CN100412273C - Constrnction method for concrete pile - Google Patents

Constrnction method for concrete pile Download PDF

Info

Publication number
CN100412273C
CN100412273C CNB031097138A CN03109713A CN100412273C CN 100412273 C CN100412273 C CN 100412273C CN B031097138 A CNB031097138 A CN B031097138A CN 03109713 A CN03109713 A CN 03109713A CN 100412273 C CN100412273 C CN 100412273C
Authority
CN
China
Prior art keywords
casing
mentioned
pile
concrete
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB031097138A
Other languages
Chinese (zh)
Other versions
CN1483900A (en
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB031097138A priority Critical patent/CN100412273C/en
Publication of CN1483900A publication Critical patent/CN1483900A/en
Application granted granted Critical
Publication of CN100412273C publication Critical patent/CN100412273C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a construction method for concrete piles, which is characterized in that a concrete pile with high bearing capacity can be formed in a hard foundation by low cost to meet the requirements of high-rise buildings and structural objects with high bearing capacity requirements. The method comprises the following steps: a) drilling a hole by a screw drill rod on the foundation of a pile position till a specified depth, and then lifting the screw drill rod out by reverse rotation to form a guide hole of a pile; b) putting a protective drum of which the external surface is provided with helical blades into the guide hole of the pile, wherein the total diameter of the protective drum and the helical blades is larger than the diameter of the guide hole of the pile; putting a guide member into the protective drum, and rotating the protective drum along the guide hole of the pile under the guide of the guide member to drive the protective drum to move downward till a specified depth; and c) carry outing the construction of the pile body, and lifting the protective drum by reverse rotation in the construction.

