CN100400786C - Method for making combined hydraulic verticallifting stereo garage - Google Patents
Method for making combined hydraulic verticallifting stereo garage Download PDFInfo
- Publication number
- CN100400786C CN100400786C CNB200610016740XA CN200610016740A CN100400786C CN 100400786 C CN100400786 C CN 100400786C CN B200610016740X A CNB200610016740X A CN B200610016740XA CN 200610016740 A CN200610016740 A CN 200610016740A CN 100400786 C CN100400786 C CN 100400786C
- Authority
- CN
- China
- Prior art keywords
- guide pipe
- base
- parking
- arm
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a method for producing a combined type hydraulic vertical lifting stereo garage, particularly to a method for producing a combined type hydraulic vertical lifting stereo garage formed by matching tubes with tubes for stopping splash structurally and amplifying lifting strokes. The present invention thoroughly breaks the mode of a major structure of the existing vertical lifting stereo parking device, and realizes a structure of the novel vertical lifting stereo parking device in which tubes form friction match with each other. The structure of the present invention has the function of preventing splash structurally. When three drag chains fractures, a parking plate can not incline or splash. The connection mode of the drag chains driven hydraulically realizes the amplified strokes of a main body of the parking device driven by lifting strokes of a hydraulic piston. The present invention has the advantages of stable operation and no noise, and realizes the multilayer hydraulic combined vertical lifting parking device. The present invention can be used for building various large-scale closed parking lots and garages, and has the functions of heat insulation, wind resistance, lift resistance, rain resistance and stealage prevention.
Description
Technical field:
The present invention relates to a kind of preparation method of combined hydraulic verticallifting stereo garage, particularly a kind of tube and tube cooperates and constitutes that structural prevention is fallen and the preparation method in the combined hydraulic verticallifting stereo garage that lifting travel amplifies, and belongs to hydraulic lifting solid parking technical field.
Background technology:
No matter existing vertical lifting three-dimensional parking device is motor-driven or hydraulic-driven, all be that metal material processing is become guide rail and guiding (guide wheel, lead boots etc.) device, guiding device and guide rail point frictional fit affect by haulage chain and are carrying parking subject and move along lifting rail.Its shortcoming is: cause parking subject to tilt when haulage chain ruptures or fall, do not have the function that stops to tilt and fall, must dispose falling proof device in addition.Its combining structure does not have the function of amplifying lifting stroke, and hydraulic-driven multilayer verticallifting stereo parking apparatus can not be realized.Waste material increases mechanical processing difficulty, the processing and assembling complexity.At present, the processing technology of verticallifting stereo parking apparatus and assembly method all can not obtain present device agent structure operation whole process and have to stop and fall the combined hydraulic verticallifting stereo garage that hydraulic-driven traction parking subject lifting travel amplifies.
Summary of the invention:
The invention provides the preparation method in a kind of combined hydraulic verticallifting stereo garage.Cooperate to constitute between particularly a kind of tube and tube and have that structural prevention is fallen and the preparation method in the combined hydraulic verticallifting stereo garage that lifting travel amplifies.
Making assemble flow of the present invention is as follows:
Material → parts making → component-assembled → check → finished product.
Of the present inventionly finish by following steps:
1, equipment base is made: get metal material (steel plate, channel-section steel, square steel) and be made into that four limits are parallel to each other, the equipment frame bottom plate of peupendicular hole font (length on long limit is not less than 4000mm, the wide 140mm that is not less than on long limit). on two long limits 1/2nd in the middle of cross hairs positions fixing soldering fluid cylinder pressure susceptor body respectively; The position that middle cross hairs extends greater than 1500mm to both sides is that arm guide pipe base is lifted in the fixing respectively welding in center; The position of extending successively again greater than 100mm is a center fixing respectively welding haulage chain linkage; Extend position greater than 200mm more successively and be center fixing welded construction guide pipe base respectively; The constitution equipment pedestal.
