CN100442933C - Method for collocating uplink discontinuous transmitting DTX parameter - Google Patents
Method for collocating uplink discontinuous transmitting DTX parameter Download PDFInfo
- Publication number
- CN100442933C CN100442933C CNB2005101261230A CN200510126123A CN100442933C CN 100442933 C CN100442933 C CN 100442933C CN B2005101261230 A CNB2005101261230 A CN B2005101261230A CN 200510126123 A CN200510126123 A CN 200510126123A CN 100442933 C CN100442933 C CN 100442933C
- Authority
- CN
- China
- Prior art keywords
- parameter
- special
- uplink
- message
- utran
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The present invention relates to a method for collocating uplink discontinuous transmitting parameters, which is characterized in that a general ground wireless access network UTRAN sends special trigger distribution parameters in uplink special physical channel information arranged in an uplink special channel to user equipment UE; when the UE has no data in the upright channel to send, and using the special trigger distribution parameters sends the upright special trigger. With the present invention, the network side can send the special trigger distribution parameters to the UE in the process of signal establishment such as RRC establishment, or RB establishment, etc. to set UE uplink DTX parameters SBGP which is different from protocol default values according to the different user connection states, service characters, etc.; after the process of signal establishment such as RRC establishment or RB establishment, etc., the present invention avoids the control process of the uplink physical channel and reduces the signal process and signal flux in an air interface.
Description
Technical field
The present invention relates to the communications field, relate in particular to the method for the discontinuous transmission of a kind of collocating uplink (DTX) parameter.
Background technology
In the mobile communication system of 3G tdd mode, because the data volume of up transmission and traffic performance is in close relations, data volume may change along with the variation of time, sometimes the user is in communication process, can appear at the situation that does not have data-signal to transmit on the direction of transfer fully, so-called DTX (Discontinuous Transmission, discontinuous transmission) process that Here it is reflects by the DTX parameter usually.
Described DTX parameter comprises up DTX parameter and descending DTX parameter.Wherein up DTX parameter has reflected the mobile subscriber in communication process, and user terminal does not transmit the process of signal.The application of up DTX parameter can make the interference of wireless channel be effectively reduced, thereby the average speech quality of network is improved, the power loss that the application of DTX simultaneously can be saved travelling carriage greatly.
As CCTrCH (Coded Composite Transport Channel, CCTrCH Coded Composite Transport Channel) gross bit rate be assigned to this CCTrCH channel physical channel the total channel bit rate not simultaneously, then to being mapped to special-purpose and shared physical channel, as UL DPCH (Uplink DedicatedPhysical Channel, uplink special physical channel) and the CCTrCH channel application DTX parameter of DL DPCH (Downlink DedicatedPhysical Channel, downward special physical channel).
When using the DTX parameter, if after the link establishment, and high-risely do not have data to offer any given CCTrCH channel to be used for sending, then special burst of emission in the frame that sends first distribution of ending.If the transmission data that do not have high level to provide in a special burst cycle (SBP) then generate another special burst, and in the possible frame of the next one, send.This pattern must last till high-rise for till the CCTrCH channel provides the transmission data.
The numerical value of SBP need be specified separately at uplink and downlink, and is assigned as SBGP (special burst generates period) parameter, is used for up emission, and SBSP (special burst scheduling) parameter is used for downlink.The default value of described SBGP and SBSP all is 8.
The prior art relevant with the present invention, be in the 3G system, by what comprise in the UPLINK PHYSICAL CHANNEL CONTROL message that in the uplink physical channel control procedure, sends " SpecialBurst Scheduling " (special burst scheduling) parameter, configuration and revise SBGP parameter in the up DTX parameter, thus can make UE when up discontinuous transmission data, use this SBGP parameter.
Described uplink physical channel control procedure comprises as shown in Figure 1:
After step 2, UE receive described message, operate according to the cell that carries in the described message.
Specific operation process is:
If Special Burst Scheduling cell is sent out, then UE replaces with new value with Special Burstgeneration (special burst generates the cycle).
