working pressure but less than prescribing a time limit under the retaining pressure, opens and blow loose valve 11, after the extremely normal district of adjusting work differential pressure is interior, closes and blow loose valve, return steps d,
If adopt step e invalid when the pressure in the f. main ash pipeline 4 exceed maximum working pressure, pressure continues to rise under the obstruction value that reaches setting in limited time, according to second page of step 4. in the method for record automatic block clearing handle, go to step c after the processing and carry out,
G. the online pressure that detects in storehouse pump and the main ash pipeline is dropped rapidly under the operation pressure interval, assert that this defeated ash finishes, and goes to a step and enters the next round operation.
Balance tubule 9 can replace the effect of freeing pipe in the blanking process, make blanking carry out smoothly, at the initial stage of system start-up, balance tubule 9 can also play the effect of tonifying Qi, the solid concentration at adjusting initial stage, the obstruction that the instability of avoiding the initial stage to press because of conveying causes.Enter after the stabilized conditions, can continue to play tonifying Qi effect one stable transfer state.The pine pipe 10 that blows of fluid bed 12 tops is inserted in interior ash pipeline 8 lower port.He can actv. overcome be deposited on after the last end of transmission in the static friction force of big grain material of ash pipeline 8 lower port, guarantee that the startup of system is smooth.Can when the pipe voltage rise is high, rapid reaction regulate solid concentration simultaneously, in time correct the tendency that departs from normal value.
For further guaranteeing reliability of system operation and raising the efficiency and can also take following measure:
1. among the step e open blow loose valve 11 in, open anti-blocking valve 7, close blow loose valve 11 in, close anti-blocking valve 7,
2. interior ash pipeline 8 sectional areas are 10-50 with the ratio of balance tubule 9 sectional areas: 1, and interior ash pipeline diameter is 3-8 with blowing pine pipe diameter ratio: 1.

Claims (4)