2, the structure directing pipe is made: get the guide pipe that metal sheet or metal tube are made vertical vertical openings 20-35mm, the corresponding fixed outside of opening is welded to connect part, constitutes the structure directing pipe.
3, the carrying guide pipe is made: get 2-4 bogey that carries the plate of parking of the fixing welding of the vertical vertical line of metal tube, constitute the carrying guide pipe.
4, lifting arm makes: get the metal sheet of two block lengths less than two structure directing tube sockets of equipment base inner distance, width is not less than 100mm; Thickness is not less than 10mm; The fixing soldering fluid cylinder pressure piston supporting base in cross hairs position in the middle of 1/2nd places in the middle of the two boards inboard; Middle cross hairs extends (equipment base is lifted arm guide pipe base Center Length) fixed-site welding to both sides and lifts arm guide pipe sleeve pipe; Extending the position of (equipment base two ends haulage chain linkage Center Length adds the pulley radius) to both sides successively again is center processing pulley spindle installing hole, and pulley is installed; Constitute and lift arm.
5, lifting the arm guide pipe makes: get external diameter and lift arm guide pipe sleeve pipe, lift the metal tube of arm guide pipe base internal diameter matched in clearance, the mobile base sleeve that length is not less than 100mm constitutes and lifts the arm guide pipe in the outside.
6, plate and the bottom plate of parking of parking is made: get metal material (channel-section steel, square steel, metal sheet) and make the rectangle of the band edge frame plate of parking.Cross hairs extends the bottom, position of (two guide pipe bases of equipment base centre distance length two ends respectively subtract 150mm) to both sides in the middle of bottom is parked 1/2nd places of two long margin frames of plate, and fixing welding haulage chain linkage constitutes the bottom plate of parking.
7, guiding lifting top cover is made: (two structure directing tube sockets of equipment base Center Length) position is the top cover lifting guide pipe of center fixation weld diameter less than carrying guide pipe internal diameter under the frame of equipment top cover, constitutes guiding lifting top cover.
8, equipment base is placed on accurately on the underground foundation ditch ground installation installation site, adjust mobile, reach the position accurately, vertical parallel.
9, the bar structure guide pipe inserts in the structure directing tube socket of equipment base, adjusts the direction and the position of structure directing pipe.
10, bottom is parked slab integral is placed on the equipment base of intersecting parallels, adjusts bottom park slab integral and vertical and parallelism between equipment base is mutual.
11, carrying guide pipe suitable for reading by the structure directing pipe, in the insert structure guide pipe, adjust structure directing pipe, carrying guide pipe, bottom fit dimension, the position of plate between mutually of parking, the bogey on the carrying guide pipe and the bottom plate of parking is fixedlyed connected.
12, hydraulic cylinder is placed on the equipment base intermediate liquid cylinder pressure susceptor body, after adjustment position, the verticality, by fastening fixing.
13, insert in the act arm guide pipe sleeve pipe lifting the arm guide pipe, move together, lift in the act arm guide pipe base on the arm guide pipe insertion equipment base with lifting arm; The intermediate support of lifting arm is placed on the hydraulic cylinder piston top, adjusts position, parallel, verticality.Move on the mobile base with device structure is fastening and fixedly connected.
14, haulage chain one end is connected the park haulage chain linkage of Board position bottom of bottom, the other end is connected on the haulage chain linkage on the equipment base by pulley.
15, the plate of parking of each layer is placed on respectively on the bogey of carrying on the guide pipe successively, adjusts parallel, vertically after, fastening fixedly connected.
16, the equipment top cover is inserted in the carrying guide pipe by top cover lifting guide pipe.
17, carry out the connection, fixing of each position connector of equipment, to complete detection such as equipment fit dimension, vertical, parallelism.Hydraulic-driven, traction parking subject lifting operation.
Many single devices aggregate erections can be built up all kinds parking lot, the storehouse of stop tens of----hundreds of.