By the technical scheme of above-mentioned prior art as can be seen:
Carry out that RRC connect to set up, professional RB sets up or when RB process such as reshuffles at UE, can't collocating uplink DTX parameter, " Special Burst Scheduling " parameter can only use agreement default value, just SBGP=8.If collocating uplink burst generation cycle SBGP then can only control (UPLINK PHYSICAL CHANNEL CONTROL) signaling by uplink physical channel and on-the-fly modify for being different from default value.Therefore there are two following main drawbacks in the method for this indirect configuration parameter:
1, RRC set up or signaling procedure such as RB foundation after and before the uplink physical channel control procedure, the up DTX process of UE can only use agreement default value, i.e. SBGP=8;
If 2 carry out the uplink physical channel control procedure after signaling procedures such as RRC foundation or RB foundation, can increase the signaling procedure and the signaling traffic of air interface undoubtedly, the physical channel control procedure can produce impact and influence to current existing connection signaling of UE and business procedure simultaneously.
Summary of the invention
The method that the purpose of this invention is to provide a kind of collocating uplink DTX parameter, by the present invention, in the middle of signaling procedures such as RRC foundation or RB foundation, network side can be provided with the up DTX parameter S of the UE BGP that is different from the agreement default value according to different user's connection status and service attribute etc.; And after signaling procedures such as RRC foundation or RB foundation, do not need to carry out the uplink physical channel control procedure, thereby can reduce the signaling procedure and the signaling traffic of air interface; By the present invention, UE can be configured to be different from the configuration of agreement default value timely in addition, thereby can strengthen the flexibility and the promptness of up DTX parameter configuration.
The objective of the invention is to be achieved through the following technical solutions:
The invention provides a kind of method of collocating uplink discontinuous transmitting DTX parameter, it comprises:
A, Universal Terrestrial Radio Access Network UTRAN will be arranged on that special burst scheduling Special Burst Scheduling parameter sends to user equipment (UE) among the uplink special physical channel information Uplink DPCH info in the special uplink channel;
When B, described UE do not have data to send at up channel, utilize described Special BurstScheduling parameter to carry out the transmission of up special burst.
Wherein, described steps A specifically comprises:
A1, UTRAN are provided with SpecialBurst Scheduling parameter in uplink special physical channel information Uplink DPCH info, and it is set to optional state;
A2, when needs dispose this parameter, then described parameter is sent to UE.
Wherein, described steps A 1 specifically comprises:
Under TDD 1.28M pattern, UTRAN is provided with Special Burst Scheduling parameter in uplink special physical channel information Uplink DPCHinfo, and it is set to optional state;
Or,
Under TDD 3.84M pattern, UTRAN is provided with Special Burst Scheduling parameter in uplink special physical channel information Uplink DPCHinfo, and it is set to optional state.
Wherein, described steps A 2 specifically comprises:
When needs disposed described parameter, described UTRAN then sent to UE by radio bearer control RRC message with described parameter.
Wherein, described steps A 2 specifically comprises:
Under TDD 1.28M pattern, when needs disposed described parameter, described UTRAN then sent to UE by radio bearer control RRC message with described parameter;
Or,
Under TDD 3.84M pattern, when needs disposed described parameter, described UTRAN then sent to UE by RRC message with described parameter.
Wherein, described RRC message comprises:
RRC connects and to set up RRC CONNECTION SETUP message, radio bearer and set up RADIOBEARER SETUP message, radio bearer and reconfigure RADIO BEARERRECONFIGURATION message, radio bearer and discharge RADIO BEARER RELEASE message, transmission channel and reshuffle that TRANSPORT CHANNEL RECONFIGURATION message, physical channel are reshuffled PHYSICAL CHANNEL RECONFIGURATION message, cell update is confirmed CELL UPDATE CONFIRM message, or switching command HANDOVER TOUTRAN COMMAND message.
Wherein, specifically comprise at described step B:
B1, described UE receive described RRC message, and obtain Special BurstScheduling parameter according to described message;
B2, when up channel does not have data to send, described UE utilizes described Special BurstScheduling parameter to carry out the transmission of up special burst.
Wherein, between described step B1 and step B2, comprise:
Described UE preserves the described Special Burst Scheduling parameter of obtaining.
