CN100410448C - Integrated casing board type long piled wharf - Google Patents

Integrated casing board type long piled wharf Download PDF

Info

Publication number
CN100410448C
CN100410448C CNB2006102004568A CN200610200456A CN100410448C CN 100410448 C CN100410448 C CN 100410448C CN B2006102004568 A CNB2006102004568 A CN B2006102004568A CN 200610200456 A CN200610200456 A CN 200610200456A CN 100410448 C CN100410448 C CN 100410448C
Authority
CN
China
Prior art keywords
wharf
longitudinal
prestressed
prefabricated
present
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2006102004568A
Other languages
Chinese (zh)
Other versions
CN1861911A (en
Inventor
邱大洪
邴晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Earth Wood Building Design Inst Co Ltd Dalian Univ Of Tech
Original Assignee
Earth Wood Building Design Inst Co Ltd Dalian Univ Of Tech
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Earth Wood Building Design Inst Co Ltd Dalian Univ Of Tech filed Critical Earth Wood Building Design Inst Co Ltd Dalian Univ Of Tech
Priority to CNB2006102004568A priority Critical patent/CN100410448C/en
Publication of CN1861911A publication Critical patent/CN1861911A/en
Application granted granted Critical
Publication of CN100410448C publication Critical patent/CN100410448C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention belongs to the field of marine traffic engineering, particularly to the design of a high-plied wharf and a construction technique thereof. The present invention is characterized in that the upper structure adopts a bidirectional prestressed integral box plate type structure which is assembled in subsections along the wharf in the longitudinal direction, and the present invention is designed according to a slug matching box girder prefabricating construction technique. When a longitudinal subsection is prefabricated, a transverse prestressed member is formed. After the prestressed longitudinal subsection is installed on a pile foundation, prestressing force stretching is conducted in a prepared hole and a pipeline, and the longitudinal prestressing force is formed. Prestressed fiber concrete is adopted in the connecting position of the integral box plate and the pile foundation. After the construction is finished, the upper structure of a standard section wharf forms the integral box plate. The present invention has the effect and the benefit that the durability of the wharf can be improved, and the problem of the durability of the high-piled wharf which troubles the marine traffic industry for many years is solved.