The present invention compares its good effect with existing verticallifting stereo parking apparatus and is: the agent structure pattern of thoroughly having broken existing verticallifting stereo parking apparatus, realized the verticallifting stereo parking apparatus structure that the mutual gap of tube and tube frictional fit is new, its structure has the function that structural prevention is fallen, article three, haulage chain fracture, the plate of parking not to tilt not fall.The connected mode of its hydraulically powered haulage chain realizes that the hydraulic piston lifting travel drives parking equipment main body stroke and amplifies, and operates steadily, and noiselessness makes multilayer hydraulic pressure combination vertically displaceable parking apparatus accomplished.Can decorateing in can fabrication deposit tens of the closed parking lot of all kinds, the storehouse of----hundreds of, integral body, decoration and environment and building are molten to be one, has insulation, windproof, against sunshine, rainproof, anti-theft feature.
The specific embodiment:
Embodiment 1
Long 4000mm, wide 2400mm; Be welded with the thick 16mm hydraulic cylinder of the wide 160mm of long 200mm pedestal above the long limit; Be welded with external diameter 56mm interior diameter 44mm height 50mm and lift arm guide pipe base; Be welded with the haulage chain linkage; The intersecting parallels equipment base that is welded with external diameter 146mm interior diameter 134mm height 200mm structure directing tube socket is placed on the underground foundation ditch ground installation installation site, adjusts vertical parallel.
The long 4000mm structure directing of external diameter 133mm interior diameter 120mm pipe is inserted in the structure directing tube socket of equipment base, adjust direction and position.
(wherein: the slab integral of parking of the bottom high 350mm of haulage chain linkage) is placed on the equipment base of intersecting parallels, adjusts vertical and parallelism the high 470mm of the wide 2200mm of long 5200mm.
In the long 3600mm carrying of external diameter 114mm interior diameter 102mm guide pipe insert structure guide pipe, fit dimension, position between adjustment mutually.
The hydraulic cylinder of the high 950mm of diameter 100mm is placed on the equipment base intermediate liquid cylinder pressure susceptor body, adjusts position, fastening fixing.
The long 1900mm of external diameter 42mm interior diameter 30mm is lifted the arm guide pipe to be inserted in the long 600mm act of the external diameter 56mm interior diameter 44mm arm guide pipe sleeve pipe, move together with lifting arm, lift in the act arm guide pipe base of the long 50mm of external diameter 56mm interior diameter 44mm on the arm guide pipe insertion equipment base; The intermediate support of lifting arm is placed on the hydraulic cylinder piston top, adjusts position, parallel, vertical.Move with device structure on the mobile base of the long 100mm of external diameter 56mm interior diameter 44mm and be fastenedly connected.
Haulage chain one end is connected the park haulage chain linkage of Board position bottom of bottom, and the other end is connected on the haulage chain linkage on the equipment base by pulley.
The plate of parking is placed on respectively on the bogey of carrying on the guide pipe, adjusts parallel, vertically after, fastening fixedly connected.
The equipment top cover is inserted in the carrying guide pipe by the long 600mm top cover of external diameter 56mm interior diameter 44mm lifting guide pipe.
Carry out the connection, fixing of each position connector of equipment, to complete detection such as equipment fit dimension, vertical, parallelism.Hydraulic-driven, traction parking subject lifting operation.
Be combined into (B1 ground floor) hydraulic verticallifting stereo garage.
Embodiment 2
Long 4000mm, wide 2400mm; Be welded with the thick 16mm hydraulic cylinder of the wide 160mm of long 200mm pedestal above the long limit; Be welded with external diameter 56mm interior diameter 44mm height 50mm and lift arm guide pipe base; Be welded with the haulage chain linkage; The intersecting parallels equipment base that is welded with external diameter 146mm interior diameter 134mm height 200mm structure directing tube socket is placed on the underground foundation ditch ground installation installation site, adjusts vertical parallel.
The long 6000mm structure directing of external diameter 133mm interior diameter 120mm pipe is inserted in the structure directing tube socket of equipment base, adjust direction and position.
(wherein: the slab integral of parking of the bottom high 350mm of haulage chain linkage) is placed on the equipment base of intersecting parallels, adjusts vertical and parallelism the high 470mm of the wide 2200mm of long 5200mm.
