CN100334570C - Production capability forecasting and ordering system and method between enterprise systems - Google Patents

Production capability forecasting and ordering system and method between enterprise systems Download PDF

Info

Publication number
CN100334570C
CN100334570C CNB021343608A CN02134360A CN100334570C CN 100334570 C CN100334570 C CN 100334570C CN B021343608 A CNB021343608 A CN B021343608A CN 02134360 A CN02134360 A CN 02134360A CN 100334570 C CN100334570 C CN 100334570C
Authority
CN
China
Prior art keywords
data
order
erp
resource planning
client
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB021343608A
Other languages
Chinese (zh)
Other versions
CN1467665A (en
Inventor
赖志忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CNB021343608A priority Critical patent/CN100334570C/en
Publication of CN1467665A publication Critical patent/CN1467665A/en
Application granted granted Critical
Publication of CN100334570C publication Critical patent/CN100334570C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a production prediction and order placing system and a method among enterprise systems. The system comprises an order form server, a database and a plurality of terminal machines; the system is connected with an enterprise external system which comprises a customer system, a vendor system and a load bearing merchant system by an external network, and is connected with an enterprise resource planning (ERP) system by a local area network; the order form server is an exchange server of electronic files and takes charge of sending, receiving, exchanging and integrating an electronic format of an order form; the data of customers, the vendor and the load bearing marchant is stored in the database; a working personnel of an enterprise utilizes the terminal machines for accessing the database of order forms and can obtain the information at the inner part of the enterprise and the information relevant to production prediction and order placing of the customers, the vendor and the load bearing merchant of the enterprise, and thus, the purpose of supervising each link of the production prediction and the order placing among the enterprises is attained.

