CN100396997C - Double-purpose and coal-saving boiler with hot air heat and water supply - Google Patents
Double-purpose and coal-saving boiler with hot air heat and water supply Download PDFInfo
- Publication number
- CN100396997C CN100396997C CNB2005101168354A CN200510116835A CN100396997C CN 100396997 C CN100396997 C CN 100396997C CN B2005101168354 A CNB2005101168354 A CN B2005101168354A CN 200510116835 A CN200510116835 A CN 200510116835A CN 100396997 C CN100396997 C CN 100396997C
- Authority
- CN
- China
- Prior art keywords
- double
- boiler
- blast
- door
- chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The present invention discloses a double-purpose and coal saving boiler with hot blast heat supply and water supply, which comprises a boiler door, a boiler mouth, a boiler grate, a boiler bottom and a heat preserving casing. The present invention is characterized in that the double-purpose and coal saving boiler with hot blast heat supply and water supply also comprises a double-layer internal water jacket and a double-layer external hot blast jacket, wherein the double-layer internal water jacket is provided with a water inlet and a steam (water) outlet, a flame generating chamber is formed between the boiler grate at the lower part of a storage coal gasification chamber of the internal water jacket and the boiler bottom, the ash cleaning boiler mouth is provided with the enclosed boiler door, and the storage coal gasification chamber and the flame generating chamber are respectively provided with a ventilation subchannel; the lower mouth of a flame combustion chamber of the internal water jacket is communicated with the flame generating chamber, the outlet of the flame combustion chamber of the internal water jacket is communicated with the outside atmospheric air, the lower part at one side of the double-layer hot blast jacket is provided with a blast inlet, and the upper part at the other side of the double-layer heat wind jacket is provided with a hot blast outlet; an air change pipe at the top of the storage coal gasification chamber is connected with an exhaust pipe, an air change valve is arranged in the exhaust pipe, and a temperature controller is arranged on the outer wall of the double-layer external hot blast jacket or the steam (water) outlet and connected to a controller. The boiler has the advantages of high heat utilization rate, little pollution and energy conservation; when used for heat supply, the mode is simple, and heating radiators are saved, and the trouble of water leakage is prevented.
Description
Technical field
The application belongs to boiler, relates in particular to heating boiler.
Background technology
No matter present various heating boiler steam heating or hot-water heating, all be manufacture hot water or steam, realize heating by the radiator circulation, its structure all is made up of combustion chamber, the bottom of a pan, double-deck furnace tube, lagging casing, water inlet, water outlet (vapour) mouth and water pipe furnace grate etc.Its water pipe furnace grate is arranged in the combustion chamber, and the combustion chamber is by the straight-through high chimney of flue.Around the combustion chamber double-deck furnace tube is set, perhaps in flue, establishes tubulation interchanger increase heat exchange effect and make full use of heat energy.Above-mentioned boiler, coal be directly burning in the combustion chamber, goes back the sufficient gas of unburned and promptly drains from flue and enter atmosphere, and heat utilization ratio is less than 30%, the combustion gas atmosphere pollution.In addition, above-mentioned heating system all be unable to do without radiator, and complexity is installed, and takes up room, and is difficult to maintenance in case leak.And the water pipe furnace grate endotherm area is little, and a large amount of heat energy also is not absorbed promptly drains from flue hurriedly, and the heat exchange weak effect wastes energy.And bulky, need fireman's specialized operations.
Summary of the invention
The application's purpose is, overcomes the deficiency of above-mentioned hot water heating, and a kind of hot-air heating coal-saving boiler is provided.
