CH609622A5 - Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks - Google Patents

Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks

Info

Publication number
CH609622A5
CH609622A5 CH167177A CH167177A CH609622A5 CH 609622 A5 CH609622 A5 CH 609622A5 CH 167177 A CH167177 A CH 167177A CH 167177 A CH167177 A CH 167177A CH 609622 A5 CH609622 A5 CH 609622A5
Authority
CH
Switzerland
Prior art keywords
carriers
wagons
train
wagon
telescopic coupling
Prior art date
Application number
CH167177A
Other languages
French (fr)
Inventor
Fritz Buehler
Original Assignee
Scheuchzer Auguste Les Fils D
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scheuchzer Auguste Les Fils D filed Critical Scheuchzer Auguste Les Fils D
Priority to CH167177A priority Critical patent/CH609622A5/en
Publication of CH609622A5 publication Critical patent/CH609622A5/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/04Loading land vehicles
    • B65G67/22Loading moving vehicles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Loading Or Unloading Of Vehicles (AREA)
  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The train of trucks is for the discharge of material in bulk particularly the screenings resulting from stripping a railway track, and comprises load trucks (1) on which conveyors (4, 5) hitched together, run. The conveyors are hitched by a telescopic coupling (10), allowing those on trucks already loaded to be moved clear of those in the course of loading without unhitching. The telescopic coupling can be driven by hand, by a medium under pressure, or by a motor-driven screw.

Description

  

  
 

**ATTENTION** debut du champ DESC peut contenir fin de CLMS **.

 



   REVENDICATIONS
 1. Train d'évacuation de matériaux en vrac, en particulier des criblures résultant du dégarnissage-criblage d'une voie de chemin de fer, composé de wagons de chargement (1) sur les quels peuvent rouler des transporteurs (4, 5) attelés les uns aux autres, caractérisé par le fait que les transporteurs (4, 5) sont reliés les uns aux autres par un accouplement télescopique (10) de façon à permettre d'écarter les transporteurs des wagons chargés de ceux des wagons en cours de chargement, sans les dételer.



   2. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique (10) est à commande manuelle.



   3. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique est à commande par fluide sous pression.



   4. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique est à commande par vis et moteur.



   5. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique (10) est relié mécaniquement à un déflecteur (9) de telle sorte que lorsque l'accouplement télescopique est dans sa position longue   (1 0'),    le déflecteur est relevé en position de travail (9'), cependant que lorsque l'accouplement télescopique est dans sa position courte (10), le déflecteur est abaissé en position de repos (9) sous le transporteur.



   La présente invention concerne un train d'évacuation de matériaux en vrac, en particulier des criblures résultant du dégarnissage-criblage d'une voie de chemin de fer, composé de wagons de chargement sur lesquels peuvent rouler des transporteurs attelés les uns aux autres.



   Dans les trains d'évacuation connus, les transporteurs sont attelés les uns aux autres de façon fixe et roulent sur un chemin de roulement, constitué par des rails, ou par des rouleaux montés sur les wagons de chargement.



   Le déplacement en va et vient des transporteurs lors du chargement est commandé doit en tractant ou en poussant les transporteurs au moyen d'un treuil, d'un cabestan ou de tout autre moyen approprié, soit au moyen des rouleaux ou galets motorisés du chemin de roulement; il est aussi possible de déplacer les wagons sous les transporteurs au moyen d'un tracteur, les transporteurs restant immobiles, accrochés à la   crieuse    ou à un wagon relais qui porte le groupe générateur et les organes de commande.



   Avec ces trains d'évacuation connus, dès que le premier wagon est chargé, les transporteurs y afférents doivent être découplés et écartés vers l'avant, et ainsi de suite pour permettre le chargement des wagons suivants, ce qui implique chaque fois un temps d'arrêt du chantier.



   La présente invention évite cet inconvénient par le fait que les transporteurs sont reliés les uns aux autres par un accouplement télescopique de façon à permettre d'écarter les transporteurs des wagons chargés de ceux des wagons en cours de chargement, sans les dételer.



   Le dessin annexé représente un exemple d'exécution du train selon la présente invention.



   La figure 1 est une vue en élévation des wagons-bennes.



   La figure 2 est une vue du wagon relais.



