CN100403824C - Method for reporting base station resource energy - Google Patents
Method for reporting base station resource energy Download PDFInfo
- Publication number
- CN100403824C CN100403824C CNB200610023312XA CN200610023312A CN100403824C CN 100403824 C CN100403824 C CN 100403824C CN B200610023312X A CNB200610023312X A CN B200610023312XA CN 200610023312 A CN200610023312 A CN 200610023312A CN 100403824 C CN100403824 C CN 100403824C
- Authority
- CN
- China
- Prior art keywords
- base station
- resource
- radio link
- capability
- radio
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 48
- 230000004044 response Effects 0.000 claims description 20
- 238000012550 audit Methods 0.000 claims description 11
- 230000002596 correlated effect Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000010295 mobile communication Methods 0.000 abstract description 5
- 230000008569 process Effects 0.000 description 23
- 230000011664 signaling Effects 0.000 description 9
- 230000000875 corresponding effect Effects 0.000 description 4
- 230000003993 interaction Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 230000001360 synchronised effect Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 238000013468 resource allocation Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005194 fractionation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention relates to the technology of mobile communication, which discloses a method for reporting the capacity of a base station, which enables the RL resource capability and the RLS resource capability of the base station to be reported simultaneously and accurately. In the present invention, an optional IE which marks the resource capability is added; or the IE interrelated to the resource capability is divided into two parts which respectively mark the RL resource capability and the RLS resource capability, and meanwhile, the consumption rule is revised. Thereby, the simultaneous report of the RL resource capability and the RLS resource capability is realized.
Description
Technical field
The present invention relates to mobile communication technology, particularly the method for reporting base station resource energy.
Background technology
Along with the development of technology, personal mobile communication has developed into 3G (Third Generation) Moblie (TheThird Generation is called for short " 3G ").3G emphasizes the leading position of individual in communication, be intended to for the user any time in the global range, any place are provided, with anyone, realize the mobile communication and the transmission of any information in high quality in any way.Third generation partner program (3rd GenerationPartnership Project, be called for short " 3GPP ") as one of standardization body of 3G, be responsible for Wideband Code Division Multiple Access (WCDMA) (Wideband Code Division Multiple Access, be called for short " WCDMA ") and the standardization effort of TD SDMA (Time Division Synchronous Code Division MultipleAccess is called for short " TD-SCDMA ") and formulate corresponding protocol.
On function, the 3GPP mobile communication system is made up of three parts: core net (Core Net, abbreviation " CN "), universal mobile telecommunications system grounding wireless access network (UMTS Terrestrial Radio AccessNetwork, be called for short " UTRAN ") and subscriber equipment (User Equipment is called for short " UE ").
UTRAN is by one or more RNSs (Radio Network Subsystem, be called for short " RNS ") form, RNS not only comprises a base station and (but also claims base-station node, Node B) and one or more radio network controller (Radio Network Controller, be called for short " RNC ").Wherein, Node B mainly finishes the processing of physical layer protocol, major function is spread spectrum, modulation, chnnel coding and despreading, demodulation, channel-decoding etc., and RNC mainly finishes functions such as connecting foundation and disconnection, switching, the merging of grand diversity, RRM control.Connect by standard I ur interface between different RNCs, be connected by standard I ub interface between RNC and the Node B.Wherein, the signaling of Iub interface is handled by base station application part (Node B Application Part is called for short " NBAP ").
In the NBAP of 3GPP signaling protocol, the base station need utilize resource status indication (RESOURCESTATUS INDICATION) or audit to respond (AUDIT RESPONSE) signaling and report the current base-band resource ability of home cell in this base station and consume rule, and the base-band resource ability of the home cell group under this home cell and consumption rule.At present " NBAP Specification, 3GPPTS 25.433 " (Chinese can be translated into " base station application part standard, third generation partner program technical standard 25.433 ") in the agreement, dedicated channel (Dedicated Channel, be called for short " DCH ") consume the consumption rule list of two types of rule definitions, be respectively RLS and RL and consume rule, corresponding up-downgoing baseband capability has only a kind of, that is to say that what present 3GPP TS 25.433 agreements were thought RL and RLS consumption is with a kind of resource capability.Those of ordinary skill in the art understands, a connecting path between base station and the UE is called a wireless links (Radio Link, be called for short " RL "), when More Soft Handoff, have many RL between base station and the same UE, these RL constitute a Radio Link collection (Radio Link Set is called for short " RLS ").But owing in base station side, for the RLS of a UE, under such as scenes such as More Soft Handoffs, also may need to carry out the processing that diversity merges, therefore, what RL and RLS consumed is not with a kind of base station resource ability.Need to consider how to realize reporting of base station RL and RLS resource capability.