Description

Integrated casing board type long piled wharf
Technical field
The invention belongs to the marine traffic engineering technical field, specially refer to the design and construction of high pile pier structure.
Background technology
High pilework is a kind of form of structure that the harbour engineering generally adopts, and it mainly is applicable to soft base.Long piled wharf mainly is made up of pile foundation and superstructure, wherein the pile foundation technology development is very fast, design and construction technology such as reinforced concrete pile, prestressed reinforced concrete stake, prestressing force Big Pipe Pile, steel pipe pile are day by day ripe, adapt to different geological conditionss and service condition, select for use different stake types can reach instructions for use; But the technical development of long piled wharf superstructure is slow, and alternative form of structure is less, up to the present, all adopts the beam and slab type structure basically.Through the practice of decades, it is to be solved that traditional beam and slab type structure exists following problem to have: 1. harbour superstructure return pulley is wide complicated, and the many spaces that can gather the salt fog moisture laden air are arranged, poor durability, and application life is short; 2. globality is poor, and rigidity is less; 3. the over-water construction workload is big; 4. cast-in-place joint workload is big; 5. speed of application is slower.
Along with developing rapidly of Chinese national economy, the application meeting of long piled wharf is more and more wider, and the problem that how to solve the Durability of High-pile Wharf difference is that present China water transport industry is badly in need of one of subject matter that solves.
Summary of the invention
The purpose of this invention is to provide a kind of novel high pile pier structure that can significantly improve Durability of High-pile Wharf, construction simple and fast, the beam and slab type high pile pier structure of construction costs and existing routine is more or less the same simultaneously.
Technical solution of the present invention is, the harbour superstructure adopts two dimension prestressing boxboard formula structure, along the assembly unit of harbour longitudinal divisions, design by the beam prefabricated construction technology of slug matching case, form the transverse prestress member when longitudinal divisions is prefabricated, prefabricated longitudinal divisions carries out prestressed stretch-draw in the hole of reserving after installing on the pile foundation, form vertical post-tensioned prestressing, make each plate be coupled to an integral body; In whole boxboard and pile foundation junction, prefabricated boxboard reserving hole, the back pouring concrete adopts the three dimension prestressing fibrous concrete in the hole, and after construction was finished, the superstructure of a standard paragraphs harbour formed a whole boxboard.
Effect of the present invention and benefit are: 1. harbour superstructure bottom profile is a plane, can not gather the space of salt fog moisture laden air; 2. adopt two dimension prestressing and high performance concrete, structural entity rigidity is big, service condition good, harbour good endurance, long service life; 3. the aquatic work amount is few, and the cast-in-situ concrete amount is few, and speed of application is fast.In addition, the beam and slab type high pile pier structure of this structural system construction costs and existing routine is more or less the same.
Description of drawings
Fig. 1 is a harbour overall structure schematic diagram.
Among the figure: the prefabricated boxboard in 1 end, the prefabricated boxboard in 2 middle parts.
Fig. 2 is a dock structure A-A generalized section.
Among the figure: 3 steel pipe piles, 4 prefabricated boxboards.
Fig. 3 is prefabricated boxboard structural plan, an end schematic diagram.
Among the figure: 5 preformed holes, 6 lower floor's tension of prestressed tendon ends, 7 back pouring concrete preformed holes.
The specific embodiment
Below in conjunction with technical scheme and accompanying drawing, be described in detail the most preferred embodiment of integrated casing board type long piled wharf structure:
A harbour standard paragraphs length is 54 meters, and width is 34.5 meters.Every boxboard width of harbour superstructure is 6 meters, high 1.5m, wherein top board, base plate is thick is 0.3 meter, the horizontal rib width of boxboard is 0.8 meter, vertical rib width is 2.6 meters and 2.2 meters in the stake, it is 0.5 meter and 0.8 meter that rib width is gone up in non-stake.A harbour standard paragraphs is made up of 9 blocks of prestressing force boxboards.The two dimension prestressing boxboard laterally adopts prefabricated prestressing without bondn structure along harbour, vertically adopts the post-tensioning prestress with bond structure along harbour.Superstructure connects into an integral body by the longitudinally on-the-spot post-tensioned prestressing muscle in scene, on whole 54 meters harbour sections, form the whole two dimension prestressing box plate superstructure of a long 54m * wide 34.5m * high 1.5m, have great horizontal rigidity, do not need to be provided with any taper pile.
Prefabricated boxboard is at place, stake top reserving hole, and hole diameter is than the big 0.6m of steel pipe pile external diameter, and back pouring concrete adopts the three dimension prestressing fibrous concrete, makes steel pipe pile and boxboard connect into integral body.
Consider stretch-draw and wear the needs of muscle; the prefabricated boxboard in end at harbour segmentation two ends adopts special-shaped prestressing force boxboard; after prestressed stretch-draw is finished at the scene; cast hole concrete; ground tackle with the protection prestressed cable; form harbour segmentation both ends wide and be 3.4 meters concrete sidewall, guarantee the ground tackle of on-the-spot post-tensioned prestressing, in the whole operating period from now on, can not relax and by corrosion.

Claims (1)

1. integrated casing board type long piled wharf, it is characterized in that: superstructure adopts the whole boxboard formula of two dimension prestressing structure, along the assembly unit of harbour longitudinal divisions, design by the beam prefabricated construction technology of slug matching case, form the transverse prestress member when longitudinal divisions is prefabricated, prefabricated longitudinal divisions is after installing on the pile foundation, in hole of reserving and pipeline, carry out prestressed stretch-draw, form longitudinal prestressing,, adopt the three dimension prestressing fibrous concrete in whole boxboard and pile foundation junction.
CNB2006102004568A 2006-05-17 2006-05-17 Integrated casing board type long piled wharf Active CN100410448C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006102004568A CN100410448C (en) 2006-05-17 2006-05-17 Integrated casing board type long piled wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006102004568A CN100410448C (en) 2006-05-17 2006-05-17 Integrated casing board type long piled wharf