   Le train, comme nous le désignerons par la suite, se compose, dans une forme préférée, de six wagons 1 équipés de deux bennes 2 et 3 et de deux transporteurs 4 et 5, ces derniers pouvant se déplacer longitudinalement sur des rouleaux 11 fixés sur les bennes 1 et 2, et d'un wagon relais 12 placé entre les wagons-bennes et la dégarnisseuse-cribleuse 13.



   Le wagon-relais 12 est équipé d'un transporteur fixe 7 et d'un transporteur intermédiaire mobile 6. Le transporteur fixe 7 amène les criblures en tête de ce wagon et les décharge sur le premier transporteur 5 d'un wagon 1 ou sur le transporteur intermédiaire 6.



   Le transporteur intermédiaire 6 est tracté dans les deux sens de marche par un cabestan 14 et un câble 15, et circule à la vitesse de 4 m/min sur son chemin de roulement. La course disponible du transporteur intermédiaire permet de charger les wagons-bennes 1.



   Un groupe générateur 16 d'une puissance de 100 KW fournit l'énergie pour les transporteurs, le cabestan, ainsi que pour l'entraînement des essieux de traction.



   Les deux essieux du wagon peuvent être entraînés pendant le travail par des moteurs hydrauliques montés sur des réducteurs intermédiaires.



   Un accouplement à commande hydraulique débraye automatiquement les réducteurs à l'arrêt du groupe générateur.



   La vitesse d'avancement du wagon-relais est variable entre 0 et 500 m/h et s'adapte à la vitesse de travail de la cribleuse.



   L'intraînement avec deux essieux motorisés développe une force de traction de 10 Mp, ce qui permet de pousser six wagons sur une rampe de   0    à 10 o/oo.



   Chaque wagon-benne 1 est équipé de deux transporteurs 4 et 5. Tous les transporteurs de tous les wagons-bennes sont attelés   l'un    à l'autre par un attelage télescopique 10. Chaque transporteur est muni, à son extrémité avant, d'un déflecteur 9 qui permet une répartition régulière du chargement sur toute la largeur de la benne. Du fait que   l'on    ne charge qu'une benne à la fois, seul le déflecteur du point de chargement doit être en position de travail 9', et en ce point de chargement les deux transporteurs 4, 5 doivent être écartés   l'un    de l'autre pour permettre la chute des matériaux dans la benne.

  En conséquence l'accouplement télescopique est relié mécaniquement au déflecteur de telle sorte que lorsque l'accouplement télescopique est dans sa position longue 10', le déflecteur est relevé en position de travail 9', cependant que lorsque l'accouplement télescopique est dans sa position courte 10, le déflecteur est abaissé en position de repos 9 sous le transporteur.



  Cette liaison mécanique peut consister par exemple par le fait que le déflecteur est relié d'une part par la bielle 17 pivotée en 18 sur l'accouplement télescopique 10, et d'autre part par la bielle 19 attachée au transporteur.



   Pendant le transport et le déchargement des wagons, les transporteurs sont amarrés sur le chemin de roulement.



   Sur chaque wagon peut être monté un coffret de commande qui permet d'avancer ou de reculer les transporteurs, d'actionner les claxons de communication et d'alarme, ainsi que les feux tournants.



   Le fonctionnement du train est le suivant:
 Avant de les amener sur le chantier, tous les transporteurs du train sont successivement attelés au transporteur intermédiaire du wagon-relais, en les déplaçant à l'aide du cabestan.

 

   Arrivé sur le chantier, le train est attelé à la cribleuse, et le chargement des wagons peut s'effectuer soit par un mouvement de va et vient des transporteurs, soit en reculant ou en avançant les transporteurs successivement à l'aide du cabestan et du transporteur intermédiaire.



   Dès que la première benne est chargée, le premier transporteur est avancé en allongeant l'attelage télescopique. En même temps, le déflecteur se met en position de travail et le deuxième transporteur commence à charger la deuxième benne.



   Ce cycle de travail continue jusqu'au chargement complet du train.



   Tous les mouvements sont commandés depuis la plateforme du wagon à charger, par un seul homme.



   Pour le déchergement des wagons les transporteurs peuvent soit rester amarrés sur les wagons, soit être déplacer sur un autre train vide. 