A prior art scheme reporting base station RL resource capability or RLS resource capability wherein a kind of.
When specific implementation, prior art Scheme Selection mode has multiple situation.For example, can decide according to resource-constrained degree, also can select the resource consumption least unit, promptly RL reports.In the prior art scheme, after having selected a kind of ability and reporting, it is 0 that the consumption rule of another kind of ability correspondence is filled out, and what select to report such as, home cell is the resource capability at RL place, and then the consumption ability of RLS is 0 in the dedicated channel consumption table of home cell.
In actual applications, there is following problem in such scheme: the prior art scheme can not realize reporting of RL resource capability and RLS resource capability exactly, can't use the RL resource capability that need accurately know Node B and the technology of RLS resource capability.
Cause the main cause of this situation to be, the prior art scheme only reports a kind of of RL resource capability or RLS resource capability, when scenes such as More Soft Handoff, RL and RLS do not share with a kind of resource capability, report when can't realize RL resource capability and RLS resource capability, this moment, RNC can't accurately know the base station resource operating position, therefore also can't use the technology that need accurately know RL resource capability and the RLS resource capability of Node B such as the pre-established grade of Radio Link.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of method of reporting base station resource energy, makes base station RL resource capability and RLS resource capability accurately to report simultaneously.
For achieving the above object, the invention provides a kind of method of reporting base station resource energy, comprise following steps:
In the base station application part protocol interface relevant, increase the information element that is used to identify described resource capability with described resource capability;
Described base station obtains current wireless link circuit resource ability and Radio Link fund-raising source capability;
Described base station is filled in the air-link resources ability of being obtained respectively in the different information elements of being correlated with described resource capability with Radio Link fund-raising source capability and reports.
Wherein, the described information element of increase is an option.
In this external described method, the base station application part protocol interface relevant with described resource capability comprises: resource status indication and audit response, the described information element that increases increases in the home cell information of described resource status indication and described audit response interface and home cell group information, and the described information element of increase comprises respectively two kinds in the uplink and downlink use.
In this external described method, when new user inserts, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, whether the surplus resources of judging current base station can support new user's access, if then insert this user, otherwise refuse this user.
In this external described method, in the time of need setting up Radio Link, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports this Radio Link to set up, if then receiving that the response of base station to " Radio Link foundation " message sent " Common Control Channel: the Radio Resource control connection is set up " message to subscriber equipment before.
In this external described method, in the time of need carrying out radio link reconfiguration, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports reshuffling of this Radio Link, if then receiving that the base station is to " sending " Dedicated Control Channel: radio bearer is set up " message to subscriber equipment before the response of radio link reconfiguration request information.
The present invention also provides a kind of method of reporting base station resource energy, comprises following steps:
The information element that is used to identify described resource capability in the base station application part protocol interface that will be relevant with described resource capability is split as first and second portion;
Described base station obtains current wireless link circuit resource ability and Radio Link fund-raising source capability, and reports mode that described current wireless link circuit resource ability and Radio Link fund-raising source capability are filled in respectively in described first and the described second portion to report by revising resource capability.
Wherein, also comprise following steps:
The byte number that expands the information element be used to represent described resource capability is the twice of original byte number.
In this external described method, when new user inserts, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, whether the surplus resources of judging current base station can support new user's access, if then insert this user, otherwise refuse this user.
In this external described method, in the time of need setting up Radio Link, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports this Radio Link to set up, if then receiving that the response of base station to " Radio Link foundation " message sent " Common Control Channel: the Radio Resource control connection is set up " message to subscriber equipment before.
In this external described method, in the time of need carrying out radio link reconfiguration, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports reshuffling of this Radio Link, if then receiving that the base station is to " sending " Dedicated Control Channel: radio bearer is set up " message to subscriber equipment before the response of radio link reconfiguration request information.