The application comprises fire door, fire door, fire grate, furnace bottom, lagging casing.Its feature also comprises, double-deck inner water sleeve and double-deck external hot air cover have water inlet and go out vapour (water) mouth on the double-deck inner water sleeve, and the inner chamber of inner water sleeve is the coal storage vaporizer, and the coal furnace mouth of adding is arranged at coal storage vaporizer top, adds coal furnace mouth and establishes closed furnace door; Coal storage vaporizer bottom is a fire grate, constitutes flame between fire grate and the furnace bottom and generates the chamber, and furnace bottom is established the deashing fire door, and the deashing fire door is established closed furnace door.Coal storage vaporizer and flame generate the chamber and respectively establish the air blast subchannel, establish air door in the passage, and air door generates constant pressure wind and oxygen supply by the outer air blast of stove to coal storage vaporizer and flame by solenoid control.Refilling double-deck hot blast cover on the double-deck inner water sleeve, forming between flame combustion between inner water sleeve and the hot blast cover, the end opening between flame combustion generates the chamber with the fire combustion and communicates, and the outlet between flame combustion communicates with outside atmosphere by blast pipe; One side lower part of double-deck hot blast cover has blast inlet, and opposite side top has hot-blast outlet.Establish scavenge trunk at coal storage vaporizer top and be connected with blast pipe, establish the ventilation door in the scavenge trunk, the ventilation door is by solenoid control open and close state.On double-deck external hot air cover outer wall or go out vapour (water) and mouthful establish temperature controller, temperature controller is connected on the controller, control air blast and each magnetic valve.When being in low-temperature burning, the closed energising of temperature controller is opened air blast automatically and is pressed wind and close scavenge trunk ventilation door automatically, guarantees to press wind not overflow in air-exchanging chamber; And open the air blast subchannel to coal storage vaporizer and the oxygen supply of flame generation constant pressure gas.The temperature detect switch (TDS) contact disconnects when reaching design temperature, closes air blast subchannel air door, stops to press wind and oxygen supply, opens the ventilation door simultaneously, and the coal storage system air chamber of making is in " anthracite " and stops to make gaseity, continues heating by waste heat in the stove.
The application also is processed with lagging casing, prevents the body of heater heat radiation, the waste resource.
When the application uses, fill it up with coal (will have part lump coal to be beneficial to ventilation) from adding coal furnace mouth, seal all fire doors, turn on the power switch with the temperature setting switch air blast and open, to coal storage gasification constant pressure wind, the fire in a stove before fuel is added produces fuel gas with the heating of upper strata coal gradually in the stove, fuel gas generates the chamber burning at flame, the arm of oxygen supply simultaneously infeeds comburant oxygen, thermal-flame enters between flame combustion, the water of inner water sleeve fully absorbs heat and generates the steam discharge or generate boiling water (hot water), and the normal temperature wind that air blast blows into is discharged hot blast from air outlet after the heating of hot blast cover.Hot blast provides hot blast through place or the drying machine that ventilation shaft leads to heating.According to setting furnace temperature, boiler moves automatically.
During first the igniting, repave one deck spunk at fire bars upper berth one deck coal earlier, light firewood and close fire door, opening power is to the vaporizer air blast.Just add the coal temporary transient blowing out in back of igniting, coal is filled it up with to be put into operation again.The ashes that spoil on the regularly blowing out removing fire grate in service and flame generate the bottom, chamber prevent to stop up the lower inlet between flame combustion.Because coal is at the vaporizer generation fuel gas that reddens of peeling from level to level, remaining ashes fall into furnace bottom automatically pressing under the wind power, so in servicely disclose stove without poker.
The application can be used for various uses such as steam, heating, bathing, drinking water simultaneously.Steam (vapor) outlet and hot air duct are connected during heating, can keep the humidity of Heating Room to prevent indoor seasoning, and this heating system is simple, as long as air supply line is led to the room, save radiator and exempt the trouble of leaking.
Because the application adopts the closed oxygen theory of combustion of joining, fugitive constituent that all combustibles produce and smog (CO in combustion process
2, NO etc.) all by thermal-flame gasification, and combustion again, become heat energy, finally reach waste gas emission standard.Again owing to adopt hot blast cover heating cold wind, enough big of cooling surface area maximizes the use heat.Both integrate, and can save coal more than 40% than existing coal-burning boiler.