As seen from the above technical solution provided by the invention, UTRAN (Universal Terrestrial Radio Access Network) will be arranged on that special burst scheduling Special Burst Scheduling parameter sends to user equipment (UE) among the uplink special physical channel information Uplink DPCHinfo in the special uplink channel among the present invention; When described UE does not have data to send at up channel, utilize described Special Burst Scheduling parameter to carry out the transmission of up special burst.By the present invention, can be in the middle of signaling procedures such as RRC foundation or RB foundation, network side sends to UE with Special Burst Scheduling parameter, thereby can the up DTX parameter S of the UE BGP that be different from the agreement default value be set according to different user's connection status and service attribute etc.; And after signaling procedures such as RRC foundation or RB foundation, do not need to carry out the uplink physical channel control procedure, thereby can reduce the signaling procedure and the signaling traffic of air interface; By the present invention, UE can be configured to be different from the configuration of agreement default value timely in addition, thereby can strengthen the flexibility and the promptness of up DTX parameter configuration.
Description of drawings
The flow chart of Fig. 1 in the prior art uplink physical channel being controlled;
Fig. 2 is the flow chart of embodiment provided by the invention;
Fig. 3 sets up the flow chart that process is configured the DTX parameter for provided by the invention by RRC;
Fig. 4 sets up the flow chart that process is configured the DTX parameter for provided by the invention by RB.
Embodiment
The invention provides a kind of method of collocating uplink DTX parameter, its core is, and: UTRAN (Universal Terrestrial Radio Access Network) will be arranged on that special burst scheduling Special Burst Scheduling parameter sends to user equipment (UE) among the uplink special physical channel information UplinkDPCH info in the special uplink channel; When described UE does not have data to send at up channel, utilize described Special BurstScheduling parameter to carry out the transmission of up special burst.
Embodiment provided by the invention when UE receives the RRC message of UTRAN transmission, analyzes described message as shown in Figure 2, if comprised corresponding up DTX parameter in the RRC message, then preserves and use this DTX parameter.When not having upstream data to send, utilize SpecialBurst Scheduling in the described DTX parameter (special burst scheduling) parameter to carry out the transmission of up Special Burst (special burst).Specific implementation process comprises:
Special burst scheduling Special Burst Scheduling parameter is set among step 1, the UTRAN uplink special physical channel information UplinkDPCH info in special uplink channel, and it is set to optional state.
The present invention is by revising the Uplink DPCH info information content in 3GPP 25.331 agreements, in special uplink channel information " Uplink DPCH info " in increase " Special Burst Scheduling " parameter, as shown in table 1:
Infbrmation Element/Group name | Need | Multi | Type and reference | Semantics description | |
Uplink DPCH power control info | OP | Uplink DPCH power control info 10.3.6.91 | |||
CHOICE mode | MP | ||||
>FDD | |||||
>>Scrambling code type | MP | Enumerated( short,long) | |||
>>Scrambling code number | MP | Integer(0..16 777215) | |||
>>Number of DPDCH | MD | Integer(1..m axDPDCH) | Default value is 1. Number of DPDCH is 1 in HANDOVER TO UTRAN COMMAND | ||
>>Spreading factor | MP | Integer(4,8, 16,32,64, 128,256) | Minimum allowed SF of the channelisation code for data part | ||
>>TFCI existence | MD | Boolean | TRUE means existence.Default value is″TRUE″ | ||
>>Number of FBI bits | OP | Integer(1, 2) | In bits. | ||
>>Puncturing Limit | MP | Real(0.40..1 by step of 0.04) | |||
>TDD | |||||
>>Uplink Timing Advance Control | OP | Uplink Timing Advance Control 10.3.6.96 | |||
>>Special Burst Scheduling | OP | Special Burst Scheduling 10.3.6.75a | UL Special Burst generation period in radio frames | ||
>>UL | OP | 1 to <maxCCTr CH> | UL physical channels to establish or reconfigure list. | ||
>>>TFCS ID | MD | Integer(1..8) | Default value is 1. | ||
>>>UL target SIR | MP | Real(-11.. 20by step of 0.5dB) | In dB | ||
>>>Time info | MP | Time info 10.3.6.83 | |||
>>>Common timeslot info | MD | Common timeslot info 10.3.6.10 | Default is the current Common timeslot info | ||
>>>Uplink DPCH timeslots and codes | MD | Uplink Timeslots and Codes 10.3.6.94 | Default is to use the old timeslots and codes. | ||
>>UL CCTrCH List to Remove | |
1..<maxCC TrCH> | UL physical channels to remove list | ||
>>>TFCS ID | MP | Integer (1..8) |
Table 1
As the font of the band underscore in the table 1 part as can be seen, in 3GPP 25.331 agreements on the Uplink DPCH info information content basis, the present invention has increased Special Burst Scheduling cell parameters newly, the SBGP parameter in its corresponding 3GPP 25.224 agreements in the up DTX parameter.And, newly-increased cell parameters " Need " attribute is set to " OP ", that is to say that this cell is to be present in as optional content " Uplink DPCH info " in the information, this just means that also this cell parameters can occur in corresponding message when needs dispose, and this cell parameters can not occur when not needing to revise and reshuffle.