In the long 5200mm carrying of external diameter 114mm interior diameter 102mm guide pipe insert structure guide pipe, fit dimension, position between adjustment mutually.
The hydraulic cylinder of the high 1750mm of diameter 100mm is placed on the equipment base intermediate liquid cylinder pressure susceptor body, adjusts position, fastening fixing.
The long 3600mm of external diameter 42mm interior diameter 30mm is lifted the arm guide pipe to be inserted in the long 600mm act of the external diameter 56mm interior diameter 44mm arm guide pipe sleeve pipe, move together with lifting arm, lift in the act arm guide pipe base of the long 50mm of external diameter 56mm interior diameter 44mm on the arm guide pipe insertion equipment base; The intermediate support of lifting arm is placed on the hydraulic cylinder piston top, adjusts position, parallel, vertical.Move with device structure on the mobile base of the long 100mm of external diameter 56mm interior diameter 44mm and be fastenedly connected.
Haulage chain one end is connected the park haulage chain linkage of Board position bottom of bottom, and the other end is connected on the haulage chain linkage on the equipment base by pulley.
The plate of parking of each layer is placed on respectively on the bogey of carrying on the guide pipe successively, adjusts parallel, vertically after, fastening fixedly connected.
The equipment top cover is inserted in the carrying guide pipe by the long 600mm top cover of external diameter 56mm interior diameter 44mm lifting guide pipe.
Carry out the connection, fixing of each position connector of equipment, to complete detection such as equipment fit dimension, vertical, parallelism.Hydraulic-driven, traction parking subject lifting operation.
Be combined into (underground two layers of ground floor) hydraulic verticallifting stereo garage.
Embodiment 3
Long 4000mm, wide 2400mm; Be welded with the thick 16mm hydraulic cylinder of the wide 160mm of long 200mm pedestal above the long limit; Be welded with external diameter 56mm interior diameter 44mm height 50mm and lift arm guide pipe base; Be welded with the haulage chain linkage; The intersecting parallels equipment base that is welded with external diameter 146mm interior diameter 134mm height 200mm structure directing tube socket is placed on the underground foundation ditch ground installation installation site, adjusts vertical parallel.
The long 7800mm structure directing of external diameter 133mm interior diameter 120mm pipe is inserted in the structure directing tube socket of equipment base, adjust direction and position.
(wherein: the slab integral of parking of the bottom high 350mm of haulage chain linkage) is placed on the equipment base of intersecting parallels, adjusts vertical and parallelism the high 470mm of the wide 2200mm of long 5200mm.
In the long 6800mm carrying of external diameter 114mm interior diameter 102mm guide pipe insert structure guide pipe, fit dimension, position between adjustment mutually.
The hydraulic cylinder of the high 2300mm of diameter 120mm is placed on the equipment base intermediate liquid cylinder pressure susceptor body, adjusts position, fastening fixing.
The long 5100mm of external diameter 42mm interior diameter 30mm is lifted the arm guide pipe to be inserted in the long 600mm act of the external diameter 56mm interior diameter 44mm arm guide pipe sleeve pipe, move together with lifting arm, lift in the act arm guide pipe base of the long 50mm of external diameter 56mm interior diameter 44mm on the arm guide pipe insertion equipment base; The intermediate support of lifting arm is placed on the hydraulic cylinder piston top, adjusts position, parallel, vertical.Move with device structure on the mobile base of the long 100mm of external diameter 56mm interior diameter 44mm and be fastenedly connected.
Haulage chain one end is connected the park haulage chain linkage of Board position bottom of bottom, and the other end is connected on the haulage chain linkage on the equipment base by pulley.
The plate of parking of each layer is placed on respectively on the bogey of carrying on the guide pipe successively, adjusts parallel, vertically after, fastening fixedly connected.
The equipment top cover is inserted in the carrying guide pipe by the long 600mm top cover of external diameter 56mm interior diameter 44mm lifting guide pipe.