Description

Capability forecasting between business system and ordering system and method
[technical field]
The present invention relates to capability forecasting and ordering system and method between a kind of business system, refer to a kind of especially by connecting the system and method that ERP (Enterprise Resource Planning), client, provider system and bearer system finish capability forecasting between enterprise and place an order.
[background technology]
In 3C (Computer, Consumer, Communication) industry, product can be considered a product supply chain by making beginning to selling in consumer's process, wherein mainly form the role and comprise brand merchant, spare part supplier, manufacturer, bearer and retailer, be responsible for product manufacturing order, spare part supply, product assembly, spare part/product turnout carrying and production marketing down respectively.This supply chain flow process starts from the product manufacturing order, production marketing finally, and each role's the sales volume will improve in the smooth and easy then supply chain of flow process.Above-mentioned brand merchant under the product manufacturing order for starting the basic of supply chain, the program that therefore places an order smoothly is especially important, and the role of related products manufacturing order comprises brand merchant, spare part supplier, manufacturer and bearer in supply chain.How these roles are coordinated to finish the program of placing an order swimmingly, be a big problem of 3C industry always.
A solution is that the program of placing an order is divided into prediction order program and product manufacturing order program down down.Under predict that the order program can allow brand business prediction order earlier down, estimate its order with test spare part supplier and manufacturer and finish ability, and, can avoid thus too much/not enough product manufacturing the foundation of this test result as product manufacturing order under the reality.Yet traditional program of placing an order can't be predicted order down to the bearer, thereby can't grasp and control its spare part in advance and transport approach/carrier, increase the unknowable variable except actual spare part/product being transported flow process, also can't determine the carrier that is fit in advance.In fact the inventory turnover time has also comprised the turnaround time of mobile stock, and just the bearer is carried spare part/product time, and also there is its necessity the turnaround time of therefore estimating its mobile stock.
Above-mentioned following prediction order program and infosystem that down the prediction order described in the product manufacturing order program and order can be by each roles such as brand merchant, spare part supplier, manufacturers with network connect carry out the e-file exchange (Electronic Document Interchanginig, EDI).Yet because of perhaps above-mentioned each computer system uses different electronic document formats, except the translation function of above-mentioned e-file exchange, more need to provide a system and method to integrate electronic document formats different between each computer system, to finish its single process down fast.
In No. the 5th, 991,732, the United States Patent (USP) of on November 23rd, 1999 bulletin, also disclosed a cover and coordinated in the supply chain each role to keep supply chain method smoothly with computer system.Its method is used as down the basis of prediction order based on the sales forecast (sales forecast) that is produced by customer demand.Its method is used as predicting the benchmark of order with the information of sales end, but does not contain the scope of product manufacturing order down.
[summary of the invention]
Capability forecasting between business system of the present invention and ordering system adopt the Terminal server architecture mode, include an order server, a database and a plurality of terminating machine.This order server by utilizing external network and LAN connect external system and comprise client, provider system, bearer system and ERP (Enterprise Resource Planning).Capability forecasting data and ordering sheet data that this database storing obtains from above-mentioned client, provider system, bearer system and ERP (Enterprise Resource Planning).This terminating machine is connected to the order server, in order to the mistake of supervision and eliminating capability forecasting and ordering system.Capability forecasting between this business system and ordering system are by the included data receiver module of order server, the data sending module, data formats conversion functional module and data conformity module are finished and will be received from client, the different electronic document formats of provider system and bearer system are integrated and conversion, comprise form with EDI, an e-file of XML form is integrated and converted to a plurality of different e-files of HTML (Hypertext Markup Language) form and E-mail form etc., and issue ERP (Enterprise Resource Planning), the XML formatted documents that also maybe will be received from ERP (Enterprise Resource Planning) converts to and comprises the EDI form, the e-file of html format or E-mail form etc. is issued client, a plurality of provider system and a plurality of bearer system.With different e-file data conformity conversions, reach the purpose of finishing capability forecasting between business system and placing an order by in time.