Description of drawings
Fig. 1 is the application's an embodiment front view, and Fig. 2 is Figure 1A-A sectional drawing, and Fig. 3 is the inner water sleeve schematic diagram, and Fig. 4 is an external hot air cover schematic diagram, and Fig. 5 is controller controling circuit figure.
Marginal data: 1-exhaust port, 2-take a breath the door, 3-magnetic valve, 4-scavenge trunk, the 5-temperature controller, the 6-outlet pipe, the 7-inner water sleeve is between the 8-flame combustion, 9-coal storage system air chamber, 10-fire grate, 11-external hot air cover, 12-system air chamber blast connection, 13-hot blast blast main, 14-oxygen blast arm, 15-base, 16-flame combustion chamber, 17-dust collecting box, 18-scarfing cinder fire door, the 19-closing door, 20-refractory-lined ovens lining, 21-looks around fire door, the 22-closing door, 23-adds coal furnace mouth, the 24-closing door, the 25-lagging casing, 26-discharge pipe interface, 27-steam outlet pipe interface, the 28-power switch, 29-temperature switch, 30-indicator lamp, the 31-air blast, 32-rectifier, 33-transformer.
The specific embodiment
Fig. 1, Fig. 2, Fig. 3, Fig. 4 are concrete a kind of modes of implementing.By making process its structure is described.
One, processing inner water sleeve 7.Inner water sleeve 7 is to be welded into as shown in Figure 3 double seal punt-pole by steel plate, is processed with the hole of fire door 18,21,23, the hole of blast pipe 4, the hole of system air chamber blast connection 12 on the tube, also is processed with the hole of steam outlet pipe 27, outlet pipe 6 and blast pipe on the skin.
Two, processing external hot air cover 11.External hot air cover 11 is to be welded into as shown in Figure 4 double seal tube by steel plate, and its internal diameter is greater than the external diameter of inner water sleeve, and two jacket casings can form the space of flame combustion after together; The tube on to be processed with inner water sleeve 7 on corresponding all holes; In addition, be welded with the exhaust port 1 that communicates with tube inner chamber, on the end face skin of tube, be welded with discharge pipe interface 26, below the side of tube, be welded with hot blast blast pipe interface 13 on the skin at the end face of tube.
Three, semi-packaged boiler
1, external hot air cover 11 is enclosed within on the inner water sleeve 7, notes the alignment of corresponding hole, remain on the same center line.
2, weld, weld upper coal feeding fire door 23 at corresponding hole, look around fire door 21, scarfing cinder fire door 18, blast pipe 12 interfaces, oxygen blast arm 14 interfaces; Set up fire grate 10 in inner water sleeve 7 inner chambers, whole erection is on base 15 again.
3, lagging casing 25 is wrapped at around the boiler and top, lagging casing 25 surface galvanized iron sheet, inner filling insulation material or poly-ammonia foamings.Paste refractory lining 20 on the perisporium of coal storage system air chamber 9 over.
4, add installation closing door 24 on the coal furnace mouth 23, look around closing door 22 is installed on the fire door 21; Closing door 19 is installed on the scarfing cinder fire door 18, and flame generates chamber 16 1 sides the deashing fire door, and the closed furnace door on the fire door is welded together with dust collecting box 17, will seal up the deashing fire door after dust collecting box 17 pushes in, and prevents to leak out.
5, hot blast pipe 13 is installed, the two-way arm is arranged in the hot blast pipe 13, promptly make 14 two arms of air chamber blast connection 12 and oxygen blast arm, connect in system air chamber 9 and 16, two arms in flame combustion chamber respectively an air door respectively is installed, air door is by magnetic valve 3b and 3c control.