  
 

** ATTENTION ** start of DESC field can contain end of CLMS **.

 



   CLAIMS
 1. Bulk material evacuation train, in particular screenings resulting from the stripping-screening of a railway track, composed of loading wagons (1) on which can run coupled carriers (4, 5) to each other, characterized by the fact that the carriers (4, 5) are connected to each other by a telescopic coupling (10) so as to allow the transporters of the loaded wagons to be separated from those of the loaded wagons , without unhitching them.



   2. Train according to claim 1, characterized in that the telescopic coupling (10) is manually controlled.



   3. Train according to claim 1, characterized in that the telescopic coupling is controlled by pressurized fluid.



   4. Train according to claim 1, characterized in that the telescopic coupling is controlled by screw and motor.



   5. Train according to claim 1, characterized in that the telescopic coupling (10) is mechanically connected to a deflector (9) so that when the telescopic coupling is in its long position (1 0 '), the The deflector is raised to the working position (9 '), while when the telescopic coupling is in its short position (10) the deflector is lowered to the rest position (9) under the conveyor.



   The present invention relates to a train for discharging bulk materials, in particular screenings resulting from stripping-screening of a railway track, composed of loading wagons on which carriers coupled to one another can run.



   In the known evacuation trains, the carriers are coupled to each other in a fixed manner and run on a track, formed by rails, or by rollers mounted on the loading wagons.



   The back and forth movement of the transporters during loading is controlled must by towing or pushing the transporters by means of a winch, a capstan or any other suitable means, either by means of the motorized rollers or rollers of the track. rolling; it is also possible to move the wagons under the carriers by means of a tractor, the carriers remaining stationary, hooked to the crier or to a relay wagon which carries the generator group and the control members.



   With these known evacuation trains, as soon as the first wagon is loaded, the related carriers must be decoupled and moved forward, and so on to allow the loading of the following wagons, which each time involves a time of stopping the site.



   The present invention avoids this drawback by the fact that the carriers are connected to each other by a telescopic coupling so as to allow the carriers to be separated from the loaded wagons from those of the wagons being loaded, without unhitching them.



   The appended drawing represents an example of execution of the train according to the present invention.



   Figure 1 is an elevational view of the dump cars.



   Figure 2 is a view of the relay car.



   The train, as we will designate hereinafter, consists, in a preferred form, of six wagons 1 equipped with two buckets 2 and 3 and two carriers 4 and 5, the latter being able to move longitudinally on rollers 11 fixed on skips 1 and 2, and a relay wagon 12 placed between the dump wagons and the stripper-screen 13.



   The relay wagon 12 is equipped with a fixed transporter 7 and a mobile intermediate transporter 6. The fixed transporter 7 brings the screenings to the head of this wagon and unloads them on the first transporter 5 of a wagon 1 or on the intermediate carrier 6.



   The intermediate conveyor 6 is towed in both directions of travel by a capstan 14 and a cable 15, and circulates at a speed of 4 m / min on its track. The available stroke of the intermediate transporter allows loading of the dump cars 1.



   A generator unit 16 with a power of 100 KW provides energy for the transporters, the capstan, as well as for driving the traction axles.



   The two axles of the wagon can be driven during work by hydraulic motors mounted on intermediate reducers.



   A hydraulically controlled coupling automatically disengages the reducers when the generator set is stopped.



   The forward speed of the relay car is variable between 0 and 500 m / h and adapts to the working speed of the screening machine.



   The drive with two powered axles develops a traction force of 10 Mp, which allows six cars to be pushed on a ramp from 0 to 10 o / oo.



   Each dump car 1 is equipped with two transporters 4 and 5. All the transporters of all the dump cars are coupled to each other by a telescopic hitch 10. Each transporter is provided, at its front end, with a deflector 9 which allows a regular distribution of the load over the entire width of the bucket. Because only one bucket is loaded at a time, only the loading point deflector must be in the working position 9 ', and at this loading point the two carriers 4, 5 must be moved apart one by one. on the other to allow materials to fall into the bucket.

  Consequently the telescopic coupling is mechanically connected to the deflector so that when the telescopic coupling is in its long position 10 'the deflector is raised to the working position 9', while when the telescopic coupling is in its position short 10, the deflector is lowered to the rest position 9 under the conveyor.