By relatively finding, the main distinction of technical scheme of the present invention and prior art is, increase information element (the Information Element of optional identifying resource ability, be called for short " IE "), or the IE relevant with resource capability is divided into two parts identifies RL resource capability and RLS respectively and revise simultaneously and consume rule, report when realizing RL resource capability and RLS resource capability.
Difference on this technical scheme, brought comparatively significantly beneficial effect, promptly at first, the present invention program can report RLS resource capability and RL resource capability accurately simultaneously, thereby make that the resource allocation of RNC side is more accurate, avoided because can't accurately know the unsuccessful phenomenon of resource allocation that RLS resource capability and RL resource capability are caused;
The second, the present invention program can the backward compatibility existing technical scheme, and little for existing equipment influence, convenient deployment will be saved the system upgrade cost greatly;
The 3rd, the present invention program can also unite use with other operation flow, reach the processing delay that reduces other operation flow, reduce other professional benefit such as failed probability, for example Radio Link is set up the parallel or wireless links reconfiguration course of flow process and RRC connection building process and RB to set up process parallel, can realize of the conversion of some serial flow processs to parallel flow process, reduce the service delay of system, and for example, also can unite use with new user's access process, can reduce the number of failed attempts that new user inserts, reduce user's access delay simultaneously.
Description of drawings
Fig. 1 is the flow process of the reporting base station resource energy of first better embodiment according to the present invention;
Fig. 2 is the flow process of the reporting base station resource energy of second better embodiment according to the present invention;
The pre-established inter-entity message interaction flow of Radio Link when Fig. 3 is calling subscriber's link setup of the 4th better embodiment according to the present invention;
The message interaction process of inter-entity when Fig. 4 is the radio link reconfiguration of the 5th better embodiment according to the present invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with accompanying drawing.
Among the present invention program, when Node B reports RL resource capability and RLS resource capability simultaneously at needs, revise the NBAP signaling interface, increase the IE of optional identifying resource ability, or the IE relevant with resource capability is divided into two parts identifies RL resource capability and RLS respectively and revise simultaneously and consume rule, report when realizing RL resource capability and RLS resource capability.
The present invention program uses in needs are accurately known the scene of the RL resource capability of Node B and RLS resource capability.Need know accurately that the RL resource capability of Node B and the scene of RLS resource capability comprise: new user inserts, and Radio Link is pre-established, radio link reconfiguration.
Describe the present invention program in order better to illustrate below in conjunction with preferred embodiment of the present invention and accompanying drawing.
The flow process of the reporting base station resource energy of first preferred embodiment as shown in Figure 1 according to the present invention.
At first, enter step 110, increase the IE that optionally is used to identify the uplink and downlink resource capability at the NBAP protocol interface respectively.Wherein, the IE of increase can be used to carry the RLS resource capability of uplink and downlink.Why the IE that increases being made as option, is to consider backwards compatibility, so that the present invention program is applicable to the implementation of different manufacturers.In the present invention's first preferred embodiment, step 110 has been revised resource status indication (RESOURCE STATUS INDICATION) and audit response (AUDIT RESPONSE) two NBAP signaling interfaces.In the present invention's first preferred embodiment, in the home cell information (Local Cell Information) of RESOURCE STATUS INDICATION and AUDIT RESPONSE signaling interface and home cell group information (Local Cell Group Information), increase by two IE respectively, be respectively up RLS ability (UL RLS Capacity Credit) and descending RLS ability (DL RLS Capacity Credit).By increasing by two IE, in conjunction with the existing IE in the existing technical standard, be descending or overall ability (DLOr Global Capacity Credit) and uplink capacity (UL Capacity Credit), report when promptly can realize RL ability and RLS ability.Amended AUDIT RESPONSE signaling interface is as shown in table 1.Amended RESOURCE STATUS INDICATION signaling interface is as shown in table 2.
Table 1
Table 2
Then, enter step 120, the base station obtains current RL resource capability and RLS resource capability.In this step, the base station promptly can be easy to obtain current RL resource capability and RLS resource capability according to current RL resource and RLS resource consumption situation, and those of ordinary skill in the art is easy to realize, does not give unnecessary details at this.