The reception that capability forecasting between business system of the present invention and ordering method possess by this system, integration and change a plurality of data with different formatted files of each system and send data with different formatted file function and link up in order to each business system.Enterprise can receive the client by the e-file exchange and predict order and predict enterprises production capacity, supplier's production capacity, especially can predict bearer's available carrier and with the loading time, the suitableeest carrier, carrier quantity, carrying route and carrying temporal information are provided, and the result is replied this client as placing an order and predicting the foundation that when receives goods.This system also can receive this customer order, real-time informing enterprises system, provider system and bearer system.
This system can reach the purpose of finishing capability forecasting between business system and placing an order, and makes supply chain in time smooth and easy, keeps the reasonable stock amount.And the client is grasped in advance by being fabricated onto the time process control that logistics is transported, in order to preferable production routine kinds of goods production and each link of shipment loading time of enterprises system arrangement, shorten the inventory turnover time to satisfy customer order.
[description of drawings]
Fig. 1 is the capability forecasting between business system of the present invention and the hardware structure figure of ordering system.
Fig. 2 is the capability forecasting related data exchange synoptic diagram of capability forecasting between business system of the present invention and ordering system.
Fig. 3 is the related data exchange synoptic diagram that places an order of capability forecasting between business system of the present invention and ordering system.
Fig. 4 is the capability forecasting between business system of the present invention and the order server capability module diagram of ordering system.
Fig. 5 is the capability forecasting between business system of the present invention and the prediction order method flow diagram of ordering method.
Fig. 6 is the capability forecasting between business system of the present invention and the ordering method process flow diagram of ordering method.
Fig. 7 is the system job schematic flow sheet of capability forecasting and ordering method between business system of the present invention.
[embodiment]
Consult shown in Figure 1ly, be the hardware structure figure of capability forecasting between business system of the present invention and ordering system.Capability forecasting and ordering system 10 are made up of an order server 101, database 102 and a plurality of terminating machine 103 between enterprise.This system 10 is connected by external network 11 (external network 11 can be Internet or Extranet etc. in the present embodiment) and a client 12, a plurality of provider system 13 and a plurality of bearer system 14, and be connected with an ERP (Enterprise Resource Planning) 16 by internal network 15 (network 15 can be enterprises lan in the present invention), to obtain capability forecasting and order related data.This order server 101 is with the capability forecasting data (not shown) that obtained and order data (not shown) integration processing in regular turn, it is stored in the order database 102 flow process that enterprise staff can come the supervision and control capability forecasting and place an order by terminating machine 103.The user of above-mentioned client 12 can be client's enterprise staff of enterprise, and the user of provider system 13 can be supplier's enterprise staff of enterprise, and the user of bearer system 14 can be the industry employee of cargo carrying commercial business of enterprise.
Consult shown in Figure 2ly, be the capability forecasting related data exchange synoptic diagram of capability forecasting between business system of the present invention and ordering system.This capability forecasting related data comprises that the spare part planning of the prediction order 201 that is obtained from client 12, provider system 13 singly replys 205, the carrying planning of bearer system 14 singly replys 207, the production capacity of ERP (Enterprise Resource Planning) 16 is estimated report 203, report 210 and prediction order report 212 are estimated in carrying, and its content comprises carrier prediction, carrier quantitative forecast, carrying route prediction and carries time prediction.This capability forecasting related data also comprises the integration converting data via order server 101 (see figure 1)s, comprises capacity planning list 202, spare part planning list 204, spare part production capacity answer 209, carrying production capacity answer 211, spare part planning list 204 altogether, carries planning list 206 and prediction order reply 208.The above-mentioned data formats that is received by client 12, provider system 13 and bearer system 14 comprises EDI, HTML and E-mail form, comprises that with the data formats that is received by ERP (Enterprise Resource Planning) 16 EDI, XML form are not quite similar.This order server 101 is integrated this capability forecasting related data in regular turn and is stored in order database 102 (see figure 1)s.