Description

The job practices of concrete pile
Technical field
The present invention relates to the construction technology of foundation, particularly relate to the construction technology of concrete pile.
Background technology
In the past, in construction, once had the construction technology of following concrete pile, this technology is characterised in that by the mode of hammering with pipe, casing is arranged at the prescribed depth of ground, at the complex carrier of soil layer formation preferably, make pile body then, thus, transfer the following soil layer preferably of stake end fully, the bearing capacity that is the soil body of bearing stratum participates in stressed, thereby the cost of above-mentioned construction technology is lower, but the shortcoming of this construction technology is that it only is suitable for softer ground soil condition, such as, the foundation surface layer, compactness is less, loose silt, silty clay etc., and be not suitable for hardpan, the darker soil layer apart from ground, such as, the powder soil horizon that compactness is bigger, powder fine sand soil layer, coarse sands layer, cobble layers etc. that is to say, when running into above-mentioned hardpan, be difficult to by the mode of hammering with pipe, casing is arranged at the prescribed depth of ground, and consequently, above-mentioned construction technology is used for more shallow foundation soil mostly, it is not too high to make bearing capacity, the pile foundation that low-rise building is used, and be not suitable in darker foundation soil, such as, it is higher to make bearing capacity through the foundation ditch bottom surface of excavation, the pile foundation that high-rise building is used still, is followed the metropolis, such as, the high stratification of the building of Beijing, the market of the foundation that high-rise building is used is more and more, therefore, people are desirable to provide a kind of these needs that satisfy, the construction technology of the stake that cost is still low.
Summary of the invention
The object of the present invention is to provide a kind of job practices of concrete pile, the job practices of this concrete pile can be made the higher concrete pile of bearing capacity with lower cost in harder ground, so that satisfy high-rise building, the requirement of the works that requirement for bearing capacity is higher.
The objective of the invention is that job practices by following concrete pile realizes, this job practices comprises the steps:
A) in the ground at place, stake position, hole by auger stem, until the prescribed depth place, counter-rotating proposes auger stem then, forms the pilot hole of stake;
B) casing that external surface is had helical blade is put into the pilot hole of above-mentioned stake, the overall diameter of this casing and helical blade is greater than the diameter of the pilot hole of above-mentioned stake, in this casing, put into guide, under the guiding of above-mentioned guide, pilot hole along above-mentioned stake, above-mentioned casing is rotated and it is moved down, until prescribed depth;
C) carry out the construction of pile body, in this work progress, counter-rotating proposes above-mentioned casing.
If adopt the job practices of above-mentioned concrete pile, can in harder soil layer, carry out pore-forming apace, carry out the construction of concrete pile, it is higher to adapt to the bigger bearing capacity in market, such as, the needs of high-rise building.In addition, can make the stake of larger diameter.In addition, because the effect of guide can prevent that above-mentioned casing from deflection taking place in sinking to process.
In the job practices of above-mentioned concrete pile, best, the diameter of this casing equals the diameter of the pilot hole of above-mentioned stake.
According to such scheme, can utilize pilot hole most effectively, casing is sunk in the ground.
In the job practices of above-mentioned concrete pile, best, the construction of the pile body above-mentioned steps c) comprises the steps: 1) pass through this casing to bottom, stake hole, building waste is inserted in gradation, makes weight do elevating movement along this casing inside, and the building waste of being inserted is rammed, make the soil body of certain limit under the stake end obtain reinforcing closely knit, carry out aforesaid operations repeatedly, until satisfying the degree of ramming, this is rammed degree and determines according to three modes of hitting the injection amount in the complex carrier compaction pile design discipline; 2) by this casing, to bottom, stake hole, harsh concrete is inserted in gradation, this harsh concrete always the amount of inserting at 0.3~1m 3Scope in, and, make weight do elevating movement along the inside of this casing less than the amount of inserting always of building waste, the harsh concrete of being inserted is rammed; 3) the casing counter-rotating is promoted 30cm~50cm, insert harsh concrete once more, it is tamped, thereby form complex carrier; 4) place reinforcing cage in above-mentioned casing, Yi Bian pour into a mould vibrated concrete, Yi Bian counter-rotating promotes above-mentioned casing, the soil body back-out with the casing outer wall until proposing casing fully, forms pile body.
According to above-mentioned scheme, the concrete stake of complex carrier can be combined with technology of passing through hardpan of the present invention, make the concrete stake of complex carrier give full play to foundation soil body and participate in stressedly that characteristics are brought into play cheaply simultaneously in the ground of hardpan.
In the job practices of above-mentioned concrete pile, best, when this pile concrete of cast, vibrator is set in the casing bottom, concrete is vibrated.
According to above-mentioned scheme, can guarantee the bond quality between stake bottom cast-in-situ concrete and the harsh concrete.
In the job practices of above-mentioned concrete pile, best, above-mentioned guide adopts weight, above-mentioned steps b) described in the guiding of guide refer to weight be passed the bottom of above-mentioned casing and stretch out, a part that is weight in casing, the state of another part in pilot hole.
According to above-mentioned scheme, when the technology with the complex carrier concrete pile combines with the present invention, weight is used as guide, and guide needn't be set separately, can reduce the quantity of the building block of construction equipment, reduce cost.
In the job practices of above-mentioned concrete pile, best, above-mentioned to pass through action that auger stem holes be that the stake position is being carried out under the state of borehole in advance.
According to above-mentioned scheme, can realize auger boring first more easily.
In the job practices of above-mentioned concrete pile, best, the diameter of this casing is less than the diameter of the pilot hole of above-mentioned stake.
According to above-mentioned scheme, can prevent in the process that screws off of casing, soil body particle is dropped at the bottom of the hole and form loosened soil.
In the job practices of above-mentioned concrete pile, the construction of the pile body best, above-mentioned steps c) comprises according to complex carrier compaction pile design discipline, in the casing bottom to soil layer preferably between the bearing stratum, the soil body is reinforced compacted processing, make the complex carrier of stake bottom.
During pile body in forming pile body, preformed pile is inserted in the above-mentioned retaining wall cylindrical shell, above-mentioned casing counter-rotating is proposed, fluid concrete or mortar in the gap between above-mentioned preformed pile and the hole.
Below in conjunction with accompanying drawing, the construction to concrete pile of the present invention specifically describes by way of example.
Description of drawings
Fig. 1 is the process chart of an embodiment of the job practices of concrete pile of the present invention.
The specific embodiment
At first, shown in Fig. 1 (A), at first dig locating hole 1 in the stake site, the pilot hole of stake is used, conventional minor diameter auger 2 is positioned in the hole, stake position; Then shown in Fig. 1 (B), in hole, stake position, drive minor diameter auger 2, drilling and forming hole, then, shown in Fig. 1 (C), above-mentioned minor diameter auger 2 is holed to projected depth, then, shown in Fig. 1 (D), counter-rotating minor diameter auger 2, soil in the hole is drawn out, form the stake hole of diameter 300~600mm, the pilot hole of employing and stake is with the steel casing 4 that adds helical blade in footpath again, in the steel casing, place weight 3, then, make guide peg with weight 3, drive this casing 4 rotations, the outer soil body of pilot hole of cutting stake, afterwards, then, shown in Fig. 1 (E), secondary spiral pore-forming is to projected depth, make the stake footpath by 300 original~600mm, expand 600~1200mm to, then, shown in Fig. 1 (F), by casing 4 to stake hole bottom gradation insert building waste 7, make weight 3 do elevating movement along casing 4, the building waste of being inserted 7 is carried out macro-energy ram, carry out aforesaid operations repeatedly by vertical direction, until satisfying the degree of ramming, this is rammed degree and determines according to three modes of hitting the injection amount in " complex carrier compaction pile " design discipline, is the compacted soil body 6 in the outside as the building waste 7 of inserts, and the outside of this compacted soil body is for influencing the soil body 5, by this casing 4 to stake hole bottom gradation insert harsh concrete 8, harsh concrete 8 always the amount of inserting at 0.3~1m 3Scope in, and less than the amount of inserting always of above-mentioned building waste 7, make weight 3 do elevating movement by vertical direction along casing 4, the harsh concrete of being inserted 8 is rammed, finish the construction of complex carrier, then, shown in Fig. 1 (G), after rammer has expanded above-mentioned harsh concrete 8, the casing counter-rotating is promoted 30cm~50cm, insert harsh concrete once more and tamp, then, shown in Fig. 1 (H), place reinforcing cage 9 in casing 4, fluid concrete is provided with vibrator concrete is carried out vibration compacting in the bottom, counter-rotating promotes casing 4, the soil body of casing 4 outer walls is drawn out, then, shown in Fig. 1 (I), until proposing casing 4 fully, form pile body.