1, a kind of upstriker ash storehouse pump is realized the method for automatic block clearing, and this method realizes by means of central process unit in existing grey storehouse pumping system, the control circuit and the process control software that is stored among the EEPROM, it is characterized in that:
1. between main ash pipeline (4) and storage ash bucket (2), be provided with and rush down ash pipe (5), be provided with the controlled grey valve (6) that rushes down in the pipeline,
2. be respectively equipped with pressure sensor at main ash pipeline (4) and the storehouse pump housing (1) internal upper part space,
The pressure data that the standard pressure data in master's ash handing pipeline and pump housing internal upper part space, storehouse and the main ash handing pipeline under the blocked state and pump internal upper part space, storehouse set during 3. with normal operation deposits the specific region among the EEPROM in,
4. realize automatic block clearing according to following steps:
A. the pressure data in the main ash handing pipeline that will gather according to the cycle of setting and pump housing internal upper part space, storehouse is delivered to central process unit and has been deposited the normal data processing of comparing, makes the block clearing judgement,
B. close grey storehouse all air inlet valves of pumping system,
C. open the controlled grey valve (6) that rushes down fast and rush down ash fast, close the controlled grey valve that rushes down after finishing to storage ash bucket (2),
That d. opens grey storehouse pumping system adds air valve (13), pressurizing valve (15), and the pressure data in online acquisition master ash handing pipeline and pump housing internal upper part space, storehouse is delivered to central process unit and has been deposited the normal data processing of comparing, main line pressure no longer raises after rising to normal operating pressure, block clearing finishes, as continues to be increased to stop up to press and change the b step over to and enter and rush down ash manipulation once more and finish until block clearing.
2, realize the method for automatic block clearing according to the said upstriker ash of claim 1 storehouse pump, it is characterized in that:
1. controlled below of rushing down grey valve (6) has added anti-blocking blowpipe (17) between main ash pipeline (4) and the gas main (16), has wherein disposed controlled anti-blocking valve (7),
2. steps d. in to open the operation that adds air valve (13), pressurizing valve (15) directly alternative with opening controlled anti-blocking valve (7), after opening anti-blocking valve (7), main line pressure no longer raises after rising to normal operating pressure, block clearing finishes, the normal start-up routine that transfers system to, as continue to be increased to stop up to press and change the b step over to and enter and rush down ash manipulation once more and finish until block clearing, transfer the normal start-up routine of system to.
3, a kind of upstriker ash storehouse pump is realized the method for continuous handling, and this method realizes by means of central process unit in existing grey storehouse pumping system, the control circuit and the process control software that is stored among the EEPROM, it is characterized in that:
1. go up the balance tubule (9) that is provided with opening near the top of the grey storehouse pump housing at interior ash pipeline (8), interior ash pipeline (8) directly is communicated with main ash pipeline (4),
2. insert one at interior ash pipeline (8) lower port place and blow loose tubule (10), this pipe is connected with compressed-air actuated gas main (16) by the controlled loose valve (11) that blows,
3. each air inlet valve, inlet valve in the pumping system of grey storehouse all adopt controlled solenoid valve or pneumatic valve,
4. realize the continuous handling of upstriker ash storehouse pump according to following steps:
A. the cleaning air valve is opened in system start-up, checks the inflation pressure, confirms the state of bringing down stocks by central process unit,
B. close all air inlet valves, start inlet valve and flapper (3), by material deadweight in the storage ash bucket (2) and balance tubule (9) exhaust realization Automatic feed, feed time to or level-sensing device close inlet valve after sending signal,
C. open fluid bed add air valve (13), top, storehouse pressurizing valve (15) and pass in ash pipeline lower port place blow loose valve (11), the pressure in the on-line measurement storehouse pump housing (1) and the main ash pipeline (4) is submitted to central process unit affirmation state,
D. the pressure in storehouse pump and the main ash pipeline is closed after the balance gradually and is blown loose valve (11), and the pressure of keeping in the main ash pipeline reaches normal working between the work nip of setting, and keep this state and finish until whole mass transport,
, open and blow loose valve (11) less than prescribing a time limit under the retaining pressure if the pressure in the e. main ash pipeline (4) exceeds maximum working pressure, after the extremely normal district of adjusting work differential pressure is interior, closes and blow loose valve, return steps d,
If adopt step e invalid when the pressure in the f. main ash pipeline (4) exceeds maximum working pressure, pressure continue to rise under the obstruction value that reaches setting in limited time, adopt the method for the said upstriker ash of claim 1 storehouse pump realization automatic block clearing to handle, go to step c after the processing and carry out
G. the online pressure that detects in storehouse pump and the main ash pipeline is dropped rapidly under the operation pressure interval, assert that this defeated ash finishes, and goes to a step and enters the next round operation.
4, realize the method for continuous handling according to the said upstriker ash of claim 3 storehouse pump, it is characterized in that:
1. among the step e open blow loose valve (11) in, open anti-blocking valve (7), close blow loose valve (11) in, close anti-blocking valve (7),
The ratio of 2. interior ash pipeline (8) sectional area and balance tubule (9) sectional area is 10-50: 1, and interior ash pipeline diameter is 3-8 with blowing pine pipe diameter ratio: 1.
CNB2006100125587A 2006-03-31 2006-03-31 Method of realizing automatic block clearing and continuous operation of up flow type ash cabin pump Expired - Fee Related CN100457589C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100125587A CN100457589C (en) 2006-03-31 2006-03-31 Method of realizing automatic block clearing and continuous operation of up flow type ash cabin pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100125587A CN100457589C (en) 2006-03-31 2006-03-31 Method of realizing automatic block clearing and continuous operation of up flow type ash cabin pump

Publications (2)

Publication Number Publication Date
CN1824593A CN1824593A (en) 2006-08-30
CN100457589C true CN100457589C (en) 2009-02-04

Family

ID=36935466

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100125587A Expired - Fee Related CN100457589C (en) 2006-03-31 2006-03-31 Method of realizing automatic block clearing and continuous operation of up flow type ash cabin pump

Country Status (1)