Consult shown in Figure 3ly, be the related data exchange synoptic diagram that places an order of capability forecasting between business system of the present invention and ordering system.This related data that places an order comprises the order 301 that is obtained from client 12, the spare part sales order 306 of provider system 13, the carrying sales order 308 of bearer system 14, and its content comprises the external order 303 of carrier kind, carrier quantity, carrying route and carrying time, ERP (Enterprise Resource Planning) 16.This related data that places an order comprises that also the integration converting data via order server 101 (see figure 1)s comprises enterprise's order 302, spare part order 305, external order answer 309, carrying order 307 and sales order 304.The above-mentioned data formats that is received by client 12, provider system 13 and bearer system 14 comprises EDI, HTML, E-mail form, comprises that with the data formats that is received by ERP (Enterprise Resource Planning) 16 EDI, XML form are not quite similar.This order server 101 is integrated this related data that places an order in regular turn and is stored in database 102.
Consult shown in Figure 4ly, be capability forecasting between business system of the present invention and the order server capability module diagram in the ordering system.This order server 101 comprises data receiver module 401 responsible receptions from client 12, provider system 13, the data of bearer system 14 and ERP (Enterprise Resource Planning) 16, data sending module 402 is responsible for sending data and is given client 12, provider system 13, bearer system 14 and ERP (Enterprise Resource Planning) 16, data formats modular converter 403 is responsible for converting data formats for example with EDI, HTML, format conversion such as E-mail become the XML form or the XML format conversion are become EDI, HTML, forms such as E-mail, data conformity module 404 is responsible for integrating EDI, HTML, the data content of different-formats such as E-mail, identical entry in the data (as spare part quantity etc.) is done to integrate (as adding up etc.), and data storing module 405 is responsible for storing from client 12, provider system 13, the related data of bearer system 14 and ERP (Enterprise Resource Planning) 16 comprises prediction order 201 (see figure 2)s, spare part planning is single replys 205, carrying planning is single replys 207, production capacity is estimated report 203, report 210 is estimated in carrying, prediction order report 212, order 301 (see figure 3)s, spare part sales order 306, carrying sales order 308, external order 303.Wherein, the content of the single answer 207 of carrying planning comprises carrier prediction, carrier quantitative forecast, carrying route prediction and carrying time prediction.The content of carrying sales order 308 comprises actual carrier kind, carrier quantity, carrying route and the data of carrying time.
Consult shown in Figure 5ly, be the prediction order method flow diagram of capability forecasting between enterprise of the present invention and ordering method.This method is implemented by capability forecasting between business system and ordering system, and its flow process is as follows:
(a) receive the prediction order 201 (step 501) that client 12 sends by an external network 11, and be stored in database 102.
(b) changing this prediction order 201 becomes capacity planning list 202 (step 502), and is stored in database 102.
(c) send this capacity planning list 202 by internal network 15 and give ERP (Enterprise Resource Planning) 16 (step 503).
(d) receive production capacity by this internal network 15 and estimate report 203 (steps 504), and be stored in database 102.
(e) change this production capacity and estimate report 203, and be stored in database 102 with generation supplier's list and single 204 (steps 505) of spare part planning.
(f) send corresponding spare part planning single 204 to provider system 13 (step 506) by this external network 16 according to this supplier's list.
(g) send the single answer of plural spare part planning 205 (steps 507) by this external network 11 by provider system 13, and be stored in database 102.
(h) integrate and change the single answer 205 of these a plurality of spare parts planning and reply 209 (steps 508), and be stored in database 102 for the spare part production capacity.
(i) send this spare part production capacity answer 209 by internal network 15 and give ERP (Enterprise Resource Planning) 16 (step 509).
(j) send carrying by internal network 15 by ERP (Enterprise Resource Planning) 16 and estimate report 210 (steps 510), and be stored in database 102.
(k) change this carrying and estimate report 210 generation bearer's lists and single 206 (steps 511) of carrying planning, and be stored in database 102.
(l) send this carrying planning single 206 to corresponding bearer system 14 (step 512) by external network 11 according to this bearer's list.
(m) send the single answer of plural number carrying planning 207 (steps 513) by external network 11 by bearer system 14, and be stored in database 102.
(n) integrate and change the single answer 207 of these a plurality of carryings planning and reply 211 (steps 514), and be stored in database 102 for carrying production capacity.
(o) send this carrying production capacity by internal network 15 and reply 211 to ERP (Enterprise Resource Planning) 16 (step 515).
(p) send a prediction order report 212 (steps 516) by this internal network 15 by ERP (Enterprise Resource Planning) 16, and be stored in database 102.
(q) conversion estimation order report 212 is prediction order reply 208 (step 517), and is stored in database 102.
(r) send prediction order reply 208 to client 12 (step 518) by external network 11.
Consult shown in Figure 6ly, be the ordering method process flow diagram of capability forecasting between business system of the present invention and ordering method.This method is implemented by capability forecasting between business system and ordering system (see figure 1), and its flow process is as follows:
(a) be received from the order 301 (step 601) that an external network 11 clients 12 send, and be stored in database 102.