  This mechanical connection can consist, for example, in the fact that the deflector is connected on the one hand by the connecting rod 17 pivoted at 18 on the telescopic coupling 10, and on the other hand by the connecting rod 19 attached to the conveyor.



   During the transport and unloading of the wagons, the carriers are moored on the track.



   A control box can be mounted on each wagon which allows the carriers to be moved forward or backward, to activate the communication and alarm horns, as well as the rotating lights.



   The operation of the train is as follows:
 Before bringing them to the site, all the train carriers are successively coupled to the intermediate carrier of the relay wagon, moving them using the capstan.

 

   Arrived on the site, the train is hitched to the screening machine, and the loading of the wagons can be done either by a back and forth movement of the carriers, or by moving back or forward the carriers successively using the capstan and the intermediate carrier.



   As soon as the first bucket is loaded, the first transporter is moved forward by extending the telescopic hitch. At the same time, the deflector moves into working position and the second transporter begins to load the second bucket.



   This work cycle continues until the train is fully loaded.



   All movements are controlled from the platform of the wagon to be loaded, by a single man.



   For the unloading of the wagons, carriers can either remain moored on the wagons, or be moved to another empty train.

 

Claims (1)

REVENDICATIONS 1. Train d'évacuation de matériaux en vrac, en particulier des criblures résultant du dégarnissage-criblage d'une voie de chemin de fer, composé de wagons de chargement (1) sur les quels peuvent rouler des transporteurs (4, 5) attelés les uns aux autres, caractérisé par le fait que les transporteurs (4, 5) sont reliés les uns aux autres par un accouplement télescopique (10) de façon à permettre d'écarter les transporteurs des wagons chargés de ceux des wagons en cours de chargement, sans les dételer. CLAIMS 1. Bulk material evacuation train, in particular screenings resulting from the stripping-screening of a railway track, composed of loading wagons (1) on which can run coupled carriers (4, 5) to each other, characterized by the fact that the carriers (4, 5) are connected to each other by a telescopic coupling (10) so as to allow the transporters of the loaded wagons to be separated from those of the loaded wagons , without unhitching them. 2. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique (10) est à commande manuelle. 2. Train according to claim 1, characterized in that the telescopic coupling (10) is manually controlled. 3. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique est à commande par fluide sous pression. 3. Train according to claim 1, characterized in that the telescopic coupling is controlled by pressurized fluid. 4. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique est à commande par vis et moteur. 4. Train according to claim 1, characterized in that the telescopic coupling is controlled by screw and motor. 5. Train selon la revendication 1, caractérisé par le fait que l'accouplement télescopique (10) est relié mécaniquement à un déflecteur (9) de telle sorte que lorsque l'accouplement télescopique est dans sa position longue (1 0'), le déflecteur est relevé en position de travail (9'), cependant que lorsque l'accouplement télescopique est dans sa position courte (10), le déflecteur est abaissé en position de repos (9) sous le transporteur. 5. Train according to claim 1, characterized in that the telescopic coupling (10) is mechanically connected to a deflector (9) so that when the telescopic coupling is in its long position (1 0 '), the The deflector is raised to the working position (9 '), while when the telescopic coupling is in its short position (10) the deflector is lowered to the rest position (9) under the conveyor. La présente invention concerne un train d'évacuation de matériaux en vrac, en particulier des criblures résultant du dégarnissage-criblage d'une voie de chemin de fer, composé de wagons de chargement sur lesquels peuvent rouler des transporteurs attelés les uns aux autres. The present invention relates to a train for discharging bulk materials, in particular screenings resulting from stripping-screening of a railway track, composed of loading wagons on which carriers coupled to one another can run. Dans les trains d'évacuation connus, les transporteurs sont attelés les uns aux autres de façon fixe et roulent sur un chemin de roulement, constitué par des rails, ou par des rouleaux montés sur les wagons de chargement. In the known evacuation trains, the carriers are coupled to each other in a fixed manner and run on a track, formed by rails, or by rollers mounted on the loading wagons. Le déplacement en va et vient des transporteurs lors du chargement est commandé doit en tractant ou en poussant les transporteurs au moyen d'un treuil, d'un cabestan ou de tout autre moyen approprié, soit au moyen des rouleaux ou galets motorisés du chemin de roulement; il est aussi possible de déplacer les wagons sous les transporteurs au moyen d'un