Carry out the connection, fixing of each position connector of equipment, to complete detection such as equipment fit dimension, vertical, parallelism.Hydraulic-driven, traction parking subject lifting operation.
Be combined into (F3/B3 ground floor) hydraulic verticallifting stereo garage.
Claims (1)
1. the preparation method of a combined hydraulic verticallifting stereo garage is characterized in that:
1) gets the parallel and vertical intersecting parallels equipment base in four limits that the steel producing device has the hydraulic cylinder pedestal, lifts arm guide pipe base, haulage chain linkage, structure directing tube socket; Get the vertical vertical openings of steel plate or steel pipe manufacturing, the corresponding outside is welded to connect the structure directing pipe of part; Get the carrying guide pipe that the vertical vertical line of steel pipe manufacturing welds several plate bogeys of parking; Make two block plate inboards, 1/2nd place's cross hairs soldering fluid cylinder pressure piston supporting bases; Cross hairs extends to both sides lifts arm guide pipe sleeve pipe to the position welding of the arm guide pipe base Center Length of attending an imperial examination; Two ends corresponding haulage chain linkage Center Length adds the act arm of the position installation pulley of pulley radius; Get the act arm guide pipe that steel pipe manufacturing is with mobile base; Get steel and make the plate of parking, bottom is parked below the edges of boards frame to the outer recessed length of tangent degree of arm two head sheaves of attending an imperial examination, welding haulage chain linkage; Get steel and make the guiding lifting top cover of counter structure guide pipe base Center Length position weldering top cover lifting guide pipe below the frame;
2) equipment base is placed on underground foundation ditch ground installation installation site; The bar structure guide pipe inserts in the structure directing tube socket of equipment base; The bottom slab integral of parking is placed on the equipment base of intersecting parallels; In carrying guide pipe insert structure guide pipe; Bogey and bottom the park plate of carrying on the guide pipe fixedlyed connected; Hydraulic cylinder is placed on equipment base intermediate liquid cylinder pressure susceptor body to be tightened fixing; Insert in the act arm guide pipe sleeve pipe lifting the arm guide pipe, move together, lift in the act arm guide pipe base on the arm guide pipe insertion equipment base with lifting arm; The intermediate support of lifting arm is placed on the hydraulic cylinder piston top; Move on the mobile base with device structure is fastening and fixedly connected; Haulage chain one end is connected the park haulage chain linkage of Board position bottom of bottom, and the other end is connected on the haulage chain linkage on the equipment base by pulley; The plate of parking of each layer is placed on respectively on the bogey that carries on the guide pipe successively, fastening fixedly connected; The equipment top cover is inserted in the carrying guide pipe by top cover lifting guide pipe; Carry out connection, the detection of each position connector of equipment; Make product.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610016740XA CN100400786C (en) | 2006-04-04 | 2006-04-04 | Method for making combined hydraulic verticallifting stereo garage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610016740XA CN100400786C (en) | 2006-04-04 | 2006-04-04 | Method for making combined hydraulic verticallifting stereo garage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1851211A CN1851211A (en) | 2006-10-25 |
CN100400786C true CN100400786C (en) | 2008-07-09 |
Family
ID=37132712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200610016740XA Expired - Fee Related CN100400786C (en) | 2006-04-04 | 2006-04-04 | Method for making combined hydraulic verticallifting stereo garage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100400786C (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1201146A (en) * | 1966-12-01 | 1970-08-05 | Hovermarine Ltd | Turntable installations |