Publications (2)

Publication Number Publication Date
CN1861911A CN1861911A (en) 2006-11-15
CN100410448C true CN100410448C (en) 2008-08-13

Family

ID=37389428

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006102004568A Active CN100410448C (en) 2006-05-17 2006-05-17 Integrated casing board type long piled wharf

Country Status (1)

Country Link
CN (1) CN100410448C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666098B (en) * 2009-08-03 2011-07-27 天津大学 Sheet-cell conduit frame prefabricated part pilling structure and dock using same
CN101949142B (en) * 2010-09-09 2012-05-30 中交第三航务工程勘察设计院有限公司 Long segmental structure of offshore high-piled wharf
CN103774611B (en) * 2014-01-26 2016-08-17 大连理工大学 Arc transmission breakwater
CN107034842A (en) * 2017-06-09 2017-08-11 中交第三航务工程勘察设计院有限公司 A kind of modular assembly formula pile foundation wharfs structural system and its construction method
CN112982131B (en) * 2021-02-07 2022-10-25 中交第三航务工程勘察设计院有限公司 Offshore open type airport runway and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001288725A (en) * 2000-04-04 2001-10-19 Nippon Steel Corp Pile-type foundation structure and method for constructing the same
CN2600488Y (en) * 2002-12-02 2004-01-21 葛勇芹 Frame-box-type high support platform and panel board structure of deep water large dolphin pierhead

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001288725A (en) * 2000-04-04 2001-10-19 Nippon Steel Corp Pile-type foundation structure and method for constructing the same
CN2600488Y (en) * 2002-12-02 2004-01-21 葛勇芹 Frame-box-type high support platform and panel board structure of deep water large dolphin pierhead

Also Published As

Publication number Publication date
CN1861911A (en) 2006-11-15

Similar Documents

Publication Publication Date Title
CN100410448C (en) Integrated casing board type long piled wharf
CN101215819B (en) Separated double-layer bridge-floor cable stayed bridge
CN202416148U (en) Bridge structure of pre-stressed concrete hollow slabs
CN205474784U (en) Prefabricated T roof beam
CN104805767A (en) Prefabricated assembly FRP-reinforcing steel-bar-concrete combined bridge deck and construction method
CN103866817B (en) Water intake pumping station
CN104988951B (en) Straddle monorail underground section track wall construction and construction method thereof
CA2848200A1 (en) Bridge system and method including four sided concrete bridge units adapted for promoting sedimentation
CN101298756A (en) Technique for widening concrete box girder without increasing foot stall steel component
CN106638274A (en) Unidirectional prestressed ultrahigh-performance concrete thin-walled box girder standard segment
CN203593939U (en) Connecting structure of concrete beams differing in performance
CN103556565A (en) Connection construction for girders made of concrete with different performance
CN204589815U (en) Prefabricated assembled FRP-steel-concrete combined bridge deck
CN201317908Y (en) Double deck cable stayed bridge of separation type
CN205474782U (en) External prestress wave form steel web T roof beam
CN109469003A (en) A kind of assembled pile foundation wharfs structure and attaching method thereof
CN205954478U (en) Assembled concrete barrier and adopt its bridge
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN209397564U (en) A kind of assembled pile foundation wharfs structure
CN201106150Y (en) Hidden floating type rope tension bridge
CN202830732U (en) Mixing-type cable- rope bearing bridge
CN209468679U (en) A kind of main pier of long span stayed-cable bridge
CN205804278U (en) A kind of assembled long piled wharf superstructure system
CN111535156A (en) FRP (fiber reinforced plastic) -concrete combined bridge structure and construction method thereof
CN202227268U (en) Concrete box beam structure capable of widening steel cantilever beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant