CN100422483C - Novel formwork-making process with disassembling-free composite die block in concrete structure - Google Patents

Novel formwork-making process with disassembling-free composite die block in concrete structure Download PDF

Info

Publication number
CN100422483C
CN100422483C CNB2006100185107A CN200610018510A CN100422483C CN 100422483 C CN100422483 C CN 100422483C CN B2006100185107 A CNB2006100185107 A CN B2006100185107A CN 200610018510 A CN200610018510 A CN 200610018510A CN 100422483 C CN100422483 C CN 100422483C
Authority
CN
China
Prior art keywords
mould
concrete
stupefied
steel
composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2006100185107A
Other languages
Chinese (zh)
Other versions
CN1837513A (en
Inventor
揭保如
揭建刚
钱胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HSBC Group Limited by Share Ltd
Original Assignee
JIANGXI FENGHE YINGZAO GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI FENGHE YINGZAO GROUP CO Ltd filed Critical JIANGXI FENGHE YINGZAO GROUP CO Ltd
Priority to CNB2006100185107A priority Critical patent/CN100422483C/en
Publication of CN1837513A publication Critical patent/CN1837513A/en
Application granted granted Critical
Publication of CN100422483C publication Critical patent/CN100422483C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a formwork technique of a disassembling-free composite mould plate for a novel concrete structure. The present invention is characterized in that the present invention comprises the following technique steps: step 1, making a composite mould plate; step 2, making a formwork constructional element; step 3, installing a basic constructional element and the composite mould plate; step 4, casting concrete; step 5, demoulding. The present invention has the advantages that the wood and the bamboo are not used so as to save resource and protect environment; the sectional steel is used as formwork materials so as to avoid damage, increase service life and reduce cost; the present invention has high universality, and can be suitable for various concrete casting structures.