6, scavenge trunk 4 usefulness bend pipes and exhaust port 1 are connected, a ventilation door 2 is installed in the scavenge trunk 4, control by magnetic valve 3a.
7, install temperature controller 5a again by the installing hole of reserving on shell 25 on hot blast cover 11, temperature controller 5b is installed on the water outlet tube wall, temperature controller 5a, 5b are connected on the controller with lead.
The control circuit of controller as shown in Figure 5.Controller (in the empty frame) mainly is to be formed by connecting by power switch 28, temperature switch 29, indicator lamp 30 and transformer 33, rectifier 32, is contained on the housing.Socket is arranged on the housing, peg graft with temperature controller 5, magnetic valve 3, blower fan 31
According to the temperature required model of choosing temperature controller 5 of boiler, as the control of needs various temperature, available a plurality of temperature controllers 5 are connected in parallel in the circuit.Transformer 33 is with civil power 380V transformation after rectifier 32 rectifications supply the 12V dc source to magnetic valve 3.The power supply of air blast 31 usefulness two-phase 380V motors.The capacity of air blast designs according to air feed windage, air quantity.The unlatching size of the diameter of blast connection 12 and oxygen blast arm 14, air door is all carried out calculation Design by the Design of ventilation principle.
Claims (3)
1. air heating and water supply double-purpose coal-saving boiler, it comprises fire door, fire door, fire grate, furnace bottom, lagging casing, its feature also comprises, double-deck inner water sleeve and double-deck external hot air cover, wherein:
Water inlet and venthole, delivery port are arranged on the double-deck inner water sleeve, the inner chamber of inner water sleeve is the coal storage vaporizer, constitute flame between the fire grate of coal storage vaporizer bottom and the furnace bottom and generate the chamber, establish closed furnace door on the deashing fire door of furnace bottom, coal storage vaporizer and flame generate the chamber and respectively establish the ventilation subchannel, ventilation is established air door in the subchannel, is used to press wind and oxygen blast;
Refilling double-deck hot blast cover on the double-deck inner water sleeve, form between flame combustion between inner water sleeve and the hot blast cover, end opening between flame combustion generates the chamber with the fire combustion and communicates, outlet between flame combustion communicates with outside atmosphere by blast pipe, one side lower part of double-deck hot blast cover has blast inlet, and opposite side top has hot-blast outlet;
Establish scavenge trunk at coal storage vaporizer top and be connected, establish the ventilation door in the scavenge trunk with blast pipe, on double-deck external hot air cover outer wall and venthole, delivery port establish temperature controller, temperature controller is connected on the controller.
2. air heating as claimed in claim 1 and water supply double-purpose coal-saving boiler is characterized in that air door in the described ventilation subchannel is by solenoid control.
3. air heating as claimed in claim 1 and water supply double-purpose coal-saving boiler is characterized in that described controller mainly is to be formed by connecting by power switch (28), temperature switch (29), indicator lamp (30) and transformer (33), rectifier (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101168354A CN100396997C (en) | 2005-10-31 | 2005-10-31 | Double-purpose and coal-saving boiler with hot air heat and water supply |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101168354A CN100396997C (en) | 2005-10-31 | 2005-10-31 | Double-purpose and coal-saving boiler with hot air heat and water supply |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1746589A CN1746589A (en) | 2006-03-15 |
CN100396997C true CN100396997C (en) | 2008-06-25 |
Family
