CH360209A - Procedure for operating an aluminum electrolysis system - Google Patents

Procedure for operating an aluminum electrolysis system

Info

Publication number
CH360209A
CH360209A CH360209DA CH360209A CH 360209 A CH360209 A CH 360209A CH 360209D A CH360209D A CH 360209DA CH 360209 A CH360209 A CH 360209A
Authority
CH
Switzerland
Prior art keywords
furnace
reserve
tank
anode
defective
Prior art date
Application number
Other languages
German (de)
Inventor
Paul Dr Mueller
Werner Dr Syz
Original Assignee
Aluminium Ind Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aluminium Ind Ag filed Critical Aluminium Ind Ag
Publication of CH360209A publication Critical patent/CH360209A/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Electrolytic Production Of Metals (AREA)

Description

  

  Verfahren zum     Betrieb    einer     Aluminiumelektrolyseanlage       In den heutigen Aluminiumhütten wird das Re  parieren der Ofenwanne meist an Ort und Stelle  durchgeführt. Hierfür schliesst man den Ofen elek  trisch kurz und hebt die Anoden aus der     Schmelze     heraus. Anschliessend werden Metall und Elektrolyt  möglichst weitgehend in     flüssigem        Zustand    heraus  gepumpt.

   Nach     Abkalten    der Wanne und des Wan  neninhaltes werden die Elektrolyt- und Metallreste  sowie die zerstörte Ausfütterung mit dem     Pressluft-          hammer    aufgebrochen und dann     herausgeschaufelt.     Nötigenfalls müssen noch die defekten Stromzufüh  rungen und Verkleidungsteile entfernt werden. Die  Arbeitsweise kann rationalisiert werden, wenn die       Ofenwannenreparaturen    in einer zentralen Werkstätte  durchgeführt werden. Bei dieser Praxis müssen die  zu     reparierenden    Wannen mittels Krans und Trans  portwagens zur Werkstätte     geführt        werden.     



  Nach     erfolgter    Reparatur geht der Wiederaufbau  der Wanne in umgekehrter Reihenfolge vor sich. Ge  gebenenfalls wird die Mauerung aus     feuerfestem     Werkstoff erneuert, dann werden die neuen Strom  zuführungen     eingebaut    und die neue Ausfütterung  entweder in Form von     gebrannten    Kohlenblöcken oder  von ungebrannter     Kohlenmasse    (Giessmasse oder       Stampfmasse)    eingebracht.

   Die     vorgebrannten    An  oden oder die selbstbackende Anode werden dann  eingesetzt und der Strom eingeschaltet.     Norma-          lerweise    wird der Strom<B>.</B> sofort, das heisst innert  weniger Minuten, voll eingeschaltet. Es ist auch mög  lich und für die Festigkeit der Ausfütterung vorteil  haft, einen     Shunt    zu verwenden, so dass die Strom  stärke nach Wunsch von 0 bis auf den Maximalwert  gesteigert werden kann.

   Wenn die     Kohleausfütterung     gebacken oder im Fall von     vorgebrannten        Bodenblök-          ken    genügend heiss ist, kann     flüssiger    Elektrolyt ein  gefüllt und der Ofen wieder in Betrieb     gesetzt    werden.    Die Ofenreparatur dauert 3 bis 4 Wochen. Wäh  rend dieser Zeit fällt die Produktion des Ofens aus.  Wenn eine     Elektrolyseanlage    voll ausgenützt werden  soll, kann man sich dadurch     behelfen,    dass stets 5  bis 10     0/9    Reserveöfen zur Verfügung stehen; hiermit  ist aber ein beträchtlicher Kapitalaufwand verbunden.  



       Erfindungsgemäss    werden nun in der Ofenserie       eine    oder mehrere     Ofenwannen    ohne Anodenteile in  Reserve     gehalten,    Der     Elektrolysestrom,    der durch  ,die Serie geht, kann     diese    Reservewannen durch Strom  schienen oder andere passende     Stromleiter    übersprin  gen.     Zeigt    es sich nun, dass der     kathodische    Teil eines  in Betrieb befindlichen Ofens, z.

   B. die Wanne,  schadhaft geworden ist und     repariert    oder ausgewech  selt werden muss, so wird erfindungsgemäss die in Re  serve gehaltene Wanne (oder eine der in     Reserve    ge  haltenen Wannen) mit der Anodeneinrichtung des       schadhaften    Ofens in Betrieb genommen.  