Description

Formwork-making process with disassembling-free composite die block in concrete structure
Technical field
The present invention relates to a kind of concrete formwork support process, particularly a kind of formwork-making process with disassembling-free composite die block in concrete structure.
Background technology
Concreting needs formwork, formwork needs a large amount of templates, template is a kind of necessary constructional materials in concrete work, since oneth century, reasons such as (account for cost 30%) consumption is big because its cost height, perplexing people, China is used for timber that civil engineering consumes every year and reaches more than 1,000 ten thousand m always 3, by with steel for wood, can save 300 every year surplus ten thousand m 3, so huge material consumption is having a strong impact on ecological environment.China is the poor countries of the forest reserves, and forest land area accounts for about 4% of world's area of woods, and the existing forest amount of holding is 90.2 hundred million m 3, accounting for 3% of world's forest amount of holding, everyone occupies the forest amount of holding less than 9m per capita 3, for the world per capita the amount of holding 12%, timber annual production per capita has only 0.05m 3/ people reduces area of woods 14,800,000,000 m every year on average 2, China's timber yield is controlled at 6,000 ten thousand m 3, the actual demand amount surpasses 9,800 ten thousand m 3, account for 1/6 of national amount of wood and be used for infrastructure timber, this shows that the innovation of formwork support process is an arduousness and very long work.
Summary of the invention
The purpose of this invention is to provide a kind of formwork-making process with disassembling-free composite die block in concrete structure, composite shuttering and concrete will be connected as a single entity, after finishing concrete building, need not to dismantle template.
The present invention is achieved like this, and its processing step is: 1, system composite shuttering; 2, prop up the making of die component; 3, the installation of basic component and composite shuttering; 4, concreting; 5, form removal;
1, system composite shuttering:
(1) raw material takes by weighing: the weight ratio by 0.05~0.10 part of 1 part of cement, sand 1-2 part, reinforcing agent takes by weighing cement, sand, reinforcing agent respectively, and reinforcing agent is a rosin soap class cement intensifier;
(2) stir: the raw material that weighs up is poured into added water in the mixer and stir, make concrete;
(3) mould of arranging net: in the mould that is provided with the square frame rib, be distributed into one deck alkali-resistant glass fiber mesh cloth, the concrete that stirs is poured into;
(4) vibration moulding: with concrete jolt ramming, allow its natural coagulation moulding with bobbing machine;
(5) maintenance: once every 12 hours water seasonings;
(6) demoulding: after 1 day mould is removed, got product.
2, prop up the making of die component:
According to the needs of site operation, make the horizontal stupefied mould of all size, perpendicular stupefied mould, angle mould and bearing post with steel plate and channel-section steel.
3, the installation of basic component composite shuttering:
(1) draws cast-in-place single footing member and composite shuttering allocation plan by the construction drawing requirement, an establishment die component and composite shuttering batching inventory;
(2) reserve axis successively, definite horizontal absolute altitude and single line are carried out mark on the substrate bed course;
(3) the horizontal stupefied mould that will prepare is assembled into the foundation bottom mould by the good geometric form of axial line control, and angle mould is installed then successively, uses bolt;
(4) the installing and locating plate is used bolt;
(5) external mold around the basis is installed successively, template adopts the made composite shuttering of step (1), with thin wire composite shuttering is fixed.
4, press the good reinforcing bar of architectural drawing paper cloth after, get final product poured in place concrete.
5, form removal: (1) removes all bolts in the basis, with its classification vanning; (2) remove horizontal stupefied mould of basic steel and perpendicular stupefied mould, and its bundling is piled; (3) remove basic angle mould; Composite shuttering and concrete are connected as a single entity.
Advantage of the present invention is: 1, without timber, bamboo wood, economize on resources, preserve the ecological environment; 2, adopt shaped steel to make a mold materials, not fragile, life cycle is long, reduces cost; 3, highly versatile, the structure of building applicable to various concretes.
The specific embodiment
At first make composite shuttering: get 425 #Portland cement, river sand, saponification rosin, carry material in 1: 1.5: 0.18 ratio, raw material is put into mixer add the water stirring, making concrete pours in the mould that is lined with alkali-resistant glass fiber mesh cloth, with concrete jolt ramming, behind dried the consolidating, add water curing with bobbing machine, every 12 hours water seasonings once, the demoulding promptly gets the complex cement template after 1 day.
According to the needs of building, adopt different mold methods:
Embodiment one
Insulated column basis mould is installed: (the following mm of specification unit)
1, the composition of insulated column basis die component: (1) horizontal stupefied mould: adopt 3 steel plate clod wash channel-section steels to make specification 80 * 40 * 3; (2) perpendicular stupefied mould: adopt 3 steel plate clod wash channel-section steels to make specification 80 * 40 * 3; (3) perpendicular stupefied mould Height Adjustment part: adopt band steel or flat tube to make specification 40 * 40 * 3; (4) angle steel mould: adopt angle steel to make specification L60 * 60 * 3; (5) location-plate: adopt band steel to make, specification 60 * 3 can be according to the location-plate of basic cross-sectional sizes preparation adaptation length; Independent ribs adopts 3 thick steel products clod wash channel-section steels to make specification 40 * 30 * 3.
2, draw cast-in-place single footing member and template die allocation plan by Design Requirement Drawing, establishment member and template die batching inventory.
3, the installation of single footing member and template die: after muscle and base for post reinforcing bar binding are finished at the bottom of (1) single footing, reserve axis successively, on the substrate bed course, determine horizontal absolute altitude and single line and carry out mark; (2) geometric form that makes by (1) line traffic control of the horizontal stupefied mould of many usefulness that preparation is combined is assembled into bottom, single footing mould, and angle mould is installed then successively, and perpendicular stupefied mould and the stupefied mould of foundation bottom upper strata channel-section steel are with the bolt jail that is fixed respectively; (3) the installing and locating plate is used bolt; (4) install external mold around the one-level basis more successively, and composite shuttering is fixed with the two silks of pricking of 18#; (5) the post mould that connects foundation is installed, is selected corresponding column of angles mould of length and tie to be fixed deeply with bolt according to base; (6) at the stupefied four jiaos of pull bars that 45 degree are installed of basic channel-section steel; (7) displacement or inclination take place to girt and diagonal brace are installed in order to avoid water in post when smashing concrete; (8) the post length of side 〉=600 o'clock should be installed
