Build the method for baking furnace flame path wall by laying bricks or stones
The present invention relates to a kind of method of building baking furnace flame path wall by laying bricks or stones.
At present; in carbon element pre-baked anode block production process; extensively adopt annular open roasting furnace to produce; when roaster is given birth to piece at baked anode; the temperature of its quirk wall will rise to 1200 ℃ high temperature from normal temperature; the quirk wall can have a strong impact on the quality of roasting piece thus through regular meeting's appearance scaling loss in various degree, therefore must often the quirk wall of scaling loss be removed and rebuild.And existing method of building the quirk wall by laying bricks or stones generally all is to build by laying bricks or stones again in the position of former quirk wall, yet when the quirk wall is built in rebuilding by laying bricks or stones, because the working environment of roaster is quite abominable, not only temperature height, dust are big, but also the work-yard narrow, be not easy to the construction, this not only can influence constructor's safety, but also has had a strong impact on the quality and the operating efficiency of building the quirk wall by laying bricks or stones.
The objective of the invention is: a kind of construction safety, convenience and efficiency of construction height, the measured method of building baking furnace flame path wall by laying bricks or stones of matter are provided.
The present invention is achieved in that it comprises and adopts refractory material to build the quirk wall by laying bricks or stones, it builds into monoblock type wall scroll quirk wall (1) in the external elder generation of roaster by laying bricks or stones with refractory material, with the mode of this lattice body formula wall scroll quirk wall (1), place it in the quirk wall that is assembled into roaster in the roaster then by handling; When building monoblock type wall scroll quirk wall (1) by laying bricks or stones, in monoblock type wall scroll quirk wall (1), be reserved with boom hole (2) and handling bolt hole (3); When handling monoblock type wall scroll quirk wall (1), earlier suspension rod (4) is put into boom hole (2), L shaped clamping plate (5) are put on both sides respectively below monoblock type wall scroll quirk wall (1) then, handling bolt (6) is passed the hole on the L shaped clamping plate (5) and the hole of handling bolt hole (3) and suspension rod (4) lower end respectively, make handling bolt (6) with monoblock type wall scroll quirk wall (1), L shaped clamping plate (5) and suspension rod (4) connect as one, then at the lifting frame of upper ends (7) of monoblock type wall scroll quirk wall (1), bolt and the monoblock type wall scroll quirk wall (1) of lifting frame (7) by suspension rod (4) connected as one, at last the suspension hook (9) of hoist tool is hooked on the handling bar (8) of lifting frame (7) and gets final product handling.
Owing to adopted technique scheme, the present invention compares with existing building method, because the present invention can construct under selected best construction environment, so the present invention has that construction environment is good, construction safety, convenience, and efficiency of construction height, the measured advantage of matter.
Accompanying drawing 1 is a schematic diagram of the present invention;
Accompanying drawing 2 is the A-A cross-sectional schematic of accompanying drawing 1;
Accompanying drawing 3 is the B-B cross-sectional schematic of accompanying drawing 1.
Embodiments of the invention: the refractory material of building the quirk wall by laying bricks or stones can adopt material commonly used in the prior art, to be removed by the quirk wall of scaling loss in the roaster earlier, then in external suitably local easily the size of roaster by original quirk wall, build into monoblock type wall scroll quirk wall (1) by laying bricks or stones with refractory material, when building monoblock type wall scroll quirk wall (1) by laying bricks or stones, in monoblock type wall scroll quirk wall (1), reserve 2~4 boom holes (2) and corresponding handling bolt hole (3); The quirk wall that its handling is assembled into roaster in the roaster is got final product with hoist tool laying and be frozen into whole monoblock type wall scroll quirk wall (1) with suspension hook (9); When handling monoblock type wall scroll quirk wall (1), earlier suspension rod (4) is put into boom hole (2), L shaped clamping plate (5) are put on both sides respectively below monoblock type wall scroll quirk wall (1) then, handling bolt (6) is passed the hole on the L shaped clamping plate (5) and the hole of handling bolt hole (3) and suspension rod (4) lower end respectively, make handling bolt (6) with monoblock type wall scroll quirk wall (1), L shaped clamping plate (5) and suspension rod (4) connect as one, then at the lifting frame of upper ends (7) of monoblock type wall scroll quirk wall (1), bolt and the monoblock type wall scroll quirk wall (1) of lifting frame (7) by suspension rod (4) connected as one, at last the suspension hook (9) of hoist tool is hooked on the handling bar (8) of lifting frame (7) and gets final product handling.