  Zu     diesem    Zweck     wird        vorteilhafterweise    wie folgt  vorgegangen: Die Reservewanne     wird    aufgeheizt, was  z. B. durch Stromdurchgang mit     Hilfe    von elektri  schen     Heizkörpern    oder durch     Koksfeuer    geschehen  kann.

   Das     Aufheizen        erfolgt    vorzugsweise gleichzeitig  mit dem Backen (Einbrennen) der     Kohleau@sfütterung.     Sobald die gewünschte Temperatur     erreicht    ist, wird  die Anodeneinrichtung aus dem     schadhaften    Ofen  herausgehoben und in die Reservewanne eingesetzt,  was nur wenig Zeit beansprucht. Die Anode soll vor  zugsweise noch rotwarm sein.     Daraufhin    wird die  Wanne mit     geschmolzenem    Elektrolyten, vorzugsweise  aus dem Ofen, dessen Wanne repariert werden muss,  beschickt.

   Die elektrischen Anschlüsse werden zweck  mässigerweise unmittelbar nach dem Einsetzen der  Anode     hergestellt.    Bei dieser Arbeitsweise     kann    die  Inbetriebnahme der Reservewanne unmittelbar nach  dem Abstellen der zu reparierenden Wanne erfolgen.      Die     schadhafte        Wanne        wird    entweder an Ort und  Stelle. oder in einer zentralen Werkstätte repariert  und in Reserve gehalten.



  Procedure for operating an aluminum electrolysis system In today's aluminum smelters, repairing the furnace pan is usually carried out on the spot. To do this, the furnace is short-circuited and the anodes are lifted out of the melt. The metal and electrolyte are then pumped out as largely as possible in a liquid state.

   After the tub and its contents have cooled down, the electrolyte and metal residues as well as the destroyed lining are broken open with the compressed air hammer and then shoveled out. If necessary, the defective power supply lines and panels must be removed. Operations can be streamlined if furnace pan repairs are carried out in a central workshop. In this practice, the tubs to be repaired must be carried to the workshop by means of cranes and transport vehicles.



  After repairs have been completed, the tub is rebuilt in reverse order. If necessary, the masonry made of refractory material is renewed, then the new power supply lines are installed and the new lining is introduced either in the form of burnt coal blocks or unfired coal mass (casting mass or rammed earth).

   The pre-burned anodes or the self-baking anode are then inserted and the power switched on. Normally, the power <B>. </B> is fully switched on immediately, i.e. within a few minutes. It is also possible and advantageous for the strength of the lining to use a shunt so that the current can be increased from 0 to the maximum value as desired.

   When the coal lining is baked or, in the case of pre-burned soil blocks, sufficiently hot, liquid electrolyte can be added and the furnace can be put back into operation. Oven repair takes 3 to 4 weeks. During this time, production of the furnace stops. If an electrolysis system is to be used to the full, one can make do with the fact that 5 to 10 0/9 reserve ovens are always available; however, this involves a considerable capital expenditure.



       According to the invention, one or more furnace pans without anode parts are now kept in reserve in the furnace series. The electrolysis current that goes through the series can run through these reserve pans through current or other suitable current conductors. If it now appears that the cathodic part of a Furnace in operation, e.g.

   B. the tub has become defective and needs to be repaired or replaced, according to the invention the tub held in reserve (or one of the tubs held in reserve) is put into operation with the anode device of the defective furnace.



  For this purpose, the procedure is advantageously as follows: The reserve tank is heated, which z. B. can be done by current passage with the help of electrical radiators rule or by coke fire.

   The heating is preferably carried out at the same time as the baking (burning in) of the cabbage feeding. As soon as the desired temperature has been reached, the anode device is lifted out of the defective furnace and inserted into the reserve tank, which takes little time. The anode should preferably still be red warm. The vat is then charged with molten electrolyte, preferably from the furnace whose vat needs to be repaired.

   The electrical connections are expediently made immediately after the anode has been inserted. With this method of operation, the reserve tank can be put into operation immediately after the tank to be repaired has been put down. The damaged tub will either be in place. or repaired in a central workshop and kept in reserve.