Figure C20061001851000061
Pull bar overlaps the every increase by 300 of the 1.5 thick rigid plastics sleeve pipe length of sides, sets up one, sets up reinforcing rib or cross reinforcing rib simultaneously; (9) installation of basic inner prop is by cast-in-place post mould installation system construction; During (10) as grade beam, press the construction of Cast-in-place concrete beam form installation system; (11) cementitious composite base for post mould adopts cement, material such as alkaline-resisting glass.
4, the dismounting of insulated column basis member: the dismounting of (1) single footing die component must be satisfied existing job specfication and designing requirement; (2) remove all bolts in the basis, and with its classification vanning; (3) remove horizontal stupefied mould of basic steel and perpendicular stupefied mould, and with its bundling or stack; (4) remove foundation columns angle mould and tie, composite filled plate etc. (step is removed with the post member); (5) remove upper and lower angle steel mould of grade beam and beam hoop (step is removed with beam); (6) need carry out superstructure construction, should member be transported to the appointed place by the tissue design; (7) engineering is finished and should in time it be transported to next building site or warehouse-in.
Embodiment two
Concrete strip foundation modular shuttering element is installed system
1, the composition of concrete strip foundation modular shuttering element: the horizontal stupefied mould in (1) concrete bar basis: adopt 3mm steel plate cold bending channel-section steel to make specification 80 * 40 * 3; (2) add tyrannical stupefied mould: adopt 3mm steel plate cold bending channel-section steel to make specification 80 * 40 * 3; (3) the perpendicular stupefied mould of bar base: adopt 3mm steel plate cold bending channel-section steel to make specification 80 * 40 * 3; (4) the perpendicular stupefied ribs of bar base: adopt the 3mm steel plate cold bending to make specification 40 * 30 * 3; (5) bar base angle mould: adopt angle steel to make specification L60 * 60 * 3; (6) bar Ji Liang goes up angle mould: adopt angle steel to make specification L60 * 60 * 3; (7) diagonal brace: adopt seamless steel pipe to make specification
Figure C20061001851000062
(8) diagonal brace bearing: adopt the clod wash channel-section steel to make specification 80 * 40 * 3; (9) pull bar: adopt round steel to make specification
Figure C20061001851000063
Cover 1.5mm plastic conduit during installation; (10) positioning splint: adopt band steel to make specification: 40 * 3; (11) ribs adjustment part: adopt band steel or flat tube to make specification: 40 * 30 * 2 or 40 * 30 * 3; (12) composite shuttering: adopt making such as cement, alkali-resistant glass fibre, specification is by design configurations.
2, press Design Requirement Drawing and draw cast-in-place matrix component and composite shuttering allocation plan, establishment member and composite shuttering batching inventory.
3, the installation of strip foundation member and composite shuttering: (1) reserves axis successively after bar base reinforcing bar binding is finished, and determines horizontal absolute altitude, width on bed course, and snap the line is also carried out mark; The horizontal stupefied and perpendicular stupefied member that waits of the bar base that (2) will configure fixes by the assembling of component template plan; (3) composite shuttering is installed, is pricked the silk fix tightly with two 18#; (4) pull bar is installed; (5) diagonal brace and diagonal brace bearing are installed; (6) installing and locating clamping plate; (7) need are installed support and scaffold, press the construction of support system and scaffold building scheme.
4, the dismounting of bar matrix component: the dismounting job specfication that the dismounting of (1) bar matrix component should be satisfied existing concrete form requires and designing requirement; (2) remove positioning splint and pull bar, diagonal brace, cut off and prick silk; (3) remove bolt and each member between each member from top to bottom piecemeal; (4) remove interior exterior angle and associated components; (5) with the bolt classification vanning of removing; (6) with component classification or the bundling removed; (7) carry out the superstructure construction as need, should member be transported to the appointed place by the tissue design; (8) engineering duty is finished and should in time it be transported to next building site or warehouse-in.
Embodiment three
Cast-in-place post mould is installed system
1, waters the composition of post formwork system member: (1) column of angles mould: adopt angle steel L-60 * 60 * 3 to make, stand on four jiaos on post, the fixed leg template die; (2) tie: adopt 3mm steel plate cold bending channel-section steel to make, specification 80 * 40 * 3 is used for fixing column of angles mould and post template die; (3) ribs: adopt clod wash channel-section steel-40 * 30 * 3 to make, be used for the post of the post length of side 〉=600, one ribs or cross ribs are set up in the every increase by 300 of the length of side; (4) the high adjustment part of post: adopt clod wash channel-section steel-40 * 30 * 3 to make, place the post bottom, be used to adjust the height of its post 2-100MM, fixed angles steel column mould is when being used for column of angles mould configuration height deficiency; (5) fill composite plate: adopt nano combined sheet material or exempt to coat with lacquer fire-proof board to serve as the tie filling, making tie and column of angles intermode thickness is 3MM, and width is got 80MM; (6) pull bar: adopt
Figure C20061001851000071
Round steel is made, and overlaps 1.5 thick plastic conduits, is used for the post of the length of side 〉=600, and the post length of side 〉=900 are provided with 2 roads, and the post length of side 〉=1200 are provided with three roads, sets up together during the every increase by 300 of the length of side.(pull bar diameter and length computation are determined)
2, Design Requirement Drawing is drawn cast-in-place post member and post template die allocation plan, establishment member batching inventory.