At last, enter step 130, the RLS resource capability is filled in the step 110 to be increased among the IE and the RL resource capability reports together.In the present invention's first preferred embodiment, realizing that RLS resource capability and RL resource capability give the correct time simultaneously, RLS resource capability with uplink and downlink is filled among UL RLS Capacity Credit and the DL RLS Capacity Credit respectively, and the RL resource capability with uplink and downlink is filled among UL CapacityCredit and the DL or Global Capacity Credit respectively.Consider backwards compatibility, in the present invention's first preferred embodiment, can also whether realize effectively that different resource capabilities reports mode by these IE are set, for example, the IE value is set, and whether effective compound mode can report mode by corresponding different resource capability.In the present invention's first preferred embodiment, whether effectively different I E value compound mode reports mode as shown in table 3 below with its corresponding resource capability, and wherein, "Yes" represents that effectively "No" is represented invalid.
Combination | DL Or Global Capacity Credit | UL Capacity Credit | DL RLS Capacity Credit | UL RLS Capacity Credit | Implication |
1 | Be | Not | Not | Not | The base station has reported overall ability, and this ability is shared by up RL, RLS and descending RL, RLS |
2 | Be | Not | Be | Not | Uplink and downlink RL shares with a kind of ability, and uplink and downlink RLS shares another kind of ability |
3 | Be | Not | Not | Be | Descending RL, RLS, up RL shares with a kind of ability, and up RLS is separately as a kind of ability |
4 | Be | Not | Be | Be | Uplink and downlink RL shares with a kind of ability, and up RLS, descending RLS are respectively independent a kind of ability |
5 | Be | Be | Not | Not | Descending RL, RLS share with a kind of ability, and up RL, RLS share another ability |
6 | Be | Be | Be | Not | Up RL, RLS share with a kind of ability, descending RL, RLS branch |
Wei independent a kind of ability | |||||
7 | Be | Be | Not | Be | Descending RL, RLS share with a kind of ability, and up RL, RLS are respectively independent a kind of ability |
8 | Be | Be | Be | Be | Descending RL, RLS, up RL, RLS are respectively independent a kind of ability |
Table 3
The flow process of the reporting base station resource energy of second preferred embodiment as shown in Figure 2 according to the present invention.
At first, enter step 210, the IE that the NBAP protocol interface is relevant with resource capability is split as two parts.In the present invention's first preferred embodiment, the NBAP protocol interface IE relevant with resource capability comprises: UL RLSCapacity Credit and DL RLS Capacity Credit in the home cell information (Local CellInformation) of RESOURCESTATUS INDICATION and AUDIT RESPONSE signaling interface and the home cell group information (Local Cell Group Information).Those of ordinary skill in the art understands, existing these two kinds of IE are respectively applied for the resource capability of indication uplink and downlink, but can't distinguish RLS resource capability and RL resource capability, it is split as two parts after, then two parts can be respectively applied for indication RLS resource capability and RL resource capability.Consider that existing these two kinds of IE are respectively two bytes totally 16 bits, in the present invention's second preferred embodiment, are split as two parts that size is a byte (8 bit) respectively with these two kinds of IE.
Then, enter step 220, revise the resource consumption rule and make RL resource and RLS resource split consumption respectively the two parts that obtain from step 210.In the present invention's second preferred embodiment, the consumption rule of the resource of high byte correspondence 8 bits that move to left are realized this step, for example, and when high byte corresponds to the RLS resource capability, the consumption rule of RLS resource 8 bits that need move to left then.
Then, enter step 230, the base station obtains current RL resource capability and RLS resource capability.In this step, the base station promptly can be easy to obtain current RL resource capability and RLS resource capability according to current RL resource and RLS resource consumption situation, and those of ordinary skill in the art is easy to realize, does not give unnecessary details at this.
At last, enter step 240, RL resource capability and RLS resource capability are filled in respectively in two parts with the relevant IE of resource capability report.In the present invention's second preferred embodiment, the RLS resource capability is filled in the high byte of IE, the RL resource capability is filled in the low byte of IE and reports.