Simultaneously, at 3GPP 25.331 " 8.6.6 Physical channel information elements " related content in increase the processing method of the cell of above-mentioned increase, attainable amending method is as follows:
If cell " Special Burst Scheduling " is sent out, UE is configured to the value of above-mentioned new configuration should for " SpecialBurst Generation Period ".
When needs dispose described parameter, described UTRAN sets up at RRC that process, RB set up that process, RB are reshuffled, by RRC message the parameter of described setting is sent to UE in the processes such as transmission channel is reshuffled, physical channel is reshuffled, cell update, switching, realizes newly-increased parameter is configured and revises.
Described RRC message comprises: RRC CONNECTION SETUP message is set up in the RRC connection, radio bearer is set up RADIO BEARER SETUP message, radio bearer reconfigures RADIOBEARER RECONFIGURATION message, radio bearer discharges RADIO BEARERRELEASE message, transmission channel is reshuffled TRANSPORT CHANNELRECONFIGURATION message, physical channel is reshuffled PHYSICAL CHANNELRECONFIGURATION message, cell update is confirmed CELL UPDATE CONFIRM message, or switching command HANDOVER TO UTRAN COMMAND message.
Said process all is suitable for for TDD 1.28M and two kinds of patterns of 3.84M.
Connecting the process of setting up of setting up process and RB with RRC below is example, and specific implementation process of the present invention is described in detail.
The RRC connection is set up process as shown in Figure 3, comprising:
Afterwards, described UE and the be connected link transmission data of UTRAN based on described foundation, when UE up when not having data to send to UTRAN, described UE utilizes the special burst scheduling SpecialBurst Scheduling parameter of described preservation to send special burst to UTRAN.
The process of setting up of RB comprises as shown in Figure 4:
Afterwards, described UE and UTRAN are based on the connecting channel transmission data of described foundation, when UE up when not having data to send to UTRAN, described UE utilizes the special burst scheduling SpecialBurst Scheduling parameter of described preservation to send special burst to UTRAN.
It is above-mentioned that to connect the process of setting up set up process and RB with RRC be example, illustrated how UTRAN sends the Special Burst Scheduling parameter that is provided with to UE by RRC message, thereby realize that network side is according to different user's connection status and service attribute etc., setting is different from the purpose of the up DTX parameter S of the UE BGP of agreement default value, reshuffle by RB as for UTRAN, transmission channel is reshuffled, physical channel is reshuffled, cell update, processes such as switching realize newly-increased parameter is configured that be connected the process of setting up of the process of foundation and RB with above-mentioned RRC similar with situation about revising, its essence all is to send UE to by the Special Burst Scheduling parameter that the RRC message that UTRAN sends will need to dispose or revise, these signaling processes and prior art are identical, are not described in detail its specific implementation process here.
As seen from the above technical solution provided by the invention, UTRAN (Universal Terrestrial Radio Access Network) sends to user equipment (UE) with special burst scheduling Special Burst Scheduling parameter among the uplink special physical channel information Uplink DPCH info that is provided with among the present invention; When described UE does not have data to send at up channel, utilize described Special Burst Scheduling parameter to carry out the transmission of up special burst.By the present invention, can be in the middle of signaling procedures such as RRC foundation or RB foundation, network side sends to UE with Special Burst Scheduling parameter, thereby can the up DTX parameter S of the UE BGP that be different from the agreement default value be set according to different user's connection status and service attribute etc.; And after signaling procedures such as RRC foundation or RB foundation, do not need to carry out the uplink physical channel control procedure, thereby can reduce the signaling procedure and the signaling traffic of air interface; By the present invention, UE can be configured to be different from the configuration of agreement default value timely in addition, thereby can strengthen the flexibility and the promptness of up DTX parameter configuration.
The above; only for the preferable embodiment of the present invention, but protection scope of the present invention is not limited thereto, and anyly is familiar with those skilled in the art in the technical scope that the present invention discloses; the variation that can expect easily or replacement all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection range of claim.