3, the installation of post mould: after the colligation of (1) post muscle is intact, reserve mast axis successively; (2) column of angles mould is erected by axis, again with the tie bolt, and axis correction position and post angle, locate with angle steel or pipe diagonal brace then temporarily; (3) erection column mould is pricked silk with 2 18# and is fixed; (4) pull bar is installed; (5) verification; (6) the correct and deviation of verification axis and level; (7) right angle or the hetermorphiscal column angle of four jiaos on verification post; (8) correctness of the junction of height and associated components at the bottom of the verification reservation beam; (9) the complete and nut of verification bolt is fastening; (10) with verification qualified carry out sign successively, stick paper label, should indicate on the label with the qualified printed words in upper part, and mark reviewer and date.
4, the dismounting of post member: the dismounting of (1) post member should be satisfied existing job specfication post mould and remove requirement and designing requirement; (2) all bundle silks on the post member are cut off; (3) remove all bolts and tie on the tie; (4) remove composite filled plate; (5) remove column of angles mould; (6) with bolt classification vanning; (7) with tie column of angles mould bundling, stick classification number and quantity, date tag.
Embodiment four
Cast-in-place concrete beam formwork is installed system
1, the composition of beam form member: (1) upper beam angle mould: adopt L60 * 60 * 3 angle steel to make; (2) underbeam angle mould: adopt L60 * 60 * 3 angle steel to make; (3) beam hoop: the clod wash channel-section steel of employing 80 * 40 * 3 and 72 * 37 * 3 is made, and joins-40 * 3 band steels and make adjustable diagonal brace; (4) composite filled plate: adopt 5MM, 3MM thick, wide 8MM nano-composite board is used for padding girder hoop and upper and lower beam angle mould and corbel face height and makes side form and bed die that the formation isoplanar is installed; (5) pull bar: adopt
Figure C20061001851000081
Round steel is made, and overlaps 1.5 thick plastic conduits, is used for a some cross section, deck-molding 〉=600 the pull bar beam is set one, during every increase by 300, sets up pull bar one; (6) 18# hole silk: adopt 2-18# to prick silk, be about 120MM, be used for fixing filling nano-composite board and beam side, beam bottom board; (7) cementitious composite beam form: adopt materials such as cement and alkali-resistant glass fibre to make.
2, press Design Requirement Drawing, draw cast-in-place beam and beam slab mould allocation plan, establishment member batching inventory.
3, the installation of beam form: (1) reserves axis on mounted support corbel, and determines deck-siding according to design, reserves underbeam angle mould position with axis; (2) the filling composite plate is installed on corbel, can adopts two-sided tape to be fixed; (3) assembling underbeam angle mould is placed into it on corbel; (4) the beam hoop and the underbeam angle mould that prepare are fixed, and the beam hoop is fixed on the corbel with diagonal brace; (5) the upper beam angle mould is fixed on the beam hoop; (6) composite plate is filled on the beam hoop, stays along the beam hoop with electric drill Composite plate is holed in the hole, inserts 2-18# again and pricks the interim location of silk work; (7) the good beam bottom board of outfit is installed, it is fixing that beam side is also pricked silk with 2-18#; (8) after the beam muscle installs, when deck-molding 〉=600, need to install one
Figure C20061001851000092
Pull bar, overlap 1.5 thick hard plastic tubes, pull bar is set up in every increase by 300 one, o'clock use instead deck-molding 〉=1200
Figure C20061001851000093
Pull bar; (annotate: beam column is too high, when reinforcing bar is tied up hole inconvenience, a bed die and a side form can be installed earlier, pacifies another side form again)
4, the dismounting of beam side member: the dismounting of (1) beam side should be satisfied cast-in-place beam side and remove job specfication; (2) cut off the porose silk of institute on beam hoop and the last underbeam angle steel mould; (3) remove the hoop bearing diagonal; (4) remove the beam ribs; (5) remove beam hoop and composite filled plate; (6) remove the upper beam angle steel; (7) with the classification bundlings of removing such as beam hoop diagonal brace; (8) dismounting of member and support is removed after reaching the job specfication requirement again at the bottom of the beam; (9) unscrew studdle successively; (10) remove underbeam angle steel mould; (11) remove girt, bridging and support and successively with its bundling classify and pile up.
Embodiment five
Cast-in-place template die is installed system
1, the composition of template die member: (1) channel-section steel is put stupefied: adopt the clod wash channel-section steel to make specification L80 * 40 * 3; (2) vertically channel-section steel is stupefied: adopt the clod wash channel-section steel to make; (3) adjusting is stupefied: adopt the clod wash channel-section steel to make; (4) adjunction is stupefied: adopt 72 * 39 * 4 clod wash channel-section steels to make; (5) plate adjustment district is auxilliary stupefied; (6) holder is stupefied: adopt the clod wash channel-section steel to make; (7) cross ribs: adopt 40 * 30 * 3 clod wash channel-section steels to make; (8) cementitious composite template die: adopt prefabricated forming such as cement mortar.
2,, draw cast-in-place board member and template die allocation plan, establishment member inventory according to the design drawing requirement.
3, the installation of template die member: the channel-section steel that (1) combines length with preparation is put and is stupefiedly put according to upper beam angle mould location-plate, and uses the bolt verification; (2) jail, stupefied top be will put with the support of Type B list, and its level height and axle central part distance determined; (3) when plate stride≤during 4.2 or floor height≤1.5M, support interval is 600 * 1200; (4) when plate stride≤when 5.2M or floor height≤5.M, support interval 600 * 900; (5) when plate stride≤when 6.0M or floor height≤6.6M, support interval 600 * 600, and unified the employing
Figure C20061001851000101
The seamless steel pipe butt joint; (6) girt is installed in support successively; (7) when floor height>6.6M, support and divide a two-layer installation, support first floor height≤3.0M; After drawknot is stable, support corresponding installation of the first floor again; (8) the vertical channel-section steel of installation is stupefied; (9) the cross reinforcing rib is installed; (10) the mounting rail periphery is adjusted angle steel and composite plate under the cast-in-place plate in district; (11) template die is installed.
4, the dismounting of template die member: each part of dismounting of (1) template die member should satisfy requirement and the designing requirement that existing concrete form is removed job specfication; (2) removing channel-section steel puts stupefied and stupefied bolt of channel-section steel adjunction and end bolt; (3) studdle is transferred loose 50-100MM; (4) remove the plate support, top rest bolt that places an order; (5) dismounting cross ribs; (6) the dismounting cannelure is put stupefied; (7) the stripper adjustment district composite plate and the member that links to each other; (8) the bolt classification of dismounting is cased; (9) with the component classification bundling of dismantling.