 

Claims (1)

PATENTANSPRUCH Verfahren zum Betrieb einer Aluminiumelektro- lyseanlage mit eine Ausfütterung aus Kohle aufwei senden Elektrolyseöfen, dadurch gekennzeichnet, dass in der Ofenserie mindestens eine Ofenwanne ohne Anodenteile in Reserve gehalten wird, PATENT CLAIM A method for operating an aluminum electrolysis system with a lining made of carbon aufwei send electrolysis furnaces, characterized in that at least one furnace pan without anode parts is kept in reserve in the furnace series, und dass bei Schadhaftwerden des katholischen Teiles eines üi Betrieb befindlichen Elektrolyseofens die in Reserve gehaltene Wanne mit der Anodeneinrichtung des schadhaften Ofens in Betrieb genommen wird. and that if the catholic part of an electrolysis furnace in operation becomes damaged, the tank kept in reserve with the anode device of the defective furnace is put into operation. UNTERANSPRüCHE 1. Verfahren nach Patentanspruch, dadurch ge kennzeichnet, dass die in Reserve gehaltene Wanne aufgeheizt und die Anodeneinrichtung aus dem Ofen mit schadhafter Wanne herausgehoben und in die Re- servewanne eingesetzt wird, worauf der Strom zu geschaltet und die Wanne mit geschmolzenem E'.ek- trolyten beschickt und in Betrieb genommen wird. 2. SUBClaims 1. The method according to claim, characterized in that the tank kept in reserve is heated and the anode device is lifted out of the furnace with the defective tank and inserted into the reserve tank, whereupon the current is switched on and the tank is filled with molten E '. Electrolyte is charged and put into operation. 2. Verfahren nach Patentanspruch, dadurch ge kennzeichnet, dass der auszuwechselnde anodische Teil mit noch rotwarmer Anode vom Ofen mit schad haftem katholischem Teil in den neu in Betrieb zu nehmenden Ofen übergeführt wird. Method according to patent claim, characterized in that the anodic part to be replaced with the anode that is still red and warm is transferred from the furnace with the defective catholic part to the new furnace to be started up.
CH360209D 1957-06-21 1957-06-21 Procedure for operating an aluminum electrolysis system CH360209A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH360209T 1957-06-21

Publications (1)

Publication Number Publication Date
CH360209A true CH360209A (en) 1962-02-15

Family

ID=4512527

Family Applications (1)

Application Number Title Priority Date Filing Date
CH360209D CH360209A (en) 1957-06-21 1957-06-21 Procedure for operating an aluminum electrolysis system

Country Status (1)

Country Link
CH (1) CH360209A (en)

Similar Documents

Publication Publication Date Title
DE3014942A1 (en) DEVICE FOR ALUMINUM RECOVERY
DE1900629C3 (en) Electric arc furnace system for the production of metal alloys, in particular steel
DE840312C (en) Process for the production of ovens for the electrolytic production of aluminum
CH360209A (en) Procedure for operating an aluminum electrolysis system
DE219575C (en)
DE1103599B (en) Method for operating an aluminum electrolysis plant
EP0219650B1 (en) Arrangement of contact electrodes for direct-current arc furnaces or resistance-melting furnaces
DE2435532A1 (en) Lining ladles or crucible furnaces with refractory - using former made of plastic foil held in place by a vacuum
DE840922C (en) Furnace for the electrolytic cleaning of aluminum
DE367480C (en) Method of restoring worn-out electric induction ovens
DE555861C (en) Process for the extraction of aluminum from aluminum electrolysis ovens
DE507880C (en) Process for heating ceramic ovens by directly acting flue gases and by electric heating elements and tunnel ovens
DE700597C (en) Procedure for commissioning low frequency ind
DE608807C (en) Procedure for burning enamel
AT164496B (en) Oven for the electrolytic cleaning of aluminum using the three-layer process
DE457816C (en) Process for melting cold insert in induction furnaces
DE903406C (en) Facility in OEfen for hard soldering
AT147780B (en) Procedure for renewing the pillars, relieved of the weight of the ceiling, between the loading doors of hearth ovens, in particular Siemens Martin ovens, during operation.
DE537229C (en) Electric shaft furnace
DE216665C (en)
DE1046892B (en) Procedure for changing the pan of aluminum electrolysis furnaces and the pan for carrying out the procedure
DE618262C (en) Process for the tempering of salt bath ovens that are heated according to the electrode principle
DE421085C (en) Carbonization and gasification of oil slate
DE390284C (en) Process for blowing alloys
DE924521C (en) Process to improve the vacuum tightness of electrical discharge vessels