CH353017A - Process for keeping highly stressed parts of steam or gas turbines cool - Google Patents

Process for keeping highly stressed parts of steam or gas turbines cool

Info

Publication number
CH353017A
CH353017A CH353017DA CH353017A CH 353017 A CH353017 A CH 353017A CH 353017D A CH353017D A CH 353017DA CH 353017 A CH353017 A CH 353017A
Authority
CH
Switzerland
Prior art keywords
flowing
cavities
working medium
parts
partial flow
Prior art date
Application number
Other languages
German (de)
Inventor
Friedrich Dipl Ing Flatt
Original Assignee
Escher Wyss Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Escher Wyss Ag filed Critical Escher Wyss Ag
Publication of CH353017A publication Critical patent/CH353017A/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/08Cooling; Heating; Heat-insulation
    • F01D25/14Casings modified therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)

Description

  

  Verfahren     zum        Kühlhalten    hochbeanspruchter Teile von Dampf- oder     Gasturbinen       Die Erfindung     betrifft    ein     Verfahren        zum    Kühl  halten hochbeanspruchter Teile von Dampf- oder  Gasturbinen mit Zwischenerhitzung des Arbeitsmit  tels zwischen zwei Stufengruppen, bei welchen Tur  binen zwecks Isolierung der hohem Innendruck aus  gesetzten äussern Gehäuseteile von den das heisse  Arbeitsmittel führenden Innenteilen besondere Hohl  räume zwischen diesen Teilen angebracht sind und  von einem Teilstrom des Arbeitsmittels, das bereits  in der Turbine Arbeit geleistet hat, durchströmt wer  den.  



  Es ist eine Dampfturbine bekannt, bei der das  Kühlhalten des äussern Gehäuses mittels eines durch  Hohlräume zwischen diesem Gehäuse und den das  heisse Arbeitsmittel führenden Innenteilen geleiteten  Teilstroms von Arbeitsmittel erfolgt. Der Teilstrom  wird dabei vom     Arbeitsmittelstrom        abgezweigt,    nach  dem dieser bereits in einer Stufengruppe der     Turbine     Arbeit geleistet hat, und er wird dann nach Durch  strömen der Hohlräume dem Hauptstrom, der einige  Turbinenstufen allein durchflossen hat, wieder zu  geleitet und leistet mit ihm wieder Arbeit in noch  folgenden Stufen der Turbine.  



  Eine solche Anordnung hat aber den Nachteil,  dass bei einer totalen Entlastung der Turbine gleich  zeitig mit dem Abschalten des     Arbeitsmittelstroms     auch der Kühlstrom abgeschaltet wird. Die von den  Innenteilen gespeicherte, ein dem heissen Arbeitsmit  tel entsprechend hohes Temperaturniveau aufwei  sende Wärme kann dann das äussere Gehäuse unbe  hindert     aufheizen,    wobei unzulässig hohe Wärme  spannungen und Wärmedehnungen im Gehäuse mit  ihren schädlichen Folgen eintreten.  



  Die Erfindung bezweckt, diesen Nachteil zu ver  meiden. Bei dem     Verfahren        zum        Kühlhalten    hoch  beanspruchter Teile von Gas- oder Dampfturbinen  der eingangs beschriebenen Art wird zu diesem    Zweck der in den Hohlräumen strömende Teilstrom  des Arbeitsmittels mindestens teilweise als     Bypass     zu mindestens einer     Teillänge    des im Zwischen  erhitzer strömenden Hauptstroms des Arbeitsmittels  geführt.  



  In der Zeichnung ist eine     Dampfturbinenanlage     mit Zwischenüberhitzung des Arbeitsmittels in ver  einfachter Darstellung veranschaulicht. An Hand  dieses     Ausführungsbeispiels    ist das erfindungsgemässe  Verfahren näher beschrieben.  



  Es zeigen:       Fig.    1 die     Dampfturbinenanlage    und       Fig.    2 den Hochdruckteil einer Anlage mit einer  von der in     Fig.    1 gezeigten verschiedenen Ausfüh  rungsform der genannten     Hohlräume    für den Teil  strom des Arbeitsmittels.  



  Die in     Fig.    1 dargestellte Anlage weist einen  Hochdruckteil 1 und einen     Niederdruckteil    2 auf, die  einen Generator 3 antreiben. Der Dampf wird in  einem Kessel 4 erzeugt, zwischen Hoch- und Nieder  druckteil in einem     Zwischenüberhitzer    5 erhitzt und  später in einem Kondensator 6 niedergeschlagen.  Der Hochdruckteil 1 weist einen äussern     Gehäuseteil     7, das heisse     Arbeitsmittel    führende     Innenteile    8 und  zwischen diesen Teilen befindliche Hohlräume 9 auf.

