CN100443855C - 桩身内部位移的悬吊量测方法及其装置 - Google Patents
桩身内部位移的悬吊量测方法及其装置 Download PDFInfo
- Publication number
- CN100443855C CN100443855C CNB200710022420XA CN200710022420A CN100443855C CN 100443855 C CN100443855 C CN 100443855C CN B200710022420X A CNB200710022420X A CN B200710022420XA CN 200710022420 A CN200710022420 A CN 200710022420A CN 100443855 C CN100443855 C CN 100443855C
- Authority
- CN
- China
- Prior art keywords
- displacement
- fixer
- stake
- flexible wires
- pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
本发明公开了一种桩身内部位移的悬吊量测方法及其装置,包括护管(2),在护管(2)中设有接头装置(4),该量测装置包括定滑轮(6)和柔性线(5),在柔性线(5)的一端设有固定仪(3),固定仪(3)位于护管(2)的接头装置(4)中,另一端设有重物(7),柔性线(5)绕在定滑轮(6)上,本发明通过在护管中设有接头装置,通过柔性线将设在该柔性线端部的固定仪缓慢放入护管中,最后使得固定仪固定在接头装置上,尤其在超长桩即桩长大于50m的桩身内部位移的量测时,该优点更为突出。
Description
技术领域
本发明涉及一种桩身内部位移的量测方法及其装置,尤其涉及一种桩身内部位移的悬吊量测方法及其装置。
背景技术
目前国内外桩身内部位移量测都是在所测位移处摆设刚性杆,将刚性杆伸至地面处,在杆顶部布设位移传感器进行位移量测。该法自使用以来一直被广泛应用。但随着钻孔桩越来越长,有时长度甚至超过100m,桩该法开始显示其缺陷,刚性杆由于各种各样的原因有弯曲现象,导致在位移传递过程中存在明显的失真现象。目前国外的改进方法是采用刚性杆接力传递方法,认为刚性杆传递宜控制长度在20m左右,即每段刚性杆长20m左右,用传感器量测该段位移传递至地面,将多段位移叠加即为总位移。显然,由于方法固有的特点,每段位移需计入传感器量测误差影响,多段叠加误差传递更大;另外其工艺相对复杂,材料费用较高,因此,该测试方法虽较传统桩身内部位移量测有所改进,但在国内使用较少,仍采用传统的一段刚性杆测试方法。
发明内容
本发明提供一种能够提高超长桩桩身内部位移量测精度的桩身内部位移的悬吊量测方法及其装置。
本发明采用如下技术方案:
一种桩身内部位移的悬吊量测方法,该方法包括以下步骤:
①在护管中设置接头装置,
②将护管预埋在桩中,
③在柔性线的一端设置固定仪,将该固定仪放入护管中,使得固定仪固定在接头装置上,
④将柔性线的另一端绕过定滑轮,且在该端设置重物,
⑤对桩施加作用力,
⑥测量柔性线的位移。
桩身内部位移的悬吊量测装置,包括护管,在护管中设有接头装置,该量测装置包括定滑轮和柔性线,在柔性线的一端设有固定仪,另一端设有重物,柔性线绕在定滑轮上。
与现有技术相比,本发明具有以下优点:
1、本发明量测精度高。目前国内外桩身内部位移量测都是在所测位移处摆设刚性杆,将刚性杆伸至地面处,在杆顶部布设位移传感器进行位移量测。该法自使用以来一直被广泛应用,但随着钻孔桩越来越长,有时长度甚至超过100m,桩该法开始显示其缺陷,刚性杆由于各种各样的原因有弯曲现象,导致在位移传递过程中存在明显的失真现象,难以保证量测精度,而本发明则通过在护管中设有接头装置,通过柔性线将设在该柔性线端部的固定仪缓慢放入护管中,最后使得固定仪固定在接头装置上,使得固定仪和其等深的桩有相同的变形,再将柔性线的另一端设置重物,绕在定滑轮上,保证了柔性线在护管中的部分总处于伸直状态,不会产生弯曲现象,从而保证了量测的精度,尤其在超长桩即桩长大于50m的桩身内部位移的量测时,该优点更为突出。
2、本发明能够降低成本。
传统的刚性量测方法在量测超长桩时,难以保证量测的精度,目前国外的改进方法是采用刚性杆接力传递方法,认为刚性杆传递宜控制长度在20m左右,即每段刚性杆长20m左右,用传感器量测该段位移传递至地面,将多段位移叠加即为总位移,显然,其工艺相对复杂,材料费用较高,而本发明所用的器件简单,测试完毕后,量测装置可以回收,降低了对超长桩内部位移量测时的量测成本。
附图说明
图1是本发明的桩身内部位移量测装置的结构示意图。
图2是本发明的接头装置和固定仪的结构示意图。
图3是本发明的接头装置和固定仪的的使用状态参考图。
以上的图中有:1、桩 2、护管 3、固定仪 31、柱桩基体 4、接头装置 5、柔性线 6、定滑轮 7、重物 8、位移传感器 9、支撑杆
具体实施方式
实施例1
一种桩身内部位移的悬吊量测方法,该方法包括以下步骤:
①在护管2中设置接头装置4,
②将护管2预埋在桩1中,
③在柔性线5的一端设置固定仪3,将该固定仪3放入护管2中,使得固定仪3固定在接头装置4上,
④将柔性线5的另一端绕过定滑轮6,且在该端设置重物7,
⑤对桩1施加作用力,
⑥测量柔性线5的位移。
实施例2
一种桩身内部位移的悬吊量测装置,包括护管2,在护管2中设有接头装置4,该量测装置包括定滑轮6和柔性线5,在柔性线5的一端设有固定仪3,另一端设有重物7,柔性线5绕在定滑轮6上,在本实施例中,所述的柔性线5为钢丝,接头装置4为矩形卡槽,固定仪3包括柱状基体31和绞接在柱状基体31上的支撑杆9,在支撑杆9上设有引线,支撑杆9在放入护管过程中处于收拢状态,当固定仪3到达预定的测量深度处的矩形卡槽时,拉动引线,此时支撑杆9就张开,就可以固定在矩形卡槽等接头装置4上。
Claims (5)
1、一种桩身内部位移的悬吊量测方法,其特征在于,该方法包括以下步骤:
①在护管(2)中设置接头装置(4),
②将护管(2)预埋在桩(1)中,
③在柔性线(5)的一端设置固定仪(3),将该固定仪(3)放入护管(2)中,使得固定仪(3)固定在接头装置(4)上,
④将柔性线(5)的另一端绕过定滑轮(6),且在该端设置重物(7),
⑤对桩(1)施加作用力,
⑥测量柔性线(5)的位移。
2、一种用于实施权利要求1所述的桩身内部位移的悬吊量测方法的桩身内部位移的悬吊量测装置,包括护管(2),其特征在于在护管(2)中设有接头装置(4),该量测装置包括定滑轮(6)和柔性线(5)和位移传感器,在柔性线(5)的一端设有固定仪(3),固定仪(3)位于护管(2)的接头装置(4)中,另一端设有重物(7),柔性线(5)绕在定滑轮(6)上。
3、根据权利要求2所述的桩身内部位移的悬吊量测装置,其特征在于所述的柔性线(5)为钢丝。
4、根据权利要求2所述的桩身内部位移的悬吊量测装置,其特征在于所述的接头装置(4)为矩形卡槽。
5、根据权利要求2或3或4所述的桩身内部位移的悬吊量测装置,其特征在于所述的固定仪(3)包括柱状基体(31),柱状基体(31)上设有支撑杆(9),且支撑杆(9)与柱状基体(31)转动连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200710022420XA CN100443855C (zh) | 2007-05-18 | 2007-05-18 | 桩身内部位移的悬吊量测方法及其装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200710022420XA CN100443855C (zh) | 2007-05-18 | 2007-05-18 | 桩身内部位移的悬吊量测方法及其装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101059336A CN101059336A (zh) | 2007-10-24 |
CN100443855C true CN100443855C (zh) | 2008-12-17 |
Family
ID=38865561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200710022420XA Expired - Fee Related CN100443855C (zh) | 2007-05-18 | 2007-05-18 | 桩身内部位移的悬吊量测方法及其装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100443855C (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103063175B (zh) * | 2012-12-19 | 2014-03-12 | 东南大学 | 一种悬吊式电动位移量测装置 |
CN104390542B (zh) * | 2014-11-12 | 2017-08-25 | 郑州磨料磨具磨削研究所有限公司 | 极限量规检测装置及使用该装置的极限量规检测方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4326337A (en) * | 1980-05-01 | 1982-04-27 | Kawasaki Seitetsu Kabushiki Kaisha | Measuring instrument for the profile of piled charge of a blast furnace |
CN1150203A (zh) * | 1995-11-02 | 1997-05-21 | 徐晓原 | 一种即时监控沉管灌注桩质量的方法 |
JP2000321048A (ja) * | 1999-05-07 | 2000-11-24 | Yazaki Corp | 細線用ダイスの孔径測定装置 |