Claims (8)
1, a kind of method of collocating uplink discontinuous transmitting DTX parameter is characterized in that, comprising:
A, Universal Terrestrial Radio Access Network UTRAN will be arranged on that special burst scheduling Special Burst Scheduling parameter sends to user equipment (UE) among the uplink special physical channel information Uplink DPCH info in the special uplink channel;
When B, described UE do not have data to send at up channel, utilize described Special BurstScheduling parameter to carry out the transmission of up special burst.
2, method according to claim 1 is characterized in that, described steps A specifically comprises:
A1, UTRAN are provided with SpecialBurst Scheduling parameter in uplink special physical channel information Uplink DPCH info, and it is set to optional state;
A2, when needs dispose this parameter, then described parameter is sent to UE.
3, method according to claim 2 is characterized in that, described steps A 1 specifically comprises:
Under TDD 1.28M pattern, UTRAN is provided with Special Burst Scheduling parameter in uplink special physical channel information Uplink DPCHinfo, and it is set to optional state;
Or,
Under TDD 3.84M pattern, UTRAN is provided with Special Burst Scheduling parameter in uplink special physical channel information Uplink DPCHinfo, and it is set to optional state.
4, method according to claim 2 is characterized in that, described steps A 2 specifically comprises:
When needs disposed described parameter, described UTRAN then sent to UE by radio bearer control RRC message with described parameter.
5, method according to claim 4 is characterized in that, described steps A 2 specifically comprises:
Under TDD 1.28M pattern, when needs disposed described parameter, described UTRAN then sent to UE by radio bearer control RRC message with described parameter;
Or,
Under TDD 3.84M pattern, when needs disposed described parameter, described UTRAN then sent to UE by RRC message with described parameter.
According to claim 4 or 5 described methods, it is characterized in that 6, described RRC message comprises:
RRC connects and to set up RRC CONNECTION SETUP message, radio bearer and set up RADIOBEARER SETUP message, radio bearer and reconfigure RADIO BEARERRECONFIGURATION message, radio bearer and discharge RADIO BEARER RELEASE message, transmission channel and reshuffle that TRANSPORT CHANNEL RECONFIGURATION message, physical channel are reshuffled PHYSICAL CHANNEL RECONFIGURATION message, cell update is confirmed CELL UPDATE CONFIRM message, or switching command HANDOVER TOUTRAN COMMAND message.
7, method according to claim 6 is characterized in that, specifically comprises at described step B:
B1, described UE receive described RRC message, and obtain Special BurstScheduling parameter according to described message;
B2, when up channel does not have data to send, described UE utilizes described Special BurstScheduling parameter to carry out the transmission of up special burst.
8, method according to claim 7 is characterized in that, comprises between described step B1 and step B2:
Described UE preserves the described Special Burst Scheduling parameter of obtaining.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101261230A CN100442933C (en) | 2005-11-30 | 2005-11-30 | Method for collocating uplink discontinuous transmitting DTX parameter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101261230A CN100442933C (en) | 2005-11-30 | 2005-11-30 | Method for collocating uplink discontinuous transmitting DTX parameter |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1867177A CN1867177A (en) | 2006-11-22 |
CN100442933C true CN100442933C (en) | 2008-12-10 |
Family
ID=37426025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005101261230A Active CN100442933C (en) | 2005-11-30 | 2005-11-30 | Method for collocating uplink discontinuous transmitting DTX parameter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100442933C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8442565B2 (en) | 2008-06-13 | 2013-05-14 | Huawei Technologies Co., Ltd. | Method, device and system for indicating discontinuous data scheduling |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101350639B (en) * | 2007-07-20 | 2012-08-08 | 鼎桥通信技术有限公司 | Power control method for non-continuity transmission |
CN101453780B (en) * | 2007-12-03 | 2011-04-06 | 中兴通讯股份有限公司 | Electricity saving method for TD-SCDMA terminal |
CN101616489B (en) * | 2008-06-24 | 2011-04-13 | 上海华为技术有限公司 | Method and system for establishing channel and radio network controller |
CN101360340B (en) * | 2008-09-04 | 2012-04-25 | 华为技术有限公司 | Service configuring method and apparatus |
CN102647756B (en) * | 2008-09-04 | 2015-03-25 | 华为技术有限公司 | Service collocation method and device |