    Neben den Leitungen für den normalen     Arbeitsmit          telstrom    sind     Bypassleitungen    10, 11, 12 und 13, 14  mit Ventilen 10', 11', 12' und 13' vorhanden; die  Ventile 10', 11', 12' sind normalerweise geschlossen.  Mit 15 ist ein     Interceptventil,    mit 16 bzw. 17 eine       Einmündungsstelle    der Leitung 14 in die vom Zwi  schenerhitzer zum     Niederdruckteil    führende     Arbeits-          mittelleitung    bzw. in den Zwischenerhitzer bezeich  net.  



  Bei dem in     Fig.2    dargestellten Hochdruckteil  sind die gleichen     Bezugsziffern    wie in     Fig.    1 verwen  det, soweit es sich um einander entsprechende Teile      handelt. Die Hohlräume 9 für das Kühlmittel befin  den sich dabei im     Innern    von Rohren 18,     während     sich ausserhalb dieser Rohre zwischen den Gehäuse  teilen 7 und 8 stagnierendes Arbeitsmittel des Hoch  druckteils befindet.  



  Ein     in    den Hohlräumen 9 strömender Teilstrom  des     Arbeitsmittels    ist in der Rohrleitung 13, 14 als       Bypass    zu dem im Zwischenerhitzer 5 strömenden  Hauptstrom des Arbeitsmittels geführt.  



  Auf diese Weise steht für das Durchströmen der  Hohlräume 9 stets das im Zwischenerhitzer 5 herr  schende     Druckgefälle    bzw. der entsprechende Teil  davon zur Verfügung. Die Kühlung wird so auch bei  totaler Entlastung der Turbine weiterhin aufrecht  erhalten, und die zu schützenden äussern Gehäuse  teile 7 sind damit bei allen auftretenden Betriebs  zuständen der Turbine vor schädlicher Wärmeein  wirkung geschützt.  



  Bei dem dargestellten Beispiel wird der durch  die Hohlräume 9 strömende Teilstrom des Arbeits  mittels an der Stelle 16 vor dem Ventil 15, das den  Eintritt der dem Zwischenerhitzer 5 folgenden       Stufengruppe    2     steuert,    dem durch den Zwischen  erhitzer 5 strömenden Hauptstrom wieder zugeführt.  



  Durch Schliessen des Ventils 15 bei totaler Ent  lastung der Turbine kann dann verhindert werden,  dass Kühldampf in den     Niederdruckteil    2 gelangt und       dort    unerwünschte Arbeit leistet.  



  Wie durch strichpunktierte Linien angedeutet,  kann die Leitung 14 auch schon innerhalb des     Zwi-          schenerhitzers    5 an der Stelle 17 an die Leitung des  Hauptstroms angeschlossen werden.  



       Vorteilhafterweise    kann auch ein Teil des durch  die Hohlräume 9 strömenden Teilstroms durch einen       Speisewasservorwärmer    geleitet werden.  



  Bei sehr hohen Dampftemperaturen in den ersten  Stufen des dem Zwischenerhitzer 5 folgenden Nieder  druckteils 2 kann auch das     Niederdruckaussengehäuse     in der beschriebenen erfindungsgemässen Art durch  einen als     Bypass    zu einem     Zwischenerhitzerteil    ge  führten Teilstrom des Arbeitsmittels kühl gehalten  werden.    Auch können andere Teile der Turbinenanlage,  die hohen Temperaturen ausgesetzt sind, in der be  schriebenen Weise gekühlt werden, wie z. B.

   Frisch  dampfleitungen, die mit     Kühlvorrichtungen    versehen  sind, Gehäuse von     Absperr-    oder Regulierventilen,  Verbindungsleitungen zwischen einem     Zwischen-          überhitzer    und der anschliessenden Mitteldruck  turbine.



  The invention relates to a method for keeping highly stressed parts of steam or gas turbines cool with intermediate heating of the Arbeitsmit means between two stage groups, in which turbines for the purpose of isolating the high internal pressure from the set outer housing parts from the internal parts carrying hot working fluids special hollow spaces are attached between these parts and a partial flow of the working fluid that has already done work in the turbine flows through who the.



  A steam turbine is known in which the outer housing is kept cool by means of a partial flow of working medium which is directed through cavities between this housing and the inner parts carrying the hot working medium. The partial flow is branched off from the working medium flow, after which it has already done work in a stage group of the turbine, and after flowing through the cavities, it is returned to the main flow, which has flowed through a few turbine stages alone, and works with it again still following stages of the turbine.