In the present invention's second preferred embodiment, the bit number of the IE relevant with resource capability after the fractionation may be not enough to represent RLS resource capability or RL resource capability, for fear of this situation, in the present invention's the 3rd preferred embodiment, also the bit number with the IE relevant with resource capability is extended for twice, i.e. 4 bytes (32bit).Accordingly, the consumption rule of the resource of high byte correspondence 16 bits that move to left are realized the modification of resource consumption rule, for example, when high byte corresponds to the RLS resource capability, the consumption rule of RLS resource 8 bits that need move to left then.
The flow process that the RL resource capability of the present invention's first preferred embodiment or second preferred embodiment and RLS resource capability report simultaneously can also and other operation flow unite use.
Based on the present invention's first preferred embodiment or second preferred embodiment, in the present invention's the 4th preferred embodiment, the present invention's first preferred embodiment or second preferred embodiment are also set up flow process with Radio Link and are united use, have realized that Radio Link is pre-established.
The pre-established inter-entity message interaction flow of Radio Link is as shown in Figure 3 during calling subscriber's link setup of the 4th preferred embodiment according to the present invention.
As can be seen, Radio Link is set up the order that message sends in the flow process and be should be CCCH:RRC Connection Request (RRC connection request) (301) during normal calling subscriber's link setup, Radio Link SetupRequest (Radio Link is set up request) (302) ... Uplink sync (uplink synchronous) (307), CCCH:RRCConnection Setup (CCCH:RRC connects foundation) (308), Radio Link Restore Indi (wireless link recovery indication) (309) ... Direct Transfer (direct transferring) (324), the present invention's the 4th preferred embodiment is compared with normal wireless link establishment flow process, with CCCH:RRC Connection Setup (308), i.e. Dedicated Control Channel: the Radio Resource control connection is set up message and is advanceed to Radio Link SetupRequest (302) and send afterwards.
In the present invention's the 4th preferred embodiment, because RNC accurately knows the operating position of RLS resource capability and the RL resource capability of Node B, whether the resource that can know Node B in advance supports this Radio Link to set up, therefore do not need to wait for other response of Node B, and can directly after having sent Radio LinkSetup Request (302) for Node B, just send CCCH:RRC Connection Setup (308) message to UE.
Based on the present invention's first preferred embodiment or second preferred embodiment, in the present invention's the 5th preferred embodiment, also use is united in the present invention's first preferred embodiment or second preferred embodiment and radio link reconfiguration flow process.
In the radio link reconfiguration flow process of the 5th preferred embodiment, the message interaction process of inter-entity as shown in Figure 4 according to the present invention.
As can be seen, the order that message sends in the normal radio link reconfiguration flow process should be RABAssignment Request (RAB assignment request) (401), Radio Link Recfg Request (radio link reconfiguration request) (402) ... Uplink sync (uplink synchronous) (411), DCCH:Radio BearSetup (DCCH: radio bearer is set up) (412), Radio Link Recfg Commit (radio link reconfiguration submission) (413) ... DCCH:Downlink Direct Transfer (DCCH: descending direct transferring) (417), the present invention's the 5th preferred embodiment is compared with normal wireless link reconfigure flow process, with DCCH:Radio BearSetup (412), i.e. Dedicated Control Channel: radio bearer is set up message and is advanceed to Radio Link RecfgRequest (402) and send afterwards.
In the present invention's the 5th preferred embodiment, because RNC accurately knows the operating position of RLS resource capability and the RL resource capability of Node B, whether the resource that can know Node B in advance supports reshuffling of this Radio Link, therefore do not need to wait for other response of Node B, and can directly after having sent RadioLink Recfg Request (402) for Node B, just send DCCH:Radio Bear Setup (412) message to UE.
Being familiar with those of ordinary skill in the art understands, in the present invention the 4th and the 5th preferred embodiment, owing to accurately know RLS and the RL resource capability of Node B in advance, therefore can be in advance with message in the serial flow process, be equivalent to realize parallel effect, thereby can shorten the wait time delay in the serial flow process, shorten user's access delay.
Though this paper has illustrated that from the angle of the present invention the 4th and the 5th preferred embodiment RL resource capability and RLS resource capability report the use of uniting with other operation flow simultaneously, but those of ordinary skill in the art are appreciated that, RL resource capability and RLS resource capability report simultaneously to use with uniting of other operation flow and are not limited to this two kinds of scenes, and this does not influence essence of the present invention.For example, can also and unite use, flog a dead horse avoiding, reduce new user's access delay by prejudging out business that current which Node B can support access newly at new user's access process.