Claims (1)

1. formwork-making process with disassembling-free composite die block in concrete structure is characterized in that processing step is:
(1) system composite shuttering: 1. raw material takes by weighing: the weight ratio by 0.05~0.10 part of 1 part of cement, sand 1-2 part, reinforcing agent takes by weighing cement, sand, reinforcing agent respectively, and reinforcing agent is a rosin soap class cement intensifier; 2. stir: the raw material that weighs up is poured into added water in the mixer and stir, make concrete; 3. the mould of arranging net: in the mould that is provided with the square frame rib, be distributed into one deck alkali-resistant glass fiber mesh cloth, the concrete that stirs is poured into; 4. vibration moulding: with concrete jolt ramming, allow its natural coagulation moulding with bobbing machine; 5. maintenance: once every 12 hours water seasonings; 6. the demoulding: after 1 day mould is removed, got product;
(2) prop up the making of die component:, make the horizontal stupefied mould of all size, perpendicular stupefied mould, angle mould and bearing post with steel plate and channel-section steel according to the needs of site operation;
(3) installation of basic component composite shuttering: 1. draw cast-in-place single footing member and composite shuttering allocation plan, an establishment die component and composite shuttering batching inventory by the construction drawing requirement; 2. reserve axis successively, definite horizontal absolute altitude and single line are carried out mark on the substrate bed course; The horizontal stupefied mould that 3. will prepare is assembled into the foundation bottom mould by the good geometric form of axial line control, and angle mould is installed then successively, uses bolt; 4. the installing and locating plate is used bolt; 5. external mold around the basis is installed successively, and template adopts the made composite shuttering of step (1), with thin wire composite shuttering is fixed;
(4) press the good reinforcing bar of architectural drawing paper cloth after, get final product poured in place concrete;
(5) form removal: 1. remove all bolts in the basis, with its classification vanning; 2. remove horizontal stupefied mould of basic steel and perpendicular stupefied mould, and its bundling is piled; 3. remove basic angle mould.
CNB2006100185107A 2006-03-08 2006-03-08 Novel formwork-making process with disassembling-free composite die block in concrete structure Active CN100422483C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100185107A CN100422483C (en) 2006-03-08 2006-03-08 Novel formwork-making process with disassembling-free composite die block in concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100185107A CN100422483C (en) 2006-03-08 2006-03-08 Novel formwork-making process with disassembling-free composite die block in concrete structure