tracteur, les transporteurs restant immobiles, accrochés à la crieuse ou à un wagon relais qui porte le groupe générateur et les organes de commande. The back and forth movement of the transporters during loading is controlled must by towing or pushing the transporters by means of a winch, a capstan or any other suitable means, either by means of the motorized rollers or rollers of the track. rolling; it is also possible to move the wagons under the carriers by means of a tractor, the carriers remaining stationary, hooked to the crier or to a relay wagon which carries the generator group and the control members. Avec ces trains d'évacuation connus, dès que le premier wagon est chargé, les transporteurs y afférents doivent être découplés et écartés vers l'avant, et ainsi de suite pour permettre le chargement des wagons suivants, ce qui implique chaque fois un temps d'arrêt du chantier. With these known evacuation trains, as soon as the first wagon is loaded, the related carriers must be decoupled and moved forward, and so on to allow the loading of the following wagons, which each time involves a time of stopping the site. La présente invention évite cet inconvénient par le fait que les transporteurs sont reliés les uns aux autres par un accouplement télescopique de façon à permettre d'écarter les transporteurs des wagons chargés de ceux des wagons en cours de chargement, sans les dételer. The present invention avoids this drawback by the fact that the carriers are connected to each other by a telescopic coupling so as to allow the carriers to be separated from the loaded wagons from those of the wagons being loaded, without unhitching them. Le dessin annexé représente un exemple d'exécution du train selon la présente invention. The appended drawing represents an example of execution of the train according to the present invention. La figure 1 est une vue en élévation des wagons-bennes. Figure 1 is an elevational view of the dump cars. La figure 2 est une vue du wagon relais. Figure 2 is a view of the relay car. Le train, comme nous le désignerons par la suite, se compose, dans une forme préférée, de six wagons 1 équipés de deux bennes 2 et 3 et de deux transporteurs 4 et 5, ces derniers pouvant se déplacer longitudinalement sur des rouleaux 11 fixés sur les bennes 1 et 2, et d'un wagon relais 12 placé entre les wagons-bennes et la dégarnisseuse-cribleuse 13. The train, as we will designate hereinafter, consists, in a preferred form, of six wagons 1 equipped with two buckets 2 and 3 and two carriers 4 and 5, the latter being able to move longitudinally on rollers 11 fixed on skips 1 and 2, and a relay wagon 12 placed between the dump wagons and the stripper-screen 13. Le wagon-relais 12 est équipé d'un transporteur fixe 7 et d'un transporteur intermédiaire mobile 6. Le transporteur fixe 7 amène les criblures en tête de ce wagon et les décharge sur le premier transporteur 5 d'un wagon 1 ou sur le transporteur intermédiaire 6. The relay wagon 12 is equipped with a fixed transporter 7 and a mobile intermediate transporter 6. The fixed transporter 7 brings the screenings to the head of this wagon and unloads them on the first transporter 5 of a wagon 1 or on the intermediate carrier 6. Le transporteur intermédiaire 6 est tracté dans les deux sens de marche par un cabestan 14 et un câble 15, et circule à la vitesse de 4 m/min sur son chemin de roulement. La course disponible du transporteur intermédiaire permet de charger les wagons-bennes 1. The intermediate conveyor 6 is towed in both directions of travel by a capstan 14 and a cable 15, and circulates at a speed of 4 m / min on its track. The available stroke of the intermediate transporter allows loading of the dump cars 1. Un groupe générateur 16 d'une puissance de 100 KW fournit l'énergie pour les transporteurs, le cabestan, ainsi que pour l'entraînement des essieux de traction. A generator unit 16 with a power of 100 KW provides energy for the transporters, the capstan, as well as for driving the traction axles. Les deux essieux du wagon peuvent être entraînés pendant le travail par des moteurs hydrauliques montés sur des réducteurs intermédiaires. The two axles of the wagon can be driven during work by hydraulic motors mounted on intermediate reducers. Un accouplement à commande hydraulique débraye automatiquement les réducteurs à l'arrêt du groupe générateur. A hydraulically controlled coupling automatically disengages the reducers when the generator set is stopped. La vitesse d'avancement du wagon-relais est variable entre 0 et 500 m/h et s'adapte à la vitesse de travail de la cribleuse. The forward speed of the relay car is variable between 0 and 500 m / h and adapts to the working speed of the screening machine. L'intraînement avec deux essieux motorisés développe une force de traction de 10 Mp, ce qui permet de pousser six wagons sur une rampe de 0 à 10 o/oo. The drive with two powered axles develops a traction force of 10 Mp, which allows six cars to be pushed on a ramp from 0 to 10 o / oo. Chaque wagon-benne 1 est équipé de deux transporteurs 4 et 5. Tous les transporteurs de tous les wagons-bennes sont attelés l'un à l'autre par un attelage télescopique 10. Chaque transporteur