  However, such an arrangement has the disadvantage that when the turbine is completely relieved of load, the cooling flow is also switched off at the same time as the working medium flow is switched off. The stored by the inner parts, a hot Arbeitsmit tel accordingly high temperature level aufwei sending heat can then heat the outer housing unhindered, with unacceptably high thermal stresses and thermal expansion in the housing with their harmful consequences.



  The invention aims to avoid this disadvantage. In the method for keeping highly stressed parts of gas or steam turbines of the type described above cool, the partial flow of the working medium flowing in the cavities is at least partially routed as a bypass to at least a partial length of the main flow of the working medium flowing in the intermediate heater.



  In the drawing, a steam turbine system with reheating of the working fluid is illustrated in a simplified representation. The method according to the invention is described in more detail using this exemplary embodiment.



  1 shows the steam turbine system and FIG. 2 shows the high-pressure part of a system with an embodiment of the stated cavities for the partial flow of the working medium that differs from that shown in FIG. 1.



  The system shown in FIG. 1 has a high-pressure part 1 and a low-pressure part 2, which drive a generator 3. The steam is generated in a boiler 4, heated between high and low pressure parts in a reheater 5 and later deposited in a condenser 6. The high-pressure part 1 has an outer housing part 7, inner parts 8 carrying the hot working fluid and cavities 9 located between these parts.

    In addition to the lines for normal Arbeitsmit telstrom bypass lines 10, 11, 12 and 13, 14 with valves 10 ', 11', 12 'and 13' are available; the valves 10 ', 11', 12 'are normally closed. With 15 is an intercept valve, with 16 or 17 a junction of the line 14 into the working medium line leading from the intermediate heater to the low-pressure part or into the intermediate heater.



  In the high-pressure part shown in Figure 2, the same reference numerals as in Fig. 1 are used, provided that they are corresponding parts. The cavities 9 for the coolant are located in the interior of tubes 18, while outside of these tubes between the housing parts 7 and 8 stagnant working fluid of the high-pressure part is located.



  A partial flow of the working medium flowing in the cavities 9 is guided in the pipeline 13, 14 as a bypass to the main flow of the working medium flowing in the intermediate heater 5.



  In this way, the prevailing pressure gradient in the intermediate heater 5 or the corresponding part thereof is always available for the flow through the cavities 9. The cooling is thus still maintained even when the turbine is completely unloaded, and the outer housing parts 7 to be protected are thus protected from harmful heat effects in all operating states of the turbine that occur.



  In the example shown, the partial flow of the work flowing through the cavities 9 is fed back to the main flow flowing through the intermediate heater 5 by means of the point 16 upstream of the valve 15, which controls the entry of the stage group 2 following the intermediate heater 5.



  By closing the valve 15 when the turbine is completely unloaded, cooling steam can then be prevented from getting into the low-pressure part 2 and doing undesirable work there.



  As indicated by dash-dotted lines, the line 14 can also be connected to the main flow line within the intermediate heater 5 at the point 17.



       A part of the partial flow flowing through the cavities 9 can advantageously also be passed through a feed water preheater.



  At very high steam temperatures in the first stages of the low-pressure part 2 following the intermediate heater 5, the low-pressure outer housing can also be kept cool in the manner described according to the invention by a partial flow of the working medium conducted as a bypass to an intermediate heater part. Other parts of the turbine system that are exposed to high temperatures can also be cooled in the manner described, such as. B.

   Fresh steam lines equipped with cooling devices, housings for shut-off or regulating valves, connecting lines between a reheater and the adjoining medium-pressure turbine.

 

Claims (1)