Publications (2)

Publication Number Publication Date
CN1837513A CN1837513A (en) 2006-09-27
CN100422483C true CN100422483C (en) 2008-10-01

Family

ID=37015010

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100185107A Active CN100422483C (en) 2006-03-08 2006-03-08 Novel formwork-making process with disassembling-free composite die block in concrete structure

Country Status (1)

Country Link
CN (1) CN100422483C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493469A (en) * 2011-12-05 2012-06-13 中建三局第三建设工程有限责任公司 Fundamental moldboard produced by cement pressure boards with steel frames and construction method thereof
CN114215101A (en) * 2022-01-29 2022-03-22 北京城建集团有限责任公司 Construction method of concrete foundation of equipment foundation in station

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2232953Y (en) * 1995-11-24 1996-08-14 梁育雄 Permanent combination building section mould
CN2282021Y (en) * 1996-11-26 1998-05-20 谢晓山 Permanent building formwork
JP2002146904A (en) * 2000-11-09 2002-05-22 Toray Ind Inc Method for reinforcing concrete structure and reinforced concrete structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2232953Y (en) * 1995-11-24 1996-08-14 梁育雄 Permanent combination building section mould
CN2282021Y (en) * 1996-11-26 1998-05-20 谢晓山 Permanent building formwork
JP2002146904A (en) * 2000-11-09 2002-05-22 Toray Ind Inc Method for reinforcing concrete structure and reinforced concrete structure