est muni, à son extrémité avant, d'un déflecteur 9 qui permet une répartition régulière du chargement sur toute la largeur de la benne. Du fait que l'on ne charge qu'une benne à la fois, seul le déflecteur du point de chargement doit être en position de travail 9', et en ce point de chargement les deux transporteurs 4, 5 doivent être écartés l'un de l'autre pour permettre la chute des matériaux dans la benne. Each dump car 1 is equipped with two transporters 4 and 5. All the transporters of all the dump cars are coupled to each other by a telescopic hitch 10. Each transporter is provided, at its front end, with a deflector 9 which allows a regular distribution of the load over the entire width of the bucket. Because only one bucket is loaded at a time, only the loading point deflector must be in the working position 9 ', and at this loading point the two carriers 4, 5 must be moved apart one by one. on the other to allow materials to fall into the bucket. En conséquence l'accouplement télescopique est relié mécaniquement au déflecteur de telle sorte que lorsque l'accouplement télescopique est dans sa position longue 10', le déflecteur est relevé en position de travail 9', cependant que lorsque l'accouplement télescopique est dans sa position courte 10, le déflecteur est abaissé en position de repos 9 sous le transporteur. Consequently the telescopic coupling is mechanically connected to the deflector so that when the telescopic coupling is in its long position 10 'the deflector is raised to the working position 9', while when the telescopic coupling is in its position short 10, the deflector is lowered to the rest position 9 under the conveyor. Cette liaison mécanique peut consister par exemple par le fait que le déflecteur est relié d'une part par la bielle 17 pivotée en 18 sur l'accouplement télescopique 10, et d'autre part par la bielle 19 attachée au transporteur. This mechanical connection can consist, for example, in the fact that the deflector is connected on the one hand by the connecting rod 17 pivoted at 18 on the telescopic coupling 10, and on the other hand by the connecting rod 19 attached to the conveyor. Pendant le transport et le déchargement des wagons, les transporteurs sont amarrés sur le chemin de roulement. During the transport and unloading of the wagons, the carriers are moored on the track. Sur chaque wagon peut être monté un coffret de commande qui permet d'avancer ou de reculer les transporteurs, d'actionner les claxons de communication et d'alarme, ainsi que les feux tournants. A control box can be mounted on each wagon which allows the carriers to be moved forward or backward, to activate the communication and alarm horns, as well as the rotating lights. Le fonctionnement du train est le suivant: Avant de les amener sur le chantier, tous les transporteurs du train sont successivement attelés au transporteur intermédiaire du wagon-relais, en les déplaçant à l'aide du cabestan. The operation of the train is as follows: Before bringing them to the site, all the train carriers are successively coupled to the intermediate carrier of the relay wagon, moving them using the capstan. Arrivé sur le chantier, le train est attelé à la cribleuse, et le chargement des wagons peut s'effectuer soit par un mouvement de va et vient des transporteurs, soit en reculant ou en avançant les transporteurs successivement à l'aide du cabestan et du transporteur intermédiaire. Arrived on the site, the train is hitched to the screening machine, and the loading of the wagons can be done either by a back and forth movement of the carriers, or by moving back or forward the carriers successively using the capstan and the intermediate carrier. Dès que la première benne est chargée, le premier transporteur est avancé en allongeant l'attelage télescopique. En même temps, le déflecteur se met en position de travail et le deuxième transporteur commence à charger la deuxième benne. As soon as the first bucket is loaded, the first transporter is moved forward by extending the telescopic hitch. At the same time, the deflector moves into working position and the second transporter begins to load the second bucket. Ce cycle de travail continue jusqu'au chargement complet du train. This work cycle continues until the train is fully loaded. Tous les mouvements sont commandés depuis la plateforme du wagon à charger, par un seul homme. All movements are controlled from the platform of the wagon to be loaded, by a single man. Pour le déchergement des wagons les transporteurs peuvent soit rester amarrés sur les wagons, soit être déplacer sur un autre train vide. **ATTENTION** fin du champ CLMS peut contenir debut de DESC **. For the unloading of the wagons, carriers can either remain moored on the wagons, or be moved to another empty train. ** CAUTION ** end of field CLMS may contain start of DESC **.
CH167177A 1977-02-11 1977-02-11 Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks CH609622A5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH167177A CH609622A5 (en) 1977-02-11 1977-02-11 Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH167177A CH609622A5 (en) 1977-02-11 1977-02-11 Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks

Publications (1)

Publication Number Publication Date
CH609622A5 true CH609622A5 (en) 1979-03-15

Family

ID=4215880

Family Applications (1)

Application Number Title Priority Date Filing Date
CH167177A CH609622A5 (en) 1977-02-11 1977-02-11 Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks

Country Status (1)

Country Link
CH (1) CH609622A5 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4923355A (en) * 1987-08-04 1990-05-08 ITI/CLM Impianti Tecnici Industriali Danieli & C. Officine Meccaniche SpA System to feed and discharge materials continuously in operations to rehabilitate railway road beds and the like
DE4104877A1 (en) * 1990-02-22 1991-08-29 Plasser Bahnbaumasch Franz Bulk material rail wagon - is open upwards and has delivery device running longitudinally in its lower part
EP1184248A2 (en) * 2000-08-30 2002-03-06 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Bulk goods handling wagon

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4923355A (en) * 1987-08-04 1990-05-08 ITI/CLM Impianti Tecnici Industriali Danieli & C. Officine Meccaniche SpA System to feed and discharge materials continuously in operations to rehabilitate railway road beds and the like
DE4104877A1 (en) * 1990-02-22 1991-08-29 Plasser Bahnbaumasch Franz Bulk material rail wagon - is open upwards and has delivery device running longitudinally in its lower part
AT400836B (en) * 1990-02-22 1996-03-25 Plasser Bahnbaumasch Franz BULK LOADING WAGON
EP1184248A2 (en) * 2000-08-30 2002-03-06 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Bulk goods handling wagon
EP1184248A3 (en) * 2000-08-30 2002-10-23 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Bulk goods handling wagon

Similar Documents

Publication Publication Date Title
US5080548A (en) Trailer dumper
US6354787B1 (en) Double container trailer apparatus and method of use
US5593272A (en) Roll on roll off device with a portable support
US4310279A (en) Trash handling system
US3910434A (en) Mechanically actuated side loading arrangement for a vehicle body
US5240303A (en) Automatic tarp apparatus
US2932244A (en) Portable hydraulic baling machine
US3207085A (en) Rail car switching
US4697509A (en) Auto body crushing device
US4934896A (en) Refuse collection apparatus and method
CH609622A5 (en) Bulk material discharge truck train - has telescopic coupling between conveyors allowing separation between trucks
US5452607A (en) Drive on roller brake dynamometer shuttle system, trailer and method of using same
CN210944014U (en) Railway transport vehicle wagon goods leveler
US3626489A (en) Tilt dump vehicle with load ejecting means
US5059081A (en) Refuse truck container handling apparatus
US20100266370A1 (en) Round Bale Trailer
US3859910A (en) Demolition device
FR2725176A1 (en) RAILWAY CONSTRUCTION MACHINE
US2828876A (en) Vehicular load handling apparatus
CN2176282Y (en) Motor tricycle with self-unloading trailer
WO1998046472A1 (en) Tractor unit and wheeled trailer combination
US4129314A (en) Towing vehicle with elevated ramp
US3404793A (en) Load carrier
CN2244506Y (en) Three-side self-discharging lorry
US4164293A (en) Packer and loader unit for a motor vehicle

Legal Events

Date Code Title Description
PL Patent ceased