CN2039728U (en) * | 1988-04-15 | 1989-06-21 | 张健民 | Multi-layer vehicles parking frame |
JPH08284451A (en) * | 1995-04-12 | 1996-10-29 | Shin Meiwa Ind Co Ltd | Multistory parking facility |
JPH08312180A (en) * | 1995-05-17 | 1996-11-26 | Shin Meiwa Ind Co Ltd | Multistage type parking facility |
US5690462A (en) * | 1996-09-16 | 1997-11-25 | Fan; James | Parking device for motor vehicles |
JPH1193443A (en) * | 1997-09-19 | 1999-04-06 | Furukawa Co Ltd | Gate device for parking facility |
JP2000027477A (en) * | 1998-07-07 | 2000-01-25 | Miwa Tec:Kk | Mechanical multistory garage facility |
JP2000096863A (en) * | 1998-09-17 | 2000-04-04 | Takenaka Komuten Co Ltd | Vehicle drop preventing stopper for multistory parking garage |
CN2473281Y (en) * | 2001-03-07 | 2002-01-23 | 聂长彬 | Mechanical stereo closed parking place |
-
2006
- 2006-04-04 CN CNB200610016740XA patent/CN100400786C/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1201146A (en) * | 1966-12-01 | 1970-08-05 | Hovermarine Ltd | Turntable installations |
CN2039728U (en) * | 1988-04-15 | 1989-06-21 | 张健民 | Multi-layer vehicles parking frame |
JPH08284451A (en) * | 1995-04-12 | 1996-10-29 | Shin Meiwa Ind Co Ltd | Multistory parking facility |
JPH08312180A (en) * | 1995-05-17 | 1996-11-26 | Shin Meiwa Ind Co Ltd | Multistage type parking facility |
US5690462A (en) * | 1996-09-16 | 1997-11-25 | Fan; James | Parking device for motor vehicles |
JPH1193443A (en) * | 1997-09-19 | 1999-04-06 | Furukawa Co Ltd | Gate device for parking facility |
JP2000027477A (en) * | 1998-07-07 | 2000-01-25 | Miwa Tec:Kk | Mechanical multistory garage facility |
JP2000096863A (en) * | 1998-09-17 | 2000-04-04 | Takenaka Komuten Co Ltd | Vehicle drop preventing stopper for multistory parking garage |
CN2473281Y (en) * | 2001-03-07 | 2002-01-23 | 聂长彬 | Mechanical stereo closed parking place |
Also Published As
Publication number | Publication date |
---|---|
CN1851211A (en) | 2006-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202346540U (en) | Lift shaft wall using combined-type headframe assembly | |
CN202279599U (en) | Safety elevator | |
CN202296706U (en) | Safety elevator with brake in cage | |
WO2017045297A1 (en) | Vertical parking system applicable to narrow and long spaces | |
CN113789948A (en) | Large-span house roof atrium side wall sliding rail hanging basket and construction method thereof | |
CN107043070A (en) | A kind of Feeding System of Urban Rail Transit equipment installs special portal frame | |
CN101537965B (en) | Step chain installation device and method thereof | |
CN100400786C (en) | Method for making combined hydraulic verticallifting stereo garage | |
CN200982092Y (en) | Double layer hydraulic stereo parking apparatus | |
CN205915494U (en) | System is protected in prefab production precuring | |
CN110700658A (en) | Power transmission system of folding type pull rod rear cantilever stereo garage | |
CN100458087C (en) | Double-deck stereo parking method | |
CN103821110A (en) | Box culvert inner form steel form trolley | |
CN100529309C (en) | Method for producing box type stereo car bay | |
CN2934168Y (en) | Structure of single-cylinder hydraulic magnification type multiple-layer residential building elevator | |
CN200955271Y (en) | Hydraulic 3-D parking apparatus | |
CN210046270U (en) | Pipe mould automatic correction translation device | |
CN100451283C (en) | Building method of multistory parking garage | |
CN100564223C (en) | Structure of a kind of hydraulic elevator and preparation method thereof | |
CN205634553U (en) | Rail mounted lift platform | |
CN207275958U (en) | A kind of hoistway elevator frame with heating equipment | |
CN100408796C (en) | Method for manufacturing structure of straight top type hydraulic stereo parking facility | |
CN201381484Y (en) | Inspection device for pier, capping beam and box beam of approach bridge of hanging-cable bridge | |
CN214989529U (en) | Furnace repairing tower body capable of stopping at any height | |
CN114482500B (en) | Rail type walking cage device for building oil storage tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080709 Termination date: 20100404 |