Also Published As

Publication number Publication date
CN1837513A (en) 2006-09-27

Similar Documents

Publication Publication Date Title
CN100554588C (en) A kind of vertical rotation steel-concrete combination arch bridge
CN105220808B (en) Large-span prestressed arch bar in-situ precast construction method of installation
CN206070562U (en) Subassembly formula underground structure
CN106437031A (en) One-step formed multi-layer prefabricated column with bracket as well as manufacturing method and construction method thereof
CN106320704A (en) Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN113293694B (en) Turnover formwork frame structure for efficient pier body construction and construction process
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN105649330A (en) External formwork system utilizing steel reinforcement cage as framework
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN105863140A (en) Precast hollow floor's component for stress island based hollow floor system
CN106088459A (en) A kind of prefabricated assembled composite heat preserving external wall body of wall and preparation method thereof, method for designing and comprise the steel building of this body of wall
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN208052253U (en) A kind of positioning moulding bed prefabricated for T beam web reinforced frames
CN100422483C (en) Novel formwork-making process with disassembling-free composite die block in concrete structure
CN105649335A (en) Construction method for core tube beam column structure of super high-rise building
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN205348767U (en) Utilize steel reinforcement cage to make external formwork system of skeleton
CN105442737B (en) A kind of complex heat-preservation floorboard and its construction method
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN206512923U (en) Multilayer prefabricated post of the one-shot forming with bracket
CN203603542U (en) Fabricated electronic workshop
CN113202310B (en) Light-support attached formwork construction process
CN212025899U (en) Concrete pipe and pier structure
CN102433961A (en) Prefabricated beam structure construction member

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20100817

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Fenghe Yingzao Group Co., Ltd.

Registration number: 2010990000848

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20110817

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Fenghe Yingzao Group Co., Ltd.

Registration number: 2010990000848

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20110817

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Fenghe Yingzao Group Co., Ltd.

Registration number: 2011990000316

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20120929

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Fenghe Yingzao Group Co., Ltd.

Registration number: 2011990000316

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20120929

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Fenghe Yingzao Group Co., Ltd.

Registration number: 2012990000587

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20131030

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Fenghe Yingzao Group Co., Ltd.

Registration number: 2012990000587

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20131030

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Chong Chong hi tech Limited by Share Ltd|Jiangxi province Fenghe Construction Group Co., Ltd.

Registration number: 2013990000797

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20141124

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Chong Chong hi tech Limited by Share Ltd|Jiangxi province Fenghe Construction Group Co., Ltd.

Registration number: 2013990000797

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20141125

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Hefeng Construction Group Co., Ltd.|Jiangxi branch of Limited by Share Ltd

Registration number: 2014990000983

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20151221

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Hefeng Construction Group Co., Ltd.|Jiangxi branch of Limited by Share Ltd

Registration number: 2014990000983

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20151229

Granted publication date: 20081001

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Hefeng Construction Group Co., Ltd.|Jiangxi branch of Limited by Share Ltd

Registration number: 2015990001187

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 330038 Nanchang City, Jiangxi province and the central road, No. 1496

Patentee after: HSBC Group Limited by Share Ltd

Address before: 330038 Nanchang City, Jiangxi province and the central road, No. 1496

Patentee before: Jiangxi Fenghe Yingzao Group Co., Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170713

Granted publication date: 20081001

Pledgee: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgor: Fenghe construction group, Limited by Share Ltd|Jiangxi,, Limited by Share Ltd

Registration number: 2015990001187

PC01 Cancellation of the registration of the contract for pledge of patent right
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20170713

Registration number: 2015990001187

Pledgee after: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgee before: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Change date: 20170713

Registration number: 2015990001187

Pledgor after: Fenghe construction group, Limited by Share Ltd

Pledgor after: Jiangxi,, Limited by Share Ltd

Pledgor before: Jiangxi Hefeng Construction Group Co., Ltd.

Pledgor before: Jiangxi branch of Limited by Share Ltd

PM01 Change of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel formwork-making process with disassembling-free composite die block in concrete structure

Effective date of registration: 20170816

Granted publication date: 20081001

Pledgee: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgor: HSBC Group Limited by Share Ltd|Jiangxi Chuangxing Gaoke Co.,Ltd.

Registration number: 2017990000755

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190826

Granted publication date: 20081001

Pledgee: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgor: HSBC Group Limited by Share Ltd

Registration number: 2017990000755