PATENTANSPRUCH Verfahren zum Kühlhalten hochbeanspruchter Teile von Dampf- oder Gasturbinen mit Zwischen erhitzung des Arbeitsmittels zwischen zwei Stufen gruppen, bei welchen Turbinen zwecks Isolierung der hohem Innendruck ausgesetzten äussern Ge häuseteile von den das heisse Arbeitsmittel führen den Innenteilen besondere Hohlräume zwischen diesen Teilen angebracht sind und von einem Teil strom des Arbeitsmittels, das bereits in der Turbine Arbeit geleistet hat, durchströmt werden, dadurch gekennzeichnet, dass der in den Hohlräumen (9) strömende Teilstrom des Arbeitsmittels mindestens teilweise als Bypass zu mindestens einer Teillänge des im Zwischenerhitzer (5) strömenden Hauptstroms des Arbeitsmittels geführt ist. UNTERANSPRÜCHE 1. PATENT CLAIM A method for keeping highly stressed parts of steam or gas turbines cool with intermediate heating of the working medium between two stages, in which the turbines have special cavities between these parts to isolate the external housing parts exposed to high internal pressure from which the hot working medium carries the internal parts a partial flow of the working medium that has already performed work in the turbine, characterized in that the partial flow of the working medium flowing in the cavities (9) is at least partially used as a bypass to at least a partial length of the main flow of the flowing in the intermediate heater (5) Work equipment is performed. SUBCLAIMS 1. Verfahren nach Patentanspruch, dadurch ge kennzeichnet, d'ass der durch die Hohlräume (9) strö mende Teilstrom des Arbeitsmittels an einer Stelle (16 bzw. 17) vor dem den Eintritt der dem Zwischen erhitzer (5) folgenden Stufengruppe (2) steuernden Ventil (15) dem durch den Zwischenerhitzer (5) strömenden Hauptstrom wieder zugeführt wird. 2. Verfahren nach Patentanspruch und Unter anspruch 1, dadurch gekennzeichnet, dass der durch die Hohlräume (9) strömende Teilstrom dem durch den Zwischenerhitzer (5) strömenden Hauptstrom an einer Stelle (17) im Zwischenerhitzer (5) wieder zu geführt wird. 3. Method according to claim, characterized in that the partial flow of the working medium flowing through the cavities (9) is at a point (16 or 17) upstream of the valve controlling the entry of the stage group (2) following the intermediate heater (5) (15) is fed back to the main stream flowing through the intermediate heater (5). 2. The method according to claim and sub-claim 1, characterized in that the partial flow flowing through the cavities (9) is fed back to the main flow flowing through the intermediate heater (5) at a point (17) in the intermediate heater (5). 3. Verfahren nach Patentanspruch, dadurch ge kennzeichnet, dass ein Teil des durch die Hohlräume (9) strömenden Teilstroms durch einen Speisewasser vorwärmer geleitet wird. Method according to claim, characterized in that part of the partial flow flowing through the cavities (9) is passed through a feed water preheater.
CH353017D 1957-10-26 1957-10-26 Process for keeping highly stressed parts of steam or gas turbines cool CH353017A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH353017T 1957-10-26

Publications (1)

Publication Number Publication Date
CH353017A true CH353017A (en) 1961-03-31

Family

ID=4509987

Family Applications (1)

Application Number Title Priority Date Filing Date
CH353017D CH353017A (en) 1957-10-26 1957-10-26 Process for keeping highly stressed parts of steam or gas turbines cool

Country Status (1)

Country Link
CH (1) CH353017A (en)

Similar Documents

Publication Publication Date Title
DE102008037410B4 (en) Combined cycle and method using supercritical steam
DE3882794T2 (en) Intermediate superheater type heat recovery boiler and power generation system using the same.
DE1601650B2 (en) GAS TURBINE SYSTEM
DE3804605A1 (en) METHOD AND SYSTEM FOR THE PRODUCTION OF HEAT-STEAM
DE2602081A1 (en) PROCEDURE FOR REGULATING THE POWER IN A THERMAL CLOSED PROCESS, SYSTEM FOR EXECUTING AND APPLYING THE PROCESS
DE3424138A1 (en) AIR STORAGE GAS TURBINE
EP2326800B1 (en) Steam power assembly for creating electrical energy
EP1390606B1 (en) Device for cooling coolant in a gas turbine and gas and steam turbine with said device
DE102011011123B4 (en) Steam plant and process for configuring the steam plant
DD295695A5 (en) COMBINED GAS AND STEAM TURBINE SYSTEM WITH COAL GASIFICATION
DE19808119A1 (en) Low temperature hydrogen combustion turbine
DE1034193B (en) Process for keeping highly stressed parts of steam or gas turbines cool
CH353017A (en) Process for keeping highly stressed parts of steam or gas turbines cool
CH621186A5 (en) Steam-generator installation heated by waste gas
DE2029830A1 (en) Warm-up circuit for steam turbine plant
CH286635A (en) Method for operating a power plant.
EP2426337A1 (en) Device for fuel preheating and method for fuel preheating
DE1601654B2 (en) DEVICE FOR PROTECTING AT LEAST TWO-WELL CLOSED GAS TURBINE SYSTEM
CH322433A (en) Process for regulating the reheating temperature in a steam power plant
DE2740530A1 (en) Thermal shock minimising arrangement in steam plant - uses continuous forward or reverse circulating flow through idle line and pump
DE2656463C3 (en) Nuclear power plant with gas-cooled reactor
DE2131347A1 (en) Steam power plant
DE1601654C (en) Device for protecting an at least two-shaft closed gas turbine system
DE19542917A1 (en) Combined turbine generating set
DE1601650C (en)