Though pass through with reference to some of the preferred embodiment of the invention, the present invention is illustrated and describes, but those of ordinary skill in the art should be understood that and can do various changes to it in the form and details, and without departing from the spirit and scope of the present invention.
Claims (11)
1. the method for a reporting base station resource energy is characterized in that, comprises following steps:
In the base station application part protocol interface relevant, increase the information element that is used to identify described resource capability with described resource capability;
Described base station obtains current wireless link circuit resource ability and Radio Link fund-raising source capability;
Described base station is filled in the air-link resources ability of being obtained respectively in the different information elements of being correlated with described resource capability with Radio Link fund-raising source capability and reports.
2. the method for reporting base station resource energy according to claim 1 is characterized in that, the described information element of increase is an option.
3. the method for reporting base station resource energy according to claim 1, it is characterized in that, the base station application part protocol interface relevant with described resource capability comprises: resource status indication and audit response, the described information element that increases increases in the home cell information of described resource status indication and described audit response interface and home cell group information, and the described information element of increase comprises respectively two kinds in the uplink and downlink use.
4. according to the method for each described reporting base station resource energy in the claim 1 to 2, it is characterized in that, when new user inserts, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, whether the surplus resources of judging current base station can support new user's access, if then insert this user, otherwise refuse this user.
5. according to the method for each described reporting base station resource energy in the claim 1 to 2, it is characterized in that, in the time of need setting up Radio Link, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports this Radio Link to set up, if then receiving that the response of base station to " Radio Link foundation " message sent " Common Control Channel: the Radio Resource control connection is set up " message to subscriber equipment before.
6. according to the method for each described reporting base station resource energy in the claim 1 to 2, it is characterized in that, in the time of need carrying out radio link reconfiguration, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports reshuffling of this Radio Link, if then receiving that the base station is to " sending " Dedicated Control Channel: radio bearer is set up " message to subscriber equipment before the response of radio link reconfiguration request information.
7. the method for a reporting base station resource energy is characterized in that, comprises following steps:
The information element that is used to identify described resource capability in the base station application part protocol interface that will be relevant with described resource capability is split as first and second portion;
Described base station obtains current wireless link circuit resource ability and Radio Link fund-raising source capability, and reports mode that described current wireless link circuit resource ability and Radio Link fund-raising source capability are filled in respectively in described first and the described second portion to report by revising resource capability.
8. the method for reporting base station resource energy according to claim 7 is characterized in that, also comprises following steps:
The byte number that expands the information element be used to represent described resource capability is the twice of original byte number.
9. according to the method for claim 7 or 8 described reporting base station resource energies, it is characterized in that, when new user inserts, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, whether the surplus resources of judging current base station can support new user's access, if then insert this user, otherwise refuse this user.
10. according to the method for claim 7 or 8 described reporting base station resource energies, it is characterized in that, in the time of need setting up Radio Link, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports this Radio Link to set up, if then receiving that the response of base station to " Radio Link foundation " message sent " Common Control Channel: the Radio Resource control connection is set up " message to subscriber equipment before.
