A kind of job practices of direct dry-hanging stone for wall
Technical field:
The present invention relates to building field, relate in particular to the decorating building job practices, particularly in the job practices of the enterprising luggage decorations of the body of wall of building, concrete is a kind of job practices of direct dry-hanging stone for wall.
Background technology:
In the prior art, stone material in the decorative applications of building masonry wall more and more widely.In the existing job practices, stone material is hung on the steel work, be connected with body of wall by steel work, this method need adopt a large amount of steel work, makes the engineering cost height, and steel work gets rusty and can reduce the application life of dry-hang stone; Method in addition is that stone material is connected with body of wall with setscrew, but be subjected to the intensity and the stable restriction of body of wall, because the exterior wall of building mostly is the lightweight body of wall at present, quality is soft, the body of wall resistance to overturning is relatively poor, stone material linked to each other with body of wall with setscrew, and that stone material is installed is unreliable, and reduces strength of wall body.
Summary of the invention:
It is long and stablize bad problem that the job practices that the purpose of this invention is to provide a kind of direct dry-hanging stone for wall, the job practices of described this direct dry-hanging stone for wall will solve in the prior art stone material installation cost height, application life.
The job practices of this direct dry-hanging stone for wall of the present invention, comprise a process and the process that on described metal suspension member, is connected stone material that the metal suspension member is installed in a side of body of wall, wherein, install in the process of metal suspension member in a described side at body of wall, at first metal mesh belt is installed at the opposite side of described body of wall, with cement mortar described metal mesh belt is whitewashed then and be enclosed on the described body of wall, the junction of the metal tape in described metal mesh belt is provided with the metal screw through walls that runs through body of wall then, then the side of described metal suspension member at body of wall is connected with described metal screw through walls, carries out the described process that on the metal suspension member, connects stone material at last.
Further, described metal suspension member adopts the stainless steel suspension member.
Further, described metal screw through walls passes the handing-over overlapping of the metal tape in the described metal mesh belt.
Further, the two ends of described metal screw through walls are provided with nut.
The present invention contrasts prior art, and its effect is actively with tangible.The present invention utilizes the metal mesh belt reinforcing wall, even if the lightweight body of wall also can be born the weight of plug-in stone material, has reduced engineering cost, has increased stone material application life, and construction is simple.
Description of drawings:
Fig. 1 is the schematic diagram of the job practices of direct dry-hanging stone for wall of the present invention.
Fig. 2 is the structural representation of the body of wall among the embodiment of job practices of direct dry-hanging stone for wall of the present invention.
The specific embodiment:
As depicted in figs. 1 and 2, the job practices of direct dry-hanging stone for wall of the present invention, comprise a process and the process that on described metal suspension member 6, is connected stone material 7 that metal suspension member 6 is installed in a side of body of wall 1, wherein, install in the process of metal suspension member 6 in a described side at body of wall 1, at first metal mesh belt 2 is installed at the opposite side of described body of wall 1, with cement mortar 5 described metal mesh belt 2 is whitewashed then and be enclosed on the described body of wall 1, the junction of the metal tape in described metal mesh belt 2 is provided with the metal screw through walls 3 that runs through body of wall then, then the side of described metal suspension member 6 at body of wall 1 is connected with described metal screw 3 through walls, carries out the described process that on metal suspension member 6, connects stone material 7 at last.
Further, described metal suspension member 6 adopts the stainless steel suspension member.
Further, described metal screw through walls 3 passes the handing-over overlapping of the metal tape in the described metal mesh belt 2.
Further, the two ends of described metal screw through walls 3 are provided with nut 4.