(b) change this order 301 with generation enterprise order 302 (steps 602), and be stored in database 102.
(c) send this enterprise's order 302 by internal network 15 and give this ERP (Enterprise Resource Planning) 16 (step 603).
(d) send external order 303 (step 604) by this internal network 15 by ERP (Enterprise Resource Planning) 16, and be stored in database 102.These external order 303 contents comprise sales order, supplier's list and corresponding spare part order, bearer's list and corresponding carrying order.
(e) conversion external order 303 produces sales order 304, supplier's list and a plurality of spare part order 305, bearer's list and a plurality of carrying orders 307 (step 605), and is stored in database 102.Conversion in this program for example XML form changes into EDI, HTML or E-mail form.
(f) send this sales order 304 to client 12 (step 606) by external network 11.
(g) send spare part order 305 to corresponding provider system 13 (step 607) by this external network 11 according to supplier's list.
(h) send carrying order 307 to corresponding bearer system 14 (step 608) by this external network 11.
(i) send spare part sales order 306 (step 609) by this external network 11 by provider system 13, and be stored in database 102.
(j) send carrying sales order 308 (step 610) by this external network 11 by bearer system 14, and be stored in database 102.
(k) integrate and change a plurality of spare part sales orders 306 and a plurality of carrying sales order 308 and reply 309 (steps 611), and be stored in database 102 for external order.
(1) sends external order by internal network 15 and reply 309 to ERP (Enterprise Resource Planning) 16 (step 612).
Consult shown in Figure 7ly, be the system job schematic flow sheet of capability forecasting and ordering method between enterprise of the present invention.This method is implemented by capability forecasting between business system and ordering system (see figure 1), and its flow process is as follows:
(a) starting data receiver module 401 receives file and confirms source (step 700), this document comprises the file from the EDI form of client 12, provider system 13 and bearer system 14, html format or E-Mail form, and from the XML formatted file of Enterprise Resources Planning (ERP) system 16.
(b) start data storing module 405 and store this reception file to database 102 (step 701).
(c) judging and whether to be received file from client 12 (step 702), is then to go to step 703 if be judged as, and is judged as otherwise goes to step 708.
(d) judge this document correct format whether (step 703), if be judged as otherwise go to step 704, being judged as is then to go to step 705.
(e) show error messages and error messages is replied to client 12 by terminating machine 103 by external network 11, and termination process (step 704).
(f) start data formats modular converter 403 and convert this document to file layout (step 705) that ERP (Enterprise Resource Planning) 16 is used.
(g) start data storing module 405 and store this convert file to database 102 (step 706).
(h) this is converted file to ERP (Enterprise Resource Planning) 16 (step 707) to start 402 transmissions of data sending module.
(i) judge that whether this is received file from ERP (Enterprise Resource Planning) 16 (step 708),, be judged as otherwise go to step 715 if to be judged as be then to go to step 709.
(j) judge that this is received file file layout whether correct (step 709), if be judged as otherwise go to step 710, being judged as is then to go to step 711.
(k) show error messages and error messages is replied to ERP (Enterprise Resource Planning) 16 by terminating machine 103 by internal network 15, and termination process (step 710).
(1) read this and be received file, and judge that it sends object (step 711), this transmission object comprises client 12, a plurality of provider system 13 and a plurality of bearer system 14.
(m) convert respective file form (step 712) to according to sending object startup data formats modular converter 403, for example convert the file of EDI form, html format or E-Mail form to according to different bearer systems.
(n) start data storing module 405 and store these convert files to database 102 (step 713).
(o) start data sending module 402 and send files after transform (step 714) according to sending object.
(p) whether judge this reception file from provider system 13 or bearer system 14 (step 715),, be judged as otherwise go to step 722 if to be judged as be then to go to step 716.
(q) judge this reception file file layout whether correct (step 716), if be judged as otherwise go to step 717, being judged as is then to go to step 718.
(r) show error messages and error messages is replied to this provider system 13 or this bearer system 14 by terminating machine 103 by internal network 15, and termination process (step 717).
(s) start data conformity module 404 and collect the identical source file (step 718) that comes, identical to come source file be file that receives by provider system 13 or the file that receives by bearer system 14.
(t) make totalling according to the like terms of collection file content and be integrated into single file (step 719), these like terms are spare part number or carrying tool number for example.
(u) file conversion that these like terms is added the General Logistics Department is ERP (Enterprise Resource Planning) 16 employed file layouts (step 720).
(v) start data storing module 405 and store these convert files to database 102 (step 721).
(w) this is converted file to ERP (Enterprise Resource Planning) 16 (step 722) to start 402 transmissions of data sending module.
(x) unusual condition has appearred, by terminating machine 103 display system error messages (step 723).