CN1388363A (zh) * | 2002-07-19 | 2003-01-01 | 张百全 | 测试桩基轴向承载力的自锚荷载法 |
CN2575636Y (zh) * | 2002-11-01 | 2003-09-24 | 董一全 | 一种小荷载单桩承载力检测装置 |
-
2007
- 2007-05-18 CN CNB200710022420XA patent/CN100443855C/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4326337A (en) * | 1980-05-01 | 1982-04-27 | Kawasaki Seitetsu Kabushiki Kaisha | Measuring instrument for the profile of piled charge of a blast furnace |
CN1150203A (zh) * | 1995-11-02 | 1997-05-21 | 徐晓原 | 一种即时监控沉管灌注桩质量的方法 |
JP2000321048A (ja) * | 1999-05-07 | 2000-11-24 | Yazaki Corp | 細線用ダイスの孔径測定装置 |
CN1388363A (zh) * | 2002-07-19 | 2003-01-01 | 张百全 | 测试桩基轴向承载力的自锚荷载法 |
CN2575636Y (zh) * | 2002-11-01 | 2003-09-24 | 董一全 | 一种小荷载单桩承载力检测装置 |
Non-Patent Citations (2)
Title |
---|
高层建筑深层平板载荷试验的研究. 杨国春,吴银柱,于波,王文臣.地质与勘探,第38卷第4期. 2002 |
高层建筑深层平板载荷试验的研究. 杨国春,吴银柱,于波,王文臣.地质与勘探,第38卷第4期. 2002 * |
Also Published As
Publication number | Publication date |
---|---|
CN101059336A (zh) | 2007-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104122201B (zh) | 一种钢筋混凝土粘结应力及滑移测量装置 | |
CN100533084C (zh) | 钢索拉力检测装置 | |
CN103673896B (zh) | 坝体全断面水平位移监测的分布式光纤测量方法及其系统 | |
CN103512686A (zh) | 一种静压高强预应力混凝土管桩桩身应力测试装置 | |
WO2008073513A3 (en) | Method and system for measuring properties of microstructures and nanostructures | |
CN101344382B (zh) | 用于模型试验的柔性传递式内置微型多点位移测试系统 | |
CN101881610A (zh) | 非开挖铺管管道孔径变形仪 | |
CN100443855C (zh) | 桩身内部位移的悬吊量测方法及其装置 | |
CN203479436U (zh) | 一种静压高强预应力混凝土管桩桩身应力测试装置 | |
CN103063175B (zh) | 一种悬吊式电动位移量测装置 | |
CN202939095U (zh) | 拉伸法杨氏模量测量仪 | |
CN203310698U (zh) | 一种煤矿巷道煤岩体锚固性能测试装置 | |
CN105973159A (zh) | 一种管道分布式光纤传感器初始应变控制装置及其控制方法 | |
CN207472227U (zh) | 一种新型边坡地表位移的监测装置 | |
CN201034541Y (zh) | 桩身内部位移的悬吊量测装置 | |
CN205825908U (zh) | 一种管道分布式光纤传感器初始应变控制装置 | |
CN102928301A (zh) | 复合绝缘子抗弯曲疲劳测性能试工装 | |
CN111307591A (zh) | 一种hrb500e钢筋断后伸长率检测装置 | |
CN102692209A (zh) | 一种用于管道沉降状况的监测结构及其监测方法 | |
CN201034762Y (zh) | 钢索拉力检测装置 | |
CN108225261B (zh) | 用于桩基模型试验的桩顶和桩端沉降同时观测装置及方法 | |
CN112695814B (zh) | 一种微型钢管桩受力野外快速监测方法 | |
CN104457524A (zh) | 曲轴连杆总成弯曲度和扭曲度的检测装置及方法 | |
CN209991906U (zh) | 一种后张法回缩量自动测量装置 | |
CN204613017U (zh) | 预埋构件围岩-支护结构钻芯法拉拔测量装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081217 Termination date: 20120518 |