Country Link
CN (1) CN100457589C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1923643B (en) * 2006-09-04 2010-06-23 李玉清 Method of alternately operating long-distance dredging and transportation for concentrated phase powdery material
CN101952058B (en) * 2007-12-11 2012-09-05 沙索技术有限公司 Cleaning and/or unblocking of process equipment
CN102134006B (en) * 2011-05-03 2013-08-07 福建龙净环保股份有限公司 Conveying control method for pneumatic conveying system
CN103600994A (en) * 2013-11-22 2014-02-26 镇江市电站辅机厂有限公司 Pneumatic limestone powder conveying system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0027909A1 (en) * 1979-10-26 1981-05-06 Krupp Polysius Ag Installation for conveying fine-grained material
US5265983A (en) * 1992-06-02 1993-11-30 The Babcock & Wilcox Company Cascading pressure continuous blow bottle
CN2317217Y (en) * 1997-01-14 1999-05-05 冶金工业部钢铁研究总院 High efficiency storehouse type pump conveying material in bulk
CN2365179Y (en) * 1999-03-10 2000-02-23 太原钢铁(集团)有限公司 Barn pump for conveying coal
CN2411238Y (en) * 1999-12-09 2000-12-20 浙江菲达机电集团有限公司 Automatic anti-block device for pneumatic conveying pipeline
CN2481981Y (en) * 2001-03-30 2002-03-13 李翊 Dry ash transportation antiplugging mechanism for power station
CN2687075Y (en) * 2004-03-08 2005-03-23 朱望孟 Upgoing forced ash-conveying caloin pump without discharge valve
CN2764742Y (en) * 2004-12-16 2006-03-15 吴伟利 Inrush current type pneumatic conveying apparatus

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0027909A1 (en) * 1979-10-26 1981-05-06 Krupp Polysius Ag Installation for conveying fine-grained material
US5265983A (en) * 1992-06-02 1993-11-30 The Babcock & Wilcox Company Cascading pressure continuous blow bottle
CN2317217Y (en) * 1997-01-14 1999-05-05 冶金工业部钢铁研究总院 High efficiency storehouse type pump conveying material in bulk
CN2365179Y (en) * 1999-03-10 2000-02-23 太原钢铁(集团)有限公司 Barn pump for conveying coal
CN2411238Y (en) * 1999-12-09 2000-12-20 浙江菲达机电集团有限公司 Automatic anti-block device for pneumatic conveying pipeline
CN2481981Y (en) * 2001-03-30 2002-03-13 李翊 Dry ash transportation antiplugging mechanism for power station
CN2687075Y (en) * 2004-03-08 2005-03-23 朱望孟 Upgoing forced ash-conveying caloin pump without discharge valve
CN2764742Y (en) * 2004-12-16 2006-03-15 吴伟利 Inrush current type pneumatic conveying apparatus

Also Published As

Publication number Publication date
CN1824593A (en) 2006-08-30

Similar Documents

Publication Publication Date Title
CN101260322B (en) Blast furnace gas dust removing device and technique by dry method
CN100457589C (en) Method of realizing automatic block clearing and continuous operation of up flow type ash cabin pump
CN203428536U (en) Coarse-ash pneumatic conveying system for converter gas dry dedusting
CN207987125U (en) A kind of dust-extraction unit of fluidized bed pulverized coal gasification production crude synthesis gas
CN103333984B (en) Converter primary exhaust gas dry dedusting coarse ash pneumatic conveying system
CN201473501U (en) Ash conveying device of gas making furnace
CN211997799U (en) Pneumatic ash conveying device for dry dedusting box of blast furnace
CN108219859A (en) A kind of dust-extraction unit and method of fluidized bed pulverized coal gasification production crude synthesis gas
CN204709989U (en) Saving low pulse dust collector
CN103333985B (en) Converter gas dry dedusting coarse ash pneumatic conveying system
CN100551488C (en) Wet bag type dust remover
CN103333986B (en) Converter coal gas dry dedusting and cinder pneumatic transmission system
CN103060500B (en) Blast furnace top pressure equalizing and releasing process and device with pressure equalized goal gas recycling function
CN201179392Y (en) Improved upper-gas-intake blast furnace cloth bag dust remover
CN201214571Y (en) Non-fluidized disk pneumatic conveying apparatus
CN2911564Y (en) Pneumatic separation dryer of semi-fluidized fluidbed
CN203373374U (en) Pneumatic conveying system for coarse ash in dry dedusting of primary flue gas of converters
CN103318648B (en) Converter gas dry-method dedusting cinder pneumatic conveying method
CN210001881U (en) blast furnace gas full-dry purification system
CN207632831U (en) The dustless ash discharging system of converter dry
CN106520209B (en) Continuous fly ash return control system and method for U-Gas gasifier
CN207632832U (en) The dustless ash discharging system of dry method dust
CN201062150Y (en) Full-automatic throughflow hopper
CN219991641U (en) Blast furnace coal injection and pulverizing system with coal powder bin negative pressure device
CN216203305U (en) Low-temperature methanol washing tail gas recycling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090204

Termination date: 20110331