Claims (9)

1. the job practices of a concrete pile, this job practices comprises the steps:
A) in the ground at place, stake position, hole by auger stem, until the prescribed depth place, counter-rotating proposes auger stem then, forms the pilot hole of stake;
B) casing that external surface is had helical blade is put into the pilot hole of above-mentioned stake, the overall diameter of this casing and helical blade is greater than the diameter of the pilot hole of above-mentioned stake, in this casing, put into guide, under the guiding of above-mentioned guide, pilot hole along above-mentioned stake, above-mentioned casing is rotated and it is moved down, until prescribed depth;
C) carry out the construction of pile body, in this work progress, counter-rotating proposes above-mentioned casing.
2. the job practices of concrete pile according to claim 1 is characterized in that the diameter of this casing equals the diameter of the pilot hole of above-mentioned stake.
3. the job practices of concrete pile according to claim 1, it is characterized in that above-mentioned steps c) in the construction of pile body comprise the steps: 1) by this casing to bottom, stake hole, building waste is inserted in gradation, make weight do elevating movement along this casing inside, the building waste of being inserted is rammed, make the soil body of certain limit under the stake end obtain reinforcing closely knit, carry out aforesaid operations repeatedly, until satisfying the degree of ramming, this is rammed degree and determines according to three modes of hitting the injection amount in the complex carrier compaction pile design discipline; 2) by this casing, to bottom, stake hole, harsh concrete is inserted in gradation, this harsh concrete always the amount of inserting at 0.3~1m 3Scope in, and, make weight do elevating movement along the inside of this casing less than the amount of inserting always of building waste, the harsh concrete of being inserted is rammed; 3) the casing counter-rotating is promoted 30cm~50cm, insert harsh concrete once more, it is tamped, thereby form complex carrier; 4) place reinforcing cage in above-mentioned casing, Yi Bian pour into a mould vibrated concrete, Yi Bian counter-rotating promotes above-mentioned casing, the soil body back-out with the casing outer wall until proposing casing fully, forms pile body.
4. the job practices of concrete pile according to claim 2 when it is characterized in that pouring into a mould this pile concrete, is provided with vibrator in the casing bottom, and concrete is vibrated.
5. the job practices of concrete pile according to claim 1, it is characterized in that above-mentioned guide adopts weight, the guiding of the guide above-mentioned steps b) refers to weight be passed the bottom of above-mentioned casing and stretch out, a part that is weight in casing, the state of another part in pilot hole.
6. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned to pass through action that auger stem holes be that the stake position is being carried out under the state of borehole in advance.
7. the job practices of concrete pile according to claim 1 is characterized in that the diameter of the diameter of this casing less than the pilot hole of above-mentioned stake.
8. the job practices of concrete pile according to claim 1, it is characterized in that above-mentioned steps c) described in the construction of pile body comprise according to complex carrier compaction pile design discipline, in the casing bottom to soil layer preferably between the bearing stratum, the soil body is reinforced compacted processing, make the complex carrier of stake bottom.
9. the job practices of concrete pile according to claim 2, when it is characterized in that the pile body in forming pile body, preformed pile is inserted in the above-mentioned casing, above-mentioned casing counter-rotating is proposed, fluid concrete or mortar in the gap between above-mentioned preformed pile and stake hole.
CNB031097138A 2003-04-11 2003-04-11 Constrnction method for concrete pile Expired - Lifetime CN100412273C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031097138A CN100412273C (en) 2003-04-11 2003-04-11 Constrnction method for concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031097138A CN100412273C (en) 2003-04-11 2003-04-11 Constrnction method for concrete pile