TWI475856B (en) | 2008-11-25 | 2015-03-01 | Interdigital Patent Holdings | Method and apparatus for utilizing a plurality of uplink carriers and a plurality of downlink carriers |
CN102868481B (en) * | 2011-07-07 | 2015-10-07 | 中国移动通信有限公司 | A kind of control method of upstream discontinuous emission state, device and communication system |
KR20140121319A (en) | 2013-04-03 | 2014-10-15 | 삼성전자주식회사 | Method and apparatus for transmitting channel state information in wireless communication system |
CN108377537B (en) * | 2016-11-04 | 2020-04-07 | 维沃移动通信有限公司 | Configuration method of discontinuous reception, discontinuous reception method, base station and terminal |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003032521A2 (en) * | 2001-10-11 | 2003-04-17 | Interdigital Technology Corporation | System and method for utilizing unused capacity in the data field of a special burst |
CN1514998A (en) * | 2001-01-31 | 2004-07-21 | �����ɷ� | Method and apparatus for inter operability between voice tansmission systems during speech inactivity |
CN1572101A (en) * | 2001-10-19 | 2005-01-26 | 美商内数位科技公司 | User equipment for improved power savings during full DTX mode of operation in the downlink |
-
2005
- 2005-11-30 CN CNB2005101261230A patent/CN100442933C/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1514998A (en) * | 2001-01-31 | 2004-07-21 | �����ɷ� | Method and apparatus for inter operability between voice tansmission systems during speech inactivity |
WO2003032521A2 (en) * | 2001-10-11 | 2003-04-17 | Interdigital Technology Corporation | System and method for utilizing unused capacity in the data field of a special burst |
CN1572101A (en) * | 2001-10-19 | 2005-01-26 | 美商内数位科技公司 | User equipment for improved power savings during full DTX mode of operation in the downlink |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8442565B2 (en) | 2008-06-13 | 2013-05-14 | Huawei Technologies Co., Ltd. | Method, device and system for indicating discontinuous data scheduling |
US9867227B2 (en) | 2008-06-13 | 2018-01-09 | Huawei Technologies Co., Ltd | Method, device, and system for indicating discontinuous data scheduling |
Also Published As
Publication number | Publication date |
---|---|
CN1867177A (en) | 2006-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100442933C (en) | Method for collocating uplink discontinuous transmitting DTX parameter | |
US11553435B2 (en) | Uplink information transmission method and apparatus | |
EP1716712B1 (en) | Direct transition to "cell dch" state | |
EP1761091B1 (en) | Method for performing admission control in a cellular network | |
CN102065474B (en) | Apparatus and method for communicating user equipment specific information in cellular communication system | |
US20030157935A1 (en) | Intersystem handover with modified parameters | |
US20070032257A1 (en) | DSCH power control method for WCDMA | |
CN101194476A (en) | Event trigger for scheduling information in wireless communication networks | |
US20040266461A1 (en) | Method and system for transmitting data | |
CN103026776A (en) | Resource allocation in a multiple USIM mobile station | |
EP1414165A1 (en) | Transporting power control information | |
WO2001065881A1 (en) | Intersystem handover with modified parameters | |
KR101049904B1 (en) | MMB service receiving method | |
KR20030029310A (en) | Method for transporting control information to dsch in a mobile communication system | |
EP1806939B1 (en) | Mobile communication system, wireless control station, wireless base station, mobile station, and mobile communication method | |
JP3713439B2 (en) | Method for transmitting signals from a plurality of base stations to one mobile station | |
CN100441042C (en) | Radio allocation activation time selecting method controlled by radio resource | |
CN102695231A (en) | Voice service bearing and switching method and system | |
CN101155373A (en) | Method and apparatus for performing radio bearer mapping in a wireless communications system | |
RU2280328C2 (en) | Method for controlling shared downlink for broadband cdma communication system | |
KR100880289B1 (en) | Method for managing processing resources in a mobile radiocommunication system | |
WO2006016396A1 (en) | Rate scheduling method and terminal | |
JP2006521047A (en) | Method for improving power control in a mobile radio communication system | |
CN101184330A (en) | Method of configuring downlink discontinuous transmission parameter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220105 Address after: 450046 Floor 9, building 1, Zhengshang Boya Plaza, Longzihu wisdom Island, Zhengdong New Area, Zhengzhou City, Henan Province Patentee after: Super fusion Digital Technology Co.,Ltd. Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd. |