Claims (8)

1. capability forecasting and the ordering system between a business system, the client can finish enterprise's capability forecasting and places an order by this system, it includes a server, a database and a plurality of terminating machine, this server is connected by network and a client, an ERP (Enterprise Resource Planning), a plurality of provider system and a plurality of bearer system, it is characterized in that:
This server includes a data receiver module, a data sending module, a data storing module and a data formats modular converter, wherein:
The data receiver module can receive from the data that comprises client, provider system, bearer system and ERP (Enterprise Resource Planning) by network;
The data sending module can send data by network and give client, provider system, bearer system and ERP (Enterprise Resource Planning);
Data storing module can store the data that comprises the data that is received from client, a plurality of provider system, the data of bearer system and the data of ERP (Enterprise Resource Planning);
The data formats modular converter convertiblely comprises the data that is received from client, integrates the data that is received from a plurality of provider system, integrates from data that is received of carrying the quotient system system and the data that is received from ERP (Enterprise Resource Planning);
Databases contains the data that is received from client, provider system, bearer system and ERP (Enterprise Resource Planning), especially finger is received from the content of carrying the quotient system system and is comprised carrier prediction, carrier quantitative forecast, carrying route prediction and carrying time prediction, and actual carrier, carrier quantity, carrying route and the data of carrying time; And
Terminating machine is connected to this server with stored data in supervision capability forecasting and flow process that places an order and the Query Database.
2. capability forecasting and ordering system between business system as claimed in claim 1 is characterized in that, wherein said client is an ERP (Enterprise Resource Planning).
3. capability forecasting and ordering system between business system as claimed in claim 1 is characterized in that, wherein said provider system is the spare part supplier's of enterprise a ERP (Enterprise Resource Planning).
4. capability forecasting and ordering system between business system as claimed in claim 1 is characterized in that, wherein said bearer system is the bearer's of bearing goods and spare part a ERP (Enterprise Resource Planning).
5. capability forecasting and ordering system between business system as claimed in claim 1 is characterized in that, wherein said data is the EDI file.
6. capability forecasting and ordering system between business system as claimed in claim 1 is characterized in that, the removal of obstacle when wherein said supervision occurs for the system mistake message.
7. capability forecasting and the ordering method between a business system, the client can finish enterprise's capability forecasting and places an order by this method, and it comprises following step:
(a) provide a server, be connected by network and a client, an ERP (Enterprise Resource Planning), a plurality of provider system and a plurality of bearer system;
(b) provide a database, stored comprises the data that is received from client, provider system, bearer system and ERP (Enterprise Resource Planning), especially finger is received from the content of carrying the quotient system system and is comprised carrier prediction, carrier quantitative forecast, carrying route prediction and carry time prediction, and the data of actual carrier, carrier quantity; And
(c) provide a plurality of terminating machines, and, comprising by this a plurality of terminating machine supervision capability forecastings and following single process:
(c1) server receives the prediction order data of being sent by client and converts thereof into the capacity planning data;
(c2) server sends this capacity planning data and gives ERP (Enterprise Resource Planning);
(c3) server receives the production capacity of being sent by this ERP (Enterprise Resource Planning) and estimates data, and this production capacity is estimated data and comprised that supplier's production capacity is estimated data and bearer's production capacity is estimated data;
(c4) server sends this supplier's production capacity and estimates data to provider system;
(c5) server sends this bearer's production capacity and estimates data to the bearer system;
(c6) server receives production capacity and replys data, and this production capacity answer data comprises that supplier's production capacity is replied data and bearer's production capacity is replied data;
(c7) server sends this production capacity and estimates the answer data to ERP (Enterprise Resource Planning);
(c8) server receives the prediction order reply data of being sent by ERP (Enterprise Resource Planning);
(c9) server sends this prediction order reply data to this client;
(c10) server receives the order data of being sent by client, and is converted into enterprise's order data;
(c11) server sends this enterprise's order data and gives ERP (Enterprise Resource Planning);
(c12) server receives the external order data of being sent by this ERP (Enterprise Resource Planning), and this external order data comprises sales order data, spare part order data and carrying order data;
(c13) server sends this sales order data, spare part order data and carrying order data to client, provider system and bearer system;
(c14) server receives the external order that is sent by provider system and bearer system and replys data, and this external order answer data comprises spare part sales order data and carrying sales order data;
(c15) server sends this external order answer data and gives ERP (Enterprise Resource Planning).
8. capability forecasting between business system as claimed in claim 7 and the method that places an order is characterized in that, the removal of obstacle when wherein (c) described supervision occurs for the system mistake message.
CNB021343608A 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems Expired - Fee Related CN100334570C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021343608A CN100334570C (en) 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021343608A CN100334570C (en) 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems

Publications (2)

Publication Number Publication Date
CN1467665A CN1467665A (en) 2004-01-14
CN100334570C true CN100334570C (en) 2007-08-29

Family

ID=34145759

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021343608A Expired - Fee Related CN100334570C (en) 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems

Country Status (1)

Country Link
CN (1) CN100334570C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574024B (en) * 2015-01-20 2018-05-01 宜昌永鑫精工科技有限公司 A kind of long-range zero inventory supply-chain management systems of ERP
CN110826949A (en) * 2018-08-08 2020-02-21 北京京东振世信息技术有限公司 Capacity control implementation method and device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279793A (en) * 1997-09-17 2001-01-10 先进处理系统有限公司 Order processing apparatus and method
JP2002024578A (en) * 2000-06-30 2002-01-25 Toshiba Corp Method for providing regular merchandise home delivery service and system for the same and recording medium recorded with program used for the method and system and computer
JP2002032643A (en) * 2000-07-17 2002-01-31 Toppan Printing Co Ltd Method and system for ordering and order reception management, server, demander terminal, and supplier terminal
US20020019812A1 (en) * 2000-06-16 2002-02-14 Board Karen Eleanor System and service for receiving, customizing, and re-broadcasting high-speed financial data to users operating wireless network-capable devices
US20020019761A1 (en) * 2000-01-12 2002-02-14 Derek Lidow Supply chain architecture
US20020038255A1 (en) * 2000-06-12 2002-03-28 Infospace, Inc. Universal shopping cart and order injection system
JP2002092372A (en) * 2000-09-13 2002-03-29 Intelligent Wave:Kk Order giving/receiving processing method and order giving/receiving processing system
CA2360221A1 (en) * 2000-10-27 2002-04-27 Joshua Geist Method and system for facilitating electronic commercial transactions

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279793A (en) * 1997-09-17 2001-01-10 先进处理系统有限公司 Order processing apparatus and method
US20020019761A1 (en) * 2000-01-12 2002-02-14 Derek Lidow Supply chain architecture
US20020038255A1 (en) * 2000-06-12 2002-03-28 Infospace, Inc. Universal shopping cart and order injection system
US20020019812A1 (en) * 2000-06-16 2002-02-14 Board Karen Eleanor System and service for receiving, customizing, and re-broadcasting high-speed financial data to users operating wireless network-capable devices
JP2002024578A (en) * 2000-06-30 2002-01-25 Toshiba Corp Method for providing regular merchandise home delivery service and system for the same and recording medium recorded with program used for the method and system and computer
JP2002032643A (en) * 2000-07-17 2002-01-31 Toppan Printing Co Ltd Method and system for ordering and order reception management, server, demander terminal, and supplier terminal
JP2002092372A (en) * 2000-09-13 2002-03-29 Intelligent Wave:Kk Order giving/receiving processing method and order giving/receiving processing system
CA2360221A1 (en) * 2000-10-27 2002-04-27 Joshua Geist Method and system for facilitating electronic commercial transactions

Also Published As

Publication number Publication date
CN1467665A (en) 2004-01-14

Similar Documents

Publication Publication Date Title
US20030171962A1 (en) Supply chain fulfillment coordination
US20030172007A1 (en) Supply chain fulfillment coordination
EA012934B1 (en) A system and a method for managing remote applications
CN102292737A (en) Systems and methods for processing requests for proposals and managing inventory
TWI757079B (en) Computer-implemented system and computer-implemented method for parsing message
TW202111623A (en) Computer-implemented systems and methods for receiving inbound products
WO2006020200A2 (en) Asset visibility management system with rule engine
WO2006020199A2 (en) Asset visibility management system with binding and unbinding of assets
KR20230134454A (en) Systems and methods for dynamic aggregation of data and minimization of data loss
KR20210056977A (en) Systems and methods for interfacing networks using a unified communication scheme
CN100334570C (en) Production capability forecasting and ordering system and method between enterprise systems
WO2006020243A2 (en) Asset visibility management system
AU2020260495A1 (en) Systems and methods for responsive and automated predictive packaging acquisition
KR101410252B1 (en) Object movement chasing method in the EPCglobal network
AU2003212308B2 (en) Supply chain fulfillment coordination
Choy et al. Improving logistics visibility in a supply chain: an integrated approach with radio frequency identification technology
WO2006020191A2 (en) Asset visibility management system with event correlator
KR20220077108A (en) Systems and methods for managing highly available distributed hybrid transactional and analytical databases
CN1459751A (en) Capacity forecast and ordering sheet data exchange system and method
WO2006020242A2 (en) Scalable asset visibility management system
AU2020104458A4 (en) Systems and methods for interfacing networks using a unified communication scheme
TWI760982B (en) Computer-implemented systems and methods for generating demand forecasting data by performing wavelet transform for generating accurate purchase orders
KR20030009595A (en) Supply Chain Management System
CN115730877A (en) Delivery management system
CN117745157A (en) Intelligent supply chain method and system for large-client multi-base service mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070829

Termination date: 20140712

EXPY Termination of patent right or utility model