ID=36166230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005101168354A Expired - Fee Related CN100396997C (en) | 2005-10-31 | 2005-10-31 | Double-purpose and coal-saving boiler with hot air heat and water supply |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100396997C (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101634488B (en) * | 2009-06-30 | 2012-09-05 | 张炳千 | Temperature regulator |
CN103277853B (en) * | 2013-05-23 | 2017-07-28 | 赵亮 | A kind of outer circulation combustion gas energy heating air conditioner |
CN104964435A (en) * | 2015-05-22 | 2015-10-07 | 芜湖鸣人热能设备有限公司 | Double-layer heat storage-type boiler |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4638943A (en) * | 1984-07-25 | 1987-01-27 | Gaz De France | Method of heating any building or room and apparatus for carrying out the said method |
US5361751A (en) * | 1993-12-15 | 1994-11-08 | Biggs Robert C | Combination hot air furnace and hot water heater |
CN2190766Y (en) * | 1994-01-03 | 1995-03-01 | 宝鸡市神农锅炉厂 | Normal pressure hot water hot wind boiler |
CN2473534Y (en) * | 2001-03-27 | 2002-01-23 | 贾立飞 | Two purpose boiler for hot water and hot air |
CN2599475Y (en) * | 2002-12-31 | 2004-01-14 | 中国人民解放军总后勤部军需装备研究所 | Hot water and hot air integrated device |
-
2005
- 2005-10-31 CN CNB2005101168354A patent/CN100396997C/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4638943A (en) * | 1984-07-25 | 1987-01-27 | Gaz De France | Method of heating any building or room and apparatus for carrying out the said method |
US5361751A (en) * | 1993-12-15 | 1994-11-08 | Biggs Robert C | Combination hot air furnace and hot water heater |
CN2190766Y (en) * | 1994-01-03 | 1995-03-01 | 宝鸡市神农锅炉厂 | Normal pressure hot water hot wind boiler |
CN2473534Y (en) * | 2001-03-27 | 2002-01-23 | 贾立飞 | Two purpose boiler for hot water and hot air |
CN2599475Y (en) * | 2002-12-31 | 2004-01-14 | 中国人民解放军总后勤部军需装备研究所 | Hot water and hot air integrated device |
Also Published As
Publication number | Publication date |
---|---|
CN1746589A (en) | 2006-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206478864U (en) | A kind of multi fuel high-efficiency cleaning condensing combustion stove | |
CN100396997C (en) | Double-purpose and coal-saving boiler with hot air heat and water supply | |
CN205579531U (en) | Environment -friendly boiler | |
CN201053764Y (en) | Highly efficient energy-saving heat-conductive oil stove | |
CN106482331A (en) | A kind of energy-conserving and environment-protective gas-heating and hot-water boiler | |
CN2835885Y (en) | Hot blast coal-saving heating boiler | |
CN206191560U (en) | Energy -saving environment -protecting steam boiler | |
CN100485283C (en) | Hot-air heating coal-saving boiler | |
CN201237344Y (en) | Environment-protection energy-saving normal pressure water-heating boiler for converting coal into coal gas | |
CN2876621Y (en) | Double purpose coal-saving boiler for hot air heating and supplying water | |
CN101109572A (en) | Double-chamber double-gas high-efficiency environment friendly energy-saving ordinary pressure water-boiling boiler | |
CN205909350U (en) | A civil boiler for cooking and heating | |
CN100538171C (en) | Combustion tube type automatically controlled boiler | |
CN203857494U (en) | Energy-saving environment-friendly biomass negative pressure counter-burning heating stove | |
CN210801269U (en) | Smokeless energy-saving heating stove | |
CN218469168U (en) | Energy-saving heat supply boiler | |
CN214064988U (en) | High smoke box boiler device | |
CN2926847Y (en) | Water spraying economical furnace | |
CN2300844Y (en) | Efficient atmosphere pressure vertical boiler | |
CN109945193B (en) | Waste incineration exhaust gas circulation purification heat energy composite set | |
CN201688555U (en) | Reversal-combustion type hot air boiler | |
CN2874301Y (en) | Environment protection energy saving stove | |
CN2445217Y (en) | Domestic semi-gasification stove with high-efficient medium heat-transfer and super-conduit heating | |
CN206890807U (en) | A kind of sealed type gas heater | |
CN2208663Y (en) | Pollution-free boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080625 Termination date: 20101031 |