Publications (2)

Publication Number Publication Date
CN1483900A CN1483900A (en) 2004-03-24
CN100412273C true CN100412273C (en) 2008-08-20

Family

ID=34152346

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031097138A Expired - Lifetime CN100412273C (en) 2003-04-11 2003-04-11 Constrnction method for concrete pile

Country Status (1)

Country Link
CN (1) CN100412273C (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2280115Y (en) * 1997-02-26 1998-04-29 王继忠 Vibration immersed tube type equipment for construction of bored concrete pile
CN2387147Y (en) * 1999-08-31 2000-07-12 中国建筑科学研究院地基基础研究所 Spirally drilling vibrating and filling pile machine
EP0687777B1 (en) * 1994-06-16 2000-09-20 Heiwerken P. van 't Wout Waddinxveen B.V. Method for arranging concrete piles in the ground
CN1354306A (en) * 2001-12-28 2002-06-19 王继忠 Construction method of concrete pile and its construction equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0687777B1 (en) * 1994-06-16 2000-09-20 Heiwerken P. van 't Wout Waddinxveen B.V. Method for arranging concrete piles in the ground
CN2280115Y (en) * 1997-02-26 1998-04-29 王继忠 Vibration immersed tube type equipment for construction of bored concrete pile
CN2387147Y (en) * 1999-08-31 2000-07-12 中国建筑科学研究院地基基础研究所 Spirally drilling vibrating and filling pile machine
CN1354306A (en) * 2001-12-28 2002-06-19 王继忠 Construction method of concrete pile and its construction equipment

Also Published As

Publication number Publication date
CN1483900A (en) 2004-03-24

Similar Documents

Publication Publication Date Title
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
EP1888848B1 (en) Slotted mandrel for lateral displacement pier and method of use
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN110318393B (en) Construction method of composite pile
JP5932124B1 (en) Steel pipe pile construction method
CN102733378B (en) Construction method of concrete pile
CN105862861B (en) A plant pile construction method
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN110984133A (en) Construction method for foundation of deep-water shallow-covering-layer trestle
CN104294818A (en) Construction method for concrete pile
CN101575852A (en) Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN102635110B (en) Construction method for concrete pile
JP4974364B2 (en) Pile burying method
KR20100086146A (en) Construction method for composite pile using digging and hardenning
CN1191257A (en) Method for construction of concrete pile
CN205776216U (en) A kind of implantation equipment of rigid pile
CN101899827B (en) Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation
RU2334049C1 (en) Method of combined in situ pile manufacturing
JP4101724B2 (en) Steel pipe pile construction method
CN100412273C (en) Constrnction method for concrete pile
CN105926621A (en) Construction method for static pressure carrier pile
JP2673677B2 (en) Pile method
CN108049401A (en) A kind of screw thread rammed bulb pile and its construction method
CN1271286C (en) Construction method for concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Yang Qiuxin

Document name: Second notice of examination advice

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: BEIJING PUISSANT GEOTECHNICAL ENGINEERING Co.,Ltd.

Assignor: Wang Jizhong

Contract record no.: 2011110000108

Denomination of invention: Concrete pile construction method

Granted publication date: 20080820

License type: Exclusive License

Open date: 20040324

Record date: 20110718

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20080820

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Yang Qiuxin

Document name: Notice of Termination of Patent Rights