11. method according to claim 7 or 8 described reporting base station resource energies, it is characterized in that, in the time of need carrying out radio link reconfiguration, air-link resources ability and Radio Link fund-raising source capability that radio network controller reports according to described base station, judge whether the surplus resources of base station supports reshuffling of this Radio Link, if then receiving that the base station is to " sending " Dedicated Control Channel: radio bearer is set up " message to subscriber equipment before the response of radio link reconfiguration request information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610023312XA CN100403824C (en) | 2006-01-13 | 2006-01-13 | Method for reporting base station resource energy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610023312XA CN100403824C (en) | 2006-01-13 | 2006-01-13 | Method for reporting base station resource energy |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1859658A CN1859658A (en) | 2006-11-08 |
CN100403824C true CN100403824C (en) | 2008-07-16 |
Family
ID=37298509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200610023312XA Active CN100403824C (en) | 2006-01-13 | 2006-01-13 | Method for reporting base station resource energy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100403824C (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101227644B (en) * | 2008-02-03 | 2012-11-28 | 中兴通讯股份有限公司 | Method and apparatus of resource allocation |
CN101631362B (en) | 2009-08-07 | 2011-09-14 | 华为技术有限公司 | Method, base station, base station controller and system for constructing wireless link |
CN102761936A (en) * | 2012-07-04 | 2012-10-31 | 中兴通讯股份有限公司 | Method for base station to report UE (user experience) capability, base station and system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1536794A (en) * | 2003-04-07 | 2004-10-13 | 华为技术有限公司 | Method for notifing distribution of up resaurce |
US20050181818A1 (en) * | 2004-02-18 | 2005-08-18 | Nec Corporation | Mobile communication system and control method thereof and radio network controller and base station used for the same |
CN1668131A (en) * | 2004-03-12 | 2005-09-14 | 华为技术有限公司 | Zone position information based wireless resource management method |
-
2006
- 2006-01-13 CN CNB200610023312XA patent/CN100403824C/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1536794A (en) * | 2003-04-07 | 2004-10-13 | 华为技术有限公司 | Method for notifing distribution of up resaurce |
US20050181818A1 (en) * | 2004-02-18 | 2005-08-18 | Nec Corporation | Mobile communication system and control method thereof and radio network controller and base station used for the same |
CN1668131A (en) * | 2004-03-12 | 2005-09-14 | 华为技术有限公司 | Zone position information based wireless resource management method |
Non-Patent Citations (2)
Title |
---|
3GPP Technical Specification Group Radio AccessNetwork,UTRAN Iub Interface NBAP Signalling(Release 4). 3GPP.3GPP TS 25.433 V4.5.0. 2002 |
3GPP Technical Specification Group Radio AccessNetwork,UTRAN Iub Interface NBAP Signalling(Release 4). 3GPP.3GPP TS 25.433 V4.5.0. 2002 * |
Also Published As
Publication number | Publication date |
---|---|
CN1859658A (en) | 2006-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10798584B2 (en) | Method, system and device for allocating resource of base station node | |
US8150411B2 (en) | Method for efficient radio resource management | |
US6961571B1 (en) | Relocation of serving radio network controller with signaling of linking of dedicated transport channels | |
CN102625472B (en) | Direct transition to cell dch | |
KR101227793B1 (en) | Method for Changing a radio access configuration between a terminal and a network | |
US8335477B2 (en) | Resource configuration method, device, and system | |
CN100414857C (en) | E-DCH radio link configuration method | |
CN101426253A (en) | Method, apparatus and system for information transmission implementation | |
US20100189067A1 (en) | Method, System and Equipment for Implementing Macro Diversity Combining | |
CN101287285B (en) | Method, system and device for calling establishing and triggering in circuit domain | |
CN101198092A (en) | Method, system and device for transmitting data to user's set | |
CN100403824C (en) | Method for reporting base station resource energy | |
US8526959B2 (en) | Method, system, base station, and user equipment for macro diversity combining | |
CN101222773B (en) | Base station resource management method, system and equipment | |
US20110128932A1 (en) | Radio resource scheduling method, apparatus, and system | |
CN101547488B (en) | Reconfiguration method, system and equipment for updating cell | |
CN104620656A (en) | Methods and apparatuses for facilitating the use of multiple transmission time intervals in a mobile communication network | |
CN101860977A (en) | Method and system for base station to obtain UE context information | |
US20060039296A1 (en) | Transmitting data in a wireless communications network | |
KR100710105B1 (en) | Method of transmitting data and signaling control message on wide-band wireless telecommunication system | |
CN100466842C (en) | Method for soft switching in wideband CDMA system | |
CN103347305B (en) | A kind of realize information transmission method, Apparatus and system | |
US20060189341A1 (en) | Method of improving power control in a mobile radiocommunication system | |
CN101562855B (en) | Method, device and system for processing wireless link increment process | |
CN101626602A (en) | User equipment capacity information indicating method, user equipment and wireless network controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220130 Address after: 450046 Floor 9, building 1, Zhengshang Boya Plaza, Longzihu wisdom Island, Zhengdong New Area, Zhengzhou City, Henan Province Patentee after: xFusion Digital Technologies Co., Ltd. Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd. |
|
TR01 | Transfer of patent right |